Ministry of Energy and Mineral Resources Republic of Indonesia 1
Firenze, September 11th 2017
MINISTRY OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA
by:
Hendra Iswahyudi
Ministry of Energy and Mineral Resources
Republic of Indonesia
GEOTHERMAL IN INDONESIA“Unlocking Geothermal Investments: Challenges and Opportunities”
Presented at High Level Conference of The GGA
Ministry of Energy and Mineral Resources Republic of Indonesia 2
Installed Capacity Target Capacity Additional Capacity
0 37110
7.560 35
205 215 165 220
866
450
858
650
1,175
999
0
500
1000
1500
2000
2500
3000
-
1,000.0
2,000.0
3,000.0
4,000.0
5,000.0
6,000.0
7,000.0
8,000.0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Ad
dit
ion
al C
apac
ity
(MW
e)
Cap
acit
y(M
We)
Installed Capacity Upadated July
2017: 1,698.5 MW (Additional Capacity from GPP
Ulubelu Unit 4 on April 25th , 2017 for
55 MW)Additional COD Plans for 2017:
▪ GPP Sarulla Unit 1 for 110 MW
▪ GPP Karaha Unit 1 for 30 MW
▪ GPP Sorik Marapi (modular) 20 MW
Indonesia become World
No.2 exceedPhilippines
Indonesia become World
No.1 exceedUnited States
TARGET AND MILESTONE OF GEOTHERMAL DEVELOPMENT
*Assumption: Philippines (1.870 MW) and US (3.450 MW) not performing any capacity increment
Ministry of Energy and Mineral Resources Republic of Indonesia 3
Assignment for SOEThe Government will give particular assignment for Geothermal SOE to develop concession including
upstream and downstream based on Geothermal Law No. 21/2014
Preliminary Survey Assignment + ExplorationInvestors who meet the requirements allowed to have opportunity to obtain a Preliminary Survey
Assignment up to Exploration stage. As the incentive, concession will be tendered using direct selection
mechanism.
Ceiling PriceFor further acceleration, Government will implement a ceiling price mechanism, in which the tender will
based on work programs and exploration commitment while the tariff will be set by the Government.
ACCELERATION FOR GEOTHERMAL DEVELOPMENT
Simplifying the Licensing ProcessOne-Stop Service Center (PTSP) at Investment Coordinating Board (BKPM), eliminating unnecessary
licences, shorten the time period
Incentives (fiscal & non-fiscal)Tax allowance, tax holiday & Government Guarantee
Geothermal FundAllocate USD 300 million on national budget for geothermal exploration
Resource Optimalization on Giant FieldEncourage PGE and GDE to develop another geothermal system inside the concession
Ministry of Energy and Mineral Resources Republic of Indonesia 4
4
Investment opportunities:
Access to Geothermal Resources for Investors:
• Preliminary Survey Assignment + Exploration;
• Obtain geothermal concession through open tender mechanism.
Other business opportunities in geothermal sector:
• Geothermal direct use;
• Low temperature geothermal potential;
• Small scale power plant;
• Services company to support the core business of geothermal.
Recent Updates:
Commercial Operation Date (COD) of 4 projects (215 MW):
➢ GPP Ulubelu Unit 4: 55 MW (April, 25th 2017)
➢ GPP Karaha Bodas: 30 MW (November 2017)
➢ GPP Sarulla Unit 2: 110 MW (December 2017)
➢ GPP Sorik Marapi (Modular Unit) 20 MW (December, 2017)
2 concessions (130 MW) succesfully tendered and license issued;
30 concessions (1725 MW) are going to be tendered in the near future
(6 concessions (295 MW) tendered in 2017);
5 concessions (210 MW) assigned to SOE.
Ministry of Energy and Mineral Resources Republic of Indonesia 5www.esdm.go.id