  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    1/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 1 of 71 09 Jan., 06 Rev. A

    PRE-COMMISSIONING AND COMMISSIONING MANUAL

    1. GENERAL

    This manual covers the general requirements for the Pre-Commissioning and CommissioningWorks of Water and Wastewater Treatment Plants for Uong Bi 300MW Extension Power Plant,under the EPC contractor Vietnam Machinery Erection Corporation (LILAMA), which consists ofRaw Water Treatment System, Demineralization System, Wastewater Treatment Plant, andDomestic Wastewater Treatment Plant. These works shall commence after the completion ofinstallation work.

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    2/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 2 of 71 09 Jan., 06 Rev. A

    2. PRE-COMMISSIONING

    The purpose of pre-commissioning work is to check the actual condition of the plant and toperform necessary adjustments on the equipments in preparation for the commissioning work.

    Mechanical Equipment Pre-Commissioning includes the following steps:1. Flushing and Cleaning2. Chemical Preparation3. Filter Media Loading4. Resin Loading5. Oil Interceptor Check6. Trial Run

    Electrical & Instrument Equipment Pre-Commissioning includes the following steps:1. MCC Power Energize2. MCC Function Test3. Motor No-Load Test4. On-Off Valve Loop Test5. Instrument Loop Test6. System Function Test7. Input-Output Test8. Sequence Test

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    3/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 3 of 71 09 Jan., 06 Rev. A

    2.1. MECHANICAL EQUIPMENT PRE-COMMISSIONING

    1. FLUSHING and CLEANING Flush inside of pipe with water for few minutes until effluent is clear. Open valves slowly to flush all dirt, debris, excess sealant and scale. Clean inner surface of filters and exchanger vessels.

    2. CHEMICAL PREPARATION

    Pre-caution:1. Person who prepares harmful or dusty chemicals should wear suitable protective equipment.2. Training and advises shall be given to workers in order to understand the cause of harm that

    would occur while working with chemicals. Method of prevention and measures to be used

    in tending to the accident should be explained clearly to the workers.3. Provide water for cleaning within the place of preparation.4. Consider which chemical uses service water for dilution, and which one uses filtered water.

    Preparation:1. Alum is prepared as per the following procedure;

    1.1. Coagulation dissolving tank (10GBN10BB001) Fill the tank with filtered water until half of required level H Load 255.5 kg/day of alum (flake) into the tank via electrical hoist manually Further fill the tank with filtered water until required level H = 1,600 mm Start Agitator (10GBN10AM001) for 1 hour or until alum is dissolved

    1.2. Coagulation Feed Tank (10GBN10BB002)

    Open On-off valve (10GBN10AA301) manually from local SVB to transferdissolved alum at 10% concentration into feed tank by gravity.

    1.3. Illustration

    M

    H

    COAGULATION DISSOLVING

    TANK (10GBN10BB001)

    COAGULATION FEED TANK

    (10GBN10BB002)

    10GBN10AA301

    COAGULA TION FEED PUMP

    1A/B (10GBN11/12AP001)

    CLARIFIER TANK A

    (10UGE11BB001)

    COAGULATION DISSOLVING TANK

    AGITATOR (10GBN10AM001)

    ALUM 10%

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    4/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    5/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 5 of 71 09 Jan., 06 Rev. A

    Table 2: List of Filter Media:NO VESSEL TO BE

    LOADED

    KKS NO FILTER MEDIA QUANTITY

    1 Auto Gravity Filter 10GBB11/12AT001 Gravel 5.04 m3Sand 7.56 m3

    2 A/C Filter (Potable) 10GBB20AT001 Gravel 0.48 m3Activated Carbon 0.90 m3

    3 A/C Filter (Demin) A/B 10GCB11/12AT001 Gravel 1.2 m3Activated Carbon 2.34 m3

    4 A/C Filter (WWTP) 10GNB10AT001 Gravel 1.92 m3Activated Carbon 3.78 m3

    4. RESIN LOADING

    Precautions:1. It is important to cross check the resin volumes loaded into each vessel. Record the actual

    resin level in delivery form after backwashing and settling.2. A careful measurement of the freeboard (in delivery form) should be made, reported, and

    checked with the original design. If necessary, corrective action should be undertaken toeither load resin or download some.

    3. Whenever possible, avoid the direct contact of the active resin with the nozzles.4. Resins to be loaded are listed in Table 3.

    Procedure:1. Remove the top head of the vessel and top nozzle plate.2. Fill 1/3 of the vessel with water. Loading resin into water ensures that any air and dirt are

    floated off the resin and come out to the surface of the water. This will allow the resin bed tosit evenly & homogeneously throughout the height of column.

    3. Load the active resin as per the specified quantity.4. Load inert resin as per the specified quantity.5. Close the top head of the vessel.

    Table 3: List of Resin:NO VESSEL TO BE

    LOADEDVESSEL TAG NO RESIN QUANTITY

    1 Cation Exchanger A/B 10GCF11/12AT001 Dowex Mono C-600 1,725 LitersDowex IF-62 150 Liters

    2 Anion Exchanger A/B 10GCF21/22AT001 Dowex Mono A-500 2,225 LitersDowex IF-62 225 Liters

    3 M/B Exchanger A/B 10GCF31/32AT001 Dowex Marathon C 375 Liters

    Dowex Marathon A 475 Liters

    5. OIL INTERCEPTOR CHECK

    5.1. Make sure that all internal equipments are in place and no tools or other loose itemsare left in the interceptor.

    5.2. With the automatic closure device in oil chamber feed, fill all interceptor compartmentswith clear water to the outlet level.

