central technical support facility (ctsf)€¦ · central technical support facility (ctsf) terry...
TRANSCRIPT
Central Technical Support Facility (CTSF)
Terry EdwardsChief Information Officer (CIO)Chief Technology Officer (CTO)HQ Army Materiel Command, CIO-G6Ft. Belvoir, VA, 22060
April 15, 2008
(UNCLASSIFIED)
(UNCLASSIFIED)
1File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
CTSF MissionThe CTSF provides a unique, innovative, and scalable environment, with skilled and dedicated personnel, using qualified synergistic processes in order to support the DoD’s net enabled strategic vision by executing configuration management, systems engineering support, and interoperability certification testing for Army and Joint C4I providers.
2File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
SILFCS
PIL
Strong Configuration Management
Developmental Testing
& Integration
WarfightingSupport
Fielding
Risk Reduction
Test Fix Test
METRICS / Entra
nce & Exit Crite
ria
TECH IPT IPR
TRR #1
TRR #2
Test Report
Field Manuals
STAKE HOLDERS/CUSTOMERS
Certification
Synchronization/Feedback
Capability
Federated Sites
CTSF Process
SOS Focused CTSF Process
3File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
G3Battle Command GOSC
TRADOCASA(ALT)
G8/ABO
DOMAIN LEADS
ATEC
Sets Operational Priority & Direction
AMC CECOM LCMC
G6CERTIFICATIONAUTHORITY
Execute CTSF Mission CTSF
Sets Technical StandardsCertification Requirements/Criteria
Command & AdministrativeDirection
PEOs/PM
ATEC
Joint
ASC/AFSBATECATECOTHER
LCMCs/MSC
Governance Structure
4File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
250,000 sq ft Facility: 41,305 square feet dedicated to integration, testing and certification Fully Wired Infrastructure: with tactically representative routers, switches, hubs, fiber, 10Base2, 10BaseT and video to provide flexibility for test and exercise reconfiguration. Instrumented Facility for data collection and reduction equipment to support a vehicle platform to Corps level architecture, fully instrumented with SIM/STIM and data collection/reduction capability.Configuration Control Capability to support integration and fielding of SoftwareHigh Speed Communication Links to facilities at Ft. Hood and externally to sister service sites, battle labs and contractor facilities; DREN access.Established Processes to support integration, testing, configuration management and training “Go to War” software.
Over 900 government civilians, and contractors form the Team of the CTSF to support, maintain & sustain the Army’s digital systems deployed world- wide.
CTSF The Stats…
5File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
FederatedSILs/DILs
Leveraging The Army“Task Organize for Success”
Utilize Federated Sites and Distributed Testing, Harness AMC/DA Expertise and Resources, Task Organize to Support Specific Missions
- AIC
- Configuration Management
- Support Integration ,RRT, & Technical Assessments
- Networthiness/IA/IATO/Spectrum
- Reachback support to the Warfighter
X
XXXX
XX
G3
G6
TRA
DO
C
ASA
(ALT)
G8
Priorities and Governance
Policy, Criteria, Tech D
irection
Capability R
eq/Threads
Process, Products, SMEs
Resources
AMC
CECOM
RDECOM SEC
CTSFATEC
NETCOM
ISEC
1st IO
CTSF as an IPT
ARL/SLAD
6File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
AMC/RDECsTESTCOMMUNITY
ARMY STAFF
TRADOC/Battle Labs
Partnering is Key
TEC
7File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
• Unity of Command - no barriers, organizations coming together to get the job done on behalf of the Warfighter, synchronization of efforts
• CTSF missions serve many customers (i.e. G3, G6, ASA(ALT), G8, ATEC, Joint and Coalition Warfighters)
• Synergy Focused on Warfighter Needs• In depth technical understanding of systems• Knowledge of warfighter needs and constraints• A set of disciplined processes for Testing, CM, and System
Engineering• Formal/Informal Partnerships (PMs, Warfighter, Test
Community, Joint Community, PdM Netops)• Adaptable and Responsive• Honest Broker• Well known across Army DoD
Key to CTSF Success
8File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
Questions?
