brochure bidner

17
A BETTER WAY TO BUILD

Upload: jts-modular

Post on 07-Mar-2016

212 views

Category:

Documents


0 download

DESCRIPTION

brochrue binder

TRANSCRIPT

Page 1: brochure bidner

A BETTER WAY

TO BUILD

Page 2: brochure bidner

Tackboard over gyp board

Concrete or Wood Flooring

Dry Well

Down spout in Column

Split FaceCMU veneer

Built in Gutter

Concrete Stem wall Footing

T-Bar Ceiling

Classroom

Standing seam metal roof

Elastomaric Stucco SidingSolar Option

Store Front Window System (Optional)

7Ft.Walkway

Permanent Modular School Manufacturer

Solar standard on all JTS Modular Buildings

Completely customizable campus, classroom, restroom, concession, library, and administration buildings

Concrete �oors, high e�ciency heating units and �xtures, natural lighting option and 9 ft plus ceilings

Industry leading design capabilities

Comprehensive full service lease-leaseback contractor

Full service electrical division

Financing and funding procurement assistance

Compare JTS to other manufactures

JTS is 75% heavier in the structural steel (JTS – 6,800lb, Competition – 3,900) R-19 (JTS) insulation on walls compared to R-13 (Competition) Ceiling heights 9’ (JTS) vs. 8’-6” (Competition) Light gauge framing (JTS) vs. wood framing (Competition) Floor Joist 16” o.c. (JTS) vs. 48” o.c. (Competition) Foundation system is considerably more sound on

JTS PC vs. simplified system presented by Competition 2x6 JTS wall framing (JTS) vs. 2x4 framing (Competition)

HSS 5x5x3/8” column (JTS) vs. HSS 4x4x5/16” (Competition) 1-1/8” floor plywood sheathing (JTS) vs. ¾” plywood sheathing. (Competition) Roof joist @ 24” o.c. (JTS) vs. 48” oc. (Competition)

3/4 moisture resistant roof diaphragm

Permanent modular school manufacturer

Completely customizable campus, classroom, restroom, concession, library, and administration buildings

Concrete floors, high efficiency heatingunits and fixtures, natural lighting option and 9' plus ceilings

COMPETITION3,900 lb of structural steel

R-13 insulation on walls8'6" ceiling heightsWood framing48" o.c. floor joistFoundation system not as soundSimplified system2'x4' wall framingHSS 4'x4' x 5/16' column 3/4" floor plywood sheathingRoof joist at 48" o.c.

6,800 lb of structural steel [75% heavier]

R-19 insulation on walls9' ceiling heights

Light gauge framing16" o.c. floor joist

Foundation system considerably more soundPC

2'x6' wall framingHSS 5'x5' x 3/8' column

1 1/8" floor plywood sheathingRoof joist at 24" o.c.

ALSO

JTS MODULAR: THERE’S NO COMPARISON

Comprehensive full-service lease-leaseback contractor

Full service electrical division

Financing and funding procurement assistance

Solar standard on all JTS modulars

Industry leading design capabilities

Page 3: brochure bidner

In addition to designing and manufacturing completely custom modular buildings, JTS Modular is proud to offer many other services.

DESIGN DEPARTMENTOur design department offers complete building design and site design consulting.

ESTIMATING DEPARTMENTOur general contracting estimating offers budgetary estimate stages at conceptual, 50%

design, 75% design and final estimates.

CONSTRUCTION MANAGEMENT DEPARTMENTWe also offer sitework construction management from conception to occupancy. From

grading and site utility installation to concrete, asphalt, and site-built structures, we will continue to help out with warranty issues.

JTS Modular offers complete lease-leaseback construction services with construction professionals specializing in school site construction.