    5.3. Check that the stainless steel automatic device follows the level of the water.

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    6/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 6 of 71 09 Jan., 06 Rev. A

    6. TRIAL RUN

    General:The following equipments shall undergo trial run to demonstrate that they can operate safelyand satisfactorily under the required operating conditions.

    1. Clarifier tank A/B (RWTS)2. Gravity filter A/B

    Manual backwash Auto backwash

    3. Demin Train A A/C filter A (Demin) soaking Manual regeneration Auto regeneration

    4. Demin Train B

    A/C filter B (Demin) soaking Manual regeneration Auto regeneration

    5. Clarifier tank (WWTP)6. Sludge receiver tank7. A/C filter (WWTP)

    Soaking Manual backwash Auto backwash

    Manual Backwash:It is very essential to perform manual backwash operation on each of Auto Gravity and Carbon

    Filters before operating to auto-mode so that foreign particle present in the media duringdelivery are washed out from the vessel. In this operation, preliminary adjustments of manual &actuator-operated valves, instrument set points, flowrate, etc. should also be done.

    Auto Backwash:When all necessary adjustments are completed, it is important to perform a trial run in automode for one cycle before performing the commissioning proper in order to counter-check theadjustments made. Final adjustments shall be done after one cycle, when necessary. Operationis the same as the commissioning operation (Refer to the section COMMISSIONING).

    Activated Carbon Soaking:Activated carbon is filled with internal pores where air may exist. Before backwashing, bed must

    be set in completely submerged condition to allow carbon pores to fill with water. Otherwise, thereduced density of carbon due to air in the pores may result in excessive backwash losses.

    Manual Regeneration:It is very essential to first perform manual regeneration and backwashing before setting to auto-mode so that preliminary adjustments in the plant can be done; such as manual and actuator-operated valves adjustment, instruments set points, flowrate adjustment, chemical dosingadjustment, etc. This is also essential for the resin in order to wash away foreign particlespresent during delivery. This step shall prepare the correct ionic exchanging capacity of resin.Manual regeneration literally means regeneration of each step of every unit in manual operation.

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    7/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 7 of 71 09 Jan., 06 Rev. A

    Automatic Regeneration:When all necessary adjustments and preparations are completed, it is important to perform a

    trial run in auto mode for one cycle before performing the commissioning proper in order tocounter-check the adjustments made. Final adjustments shall be made after one cycle, whennecessary. Operation is the same as the commissioning operation (Refer to the sectionCOMMISSIONING).

    Initial Resin Regeneration:Irrespective of the form delivered, the resin bed should receive at least a double amount ofregenerant compared to the design level. This means a double-injection-time only, whiledisplacement and rinse should be performed as per original design.

    First Run:Expected high water quality will be achieved only after final rinsing, after Mixed Bed Exchanger

    in the case of Demineralizer, but provided that endpoint is monitored correctly and the plant isnot overrun.

    Procedure:A. Manual and Auto Backwash Operation

    1. Set following pumps & blowers to manual mode operation in MCC and Local ControlPanel; Freshwater Supply Pump (10GAF10AP001) Backwash Water Pumps A/B (10GBK11/12AP001) Air Blowers A/B (10GBC11/12AN001) Filtered Water Transfer Pumps A/B (10GBK41/42AP001) Demin Feed Pumps A/B (10GCK11/12AP001)

    Clarified Water Transfer Pumps A/B (10GNK31/32AP001) Backwash Pumps A/B (10GNK61/62AP001)

    2. Set all actuator-operated valves used in Auto Gravity and Carbon filtering processinto manual mode operation in the Local Control Panel.

    3. Perform manual preliminary washing in each filter in order to wash away foreignparticles present in the media during delivery until the effluent is clear.

    4. Perform manual backwash operation in accordance with the Operation Chart andSequence of Auto Gravity and Carbon Filters, and P&ID.

    5. Make necessary adjustments in order to meet the required water quality.6. Perform backwash operation again, this time in auto backwash operation.7. Make final adjustments as required.

    B. Manual and Auto Regeneration Operation1. Set the following pumps and blowers into manual mode operation in the MCC and

    Local Control Panel; Demin Feed Pumps A/B (10GCK11/12AP001) Booster Pumps A/B (10GCK21/22AP001) Regeneration Pumps A/B (10GCK31/32AP001) Degasifier Blowers A/B (10GCH11/12AN001) HCl Feed Pumps A/B (10GCN11/12AP001) NaOH Feed Pumps A/B (10GCN21/22AP001)

    2. Set all actuator-operated valves used in Demineralizer into manual modeoperation in the Local Control Panel.

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    8/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 8 of 71 09 Jan., 06 Rev. A

    3. Perform manual regeneration of Demineralizer in accordance with OperationChart and Sequence of Demineralization Train A & B by train and P&ID,sequentially as follows; A/C Filters A/B (10GCB11/12AT001) Cation Exchangers A/B (10GCF11/12AT001) Degasifier Tower & Sump A/B (GCH11/12AW001 & GCH11/12BB001) Anion Exchangers A/B (10GCF21/22AT001) Mixed Bed Exchangers A/B (10GCF31/32AT001)

    4. Make necessary adjustments in order to meet the required water quality.5. Perform regeneration operation again, this time in auto mode regeneration.6. Make final adjustments, as necessary.