/
9File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
Back-Up
10File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
CTSF VisionCTSF VisionTo become a customer valued organization ensuring thebest net-centric C4I capabilities are available to US Army, Joint and Coalition Warfighters.
Bottom Line: CTSF is the Bottom Line: CTSF is the Interoperability Interoperability ““Check RideCheck Ride”” for for Current & Future Army ProgramsCurrent & Future Army Programs
11File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
PEOs
Trail Boss
SWB 1 - 75+ Systems
Director
Systems requiring AICTBD
Future Digital ForceNet Centric Interoperability
ABCS Integration SoS Interoperability Army Net-Centric Interoperability
10 Digital Divs40+ BCTsC2 Interoperability
11 Systems
1 Digital DivProof of PrincipalSW Functionality
Director
PEO C3T
CTSF CTSF
G3G6
G8
CECOM
PEOs
G3
G6
G8
CTSF
IntegrationAMC
JOINT
CTSF Organizational EvolutionIntegration and Certification
CECOM
12File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
Pro
gram
s of
Rec
ord
(PO
Rs)
PEO/SoSIntegration
ONS
Enterprise SoSIntegration
Certified
Integrated, InteroperableCapabilities to the Warfighter!
WARFIGHTER
Inte
grat
ion
Pro
cess
CTSF SOS Focus
13File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
Federated Testing
Business
Joint
Fires(FT Sill)
FCS(FT Bliss/WSMR)
Battle Command(CTSF)
Aviation (Huntsville/Rucker)
Intel
AMD (Hunstville)
Sim(DIL Orlando)
Others
FANS Concept of Execution
Federated Army Net-Centric Sites
14File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
JTAC
TLDHS
JSIC - Suffolk, VaSOF JTAC, USAF AOC with BCD & SOLE
NCTSI - San Diego, CaNAVY N3
JTAC
CASS
CTSF - Fort Hood, TXUSAF ASOC, JTAC & TACP, USA Co, BN, BCT, Div, Corps
46th Test Squadron,Eglin AFBSOF JTAC & JSOTF
JITC, Ft HuachucaJDEP Ops CenterJOCAT Tool
SOF JTAC
BAO Kit
SPAWAR - Charleston, SCUSMC JTAC, FAC, CO, BN, Regt, DASC, Div, MEF
WHITFILL WHITFILL ––CENTRAL TECHNICAL SUPPORT FACILITY CENTRAL TECHNICAL SUPPORT FACILITY ––TECH DIVISIONTECH DIVISION
PROGRAM EXECUTIVE OFFICE COMMAND CONTROL AND COMMUNICATIONS TACTICAL
SE&I
TEST
CM
TD
SE&ISE&I
MECC:MECC: 12E
12W
CTOC: Data
Products OIF/OEF SE&I Lab 8W8W
SW BL RR Floor
COMMS
SE&I OFFICES
TestTestOfficesOffices
SE LAB
CICCIC
TestTestOfficesOffices
TD TD Trl 4
Trl 6
Trl 8
Trl12
CTSF TDFloor Layout
IA Office
Graphics
SE& I
CMCM
TEST
TD
TESTTEST
JCR
CTSF Distributed Testing Capability
DREN
15File Name.pptPromote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
Director
S3
DA LNOs Admin
HQsGS13 Site Ops
FCS
Ops Offs
KM
Site Spt
IT
BCNSD
PEO AVNPM’s
PEOC3T
NCOIC
Deputy DirectorGS15
Site Sec
TDGS 15
Deputy TD
TESTGS 14
SE&IGS 14
CMGS 13
TD CM
Army CM
Test Ops
DP & JT
AIC
Integration
Dig Maps SW V/V
TacticalNetwork
IAGS 14
ORAGS 13
MAD
Tech Advisor
LogGS9
PBOGS 12
TD Spt Ops
BMDGS 14
Budget AnalystGS12Budget Coordinator
Procur/ContractingGS12
Resource ManagementGS13
Motorpool
Facility Spt
Ship/Rec
Security
TD Sec
OPS
Government PositionContractor
CTSF Organization
16File Name.ppt Promote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
