colusanet’s wisp tower project

88
ColusaNET’s WISP Tower Project www.do-it-yourself- tower.com This presentation chronicles the complete installation of a 150’ Self Supporting Tower including the entire foundation project.

Upload: others

Post on 12-Sep-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ColusaNET’s WISP Tower Project

ColusaNET’s WISP Tower Project

www.do-it-yourself-tower.com

This presentation chronicles the complete installation of a 150’ Self Supporting Tower including the entire foundation project.

Page 2: ColusaNET’s WISP Tower Project

This presentation and all photographs:

© Copyright, 2003 Rick Kunze, all rights reserved.

No part of this presentation may be reproduced or used without permission.

Page 3: ColusaNET’s WISP Tower Project

Topics Covered in this Presentation:

•Tower Selection•Engineering Information•Make a Plan •Foundation Preparation •Making the J-Bolt Fixture •J-Bolt and rebar placement •Pouring the cement (monolithic) •Assembling the Tower Sections •Stacking the Tower Sections

Page 4: ColusaNET’s WISP Tower Project

Official Disclaimer and other boring issues

I am not a licensed contractor nor a licensed engineer.If you embark on a project such as a tower installation, as is presented here, as well as any other projects that may appear in the future on www.do-it-yourself-tower.com, you should seek appropriate professional advice. Erecting a tower is not a trivial undertaking. There are issues that must be engineered by qualified and trained professionals. You can not do this by guessing. A properly engineered tower will perform as it was designed, and will ensure maximum safety. DO YOUR HOMEWORK!

Page 5: ColusaNET’s WISP Tower Project

Tower Selection: How much tower do I really need?A) Figure out how much you can afford to spend on the entire

project for starters. In my case, the tower cost was about halfof the total cost of the entire project. Approximate dollaramounts for my situation will follow.

B) Find out what weather zone you’re in. Get to know your localbuilding inspectors, they’ll know. Pray they will like you.

C) Shop around for towers for a while, paying attention to the amount of wind load they’ll support for your zone, whether ice isin play, etc. Mine was a “2 carrier” tower.

C) Do some simple calculations to determine the amount of loading(surface area) you THINK you want on the tower. Then, allow for way more than that.

Page 6: ColusaNET’s WISP Tower Project

Tower Selection: How much tower do I really need?D) Factor reasonable growth into “C”, then double it.

E) Double or triple what you came up with in “D” above.

F) Multiply that by 10.

In other words, it was my intention to put up as much tower as Icould possibly afford. A renter might come along. One renter could pay for the entire tower over a few years.

My “two carrier” tower is designed for 2 of those standard issue tri-angular platforms you see everywhere, each loaded with sector panels, one at 140’ and one at 149’ for a total combined allowable surface area of about 100 square feet as well as a few thousand pounds of mass. I’m in a zone rated at 75MPH maximum wind and no radial ice.

Page 7: ColusaNET’s WISP Tower Project

Engineering Information to get:I would recommend you acquire a copy of these and/or whatever isrequired by your building inspector and/or tower manufacturer.

1) ANSI/TIA/EIA-222-F-1996“Structural Standards for Steel Antenna Towers and AntennaSupporting Structures.”

This document cost me $104.00 downloaded. A quick search led me to Global Engineering Documents at www.global.ihs.com. I’m sure there are other sources too. Search for TIA/EIA-222.

Topics include; wind loading, paint, guys, foundations, climbing, maintenance to name a few. About 115 pages. It specifies the bolt tightening specifications most importantly. Probably worthhaving in any case. It’s full of tower related information.

Page 8: ColusaNET’s WISP Tower Project

Engineering Information to get:I would recommend you acquire a copy of these and/or whatever isrequired by your building inspector and/or tower manufacturer.

2) LRFD Specification 94“Specification for Structural Joints Using ASTM A325 or A490bolts.”

I found this document at www.boltcouncil.org and it was free, but itis a version only usable for reference. This document covers bolted parts, design of bolted connections, tightening specifications and other accepted procedures you might want to be familiar with. My tower specified grade A325 bolts. They came with the tower.

3) Rebar placement guidelines.Information on industry standards for the placement of reinforcing bar in concrete structures.

Page 9: ColusaNET’s WISP Tower Project

Get the drawings and make a plan1- I placed my PO and made a partial payment in order to obtain the drawings before starting anything.

2- Once I had the drawings, I decided on location: in the parking lot right next to the building, the logical place to put it in my case. Make sketches. Ask for advise from professional sources if you have to. Do your homework. Ask for help. Hire professionals when needed.

3- Inquire with planning department regarding set-backs or other applicable zoning issues if any.

4- Call for underground utilities check, usually free.

5- Get your checkbook ready

6- Check with www.fcc.gov to see if you have to register the tower.

Page 10: ColusaNET’s WISP Tower Project

Foundation Preparation

-or-

Realizing how few friendsyou really have.