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    9/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 9 of 71 09 Jan., 06 Rev. A

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    FRESHWATERPUMP HOUSE

    STATION

    AUTO-GRAVITY FILTER(10GBB11/12AT001)

    10GBD11/12AA301

    CLARIFIER TANK A(10UGE11BB001)

    10GAC21AA001

    10GAC21QP001

    MCLARIFIER TANK A AGITATOR10GBD11AM001

    NaOH FEED PUMP(10GBN41/42AP001)

    POLYMER FEED PUMP(10GBN31AP001)

    COAGULATIONFEED PUMP

    (10GBN11/12AP001)pH

    QT

    TRIAL RUN PACKAGE M4:

    Steps of Clarifier Tank A (UGE11BB001) Trial Run:

    1.) Fill Water

    Purpose: To supply raw water from Freshwater pond to Clarifier A (RWTS)

    Operation:

    Receive freshwater from Freshwater pump house station

    Open Control valve (10GAC21AA001) manually from local SVB

    Start Chemical feed pumps simultaneously with raw water flow in manual operation

    o Coagulation feed pump 1A/B (10GBN11/12AP001)

    o NaOH feed pump 2A/B (10GBN41/42AP001)

    o Polymer feed pump 1A/B (10GBN31AP001)

    Flow rate: 106.5 m3/hr

    Duration: Until water level is 100mm below overflow line, then close control valve and stop

    chemical feed pumps

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    10/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 10 of 71 09 Jan., 06 Rev. A

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    FRESHWATERPUMP HOUSE

    STATION

    AUTO-GRAVITY FILTER(10GBB11/12AT001)

    10GBD11/12AA301

    CLARIFIER TANK A(10UGE11BB001)

    10GAC21AA001

    10GAC21QP001

    MCLARIFIER TANK A AGITATOR(10GBD11AM001)

    NaOH FEED PUMP(10GBN41/42AP001)

    POLYMER FEED PUMP(10GBN31AP001)

    COAGULATIONFEED PUMP

    (10GBN11/12AP001)pH

    QT

    2.) Agitation

    Purpose: To create disturbance inside Clarifier to enhance coagulation and flocculation

    Operation:

    Start Clarifier tank A agitator (10GBD11AM001) manually from LOP

    Duration: ~2 hours or until floc is formed

    (Note: Agitation continues until shutdown.)

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    11/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 11 of 71 09 Jan., 06 Rev. A

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    FRESHWATERPUMP HOUSE

    STATION

    AUTO-GRAVITY FILTER(10GBB11/12AT001)

    10GBD11/12AA301

    CLARIFIER TANK A(10UGE11BB001)

    10GAC21AA001

    10GAC21QP00

    M

    CLARIFIER TANK AAGITATOR (10GBD11AM001)

    NaOH FEED PUMP(10GBN41/42AP001)

    POLYMER FEED PUMP(10GBN31AP001)

    COAGULATIONFEED PUMP

    (10GBN11/12AP001)pH

    QT

    3.) Start Operation

    Purpose: To further receive freshwater from Freshwater pump house station

    Operation:

    Open Control valve (10GAC21AA001) manually from local SVB

    Flow rate:

    50% of 106.5 m3/hr until sludge blanket is 500 mm lower than overflow

    100% of 106.5 m3/hr

    Duration: Continues operation

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    12/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 12 of 71 09 Jan., 06 Rev. A

    AUTO-GRAVITY FILTERA/B (10GBB11/12AT001)

    CLARIFIER TANK A/B(10UGE11/12BB001)

    10GBB11/12AA301

    10GBB11/12AA302

    FILTERED WATER PIT(10UGG10BB001)

    BACKWASH WATERPUMP (GBK11/12AP001)

    AIR BLOWER(10GBC11/12AN001)

    10GBB11/12AA303

    10GBB11/12AA306

    10GBB11/12AA304

    10GBB11/12AA305

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    Steps of Auto-Gravity Filter A/B (10GBB11/12AT001) Manual Preliminary Operation:

    1.) Washing

    Purpose: To wash away foreign particles from gravel in preparation for the filter operation

    Operation:

    Open On-off valve (10GBB11/12AA301) manually from local SVB

    Open On-off valve (10GBB11/12AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 105 m3/hr

    Duration: Until effluent is clear

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    13/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    14/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 14 of 71 09 Jan., 06 Rev. A

    AUTO-GRAVITY FILTERA/B (10GBB11/12AT001)

    CLARIFIER TANK A/B(10UGE11/12BB001)

    10GBB11/12AA301

    10GBB11/12AA302

    FILTERED WATER PIT(10UGG10BB001)

    BACKWASH WATERPUMP (GBK11/12AP001)

    AIR BLOWER(10GBC11/12AN001)

    10GBB11/12AA303

    10GBB11/12AA306

    10GBB11/12AA304

    10GBB11/12AA305

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    Steps of Auto-Gravity Filter A/B (10GBB11/12AT001) Manual Backwash Operation:

    1.) Water Drain

    Purpose: To reduce water level in vessel to prevent overflowing of media

    Operation:

    Open On-off valve (10GBB11/12AA304) manually from local SVB

    Other On-off valves are closed

    Flow rate: 0 m3/hr

    Duration: 10 minutes

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    15/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 15 of 71 09 Jan., 06 Rev. A

    AUTO-GRAVITY FILTERA/B (10GBB11/12AT001)

    CLARIFIER TANK A/B(10UGE11/12BB001)

    10GBB11/12AA301

    10GBB11/12AA302

    FILTERED WATER PIT(10UGG10BB001)

    BACKWASH WATERPUMP (GBK11/12AP001)

    AIR BLOWER(10GBC11/12AN001)

    10GBB11/12AA303

    10GBB11/12AA306

    10GBB11/12AA304

    10GBB11/12AA305

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    2.) Air Backwash

    Purpose: To polish the media to remove foreign particles that attached to the media