To find out more about our lease-leaseback construction services, please contact one of our sales representatives: (661) 578-2285 [[email protected]] Adam Engler

(559) 318-0833 [[email protected]] Tom Giampietro (661) 904-8944 [[email protected]] David Albee

(661) 835-9270 Office

JTS MODULAR: YOUR COMPLETE CONTRACTOR

Page 4: brochure bidner

7001 McDivitt Dr., Suite B, Bakersfield, CA 93313Phone: 661-835-9270 ~ Fax: 661-847-1007

Adam Engler (661) 578-2285

[email protected]

Photovoltaic Solar System Options

Permanent Building Quality at Modular Building PricesAttractive * Durable * Functional

In-plant Poured Concrete Floor

In-plant Fully Assembled Interior View

In-plant Fully Assembled Exterior View

Wasco High School Classroom Wing

2 Story Multi Classroom Bathroom Building

Vandal Resistant Bathroom Building

ATTRACTIVE|DURABLE|FUNCTIONALPERMANENT BUILDING QUALITY AT MODULAR BUILDING PRICES

why does solar

pay off now?Solar immediately lowers or

eliminates your monthly electric bill! JTS will provide you with a

comprehensive analysis showing the saving generated by a new

photo voltaic solar system.

Instead of renting your electricity from your utility

company, you can now have your own clean energy solar system.

Producing your own clean energyis environmentally friendly,

financially rewarding, and reduces your dependence on local and

state utility companies. INTERNAL RATE OF RETURN

CURRENT AND FUTURE CASH FLOW ANALYSIS

LIFE-CYCLE PAYBACK

INCREASED RESALE VALUE

STATE AND FEDERAL INCENTIVE ANALYSIS

COST OF SOLAR VS. NO SOLAR

NET ANNUAL SAVINGS

ANNUAL SAVINGS BEFORE, AFTER PAYBACK

ADDED VALUE AND EQUITY OVER TIME

ANALYSIS INCLUDES

PHOTO VOLTAIC & SOLAR SYsTEM OPTIONS

Page 5: brochure bidner

Instead of renting your electricity from your utility

company, you can now have your own clean energy solar system.

Producing your own clean energyis environmentally friendly,

financially rewarding, and reduces your dependence on local and

state utility companies.

MODULAR DESIGN AFFORDS 2 STRUCTURAL SYSTEMSSHEAR WALL (Simple lateral resistive system)Typical plywood diaphram with studsDefined openingsNo special testingMajority of school facilities use this systemHigh energy performance (wood is a good insulator)Very cost effective to buildLimited to length and width ratiosLimited size

MOMENT FRAME (Complex lateral resistive system)

All steel constructionRequires special testing

Requires special inspections (Mil certifications)Superior flexibility

Unlimited size

Layout designs no longer confined to 12' wide x 40' long. Revised transportation limits allow for 15' wide x 72' long x 18' high, giving you the opportunity to experiment with more creative design options. Curved walls or more intricate shapes are no longer outside the realm of possibility.

Think about end-use before you define your structural system. A media center may not need a lot of exterior glass & may be well-suited for shear wall.

HOLD FAST TO MODULAR ALTERNATIVES

Page 6: brochure bidner

addit ional featuresPHOTO VOLTAIC SOLAR SYSTEMSThe ultimate in affordable renewable energy systems is now available at JTS! JTS has a factory authorized direct designer and installer of PV solar panels, inverters and components. Our solar option is offered on all of our new modular buildings. Ask our sales representatives for more information.

Our system is a Direct-to-grid System that supplements your utility needs during occupancy or banks your extra energy by returning it to the grid. Your electric meter actually spins backwards! While your buildings are not in use during the summer months, your PV system is working for you by selling kilowatt hours back to your utility company.

Most energy providers now offer significant rebates for an alternative energy system and, of course we can’t ignore the environmental benefits provided by clean, free sunshine.

JTS has changed the standards in modular manufacturing. COMMON EXPECTATION: Modular buildings are poorly constructed, non-energy efficient grey boxes built as a temporary solution.

TRUTH: Permanent modular building having limitless design capabilities and precision engineering with indistinguishable characteristics as site-built buildings.