Page 11: ColusaNET’s WISP Tower Project
Page 12: ColusaNET’s WISP Tower Project
Page 13: ColusaNET’s WISP Tower Project
Page 14: ColusaNET’s WISP Tower Project
Page 15: ColusaNET’s WISP Tower Project
Page 16: ColusaNET’s WISP Tower Project
Page 17: ColusaNET’s WISP Tower Project
Page 18: ColusaNET’s WISP Tower Project
Page 19: ColusaNET’s WISP Tower Project

Making the J-Bolt Fixture

Page 20: ColusaNET’s WISP Tower Project
Page 21: ColusaNET’s WISP Tower Project
Page 22: ColusaNET’s WISP Tower Project
Page 23: ColusaNET’s WISP Tower Project
Page 24: ColusaNET’s WISP Tower Project
Page 25: ColusaNET’s WISP Tower Project
Page 26: ColusaNET’s WISP Tower Project
Page 27: ColusaNET’s WISP Tower Project
Page 28: ColusaNET’s WISP Tower Project
Page 29: ColusaNET’s WISP Tower Project

J-Bolt and ReBar Placement

Page 30: ColusaNET’s WISP Tower Project
Page 31: ColusaNET’s WISP Tower Project
Page 32: ColusaNET’s WISP Tower Project
Page 33: ColusaNET’s WISP Tower Project
Page 34: ColusaNET’s WISP Tower Project
Page 35: ColusaNET’s WISP Tower Project
Page 36: ColusaNET’s WISP Tower Project
Page 37: ColusaNET’s WISP Tower Project
Page 38: ColusaNET’s WISP Tower Project

This is called a “standee”. These typically come from your rebar supplier and are bent per your specs. They get tied to the lower grid to support the upper grid.These need not be made of special steel, are not part of the structure and don’t get inspected.Be careful when you specify the dimensions.

Page 39: ColusaNET’s WISP Tower Project
Page 40: ColusaNET’s WISP Tower Project
Page 41: ColusaNET’s WISP Tower Project
Page 42: ColusaNET’s WISP Tower Project
Page 43: ColusaNET’s WISP Tower Project
Page 44: ColusaNET’s WISP Tower Project
Page 45: ColusaNET’s WISP Tower Project
Page 46: ColusaNET’s WISP Tower Project
Page 47: ColusaNET’s WISP Tower Project
Page 48: ColusaNET’s WISP Tower Project
Page 49: ColusaNET’s WISP Tower Project

Building Inspector needed at this stageYour building inspector will probably want to sign off on the foundation preparation before you go any further. Check with them before you get to this point to be safe. DON’T POUR CONCRETE WITHOUT CHECKING WITH YOUR INSPECTOR FIRST!

Special Inspection Required NextYou will probably have to hire a “Special Inspector” for the next stage, the pouring of the concrete. Your building inspector will specify whether this is necessary or not. They take samples of the cement and test them for overall strength to assure it meets thespecifications prescribed by the tower manufacturer, and they also act as an independent third party authority as to the grade of rebar and techniques used during the pour. They were also required after final stacking to verify the torque on the flange bolts in my case.

Page 50: ColusaNET’s WISP Tower Project

Pouring The Cement

Page 51: ColusaNET’s WISP Tower Project
Page 52: ColusaNET’s WISP Tower Project
Page 53: ColusaNET’s WISP Tower Project
Page 54: ColusaNET’s WISP Tower Project
Page 55: ColusaNET’s WISP Tower Project
Page 56: ColusaNET’s WISP Tower Project
Page 57: ColusaNET’s WISP Tower Project
Page 58: ColusaNET’s WISP Tower Project
Page 59: ColusaNET’s WISP Tower Project
Page 60: ColusaNET’s WISP Tower Project
Page 61: ColusaNET’s WISP Tower Project
Page 62: ColusaNET’s WISP Tower Project

Assembly of the TowerSections

Page 63: ColusaNET’s WISP Tower Project
Page 64: ColusaNET’s WISP Tower Project
Page 65: ColusaNET’s WISP Tower Project
Page 66: ColusaNET’s WISP Tower Project
Page 67: ColusaNET’s WISP Tower Project
Page 68: ColusaNET’s WISP Tower Project
Page 69: ColusaNET’s WISP Tower Project
Page 70: ColusaNET’s WISP Tower Project
Page 71: ColusaNET’s WISP Tower Project
Page 72: ColusaNET’s WISP Tower Project
Page 73: ColusaNET’s WISP Tower Project
Page 74: ColusaNET’s WISP Tower Project
Page 75: ColusaNET’s WISP Tower Project
Page 76: ColusaNET’s WISP Tower Project
Page 77: ColusaNET’s WISP Tower Project
Page 78: ColusaNET’s WISP Tower Project

Final Stacking of the Sections

Page 79: ColusaNET’s WISP Tower Project
Page 80: ColusaNET’s WISP Tower Project
Page 81: ColusaNET’s WISP Tower Project
Page 82: ColusaNET’s WISP Tower Project
Page 83: ColusaNET’s WISP Tower Project
Page 84: ColusaNET’s WISP Tower Project
Page 85: ColusaNET’s WISP Tower Project
Page 86: ColusaNET’s WISP Tower Project
Page 87: ColusaNET’s WISP Tower Project
Page 88: ColusaNET’s WISP Tower Project