    Operation:

    Keep On-off valve (10GBB11/12AA304) open

    Start Air blower A/B (10GBC11/12AN001) manually from LOP

    Open On-off valve (10GBB11/12AA306) manually from local SVB

    Other On-off valves are closed

    Flow rate: 12.6 Nm3/min

    Duration: 10 minutes

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    16/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 16 of 71 09 Jan., 06 Rev. A

    AUTO-GRAVITY FILTERA/B (10GBB11/12AT001)

    CLARIFIER TANK A/B(10UGE11/12BB001)

    10GBB11/12AA301

    10GBB11/12AA302

    FILTERED WATER PIT(10UGG10BB001)

    BACKWASH WATERPUMP (GBK11/12AP001)

    AIR BLOWER(10GBC11/12AN001)

    10GBB11/12AA303

    10GBB11/12AA306

    10GBB11/12AA304

    10GBB11/12AA305

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    3.) Water Backwash

    Purpose: To remove foreign particles detached from the media out of the vessel

    Operation:

    Keep On-off valve (10GBB11/12AA304) open

    Close On-off valve (10GBB11/12AA3046) manually from local SVB

    Stop Air blower A/B (10GBC11/12AN001) manually from LOP

    Start B/W water pump A/B (10GBK11/12AP001) manually from LOP

    Open On-off valve (10GBB11/12AA303) manually from local SVB

    Other On-off valves are closed

    Flow rate: 500 m3/hr

    Duration: 10 minutes

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    17/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 17 of 71 09 Jan., 06 Rev. A

    AUTO-GRAVITY FILTERA/B (10GBB11/12AT001)

    CLARIFIER TANK A/B(10UGE11/12BB001)

    10GBB11/12AA301

    10GBB11/12AA302

    FILTERED WATER PIT(10UGG10BB001)

    BACKWASH WATERPUMP (GBK11/12AP001)

    AIR BLOWER(10GBC11/12AN001)

    10GBB11/12AA303

    10GBB11/12AA306

    10GBB11/12AA304

    10GBB11/12AA305

    FILTER BACKWASH WATERPIT (10UGH10BB001)

    4.) Stop

    Purpose: To remove foreign particles detached from the media out of the vessel

    Operation:

    Close On-off valve (10GBB11/12AA304) manually from local SVB

    Stop B/W water pump A/B (10GBK11/12AP001) manually from LOP

    Close On-off valve (10GBB11/12AA303) manually from local SVB

    Other On-off valves are closed

    Flow rate: 0 m3/hr

    Duration: 10 minutes

    Illustration:

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    18/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 18 of 71 09 Jan., 06 Rev. A

    AUTO-GRAVITY FILTERA/B (10GBB11/12AT001)

    CLARIFIER TANK A/B(10UGE11/12BB001)

    10GBB11/12AA301

    10GBB11/12AA302

    FILTERED WATER PIT(10UGG10BB001)

    BACKWASH WATERPUMP (GBK11/12AP001)

    AIR BLOWER(10GBC11/12AN001)

    10GBB11/12AA303

    10GBB11/12AA306

    10GBB11/12AA304

    10GBB11/12AA305

    FILTER BACKWASH WATER

    PIT (10UGH10BB001)

    5.) Washing

    Purpose: To remove foreign particles detached from the media out of the vessel

    Operation:

    Open On-off valve (10GBB11/12AA301) manually from local SVB

    Open On-off valve (10GBB11/12AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 105 m3/hr

    Duration: 10 minutes

    Illustration:

    Note: Repeat Manual Backwash Operation Until Effluent Is Clear.

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    19/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 19 of 71 09 Jan., 06 Rev. A

    Steps of A/C Filter Potable (10GBB20AT001) Manual Backwash Operation:

    1.) Soaking

    Purpose: To saturate the carbon with water in order to optimize backwashing

    Operation:

    Open manhole MH manually

    Start Filtered water transfer pump A/B (10GBK41/42AP001) manually from LOP

    Open On-off valve (10GBB20AA301) manually from local SVB, then close valve

    when water reaches top distributor level by looking through the manhole MH

    Other On-off valves are closed

    Close manhole MH manually

    Duration: 1 hour or until activated carbon is fully saturated

    (Note: If some carbon still found floating on water surface, use any wooden paddle to

    sweep or disturb floating carbon so that water may enter into the available pores)

    Illustration:

    AA301

    FILTERED WATER

    TRANSFER PUMP A/B

    (10GBK41/42AP001)A/C FILTER

    (10GBB20AT001)

    POTABLE WATER

    TANK

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GBK35CF501)

    CP501

    CP502

    MH

    FILTER B/W WATER

    PIT

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    20/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 20 of 71 09 Jan., 06 Rev. A

    2.) Washing

    Purpose: To wash away foreign particles from gravel

    Operation:

    Keep Filtered water transfer pump A/B (10GBK41/42AP001) running

    Keep On-off valve (10GBB20AA301) open

    Open On-off valve (10GBB20AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 10 m3/hr

    Duration: Until effluent is clear

    Illustration:

    AA301

    FILTERED WATER

    TRANSFER PUMP A/B

    (10GBK41/42AP001)A/C FILTER

    (10GBB20AT001)

    POTABLE WATER

    TANK

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GBK35CF501)

    CP501

    CP502

    MH

    FILTER B/W WATER PIT

    (10UGH10BB001)

    AA501

    Note: Open Air Vent valve (10GBB20AA501) once a day, anytime of the day, to releasesome air trapped in vessel