OPERATIONSOPERATIONSInitial Support RequestsInitial Support RequestsEvent Cost EstimationEvent Cost EstimationDeployment SupportDeployment SupportTours / DemosTours / DemosSynchronization NotesSynchronization Notes
BATTLE COMMAND AND BATTLE COMMAND AND NETWORK SUPPORT DIRECTORATE NETWORK SUPPORT DIRECTORATE DIGITAL SYSTEMS ENGINEERS DIGITAL SYSTEMS ENGINEERS
DSI NET DSI NET SUPPORT OPERATIONS CENTERSUPPORT OPERATIONS CENTERSupport USF ActivitiesSupport USF Activities
TENANT PROGRAMS / AGENCIESTENANT PROGRAMS / AGENCIES(Integration/ Support Testing / Training)(Integration/ Support Testing / Training)PEOPEO--C3T, PEOC3T, PEO--STRI, PEOSTRI, PEO--Aviation, Aviation, TRADOC, ATEC, University XXI, TRACTRADOC, ATEC, University XXI, TRAC--WSMR, WSMR, Future Combat SystemsFuture Combat Systems
INSTALL YARDINSTALL YARDInstall H/W and Install H/W and Communications on Communications on Tactical PlatformsTactical Platforms
CONFIGURATION MANAGEMENTCONFIGURATION MANAGEMENTBaseline Maintenance, Master Drive Baseline Maintenance, Master Drive Storage, Quality Assurance, Storage, Quality Assurance, S/W S/W Replication,SReplication,S/W Distribution, /W Distribution, Systems Architecture,Systems Architecture,Digital MapsDigital Maps
TEST AND EVALUATIONTEST AND EVALUATIONInteroperability Baseline TestingInteroperability Baseline TestingIntraIntra--Army Certification TestingArmy Certification TestingSimulation/Stimulation ValidationSimulation/Stimulation ValidationDistributed TestingDistributed Testing
SYSTEMS ENGINEERINGSYSTEMS ENGINEERINGFoundation ProductsFoundation ProductsData ProductsData ProductsS/W Validation and VerificationS/W Validation and VerificationNetwork EngineeringNetwork EngineeringInformation AssuranceInformation AssuranceSOS Integration LabsSOS Integration Labs
SPECIAL PROJECTSSPECIAL PROJECTSAnalyzes, Recommends, and Executes Analyzes, Recommends, and Executes Special ProjectsSpecial ProjectsBring Rapid Benefit to the Soldier Bring Rapid Benefit to the Soldier Integrate Emerging TechnologiesIntegrate Emerging TechnologiesPerform Special Projects as TaskedPerform Special Projects as Tasked
SUPPORT OPERATIONS/LOGSUPPORT OPERATIONS/LOGProperty Accountability,Property Accountability,Purchasing, Computer Repair, Purchasing, Computer Repair, Test Floor Setup and Support,Test Floor Setup and Support,Facilities SupportFacilities Support
CTSF Campus
17File Name.pptPromote a Lean Culture in All We Do. nn Month 2007
(UNCLASSIFIED)
(UNCLASSIFIED)
CIO/CTOG6
OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
Testing
System Eng
Unit SPT
SWB I OOC
SWB II
Systems Integration Support
Data Products
Risk Reduction on 3 Distinct Baselines
6,600Hard DrivesImaged
415 SWProductsV&V
1200 IAScans
130Test RPTs
59 UnitData PKGsTested
26 EngIntegrationExcursionsOver 2300
SW Updates
22 BCT Rotations
2 Division Rotations + 2 Division Prep
1 Corps Rotation + 1 Corps Prep
22 CTC Spt
2 Div + 1 CorpsMRXs
144 DSE Tool Kits
148K CD Images
13K DVD Images
225 CableShop WO
1821 CablesProduced
335 Units’Digital MapRequests
Joint TestingJTT InterTECJCAS
117 DPProcessed
FY07 Accomplishments