(661) 578-2285 [[email protected]] Adam Engler (559) 318-0833 [[email protected]] Tom Giampietro

(661) 904-8944 [[email protected]] David Albee (661) 835-9270 Office

ULTIMATE DESIGN CAPABILITIES

Page 7: brochure bidner

wasco high school[WASCO, CALIFORNIA]

classroom and restroom27 modular classrooms

3 modular bathrooms

Page 8: brochure bidner

PHASE ONE

[1] 36 x 40 building

[5] 24 x 40 classrooms

[3] 48 x 40 M/U buildings

[1] 30 x 32 restroom [11,520 total ft2]

PHASE TWO

[15] classrooms

[1] 40 x 48 band room

[2] 30 x 32 restrooms [18,240 total ft2]

ORO GRANDE ELEMENTARY CAMPUS

[oro grande, california]

48' x 40' 48' x 40' 48' x 40' 36' x 40'

36' x 40'

36' x 40'

32' X 30'

24' x

40

'

24' x

40

'

24' x

40

'

oro grande elementary campus[ORO GRANDE, CALIFORNIA]

Page 9: brochure bidner

riverside preparatory school[ORO GRANDE, CALIFORNIA]

4O,OOO square feet

Page 10: brochure bidner

KERMAN UNIFIED sCHOOL DISTRICT

new elementary school

ORIGINAL SITE BUILT PROJECT BUDGET INCLUDED

NEW PERMANENT MODULAR PROJECT BUDGET INCLUDED

[KERMAN, CALIFORNIA]

After going with JTS Modular’s permanent modular buildings, why would I ever go back to

site built? �e quality is just as good, if not better, and it is significantly less expensive

than conventional construction.

KSUD was able to maximes their space, add additional structures, increase their green areas, decrease their carbon footprint and save over $5,000,000 by switching to a permanent modular campus instead of site built. Now...so can you!

- J A M E S F O L E Yassistant superintendant

After going with JTS Modular’s permanent modular buildings, why would I ever go back to

site built? �e quality is just as good, if not better, and it is significantly less expensive

than conventional construction.

KSUD was able to maximes their space, add additional structures, increase their green areas, decrease their carbon footprint and save over $5,000,000 by switching to a permanent modular campus instead of site built. Now...so can you!

- J A M E S F O L E Yassistant superintendant

3 classroom wings 1 administration building 1 multi-purpose building1 kindergarten building

4 classroom wings1 administration building1 multi-purpose building1 kindergarten building

2 baseball fields with 400-seat bleachers1 concession/restroom 88 KW photo voltaic solar

After going with JTS Modular’s permanent modular buildings, why would i ever go back to site built? The quality is just as good, if not better, and it is significantly less expensive than conventional construction.

Page 11: brochure bidner

Project Name: Inyo County O�ce of EducationAdministration building

6,200 s/f Design / Build Administration Building

INYO COUNTY OFFICE OF EDUCATION

administration building6,200 square feet design/build

[INDEPENDENCE, CALIFORNIA]

3'-10 12 "

12'-0"

15'-10 12 "

24'-0"

7'-10 12 "

24'-0"

27'-10 12 "

9'-1

01 4

"

14'-1

01 4

"

CRIPPLE:33 1

4 "

4 X 6 48"

CRIPPLE:84-3/4"

404051"6 X 6

4'-0

"

CRIPPLE:33 1

4 "

48"4 X 6

CRIPPLE:33 1

4 "

48"4 X 6

CRIPPLE:84-3/4"

4040

CRIPPLE:84-3/4"

4040 8040

CRIPPLE:84-3/4"

60'-0"

CRIPPLE:33 1

4 "

6 X 6 51" 6 X 6 51" 6 X 8 99"

96"4 X 6

ADMINISTRATION BLDG.

