building lineout
DESCRIPTION
building line out procedure for civil engg....................TRANSCRIPT
Line Out & Building Line Out & Building SettingSetting
IntroductionIntroduction
Line Out & Building SettingLine Out & Building Setting
IntroductionIntroduction
1.1. Correct line outCorrect line out
2.2. Building SettingBuilding Setting
Steps Involved In Line Out & Steps Involved In Line Out & Building SettingBuilding Setting
Cleaning & LevelingCleaning & Leveling
Demarcation of the plot Demarcation of the plot
Checking & approval of all drawingsChecking & approval of all drawings
Preliminary Line outPreliminary Line out
Detailed Line outDetailed Line out
Necessary precautions to be takenNecessary precautions to be taken
Requirements for Line out Requirements for Line out workwork
Layout drawings Layout drawings
Instruments & materialsInstruments & materials
Site cleaning & LevellingSite cleaning & Levelling
Preliminary Line outPreliminary Line out
Preliminary Line out WorkPreliminary Line out Work
Decided fixed bench markDecided fixed bench mark
Locate the structure on planLocate the structure on plan
Fixed the face of the building Fixed the face of the building
Check the area of open spaces & distancesCheck the area of open spaces & distances
Approval by the ArchitectApproval by the Architect
Detailed Line out WorkDetailed Line out Work
Marking of road widening lineMarking of road widening line
Study of working & centre line drawingStudy of working & centre line drawing
Tally the measurement as per the layout planTally the measurement as per the layout plan
Setting of theodoliteSetting of theodolite
Locate actual corners of the buildingLocate actual corners of the building
Cross check the distances & diagonalsCross check the distances & diagonals
Railing & MundhasRailing & Mundhas
Centre Marking of columnsCentre Marking of columns
Fixing the nailsFixing the nails
MarkingMarking
Checking by ArchitectChecking by Architect
Final N.O.C.Final N.O.C.
Fixing of position of columnsFixing of position of columns
Precautions To be TakenPrecautions To be Taken
All Mundhas & Railing should be fixed properlyAll Mundhas & Railing should be fixed properly
Joints of railing should be flushedJoints of railing should be flushed
Periodical checking should be donePeriodical checking should be done
Height of the railing should be minimumHeight of the railing should be minimum
Nails should not to be disturbedNails should not to be disturbed
Any discrepancies should be rectifiedAny discrepancies should be rectified
Certified by ArchitectCertified by Architect