Executive summary

Most of the requirement of energy is currently being met by coal, around 70 per cent contributing only to electricity requirements. It is being employed by all major sectors and is an important contributor to the growth situation in India. Given the importance of coal in India's energy mix and also its increasing use in industries like power, steel and cement, coal blocks were allotted under captive deals to companies in above mentioned sectors.

Ministry of Coal has allocated 216 coal blocks so far to different consumers. State and Central Government companies are being allotted coal mining blocks without restriction of captive mining. Out of these 216 coal blocks 28 coal blocks have started Production and 8 blocks have been de-allocated by Ministry of Coal.

As far as lignite blocks are concerned, so far, a total number of 29 lignite blocks have been allocated. Out of these, 20 blocks have been allocated to government companies and 9 blocks to private companies. However, one lignite block allotted to Tamil Nadu Industries Captive Power Company Limited TIPACO was de-allocated. Production of lignite has started in 9 blocks allotted to government and at 2 blocks allotted to private company.

An ambitious target of 656 MT of production of coal was kept for 2010-2011 but the actual production during the year was only 527 MT resulting in around 20 per cent shortfall against the target. The concerted efforts to remove regulatory hurdles could help boost India's coal output by 7 per cent to 8 per cent by the next fiscal, the terminal year for the XI Five year plan. However, MoC has estimated the coal production for 2011-12 to be 559 MT.

Out of total number of 208 coal blocks the major chunk of coal blocks have been allocated to Power sector with reserves of 28.7 billion tonnes put of the total reserves of 50 billion tonnes for captive coal mining, followed by Iron and steel sector and Commercial mining.

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

Page 3: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

Coal India Limited (CIL) along with its 8 subsidiaries supplies 80 per cent of the coal requirement in the country and has still not been able to plug the gap between demand and supply, there remains a need for private expenditure in developing coal mines for captive use to plug the gap.

The much awaited coal reforms to open up the sector has been debated for quite a long time and it is yet to see the light of the day. Forming of Coal regulator, competitive bidding of coal blocks is in the pipeline of coal ministry's agenda.

Keeping in view the robust growth in the Indian economy, Coal India Limited (CIL) and its subsidiary companies are striving to do their best to increase coal production despite the difficult conditions existing in several coal fields and also keeping in view the constraint faced by the nation of the need to strike an appropriate balance between the energy needs of the country and the environmental concerns associated with coal mining and by taking appropriate steps to address these concerns.

This report not only provides the comprehensive details of more than 200 Captive Coal Blocks along with 28 Lignite Blocks allotted to different companies but also covers the end-use progress of linked power projects, cement projects, iron and steel projects and other projects. This report highlights the status of each block, key regulatory clearances obtained and issues pertaining to the progress of the project.

Page 4: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

Table of Contents

Executive Summary

Abbreviations & Units

1. Coal Mining in India – An Overview

2. Demand-Supply Scenario of Coal in India

?Demand-Supply Scenario

?Projections of demand-supply gap at the end of XI and XII Plan

?Sector-wise demand in the terminal year of XI and XII plan

?Demand Projections for coal in power sector

?Coal Requirement and supply for the year 2011-12 in respect of plants designed on domestic coal

3. Captive Coal Mining in India

?Share of Captive Coal Production

?4 years production figures from captive coal blocks

?Value chain of captive coal development

?Coal and Lignite map of India

4. Legal framework and guidelines for captive coal mining in India

?Procedure for identification of coal block

?Eligibility for allocation of coal block

?Existing systems for allocation of coal blocks

?General conditions of allocation of blocks

?Disposal of coal during development phase

?Major milestones in mine development plan

?Follow up steps after allocation

?Mechanism to monitor development of allocated blocks

?Total coal blocks allocated as on March 31, 2011

5. Major Issues and Challenges faced by coal block developer

?Techno Commercial Issues

?Socio Political Issues

?Environment & Forest Issues

6. State-wise details of captive coal and lignite blocks with end-use details

A. List of Allocated Captive Coal Blocks

?Andhra Pradesh (Coal Block Map)

o Anesettipali Coal Block

o Pengadappa Khammam Coal Block

o Punkula Chilka Coal Block

o Tadicherla - I Coal Block

Page 5: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

?