JOB # 03-710

INYO COUNTY

SIDEWALLS

L

DBA C

R

E F G

HIJKLMN

FRAMING TEMPLATELEFT SIDEWALL

Page 12: brochure bidner

TRANSBAY TRANSIT TERMINAL[SAN FRANCISCO, CALIFORNIA]

TRANSIT TERMINAL8,500 square feet

Project Name: Transbay Transit Terminal 8,500 s/f transit terminal downtown San Francisco

Page 13: brochure bidner

grimmway academy[ARVIN, CALIFORNIA]

29,500 square feet2,160 square feet admin. office

3,600 square feet library/computer lab 1,440 square feet restroom buildings

14,200 square feet classrooms 4,160 square feet kitchens

3,600 square feet multi-purpose960 square feet storage space

Slab on grade campus

12

AB

11 1

40' - 0"

17' - 1 1/2" 5' - 5 1/2" 17' - 5"

AA-3.30

1

AA-3.30

5

AA-3.30

9

2

3

4

6

7

8

10

11

12

R 2' - 6"

R 2' - 6"

12"42"

6"36"

12' - 0"

6' - 0 1/2"0' - 5"6' - 0 1/2"

48" MIN

30" MIN

30" MIN

48" MIN

18" MIN 30"

35" 86 1/2"

18" MIN30"

30"

48"

R 2' - 6"

42" MIN

MAX

12"

6" MAX

36" MIN

24" MIN18"

MIN12"

87 1/2" 35" 33" 33"

36" MIN

2TYP

2TYP

2TYP

2TYP

3TYP

3TYP

2AA-6.30

180 SFM

ENS55 SFCUSTO

DIAL

180 SFW

OM

ENS

AF

B

C

DF

E

WC1

TYP

WC1

TYP

L1TYP

L1TYP

U1TYP

S1

FIRE SPR

INKLER

RISER

5

4

1BU

ILDIN

G M

OD

LINE TYP.

2R

ESTRO

OM

ACC

ESSOR

IES - SEE INTER

IOR

ELEVATION

S

3PLU

MBIN

G FIXTU

RES - SEE PLU

MBIN

G PLAN

FLOO

R VEN

TILATION

- SEE FOU

ND

ATION

PLAN

FLOO

R AC

CESS - SEE FO

UN

DATIO

N PLAN

45

CHECKED BY:

DATE:

JOB NUMBER:

DRAWN BY:

CLIENT NAME:

SHEET N

O.

SCALE:

SHEET N

AME.

REVISIONS DECRIPTION:

No. 16825

STATEOF

CALI FORN I A

E DWATERMAN

L I CNSED

ARCHITE

T

E

C

RWA

DRENEWAL

DATE:

3-31-11

JM

OD

UL

AR

INC

.

TS

A B

ET

TE

R W

AY

TO

BU

ILD

7001 Mc D

ivitt Dr.

Bakersfield, C

A 93313

Plant: (661) 833-2940F

ax: (661) 847-1007

Office: (661) 835-9270

ww

w.jtsm

odular.com

CO

MM

ER

CIA

LIN

ST

ITU

TIO

NA

LA

ND

RE

SID

EN

TIA

LM

OD

UL

AR

BU

ILD

ING

SD

ES

IGN

&P

LA

NN

ING

3/24/2011 9:06:41 AM

As indicated12x40 RESTROOM BUILDINGS (3)

M:\05-10 Master Project File\2010 Projects\Grimmway Academy\Grimmway Academy - Cad Design\01 (Job Name) Preliminary Design\Restroom\12x40 Restroom Building.rvt

AA-1.30

Restroom

Building -Floor Plan

RLG Land Foundation

GRIMMWAY ACADEMYCHARTER SCHOOL

KEYNO

TES

3/8" = 1'-0"1

Restroom

- Floor Plan

Page 14: brochure bidner

san jacinto community college[SAN JACINTO, CALIFORNIA]

SAN GORGONIO PASS CAMPUS

A-2.00

3

A-2.00

A-2.00

A-2.00 1

2

4

30' - 0"

30' -

0"

21' -

0"

9' -

0"

33

2

1 2 3

15' - 0"15' - 0"

A

B

2' - 0" 3' - 0" 10' - 0" 5' - 11" 9' - 1"

0' -

7 1/

2"16

' - 0

"

0' - 7 1/2" 13' - 11 1/2" 0' - 10" 3' - 4" 10' - 7 1/2" 0' - 7 1/2"

573 SF

Room

166 SF

Room

71 SF

Restroom

1

CHEC

KED

BY:

DATE

:

JOB N

UM

BER

:

DRAW

N B

Y:

CLI

ENT

NAM

E:

SHEET NO.

