close - lntecc · which will enable the user to plan, execute and reconcile easily through it...
TRANSCRIPT
The
Team
Mr. M. Ramkumar Vice President & Head – HCP
(Pipelines)
Mr. A. Radharaman Vice President & Head – HCP (Process Plant Construction)
Mr. T CHINNAPPA Executive Vice President &
Head-HCP (Domestic)
B Puhazhendi General Manager-HCP
(Process Plant Construction)
C Chokkalingam General Manager-HCP
(Pipelines)
` `
In House Faculty Co-ordinators
K. N. Sen Head-HSE
K.Rajeevan Head-Engineering
Ravi Shanmugam Head-
Information Systems
P. Nageswara Rao Task Force Leader-
Mangalore Projects
S Murali Head-Finance &
Accounts
J Joseph Amalraj Head-QM & QA
Manjit Singh Head-P&M
Pradip P Gandhi Head-Operations
(Process Plant Construction)
C S Sundaram Head-Human
Resources
P Vellaipandi Head-Materials
Raghunath Rautray Head-Site
Administration
Tell me and I forget, Teach me and I remember, Involve me and I learn. -Benjamin Franklin -Author/politician
EIP 2010
- Supply Chain Management
OBJECTIVE
Enhanced understanding of the EIP
BROAD CONTENTS/ COVERAGE
EIP 2010 – Introduction SCM – Pre-Requisite of Parameters SCM – Full Cycle of Operation in EIP SCM – e-Document Flow in EIP SCM – Discussion (Issues &
Resolution)
VENUE
Chennai-HQ
FACULTY CO-ORDINATOR
Ravi Shanmugam
TARGET GROUP
Store Keepers & Store Managers
DURATION
1 Day
e-ALPS-Equipment Quantity Surveying and Execution Planning
OBJECTIVE
To create awareness about the newly
developed e-ALPS Equipment Module,
which will enable the user to plan, execute
and reconcile easily through IT enablement
Introduction to e-ALPS system
Overview of existing system EASYTRACK – Equipment
module
Overview of e-ALPS Equipment Module
Importance of IT data flow from other disciplines
(Civil, Structural and Piping)
Execution Planning
Quantity Survey : Client Invoicing and S/C Billing
Report generation for planning and billing
through system
MRN, MRIR, MIV, MRV through e-ALPS & Practical session
on usage e-ALPS
BROAD CONTENTS / COVERAGE
DURATION
2 days
FACULTY CO-ORDINATOR
Sainath Kusumanchi
TARGET GROUP
All Equipment Engineers VENUE
HQ-Chennai
OBJECTIVE
To identify as well as ascertain root causes of any incidents and effective methods to prevent the same.
BROAD CONTENTS / COVERAGE
Myths of Incident Investigation
Tools for Root cause analysis
Prevention of Incidents
Post Incident Management
TARGET GROUP
HSE (S-1 and Above)
VENUE
WRO
DURATION
2 Days
FACULTY CO-ORDINATOR
K. N.Sen
OBJECTIVE
BROAD CONTENTS / COVERAGE
VENUE
HQ-Chennai
TARGET GROUP Civil & Mechanical
(O2 to M1C)
DURATION
3 days
FACULTY CO-ORDINATOR
Yamini Kanta Tripathy
Costing & Cost Control Systems
To enhance the Costing and Cost Control skills of
Costing Engineers
Cost Estimation fundamentals for Civil, Mechanical and IDC Heads
ACE/JCR Preparation
Use of EIP for Costing and Cost Control and
Revenue Ledger Reconciliation
Surface Preparation & Protection
OBJECTIVE
BROAD CONTENTS / COVERAGE
To impart knowledge on Surface preparation & Painting per codes and standards
Surface Preparation Methods, Painting applications and Inspection methods
TARGET GROUP
S2 to M1B (Mechanical)
VENUE
WRO
DURATION
2 days
FACULTY CO-ORDINATOR
J.Joseph Amalraj
Effective Communication Skills
OBJECTIVE
Impart techniques/tools for improved &
Effective communication
BROAD CONTENTS / COVERAGE
Understanding communication/types &
dimensions of Communication
TARGET GROUP
All Disciplines
O-1 to M1-C
VENUE
ERO
DURATION
2 Days
FACULTY CO-ORDINATOR
Shovan Kumar Ghosh
Integrated Project Planning & Control (I-EPC)
OBJECTIVE
BROAD CONTENTS / COVERAGE
TARGET GROUP
Civil, Mechanical -
Site exposure (at least
one year)
(O-1 to M1-A)
VENUE
HQ-Chennai
DURATION
5 days
Create an awareness about I-EPC
Concept & planning Tool i.e.