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    21/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 21 of 71 09 Jan., 06 Rev. A

    3.) Backwashing

    Purpose: To remove foreign particles of filter media

    Operation:

    Keep Filtered water transfer pump A/B (10GBK41/42AP001) running

    Close On-off valve (10GBB20AA301, 10GBB20AA305) manually from local SVB

    Open On-off valve (10GBB20AA303, 10GBB20AA304) manually from local SVB

    Other On-off valves are closed

    Flow rate: 10 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    FILTERED WATER

    TRANSFER PUMP A/B

    (10GBK41/42AP001)A/C FILTER

    (10GBB20AT001)

    POTABLE WATER

    TANK

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GBK35CF501)

    CP501

    CP502

    MH

    FILTER B/W WATER PIT

    (10UGH10BB001)

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    22/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    23/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 23 of 71 09 Jan., 06 Rev. A

    5.) Washing

    Purpose: To remove foreign particles remaining in the bottom of filter bed

    Operation:

    Start Filtered water transfer pump A/B (10GBK41/42AP001) manually from LOP

    Open On-off valve (10GBB20AA301, 10GBB20AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 10 m3/hr

    Duration: 10 minutes or until effluent does not show activated carbon powder

    Illustration:

    AA301

    FILTERED WATER

    TRANSFER PUMP A/B

    (10GBK41/42AP001) A/C FILTER

    (10GBB20AT001)

    POTABLE WATERTANK

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GBK35CF501)

    CP501

    CP502

    MH

    FILTER B/W WATER PIT

    (10UGH10BB001)

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    24/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    25/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 25 of 71 09 Jan., 06 Rev. A

    TRIAL RUN PACKAGE M5:

    Steps of Demineralization Train A/B Manual Regeneration Operation

    For A/C Filter A/B:

    1.) Soaking

    Purpose: To saturate the carbon with water in order to optimize backwashing

    Operation:

    Open manhole MH manually

    Start Demin feed pump A/B (10GCK11/12AP001) manually from LOP

    Open On-off valve (10GCB11/12AA301) manually from local SVB, then close valve

    when water reaches top distributor level by looking through the manhole MH

    Other On-off valves are closed

    Close manhole MH manually

    Duration: 1 hour or until carbon is fully saturated

    (Note: If some carbon still found floating on water surface, use any wooden paddle to

    sweep or disturb floating carbon so that water may enter into the available pores)

    Illustration:

    AA301

    DEMIN FEED PUMP A/B

    10GCK11/12AP001

    A/C FILTER A/B

    (10GCB11/12AT001)

    10UGV10BB001

    CATION EXCH. A/B

    (10GCF11/12AT001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GCK13CF501/502)

    CP501

    CP502

    MH

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    26/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    27/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 27 of 71 09 Jan., 06 Rev. A

    3.) Backwashing

    Purpose: To remove foreign particles of filter media

    Operation:

    Keep Demin feed pump A/B (10GCK11/12AP001) running

    Close On-off valve (10GCB11/12AA301) manually from local SVB

    Close On-off valve (10GCB11/12AA305) manually from local SVB

    Open On-off valve (10GCB11/12AA303) manually from local SVB

    Open On-off valve (10GCB11/12AA304) manually from local SVB

    Other On-off valves are closed

    Flow rate: 41 m3/hr

    Duration: Until effluent is clear

    Illustration:

    AA301

    DEMIN FEED PUMP A/B

    10GCK11/12AP001

    A/C FILTER A/B

    (10GCB11/12AT001)

    10UGV10BB001

    CATION EXCH. A/B

    (10GCF11/12AT001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GCK13CF501/502)

    CP501

    CP502

    MH

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    28/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 28 of 71 09 Jan., 06 Rev. A

    4.) Stop

    Purpose: To allow floating filter media to settle by gravity

    Operation:

    Stop Demin feed pump A/B (10GCK11/12AP001) manually from LOP

    Close On-off valve (10GCB11/12AA303) manually from local SVB

    Close On-off valve (10GCB11/12AA304) manually from local SVB

    Other On-off valves are closed

    Flow rate: 0 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    DEMIN FEED PUMP A/B

    (10GCK11/12AP001)

    A/C FILTER A/B

    (10GCB11/12AT001)

    10UGV10BB001

    CATION EXCH. A/B

    (10GCF11/12AT001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GCK13CF501/502)

    CP501

    CP502

    MH

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    29/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 29 of 71 09 Jan., 06 Rev. A

    5.) Washing

    Purpose: To remove foreign particles remaining in the bottom of filter bed

    Operation:

    Start Demin feed pump A/B (10GCK11/12AP001) manually from LOP

    Open On-off valve (10GCB11/12AA301) manually from local SVB

    Open On-off valve (10GCB11/12AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 25 m3/hr

    Duration: 10 minutes or until effluent does not show activated carbon powder

    Illustration:

    AA301

    DEMIN FEED PUMP A/B

    10GCK11/12AP001

    A/C FILTER A/B

    (10GCB11/12AT001)

    10UGV10BB001

    CATION EXCH. A/B

    (10GCF11/12AT001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GCK13CF501/502)

    CP501

    CP502

    MH

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    30/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 30 of 71 09 Jan., 06 Rev. A

    6.) Service

    Purpose: To produce filtered water

    Operation:

    Keep Demin feed pump A/B (10GCK11/12AP001) running

    Keep On-off valve (10GCB11/12AA301) open

    Close On-off valve (10GCB11/12AA305) manually from local SVB

    Open On-off valve (10GCB11/12AA302) manually from local SVB

    Other On-off valves are closed

    Flow rate: 41 m3/hr

    Duration: 1,200 minutes

    Illustration:

    AA301

    DEMIN FEED PUMP A/B

    10GCK11/12AP001

    A/C FILTER A/B

    (10GCB11/12AT001)

    10UGV10BB001

    CATION EXCH. A/B

    (10GCF11/12AT001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GCK13CF501/502)

    CP501

    CP502

    MH

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    31/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 31 of 71 09 Jan., 06 Rev. A

    For Cation Exchanger A/B:

    1.) SAC Compaction

    Purpose: To lift the bed without reclassification of cation resin layers and pushes out any

    solids or fines that have accumulated on top of the bed.