? Chattisgarh (Coal Block Map)

o Bhaskarpura Coal Block

o

o Dahegaon Makardhok Coal Block

o Durgapur II / Sariya Coal Block

o Durgapur II / Taraimar Coal Block

o Fatehpur Coal Block

o Fatehpur East Coal Block

o Gare Palma - IV/2 Coal Block

o Gare Palma - IV/3 Coal Block

o Gare Palma - IV/4 Coal Block

o Gare Palma - IV/7 Coal Block

o Gare Palma ( Sector -I) Coal Block

o Gare Palma ( Sector -II) Coal Block

o Gare Palma IV /6 Coal Block

o Gare Palma IV/8 Coal Block

o Gare Palma Sector - III Coal Block

o Gidhmuri Coal Block

o Gotitoria East Coal Block

o Gotitoria West Coal Block

o Kanta basan Coal Block

o Kesla North Coal Block

o Madanpur (North) Coal Block

o Madanpur South Coal Block

o Morga - I Coal Block

o Morga - II Coal Block

o Morga III Coal Block

o Morga IV Coal Block

o Nakia I Coal Block

o Nakia II Coal Block

o Parsa Coal Block

o Parsa East Coal Block

o Paturia Coal Block

o Pindrakhi Coal Block

o Puta Parogia Coal Block

o Rajgamar Dipside Coal Block

o Sayang Coal Block

Shankarpur Bht II & Ext Coal Block

Arunachal Pradesh (Coal Block Map)

o Namchik Namphuk Coal Block

o

Chotia Coal Block

Page 6: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

o Sondiha Coal Block

o Talaipalai Coal Block

o Tara Coal Block

?Jharkhand (Coal Block Map)

o Amarkonda Muragdangal Coal Block

o Ashok Karkata central Coal Block

o Badam Coal Block

o Banhardih Coal Block

o Brahmini Coal Block

o Brinda Coal Block

o Bundu Coal Block

o Burakhap Small Patch Coal Block

o Chakla Coal Block

o Chatti Bariatu Coal Block

o Chhati Bariatu South Coal Block

o Chichro Patsimal Coal Block

o Chitrapur Coal Block

o Choritand Tailaiya Coal Block

o Dumri Coal Block

o Ganespur Coal Block

o Gomia Coal Block

o Gondulpura Coal Block

o Jitpur Coal Block

o Jogeswar & Khas Jogeswar Coal Block

o Kathautia Coal Block

o Kerandari BC Coal Block

o Kerandari Coal Block

o Kotre Basantpur Coal Block

o Lalgarh ( North) Coal Block

o Latehar Coal Block

o Lohari Coal Block

o Macherkunda Coal Block

o Mahal Coal Block

o Mahuagarhi Coal Block

o Mednirai Coal Block

o Meral Coal Block

o Moitra Coal Block

o Mourya OC Coal Block

o North Dhadu Coal Block

o Pachmo Coal Block

Page 7: Coal Block Done

o Pakri Barwadih Coal Block

o Panchwara Central Coal Blok

o Panchwara North Coal Block

o

o Patal East Coal Block

o Patratu Coal Block

o Pindra Debipur Khaowatand Coal Block

o Parbatpur- A to C Coal Block

o Rabodih OCP Coal Block

o Rajbar E& D Coal Block

o Rajhara North (Central & Eastern ) Coal Block

o Rauta Closed Mine Coal Block

o Rohne Coal Block

o Saharpur Jamarpani Coal Block

o Saria Koiyatand Coal Block

o Sasai Coal Block

o Seregarha Coal Block

o Sitanala Coal Block

o Sugia Closed Mine Coal Block

o Tasra Coal Block

o Tenughat Jhikri Coal Block

o Tokisud North Coal Block

o Tubed Coal Block

o Umra Paharitora Coal Block

?Madhya Pradesh (Coal block map)

o Amelia (North) Coal Block

o Amelia Coal Block

o Bicharpur Coal Block

o Bikram Coal Block

o Brahmpuri Coal Block

o Chatrasal Coal Block

o Dongeri Tal -II Coal Block

o Mahan Coal Block

o Mandla North Coal Block

o Mandla South Coal Block

o Mara II Mahan Coal Block

o Marki Barka Coal Block

o Moher Amlori Extention Coal Block

o Moher Coal Block

o Ravanmara North Coal Block

o Saharpur East Coal Block

Parbatpur Coal Block

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

Page 8: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

o Saharpur West Coal Block

o Sial Ghogri Coal Block

o Simaria / Piparia Coal Block

o Shankarpur Bht II & Ext Coal Block

o Sondiha Coal Block

o Talaipali Coal Block

o Tara Coal Block

o Suliyari Belwar Coal Block

o Tandsi III & Tandsi III Extn Coal Block

o Thesgera / Rudrapur Coal Block

o Urtan North Coal Block

?Maharashtra (Coal block map)

o Agarzari Coal Block

o Bander Coal Block

o Baranj - I Coal Block

o Baranj - II Coal Block

o Baranj - III Coal Block

o Baranj - IV Coal Block

o Belgaon Coal Block

o Bhandak West Coal Block

o Bhivkund Coal Block

o Chinora Coal Block

o Gondhkhari Coal Block

o Khappa Extention Coal Block

o Kiloni Coal Block

o Kosar Dongergaon Coal Block

o Lohara West Extention Coal Block

o Majra Coal Block

o Manora Deep Coal Block

o Marki Mangli - I Coal Block

o Marki Mangli -II Coal Block

o Marki Mangli -III Coal Block

o Marki Mangli -IV Coal Block

o Marki - zari Jamani Adkoli Coal Block

o Neard Malegaon Coal Block

o Warora (West ) Southern Part Coal Block

o Warora (West) North Coal Block

o Warora Coal Block

" Orissa (Coal block map)

