cemmethod orca overview
DESCRIPTION
The CEMMethod ORCA toolkit is a Process Governance resource. Originally launched in 2004 now significantly updated to this version.For more see www.cemmethod.com and www.oibpm.comTRANSCRIPT
tm
8 Omega ORCA® and CEMMethod® ORCA Organisation Readiness & Competence Assessment
A Process Governance Framework
Steve Towers
BP Group www.bpgroup.org
tm
BP Group, New Bond House, 124 New Bond Street, London W1S 1DX
Offices in London – Houston – Denver - Bangalore – Sydney - Associates in 118 countries
tm
PROPRIETARY NOTICE
1. All ideas, information, concepts, methods and know-how embodied in this material (the "Information”) have been created by or for BP Group or another company within our group.
2. The Information is of considerable value to our business and is disclosed to you on the basis that you do not use it otherwise than as expressly permitted by us. Copyright on all materials contained in this presentation is owned by us (unless otherwise stated). We are providing this material to you on the basis that you agree that you will use it only for reference. No part of this material may be reproduced or disclosed to any third party without our express written permission.
3. Save as provided above, all our other rights are reserved.
tm
Objectives
• Provide process leaders with an
overview of the CEMMethod® ORCA
process
• Provide direction on undertaking ORCA
• Provide process leaders with information
regarding additional techniques and
templates for undertaking „Deep‟ ORCA
tm
A New Way for the
Age of the Customer Many of the challenges facing businesses today are forcing organisations to make
changes for which they have no existing delivery mechanism. These changes
often place corporations between the proverbial “rock and a hard place,”
caught between external change forces and internal change barriers.
Enterprise Business Process Management has come to the rescue, almost.
Leading business thought leaders have delivered compelling materials to help
businesses understand why enterprise business process management can
“deliver the goods.”
What was missing, until recently, was a framework focused on achieving results
that is proven, flexible, technology neutral and that can apply to virtually any
business or business problem.
Launched originally in 2004* the framework is now updated to reflect the
continuing evolution of next practice in the worlds leading organisations.
* see www.8omega.com
tm
A New Way for a New Age
CEMMethod® is this overarching approach that provides a single framework that
can be applied to any enterprise, business process, challenge or problem.
The framework is not a theoretical concept or academic exercise, nor does it
mandate the depth, breadth and sophistication of the actions taken by the
organisations that use it. The framework is flexible and adaptable to meet the
broad range of individuality and needs of corporations in all markets and any
size.
The CEMMethod® comes from real world experience with hundreds of
organisations that have made the transition to being process managed.
More than anything else CEMMethod® is DOMAIN KNOWLEDGE gathered
from leading business process management professionals, most of whom
have been actively practicing BPM for over ten years.
tm
A New Way for a New Age
The framework is the revised, refined and tested results of these real activities, in
real businesses, by BPM experts, over a broad market spectrum. The origin
of the framework came from the common, stated desire by corporations all
over the globe for an approach that was clear, actionable and that would help
them achieve their desire to become processed managed organisations.
Implementing the original 8 Omega framework and its successor the
CEMMethod ® allows organisations to realise the benefits of Enterprise
Business Process Management. A major component of the frameworks is the
organisation Competence & Readiness Assessment (ORCA). That is what this
resource focuses on
.CEMMethod® ORCA Overview
Information in this pack provides a structured technique for understanding an
organisations process maturity. It helps to identify the main dimensions of
change and understand the current status, the organisational aspiration and
the potential future state
tm
What is CEMMethod® ORCA?
ORCA is an approach within the CEMMethod® which allows organisations to assess and evaluate, develop and then build their competence in achieving Successful Customer
Outcomes. It goes beyond the concept of process maturity by including key
dimensions of an organisations capability. As such it is a Process Governance framework.
Accordingly it is a pragmatic and immediately useful approach to helping organisations identify and develop consensus around where they are now,
where they would like to get to, and
the gap between the two.
tm
The Good News: You can actually measure how
you are progressing towards your Strategic Goals!
