Page 1: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 1

COGENERATIONCOGENERATION

in in

BELIZEBELIZEBy By

Robert TillettRobert TillettChief Plant EngineerChief Plant Engineer

Belize Sugar Industries LimitedBelize Sugar Industries Limited

Page 2: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 2

CONTRIBUTION OF SUGAR CONTRIBUTION OF SUGAR SECTORSECTOR

2000 1993

Numbers Employed 10290 7970

TO EMPLOYMENTAs A Percentage of Working Population 12.2 11.6

As A Percentage of Employment in Agriculture 44.3 38.6

Page 3: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 3

CONTRIBUTION OF SUGAR CONTRIBUTION OF SUGAR SECTORSECTOR

2000 1993

TO ECONOMY

Sugar Industry Revenueas % of GDP 6.2 9.8

Sugar Industry Revenueas % of Total AgriculturalProduction 49.4 68.8

Page 4: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 4

CONTRIBUTION OF SUGAR CONTRIBUTION OF SUGAR SECTORSECTOR

2000 1993FOREIGN EXCHANGEEARNINGS

USD (Million) 37.6 42.7

% of Value of Domestically Produced Exports 18.9 37.5

% of Value of Agriculture Exports 21.4 48.3

NB: Average Foreign Exchange Earnings 1991-2000 USD 44.3 Million

Page 5: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 5

Why Cogeneration ?Why Cogeneration ?

Mitigate the Impact of External ShocksMitigate the Impact of External Shocks

While the Sugar Industry in While the Sugar Industry in Belize is still strong, it is Belize is still strong, it is stagnantstagnantDeclining Cane ProductionDeclining Cane ProductionIncrease cost as a result of being Increase cost as a result of being import dependent especially import dependent especially shipping and insuranceshipping and insuranceThreats to Existing MarketsThreats to Existing Markets

Page 6: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 6

External Market Threats:External Market Threats:

WTO challenge to EU Regime by WTO challenge to EU Regime by Australia, Brazil, and ThailandAustralia, Brazil, and ThailandEPA Negotiations set 2008 deadline to EPA Negotiations set 2008 deadline to dismantle present market accessdismantle present market accessEU CAP Reform EU CAP Reform -- reduce quotas & reduce quotas & price but increase quality demandprice but increase quality demandEBA Initiative EBA Initiative –– LDC’sLDC’s market market preference reduced SPS access by 33%preference reduced SPS access by 33%Continued Oversupply of Sugar to the Continued Oversupply of Sugar to the World MarketWorld Market

Page 7: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 7

Why Cogeneration ?Why Cogeneration ?

Provide opportunity for Sugar Provide opportunity for Sugar Industry Expansion to Increase Industry Expansion to Increase Throughput and further value Throughput and further value added such as a Sugar Refinery added such as a Sugar Refinery and Ethanol Productionand Ethanol Production

Provide Steam CapacityProvide Steam Capacity

Provide Power & EnergyProvide Power & Energy

Page 8: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 8

Why Cogeneration ?Why Cogeneration ?

Provide for Value Added Income To Provide for Value Added Income To BSIBSI

Provide Investment Opportunity Provide Investment Opportunity and Security of Market To Farmersand Security of Market To Farmers

Provide Fossil Fuel Displacement Provide Fossil Fuel Displacement and Import Substitutionand Import Substitution

Provide Needed Power to the GridProvide Needed Power to the Grid

Page 9: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 9

Why Cogeneration ?Why Cogeneration ?