    Operation:

    Start Regen pump A/B (10GCK31/32AP001) manually from LOP

    Open On-off valve (10GCF11/12AA303) manually from local SVB

    Open On-off valve (10GCF11/12AA304) manually from local SVB

    Other On-off valves are closed

    Flow rate: 29 m3/hr

    Duration: 5 minutes

    Illustration:

    AA301

    AA302

    A/C FILTER A/B

    (10GCB11/12AT001)

    AA304

    CATION

    EXCH A/B(10GCF11/12

    AT001)

    PI

    DEGASIFIER TOWER

    A/B (10GCH11/12AW001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    HCl FEED PUMP

    A/B

    AA303

    AA80110GCK62AA801

    FT

    (10GCK14/15CF001)

    FI

    10GCK63CF001

    10GCN78AA801

    FI

    (10GCN78CF501)

    10UGV10BB001

    FI

    (10GCK62CF502)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    32/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 32 of 71 09 Jan., 06 Rev. A

    2.) Regenerant HCl 30% Injection

    Purpose: To regenerate exhausted cation resin

    Operation:

    Keep Regen pump A/B (10GCK31/32AP001) running

    Close On-off valve (10GCF11/12AA303) manually from local SVB

    Keep On-off valve (10GCF11/12AA304) open

    Open On-off valves (10GCK62AA801, 10GCF11/12AA801) manually from local SVB

    Start HCl feed pump A/B (10GCN11/12AP001) manually from LOP

    Open On-off valve (10GCN78AA801) manually from local SVB

    Other On-off valves are closed

    Flow rates: HCl 30% = 1.20 m3/hr, Regen water = 7.1 m3/hr

    Duration: 35 minutes

    Illustration:

    AA301

    AA302

    A/C FILTER A/B

    (10GCB11/12AT001)

    AA304

    CATIONEXCH A/B

    (10GCF11/12

    AT001)

    PI

    DEGASIFIER TOWER

    A/B (10GCH11/12AW001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    HCl FEED PUMP A/B

    (10GCN11/12AP001)

    AA303

    AA80110GCK62AA801

    FT

    (10GCK14/15CF001)

    FI

    (10GCK63CF001)

    10GCN78AA801

    FI

    (10GCN78CF501)

    10UGV10BB001

    FI

    (10GCK62CF502)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    33/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 33 of 71 09 Jan., 06 Rev. A

    3.) Acid Displacement (Slow rinse)

    Purpose: To push active regenerant from bottom to top of resin bed and start rinsing out

    Operation:

    Keep Regen pump A/B (10GCK31/32AP001) running

    Keep On-off valves (10GCF11/12AA304, 10GCK62AA801, ) open

    Close On-off valve (10GCN78AA801) manually from local SVB

    Stop HCl feed pump A/B (10GCN11/12AP001) manually from LOP

    Keep On-off valve (10GCF11/12AA801) open

    Other On-off valves are closed

    Flow rates: 7.1 m3/hr

    Duration: 30 minutes

    Illustration:

    AA301

    AA302

    A/C FILTER A/B

    (10GCB11/12AT001)

    AA304

    CATION

    EXCH A/B

    (10GCF11/12

    AT001)

    PI

    DEGASIFIER TOWER

    A/B (10GCH11/12AW001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    HCl FEED PUMP A/B

    (10GCN11/12AP001)

    AA303

    AA80110GCK62AA801

    FT

    (10GCK14/15CF001)

    FI

    (10GCK63CF001)

    10GCN78AA801

    FI

    (10GCN78CF501)

    10UGV10BB001

    FI

    (10GCK62CF502)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    34/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 34 of 71 09 Jan., 06 Rev. A

    4.) Resin Bed Settling

    Purpose: To allow floating resin to settle by gravity

    Operation:

    Stop Regen pump A/B (10GCK31/32AP001) manually from LOP

    Close On-off valves (10GCF11/12AA304, 10GCK62AA801, 10GCF11/12AA801)

    manually from respective local SVBs

    Other On-off valves are closed

    Flow rates: 0 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    AA302

    A/C FILTER A/B

    (10GCB11/12AT001)

    AA304

    CATION

    EXCH A/B

    (10GCF11/12

    AT001)

    PI

    DEGASIFIER TOWER

    A/B (10GCH11/12AW001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    HCl FEED PUMP A/B(10GCN11/12AP001)

    AA303

    AA80110GCK62AA801

    FT

    (10GCK14/15CF001)

    FI

    (10GCK63CF001)

    10GCN78AA801

    FI

    (10GCN78CF501)

    10UGV10BB001

    FI

    (10GCK62CF502)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    35/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 35 of 71 09 Jan., 06 Rev. A

    5.) Rinsing

    Purpose: To finally rinse out remaining regenerant and to arrange resin layer

    Operation:

    Start Demin feed pump A/B (10GCK11/12AP001) manually from LOP to feed

    filtered water through A/C filter A/B (10GCB11/12AT001)