• Commitment by Top Management
• Program Organisation & Structure
• Improvement Training
• Performance Objectives
• Functioning of Improvement teams
• Tools and Techniques
• Stakeholder specifications
• Information Systems
• Accreditation/Certification (individual – enterprise – partners)
• Customer Alignment
And in doing so align the organisation to achieve SCO‟s. The ORCA approach fits neatly with the CEMMethodTM (see www.cemmethod.com)
tm
Level Commitment by Top
Management
Programme
Organisation and
Structure
Improvement
Training
Performance
Objectives
Functioning of
Improvement Teams
Tools and
Techniques
Stakeholder
Specifications
Information
Systems
Integration
Accreditation Customer and
Maturity Centricity
10 Process improvement is a normal part of the culture.
Process improvement is part of the day to day culture of
the organisation.
Everybody trained. Process improvement is a natural part of training efforts.
Embedded within all aspects of work. The Process
Performance Landscape encompasses the whole
organisation.
Outside-In Approach is part of normal working practice.
All processes fully measured and controlled with
appropriate tools. The CEMMethod® is deployed
fully.
Specification reviewed and periodically revised with
stakeholders.
Processes operate within, and are supported by IS
tools. A complete BPMS has been deployed and is maintained to agreed
standards.
More than 50% of all processes and people have received accreditation. More than 1 in 20 are qualified as
Certified Process Professional Masters®
Every employee is aligned to delivering Successful Customer Outcomes
9
Communicates improvement information to customers
and internally.
Process improvement cost savings significant,
measured and achieved.
Process improvement competence achieved by all
staff.
Initial targets achieved, full audit review complete.
Teams systematically identify new actions and
developments.
All process measurement complete and on-going as
part of daily reporting.
Stakeholder contracts established, communicated
and understood by organisation.
Key processes supported by IS infrastructure.
Integration work towards a full BPMS is underway.
Remedial work and review of actions to achieve full
accreditation.
Successful Customer Outcomes used to drive continuous improvement
8
Improvement is an integral part of objective setting and
appraisals.
BPM systematically being implemented with full IS
support.
Trainers, facilitators and mentors fully deployed and
integral to process.
Performance measures identified for all key
processes.
More than 50% of organisation have actively participated within teams. Positive results of projects
are recognised.
Gap analysis complete for all key processes.
Stakeholder requirements monitoring process
established. First deliveries against key stakeholder.
Pilot testing underway, success criteria monitored
and reviewed. Initial deployment of strategic IS tools within key processes.
Initial external accreditation of processes.
Successful Customer Outcomes developed for key
processes. Customer expectations actively
managed
7
Improvement is an agenda item in meetings, manager
gives meetings and publishes on improvements.
Regular communication activity and BPM evaluation underway. BPM proposals
costed.
Middle management trained in PI approach. Training in
techniques completed across the organisation.
Performance indicators and maintenance methods
introduced into the organisation.
Implementation of Rapid Actions complete. Core
process teams delivering first results.
All key processes are measured and tracked, exception reporting and action plans delivered.
Initial work underway to communicate stakeholder requirements and required
action.
IS review of delivery tools to support key processes and agreed deployment plan.
Processes and improvement actions revised and upgraded. Internal
accreditation complete and reviewed.
Customer experience management program in
place. Customer interactions actively managed. Customer
needs understood
6
Has participated in an improvement project.
Involved in progress and commits available resources.
Regular progress meetings. WPR complete and business
process redesign (BPR) underway.
PI training underway. Facilitators assigned.
Communication to the organisation of performance
objectives underway. Performance reviews and
audit begun.
Action teams assigned and underway within key
processes.
Tools and techniques harmonised. User training
complete.
Action programme agreed with stakeholders.
Key process requirements understood, agreed and action plan developed.
Initial key process identified and submitted for internal
accreditation.
Customer interactions understood. Customer
experience management planned
5
Improvement Goals are understood across the management teams
Three CEMMethod® workshops complete with Action Plans implemented
1 in 10 of the organisation has been trained and able to
deploy Outside-In techniques
Performance objectives linked to individual
objectives across the organisation
Leadership of Improvement Teams 80% implemented
CEMMethod® with associated techniques
deployed to more than 50% of organisation.
Stakeholder Management Matrix established and deployed to Process Improvement teams
IS/IT SWOT Analysis complete AND more than
50% IT systems evaluated for Process Maturity
More than 5% of the organisation have achieved
the Certified Process Professional® accreditation
End to End process maps reflect the customer
experience
4 Improvement goals are defined and published.
Steering group assigned, first work process redesign
(WPR) underway.
Whole organisation aware of PI programme.
Performance objectives quantified and charted.
Initial stretch targets agreed.
Initial team undertake work process redesign and
complete report back to steering group.
