cets 2011, jennifer de vries, handout for defusing landmines in elearning projects

2

Click here to load reader

Upload: chicago-elearning-technology-showcase

Post on 14-Apr-2017

219 views

Category:

Education


0 download

TRANSCRIPT

Page 1: CETS 2011, Jennifer De Vries, handout for Defusing Landmines in eLearning Projects

   

P.O. Box 1067, Elmhurst, IL 60126              [email protected]  630‐842‐1865 

eLearning Scoping Questions  1. Stakeholders/Owners and Results Needed 

a. What is the ultimate objective/goal for this project and its target audience? b. Who are the stakeholders and what will be their involvement? c. Who will be our primary point of contact (project owner) for tracking, progress reports and 

issue escalation? d. How will the client want to measure satisfaction, learning and/or performance? 

i. Post course survey ii. Pre and/or Post testing iii. Completion of course, including quizzes iv. Time taking the course 

2. Previous eLearning Projects and Expectations a. Has this group or client done an eLearning project before?   

i. If not, have they seen an eLearning course that they like?  Can they show it to you? If not, show them some eLearning courses and assess what they like and dislike. 

ii. If so, take a look at their existing eLearning course(s). Are they pleased with the result? What do they want to do the same/different? 

b. If they’ve done eLearning before, have they established templates, and style guides that they can provide? 

c. What development tool(s) did they use for their previous eLearning project? 3. Target Audience and Course Delivery 

a. Who is the target audience for this course? i. Where are they located? ii. What OS and browsers do they use? iii. What internet connection speed can you assume they have? iv. Are there any firewalls or corporate IT policies that may prevent access to certain 

file types? b. Does the client have a Learning Management System?   

i. Which one?   ii. Is it SCORM or AICC conformant? iii. Have they used it to deliver courses to the target audience? 

4. Existing Content a. What existing content do they have on this topic? Is it current and relevant, or does it need 

work? b. What format is the content in? (e.g. PPT, .doc, .pdf, ILT, people’s heads) c. How solid is the content?  Does it change frequently, regularly, or it is relatively evergreen? d. How much content needs to be covered?  Try to get a feel for the target course length based 

on conversations and what exists.  Does their desired course length make sense in light of what you can see? 

e. Who are the SMEs for this topic and what role do you want them to play?  Explain the different ways that you can work with SMEs and have them select what would work best for them. 

   

Page 2: CETS 2011, Jennifer De Vries, handout for Defusing Landmines in eLearning Projects

   

P.O. Box 1067, Elmhurst, IL 60126              [email protected]  630‐842‐1865 

5. Course Development/Production a. Does the client have a preference for certain authoring tools? (e.g. Articulate, Captivate, 

Lectora, Toolbook, Other)  Or does the client have a Learning Content Management System that they want to use? (e.g. CourseAvenue, DominKnow, Xyleme, etc.) 

b. Will the client provide photos?  Videos?  Graphics? Do you need to use a stock library or create new media? 

c. Does the client want voiceover?  If so, do they have a particular voice that they always use? d. Discuss the process that you will use to develop the course and ask how many 

review/revision cycles they’d like at each stage? i. Course Design Document ii. Storyboards iii. Alpha version of the course running outside the LMS iv. Beta version of the course running inside the LMS 

e. Will they be doing a beta test of the course with some target audience members?  

 

eLearning Development Project Kick‐off Items 

The premise of the project kick‐off meeting is to get everyone on the same page with regard to the project process, parameters, timeframes, roles and responsibilities. 1. Team introductions 2. Goals for the project (stakeholder/project owner) 3. Work Process ‐‐ Go over the work process and timeframes for the project, including the deliverables 

and number of review/revision cycles.  Show sample deliverables, if appropriate. 4. Roles and Responsibilities ‐‐ Discuss roles and responsibilities and time commitments (including 

SMEs and Project Owner).  Air any disagreements and make sure everyone is on‐board and ready to do their part. 

5. Tools and Templates ‐‐ Confirm the tools and templates that will be used for the project. 6. Branding/Style Guidelines ‐‐ Ask for branding/color/writing style guidelines, if you don’t already 

have them. 7. Visuals and Media Elements ‐‐ Discuss visuals for the course.  Where will the photos, graphics, and 

any other media elements come from?  Get access to the appropriate photo library, if there is one. 8. File Sharing and Version Control ‐‐ Discuss methods for file sharing.  How do you best exchange files 

and track versions?  What methods will the whole team use for that? 9. Action Items and Next Steps ‐‐ Change the project plan, as needed, based on the discussion.  If 

necessary, ask client contact to clarify roles/responsibilities, get people on‐board.  If client roles or other scope items have changed, discuss cost of changes with client in an appropriate setting.