o Baitarni West Coal Block

Page 9: Coal Block Done

o Bankhui Coal Block

o Bijahan Coal Block

o Chendipada - II Coal Block

o Chendipada Coal Block

o Dip Side of Meenakshi Coal Block

o Dip side of Rampia Coal Block

o Machhakata Coal Block

o Mahanadi Coal Block

o Mandakini A Coal Block

o Mandakini B Coal Block

o Manoharpur Coal Block

o Meenakshi B Coal Block

o Meenakshi Coal Block

o Naini Coal Block

o New Patrapara Coal Block

o North of Akrapal Srirampur Coal Block

o Nuagaon Telisahi Coal Block

o Radhikapur ( East ) Coal Block

o Radhikapur (West ) Coal Block

o Ramchandi Promotional Block Coal Block

o Rampia Coal Block

o Talabira II Coal Block

o Talabira III Coal Block

o Utkal - A Coal Block

o Utkal - E Coal Block

o Utkal - B1 Coal Block

o Utkal -B2 Coal Block

o Utkal -C Coal Block

o Utkal -D Coal Block

?West Bengal (Coal block map)

o Andal East Coal Block

o Ardhagram Coal Block

o Barjora Coal Block

o Barjora North Coal Block

o Biharinath Coal Block

o East of Damagoria Coal Block

o Gangaramchak Bhadulia Coal Block

o Gangaramchak Coal Block

o Gourangdih ABC Coal Block

o Ichapur Coal Block

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

Page 10: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

o Jaganathpur A Coal Block

o Jaganathpur B Coal Block

o Khagra Joydev Coal Block

o Kulti Coal Block

o Moira Madhujore Coal Block

o Sarshatolli Coal Block

o Sitarampur Coal Block

o Trans Damodar Coal Block

B. Lignite Blocks

o Akrimota Lignite Block

o Giral Lignite Block

o Gurha East Lignite Block

o Gurha West Lignite Block

o Indawar Lignite Block

o Jalipa Lignite Block

o Kaprion-ki-Dhani Lignite Block

o Kapurdih Lignite Block

o Kasnau-Igiya Lignite Block

o Khadsaliya II Lignite Block

o Kharsalia-I Lignite Block

o Lunsara Lignite Block

o Madana-Modh Lignite Block

o Matasukh Lignite Block

o Merta Road Lignite Block

o Mokhala Lignite Block

o Mondal Charan Lignite Block

o Mongrol Valia Lignite Block

o Nimbri Chandrabadan Lignite Block

o Panandhro Lignite Block

o Rajpardih G-19 Extn. Lignite Block

o Rajpardih Lignite Blocks

o Sacha Sauda Lignite Block

o Shivkar Kurla Lignite Block

o Soneri Lignite Block

o Surka III Lignite Block

o Tadkeswar Lignite Block

o Vastan Lignite Block

C. Deallocated Captive Coal Blocks

o Takli Jena Bellora (North)

o West of Umaria

Page 11: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

o Panchbahani

o Jainagar

o Kasta (East)

o Datima

o Lohara (East)

o Agarzari

o Tenughat Jhikri

o Mahal

8. State-wise and sector-wise coal block analysis

9. Summary and Conclusion

10. Annexure

1. Requests by various state governments for the allocation of coal blocks

2. Exploration status of Captive Coal Blocks

3. State-wise Coal Block Allocation

4. Coal Resources identified by GSI during the last three years

5. Details of 205 Coal Blocks

Page 12: Coal Block Done

®

Metis Knowledge SeriesAn Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

K Rnowledge edefined

List of Figures and Tables

Tables

2.1 Year-wise demand-supply scenario-delete

2.2 Projections of demand-supply gap at the end of XI and XI plan

2.3 Sector-wise coal demand in the terminal year of XI and XII plan

2.4 Demand projection for coal in power sector

3.1 Four years production figures from captive coal blocks

4.1 Total coal blocks allocated as on March 31, 2011

8.1 State-wise geological resources of coal

Figures

1.1 Progress of Coal Sector

2.1 Year-wise demand-supply scenario

3.1 Share of captive coal production

3.2 Value chain of captive coal development

4.1 Three routes for allocation of coal blocks

4.2 Major milestones in mine development

5.1 Issues and challenges faced by captive coal block developer

7.1 State-wise block allocation

7.2 Sector-wise allocation of coal reserves

7.3 Sector-wise allocation by number of blocks

8.1 Measures pertaining to captive coal mining

8.2 Steps Taken by Ministry of Coal to increase production

Page 13: Coal Block Done

K Rnowledge edefined

®

Metis Knowledge Series

An Exhaustive Coverage :

Status of Captive Coal & Lignite

Blocks along with End-Use Projects

+91 9999 221 [email protected]

7

CONTACT US