Tools and support in place. Tracking and monitoring
underway.
Key shortfalls and targets identified with stakeholders.
Initial processes reviewed for IS support and
specifications developed
Accreditation process communicated. Awareness
workshops define issues and agree targets.
Customer advocate appointed. Improvement
projects implemented
3 Is chairman of the
improvement effort. Process improvement
responsibility assigned.
Process improvement responsibility assigned.
Managers have participated in PI workshop.
Senior management have identified key objectives.
Initial team structure in place and communicated to
the organisation.
Tool kit agreed and communicated to senior
management.
Most important areas identified for the
establishment of stakeholder specification requirements.
Gap analysis undertaken to identify key requirements
and quick hits.
Senior management participate in accreditation
workshop.
Customer feedback results measured. Add hoc
improvements projects planned
2
Improvement principles understood, verbal support
given, but no personal involvement.
Process improvement discussed but no formal responsibility assigned.
Process improvement training agreed, method
selected.
Approach defined, selection criteria agreed.
Team structure(s) agreed within senior management.
Tools and techniques identified and short-listed.
Responsibility assigned for establishing stakeholder
requirements.
Current state analysis agrees current integration.
Accreditation process agreed and communicated to senior
management.
Customer feedback surveys underway
1 Has no interest. Structure completely
lacking. No process improvement
training. Non identified. No improvement projects. Not identified. No progress. Not identified. No action.
No customer initiatives underway
CEMMethod® ORCA™ (organisation Readiness & Competency Assessment)
This is where
we are
This is where
we want to be
This is the gap
Answers a number of questions against a range of key
Enterprise BPM Issues
tm Level Commitment by
Top Management
Programme
Organisation and
Structure
Improvement
Training
Performance
Objectives
Functioning of
Improvement
Teams
Tools and
Techniques
Stakeholder
Specifications
Information
Systems
Integration
Accreditation
Customer and
Maturity
Centricity
10
Process improvement is a normal part of the
culture.
Process improvement is part of the day to day culture of the
organisation.
Everybody trained. Process improvement
is a natural part of training efforts.
Embedded within all aspects of work. The Process Performance
Landscape encompasses the
whole organisation.
Outside-In Approach is part of normal working practice.
All processes fully measured and controlled with
appropriate tools. The CEMMethod® is deployed fully.
Specification reviewed and periodically
revised with stakeholders.
Processes operate within, and are
supported by IS tools. A complete BPMS has been deployed and is maintained to agreed
standards.
More than 50% of all processes and people
have received accreditation. More
than 1 in 20 are qualified as Certified Process Professional
Masters®
Every employee is aligned to delivering Successful Customer
Outcomes
9
Communicates improvement information to customers and
internally.
Process improvement cost savings
significant, measured and achieved.
Process improvement competence achieved
by all staff.
Initial targets achieved, full audit review complete.
Teams systematically identify new actions and developments.
All process measurement
complete and on-going as part of daily
reporting.
Stakeholder contracts established,
communicated and understood by organisation.
Key processes supported by IS infrastructure.
Integration work towards a full BPMS is
underway.
Remedial work and review of actions to
achieve full accreditation.
Successful Customer Outcomes used to drive continuous
improvement
8
Improvement is an integral part of
objective setting and appraisals.
BPM systematically being implemented with full IS support.
Trainers, facilitators and mentors fully
deployed and integral to process.
Performance measures identified
for all key processes.
More than 50% of organisation have
actively participated within teams.
Positive results of projects are recognised.
Gap analysis complete for all key processes.
Stakeholder requirements
monitoring process established. First
deliveries against key stakeholder.
Pilot testing underway, success
criteria monitored and reviewed. Initial deployment of
strategic IS tools within key processes.
Initial external accreditation of
processes.
Successful Customer Outcomes developed for key processes.
Customer expectations actively
managed
7
Improvement is an agenda item in
meetings, manager gives meetings and
publishes on improvements.
Regular communication activity and BPM
evaluation underway. BPM proposals costed.
Middle management trained in PI
approach. Training in techniques completed
across the organisation.
Performance indicators and
maintenance methods introduced into the
organisation.
Implementation of Rapid Actions
complete. Core process teams
delivering first results.
All key processes are measured and
tracked, exception reporting and action
plans delivered.
Initial work underway to communicate
stakeholder requirements and required action.
IS review of delivery tools to support key
processes and agreed deployment plan.