SCALE

:

SHEET NAME.

JMODULAR INC.

TSA BETTER WAY TO BUILD

7001 Mc Divitt Dr.Bakersfield, CA 93313

Plant: (661) 833-2940Fax: (661) 847-1007

Office: (661) 835-9270

www.jtsmodular.com

COMMERCIALINSTITUTIONAL

ANDRESIDENTIAL

MODULARBUILDINGSDESIGN &

PLANNING

REV

ISIO

NS D

ECRI

PTIO

N:

No. 16825

ST A T E OF CA L I FORN I

A

EDWA

TERMAN

L I

CNSED

ARCHI T E

T

E CR WAD

RENEWAL

DAT

E:

3-31-11

Ente

r add

ress

her

e 1

/4" =

1'-0

"

8/18

/201

0 5:

07:2

0 PM

CSU

B - E

ast B

ay B

agel

Bui

ldin

g

A-1.00

Floor Plan

Auth

or

Proj

ect N

umbe

r

1/4" = 1'-0"1 Project Floor Plan

Page 15: brochure bidner

einstein bros bagel company [HAYWARD, CALIFORNIA]

A-2.00

3

A-2.00

A-2.00

A-2.00 1

2

4

30' - 0"

30' -

0"

21' -

0"

9' -

0"

33

2

1 2 3

15' - 0"15' - 0"

A

B

2' - 0" 3' - 0" 10' - 0" 5' - 11" 9' - 1"

0' -

7 1/

2"16

' - 0

"

0' - 7 1/2" 13' - 11 1/2" 0' - 10" 3' - 4" 10' - 7 1/2" 0' - 7 1/2"

573 SF

Room

166 SF

Room

71 SF

Restroom

1

CHEC

KED

BY:

DATE

:

JOB N

UM

BER

:

DRAW

N B

Y:

CLI

ENT

NAM

E:

SHEET NO.

SCALE

:

SHEET NAME.

JMODULAR INC.

TSA BETTER WAY TO BUILD

7001 Mc Divitt Dr.Bakersfield, CA 93313

Plant: (661) 833-2940Fax: (661) 847-1007

Office: (661) 835-9270

www.jtsmodular.com

COMMERCIALINSTITUTIONAL

ANDRESIDENTIAL

MODULARBUILDINGSDESIGN &

PLANNING

REV

ISIO

NS D

ECRI

PTIO

N:

No. 16825

ST A T E OF CA L I FORN I

A

EDWA

TERMAN

L I

CNSED

ARCHI T E

T

E CR WAD

RENEWALD

ATE:

3-31-11

Ente

r add

ress

her

e 1

/4" =

1'-0

"

8/18

/201

0 5:

07:2

0 PM

CSU

B - E

ast B

ay B

agel

Bui

ldin

g

A-1.00

Floor Plan

Auth

or

Proj

ect N

umbe

r

1/4" = 1'-0"1 Project Floor Plan

Page 16: brochure bidner

typical state school building funding processFROM THE OFFICE OF PUBLIC SCHOOL CONSTRUCTION

DISTRICT SUBMITS APPLICATION FOR

ELIGIBILITY DETERMINATION TO THE OPSC

opsc performs audit

OPSC PROCESSES

APPLICATIONS FOR

SAB APPROVAL AND

FUNDING FOR GRANT

ALLOWNACE AND SITE

sab approvalunfunded approval

certification filing

sab apportionment

OPSC PROCESSESELIGIBILITY

APPLICATIONS FOR SAB APPROVAL

district submits expenditure

reports to the opsc

DISTRICT SUBMITS

FUNDING APPLICATION

INCLUDING DSA AND

CDE APPROVED PLANS

OT THE OPSC

opsc releases grant

amount upon evidence

of district match and

construction

contract

SAB APPROVAL

project

construction

START

FINISH

Page 17: brochure bidner