Primavera
Introduction to I-EPC concept,
e-ALPS,IPMS, P&M & Resource
Planner
Case Study & discussion on
outputs
Discussion on Subcontract
Management
Primavera Training
FACULTY CO-ORDINATOR
R Swapnil Nashikkar
e-ALPS-Civil Quantity Surveying and Execution Planning
Create awareness about Quantity Surveying and Execution planning through e-ALPS-Civil.
Overview-Quantity Surveying and Estimation Overview -I-EPC planning Overview -Execution planning Overview -Tekla Software and its usage. It enablement on Quantity Estimation/CADSRC Software Site facilities planning Subcontracts strategy/Constructability Study e-ALPS-Civil introduction and usage as Execution planning
tool. Hands on e-ALPS Civil, Tekla, Quantity Surveying Software
VENUE
HQ-Chennai/Vadodara
TARGET GROUP
Civil (O1 to M1A)
DURATION
4 days
FACULTY CO-ORDINATOR
Rahul Singh
OBJECTIVE
BROAD CONTENTS / COVERAGE
January
Anyone who stops learning is old,
whether at twenty or eighty. Anyone who keeps learning stays young.
The greatest thing in life is to keep your mind young.
-Henry Ford -Industrialist
e-ALPS-Piping Quantity Surveying and Execution Planning
Create awareness about Quantity Surveying and Execution planning through e-ALPS-Piping
OBJECTIVE
BROAD CONTENTS / COVERAGE
e-ALPS Enhancement Drawing/Material flow Workpack allocation/easyTRACK, AutoSpool (Joint Marking) Stores Management, Master Setup, Quantity Survey, Milestone
Management, Activity planning fabrication, Activity planning
erection
February
Learn from yesterday, live for today, hope for tomorrow. The important thing is not to stop questioning. - Albert Einstein Physicist/Mathematician
Indirect Taxation
BROAD CONTENTS /COVERAGE
Compliance requirement under VAT and Service tax
OBJECTIVE
VENUE
HQ-Chennai
TARGET GROUP
Site Accountants/Tendering Team/
BU Coordinators
DURATION
1 day
FACULTY CO-ORDINATOR
P.Ravi Kumar
To explain the documentation and
calculation methodology
March
Our greatest weakness lies in giving up. The most certain way to succeed is
always to try just one more time -Thomas Edison
- Inventor
TARGET
GROUP
TA/CA , S1-O2
VENUE
Job
Sites/Depots
DURATION
2 days
FACULTY
COORDINATOR
Manjit Singh
CRAWLER CRANES- OPERATION/MAINTENANCE &
REPAIR
OBJECTIVE
To give exposure on Crawler cranes operation,
maintenance and repair
BROAD CONTENTS /COVERAGE
Hydraulic Crawler cranes
i)Maintenance ,Trouble
Shooting & Operation
procedure
ii)Safe usage of cranes
iii)Safe rigging procedure
OBJECTIVE
Enhanced understanding of the EIP
BROAD CONTENTS/ COVERAGE
EIP 2010 – Introduction CRM – Pre-Requisite of Parameters CRM – Full Cycle of Operation in EIP CRM – e-Document Flow in EIP CRM – Discussion (Issues & Resolution) EPM – Provision / ETC JCM - Cost Processing
DURATION
1 Day
FACULTY CO-ORDINATOR
Ravi Shanmugam
TARGET GROUP
Planning & Billing Engineers
VENUE
Chennai-HQ
EIP 2010 -
Customer Relation Management & EPM