Processes and improvement actions revised and upgraded. Internal accreditation
complete and reviewed.
Customer experience management program
in place. Customer interactions actively managed. Customer needs understood
6
Has participated in an improvement project. Involved in progress
and commits available resources.
Regular progress meetings. WPR complete and
business process redesign (BPR)
underway.
PI training underway. Facilitators assigned.
Communication to the organisation of performance
objectives underway. Performance reviews
and audit begun.
Action teams assigned and underway within
key processes.
Tools and techniques harmonised. User training complete.
Action programme agreed with
stakeholders.
Key process requirements
understood, agreed and action plan
developed.
Initial key process identified and
submitted for internal accreditation.
Customer interactions understood. Customer
experience management planned
5
Improvement Goals are understood across
the management teams
Three CEMMethod® workshops complete
with Action Plans implemented
1 in 10 of the organisation has been
trained and able to deploy Outside-In
techniques
Performance objectives linked to individual objectives
across the organisation
Leadership of Improvement Teams 80% implemented
CEMMethod® with associated techniques
deployed to more than 50% of organisation.
Stakeholder Management Matrix
established and deployed to Process Improvement teams
IS/IT SWOT Analysis complete AND more
than 50% IT systems evaluated for Process
Maturity
More than 5% of the organisation have
achieved the Certified Process Professional®
accreditation
End to End process maps reflect the
customer experience
4
Improvement goals are defined and
published.
Steering group assigned, first work process redesign (WPR) underway.
Whole organisation aware of PI programme.
Performance objectives quantified and charted. Initial
stretch targets agreed.
Initial team undertake work process redesign and complete report
back to steering group.
Tools and support in place. Tracking and
monitoring underway.
Key shortfalls and targets identified with
stakeholders.
Initial processes reviewed for IS
support and specifications
developed
Accreditation process communicated.
Awareness workshops define issues and
agree targets.
Customer advocate appointed.
Improvement projects implemented
3 Is chairman of the
improvement effort.
Process improvement responsibility
assigned.
Process improvement responsibility
assigned. Managers have participated in PI
workshop.
Senior management have identified key
objectives.
Initial team structure in place and
communicated to the organisation.
Tool kit agreed and communicated to
senior management.
Most important areas identified for the establishment of
stakeholder specification
requirements.
Gap analysis undertaken to identify key requirements and
quick hits.
Senior management participate in accreditation workshop.
Customer feedback results measured. Add
hoc improvements projects planned
2
Improvement principles understood, verbal support given,
but no personal involvement.
Process improvement discussed but no
formal responsibility assigned.
Process improvement training agreed,
method selected.
Approach defined, selection criteria
agreed.
Team structure(s) agreed within senior
management.
Tools and techniques identified and short-
listed.
Responsibility assigned for establishing stakeholder
requirements.
Current state analysis agrees current
integration.
Accreditation process agreed and
communicated to senior management.
Customer feedback surveys underway
1 Has no interest. Structure completely
lacking. No process
improvement training. Non identified.
No improvement projects.
Not identified. No progress. Not identified. No action. No customer
initiatives underway
tm
Steps for Using ORCA
1. Identify the Participants
2. Arrange the ORCA Process
3. Undertake the Review
4. Assess the Results
5. Prepare the Findings
tm
Identify the Participants
Identify a representative cross
sample:
the senior management team
key process practitioners
front-line staff
tm
Arrange the ORCA Process
Plan the process to complete within two
weeks
Brief the ORCA team
Supply the ORCA team with the template
Confirm meetings/workshops for the ORCA
sessions
tm
Undertake the Review
Brief the participants
Complete the template
Co-ordinate data entry
Resolve issues
tm
Assess the Results
Review current situation
Discuss future aspiration
Agree Gap(s)
Determine Transition Plan
Confirm Action Plan
tm
Prepare the Findings
• Report to the Board/Sponsor
• Confirm Program
• Implement Change
tm
For More Information
– To contact us.
• www.bpgroup.org
• www.bp2010.com
• www.oibpm.com
– To catch the latest news on BPM and Outside-In
tm
8 Omega ORCA® and CEMMethod® ORCA Organisation Readiness & Competence Assessment
A Process Governance Framework
Steve Towers
BP Group www.bpgroup.org
tm
BP Group, New Bond House, 124 New Bond Street, London W1S 1DX
Offices in London – Houston – Denver - Bangalore – Sydney - Associates in 118 countries