Environmental BenefitsEnvironmental Benefits

6400 tons/yr to be reduced to 240 6400 tons/yr to be reduced to 240 tons/yr of Fly Ashtons/yr of Fly Ash

Reduce Air pollution to below 100 Reduce Air pollution to below 100 mg/normal meter cubemg/normal meter cube

No water Pollution from No water Pollution from Cogeneration and provide Cogeneration and provide additional power to BSI for Water additional power to BSI for Water TreatmentTreatment

Page 10: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 10

Cogeneration ModelsCogeneration Models

Island economies: Guadeloupe, Reunion, Mauritius

Growing energy demand (from tourism)

Generally power utility as developer ; (power plants are power stations)

Strong preferential sugar markets

Reliance on imported fossil fuels

Government support

Page 11: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 11

In-house: owned and operated by sugar factory (India, Brazil, Guatemala)

Low cost and rates

Interrupted power supply contracts

Incremental revenue

Unattractive to third party investors (IPPs)Some government support

Cogeneration ModelsCogeneration Models

Page 12: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 12

Biomass IPP: BELIZE, Kenya, Guyana

Attractive to third party investors

Long-term, guaranteed base load supplyMinimal fossil fuel

“Green” Credentials which attract Carbon Credits

Cogeneration ModelsCogeneration Models

Page 13: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 13

TECHNICAL COMPARISONTECHNICAL COMPARISON

Industry Bagasse Coal RatiokWh/tc

Mauritius 10 360 420 60

Guatemala 1 6 242 179 27

Hawaii 2 12 60 3

No of factories

GWh

n/a

Annual export energy

Notes: 1: Concepcion, Magdalena, Madre Tierra, Pantaleon, Santa Ana, La Union

2: 1980 - 89 data

3: Gross energy (including factory usage)

Belize 1 80 12 66

Page 14: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 14

CARBON CREDITSCARBON CREDITSCarbon market undeveloped

Opportunity to Access Dutch Clean Development Mechanism (CDM) Funds

Baseline Study to Quantify Carbon Credits

Valuation uncertain

Carbon Credits will largely be channeled to consumers through the PUC

Page 15: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 15

OVERVIEW OF COGENERATION PROJECTOVERVIEW OF COGENERATION PROJECT

Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant

Capital Cost of the Cogeneration Plant US $ 34 MCapital Investment to upgrade Tower Hill Factory US $ 8 M

Owned and Operated as a Private Sector Commercial Operation by

Belize Cogeneration Energy Limited (BELCOGEN)Supply approximately 20% of the National Capacity Demand by 2007Generate Power and Steam to Supply Tower Hill Factory

Project is the initiative of BSI as Project Promoter

BSI has engaged Booker Tate as the Project Developer

Commencement of Full Commercial Operation December 2006

Page 16: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 16

Project DescriptionProject DescriptionPower Plant Design - key elements

Parallel 15 MW turbo-alternator for an installed capacity of 30 MW, generating at 13.8 kV and then transformed to 115 kV

Powered by

Parallel 125 - 135 t/h boiler (bagasse and oil) Steam quality: 82bar A, 540 oC

that will utilize

390,000 tonnes of bagasse

Annual storage of approximately 86,000 tonnes.

Page 17: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 17

Project DescriptionProject DescriptionKey Project Technical ParametersKey Project Technical Parameters

1.22 M tonnes of cane390,000 tonnes of bagasse to IPP

6000 tonnes of Bunker “C” fuel oil

13.5 MW power to BEL (year round)

9 MW power to BSI

465,000 tonnes of process steam to BSI

Page 18: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 18

Projected Allocation ofProjected Allocation ofCapacity and Energy ProductionCapacity and Energy Production

Grid IPP BSI TotalCapacity MW 13.5 2.5 9.0 25.0

Energy Supply GWh 90.4 15.8 39.2 145.4

Time Utilization % 90

Represent 20% of grid demand by 2007 and therefore must be efficient, reliable, stable base load and environmentally sound.

Page 19: COGENERATION in BELIZE - SICA 4/15/2004 15 OVERVIEW OF COGENERATION PROJECT Development, Construction & Operation of a 30MW Installed Capacity Cogeneration Power Plant Capital Cost

4/15/2004 19

This has been a presentation of This has been a presentation of

Cogeneration Cogeneration

in Belize in Belize

By By

Robert TillettRobert TillettChief Plant EngineerChief Plant Engineer

Belize Sugar Industries LimitedBelize Sugar Industries Limited

Thanks for Your Thanks for Your Attention!!!Attention!!!