    Open On-off valves (10GCF11/12AA301, 10GCF11/12AA305) manually from

    respective local SVBs

    Other On-off valves are closed

    Flow rates: 41 m3/hr

    Duration: 7 minutes

    Illustration:

    AA301

    AA302

    A/C FILTER A/B

    10GCB11/12AT001

    AA304

    CATION

    EXCH A/B

    (10GCF11/12

    AT001)

    PI

    DEGASIFIER TOWER

    A/B (10GCH11/12AW001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    HCl FEED PUMP A/B

    (10GCN11/12AP001)

    AA303

    AA80110GCK62AA801

    FT

    (10GCK14/15CF001)

    FI

    (10GCK63CF001)

    10GCN78AA801

    FI(10GCN78CF501)

    10UGV10BB001

    FI

    (10GCK62CF502)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    36/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 36 of 71 09 Jan., 06 Rev. A

    6.) Service

    Purpose: To produce soft water

    Operation:

    Keep Demin feed pump A/B (10GCK11/12AP001) running to feed filtered water

    through A/C filter A/B (10GCB11/12AT001)

    Keep On-off valve (10GCF11/12AA301) open

    Close On-off valve (10GCF11/12AA305) manually from respective local SVBs

    Open On-off valve (10GCF11/12AA302) manually from respective local SVBs

    Other On-off valves are closed

    Flow rates: 41 m3/hr

    Duration: 1,228 minutes

    Illustration:

    AA301

    AA302

    A/C FILTER A/B

    10GCB11/12AT001

    AA304

    CATION

    EXCH A/B

    (10GCF11/12

    AT001)

    PI

    DEGASIFIER TOWER

    A/B 10GCH11/12AW001

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    HCl FEED PUMP A/B

    (10GCN11/12AP001)

    AA303

    AA80110GCK62AA801

    FT

    (10GCK14/15CF001)

    FI

    (10GCK63CF001)

    10GCN78AA801

    FI

    (10GCN78CF501)

    10UGV10BB001

    FI

    (10GCK62CF502)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    37/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 37 of 71 09 Jan., 06 Rev. A

    For Degasifier A/B

    Purpose: To remove CO2

    Operation:

    Keep A/C filter A/B (10GCB11/12AT001) and Cation Exchanger A/B

    (10GCF11/12AT001) in service

    Keep On-off valve (10GCF11/12AA302) open

    Start Degasifier blower A/B (10GCH11/12AN001) manually from LOP

    Flow rates: 41 m3/hr

    Duration: 1,228 minutes

    Illustration:

    10GCF11/12AA302

    DEGASIFIER BLOWER

    A/B (10GCH11/12AN001)

    DEGASIFIER SUMP A/B

    (10GCH11/12BB001)

    DEGASIFIER TOWER A/B

    (10GCH11/12AW001)

    CATION EXCH A/B

    (10GCF11/12AT001)

    ANION EXCH A/B

    (10GCF21/22AT001)

    BOOSTER PUMP A/B

    (10GCK21/22AP001)

    LT

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    38/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    39/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    40/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 40 of 71 09 Jan., 06 Rev. A

    3.) Acid Displacement (Slow rinse)

    Purpose: To push active regenerant from bottom to top of resin bed and start rinsing out

    Operation:

    Keep Regen pump A/B (10GCK31/32AP001) running

    Close On-off valve (10GCF21/22AA303) manually from local SVB

    Keep On-off valve (10GCF21/22AA304) open

    Keep On-off valves (10GCK62AA803, 10GCF21/22AA801) manually from local SVB

    Close On-off valve (10GCN91AA801) manually from local SVB

    Stop NaOH feed pump A/B (10GCN21/22AP001) manually from LOP

    Other On-off valves are closed

    Flow rates: 7.30 m3/hr

    Duration: 40 minutes

    Illustration:

    AA301

    AA302

    MIXED BED EXCH A/B

    (10GCF31/32AT001)

    AA304

    ANIONEXCH A/B

    (10GCF21/22

    AT001)

    PI

    BOOSTER PUMP A/B

    (10GCK21/22AP001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP A/B

    (10GCN21/22AP001)

    AA303

    AA80110GCK62AA803

    FT

    (10GCK37/38CF001)

    FI

    (10GCK63CF001)

    10GCN91AA801

    FI

    (10GCN91CF501)

    10UGV10BB001

    FI

    (10GCK62CF504)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    41/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 41 of 71 09 Jan., 06 Rev. A

    4.) Resin Bed Settling

    Purpose: To allow floating resin to settle by gravity

    Operation:

    Stop Regen pump A/B (10GCK31/32AP001) manually from LOP

    Close On-off valves (10GCF21/22AA304, 10GCK62AA803, 10GCF21/22AA801)

    manually from respective local SVBs

    Other On-off valves are closed

    Flow rates: 0 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    AA302

    MIXED BED EXCH A/B

    (10GCF31/32AT001)

    AA304

    ANION

    EXCH A/B

    (10GCF21/22

    AT001)

    PI

    BOOSTER PUMP A/B

    (10GCK21/22AP001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP A/B(10GCN21/22AP001)

    AA303

    AA80110GCK62AA803

    FT

    (10GCK37/38CF001)

    FI

    (10GCK63CF001)

    10GCN91AA801

    FI

    (10GCN91CF501)

    10UGV10BB001

    FI

    (10GCK62CF504)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    42/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 42 of 71 09 Jan., 06 Rev. A

    5.) Rinsing

    Purpose: To finally rinse out remaining regenerant and to arrange resin layer

    Operation:

    Start Booster pump A/B (10GCK21/22AP001) manually from LOP

    Open On-off valves (10GCF21/22AA301, 10GCF21/22AA305) manually from

    respective local SVBs

    Other On-off valves are closed

    Flow rates: 41 m3/hr

    Duration: 15 minutes

    Illustration:

    AA301

    AA302

    MIXED BED EXCH A/B

    (10GCF31/32AT001)

    AA304

    ANION

    EXCH A/B

    (10GCF21/22

    AT001)

    PI

    BOOSTER PUMP A/B

    (10GCK21/22AP001)

    PI

    AA305

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP A/B(10GCN21/22AP001)

    AA303

    AA80110GCK62AA803

    FT

    (10GCK37/38CF001)

    FI

    (10GCK63CF001)

    10GCN91AA801

    FI

    (10GCN91CF501)

    10UGV10BB001

    FI

    (10GCK62CF504)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    43/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    44/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 44 of 71 09 Jan., 06 Rev. A

    For Mixed Bed Exchanger A/B:

    1.) Backwashing

    Purpose: To separate anion and cation resin layers

    Operation:

    Start Regen pump A/B (10GCK31/32AP001) manually from LOP

    Open On-off valves (10GCF31/32AA805, 10GCF31/32AA806) manually from

    respective local SVBs

    Other On-off valves are closed

    Flow rate: 8.4 m3/hr

    Duration: 20 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    45/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 45 of 71 09 Jan., 06 Rev. A

    2.) Stop

    Purpose: To allow floating resins to settle by gravity

    Operation:

    Stop Regen pump A/B (10GCK31/32AP001) manually from LOP

    Close On-off valves (10GCF31/32AA805, 10GCF31/32AA806) manually from

    respective local SVBs

    Other On-off valves are closed

    Flow rate: 0 m3/hr

    Duration: 10 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    46/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 46 of 71 09 Jan., 06 Rev. A

    3.) Regenerant NaOH 50% Injection

    Purpose: To regenerate exhausted anion resin

    Operation:

    Start Regen pump A/B (10GCK31/32AP001) manually from LOP

    Open On-off valves (10GCF31/32AA801, 10GCF31/32AA802, 10GCF31/32AA804,

    10GCK62AA804, 10GCK62AA802) manually from respective local SVBs

    Start NaOH feed pump A/B (10GCN21/22AP001) manually from LOP

    Open On-off valve (10GCN90AA801) manually from local SVB

    Other On-off valves are closed

    Flow rate: NaOH 50% = 0.16 m3/hr, Downward = 2.10 m3/hr, Upward = 2.20 m3/hr

    Duration: 25 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED

    PUMP 1A/B

    (10GCN21/22AP001)

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    47/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 47 of 71 09 Jan., 06 Rev. A

    4.) Displacement of NaOH 50% (Slow rinse)

    Purpose: To displace active NaOH 50% residual from the line before ends of spray nozzle

    Operation:

    Keep Regen pump A/B (10GCK31/32AP001) running

    Keep On-off valves (10GCF31/32AA801, 10GCF31/32AA802, 10GCF31/32AA804,

    10GCK62AA804, 10GCK62AA802) open

    Close On-off valve (10GCN90AA801) manually from local SVB

    Stop NaOH feed pump A/B (10GCN21/22AP001) manually from LOP

    Other On-off valves are closed

    Flow rate: 2.10 m3/hr

    Duration: 30 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    48/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 48 of 71 09 Jan., 06 Rev. A

    5.) Regenerant HCl 30%

    Purpose: To regenerate exhausted cation resin

    Operation:

    Keep Regen pump A/B (10GCK31/32AP001) running

    Keep On-off valves (10GCF31/32AA801, 10GCF31/32AA802, 10GCF31/32AA804,

    10GCK62AA804, 10GCK62AA802) open

    Start HCl feed pump A/B (10GCN11/12AP001) manually from LOP

    Open On-off valve (10GCN77AA801) manually from local SVB

    Other On-off valves are closed

    Flow rate: HCl 30% = 0.39 m3/hr, Upward = 2.20 m3/hr, Downward = 2.10 m3/hr

    Duration: 20 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED

    PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    49/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    50/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    51/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 51 of 71 09 Jan., 06 Rev. A

    8.) Resin Air Mixing

    Purpose: To mix back cation and anion resins

    Operation:

    Close On-off valve (10GCF31/32AA305) manually from local SVB

    Open On-off valve (10GCF31/32AA803) manually from local SVB

    Other On-off valves are closed

    Flow rate: 47.1 Nm3/hr

    Duration: 10 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATERTANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    52/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 52 of 71 09 Jan., 06 Rev. A

    9.) Vessel Filling

    Purpose: To fill the vessel with water until required level

    Operation:

    Start Booster pump A/B (10GCK21/22AP001) manually from LOP to feed demin

    water through Anion Exchanger A/B (10GCF21/22AT001)

    Open On-off valve (10GCF21/22AA302) manually from local SVB

    Open On-off valve (10GCF31/32AA801) manually from local SVB

    Other On-off valves are closed

    Flow rate: 20.0 m3/hr

    Duration: 2 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

    AA801

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    53/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 53 of 71 09 Jan., 06 Rev. A

    10.) Rinsing

    Purpose: To fill the vessel with water until required level

    Operation:

    Keep Booster pump A/B (10GCK21/22AP001) running to feed demin water through

    Anion Exchanger A/B (10GCF21/22AT001)

    Keep On-off valve (10GCF21/22AA302) open

    Open On-off valve (10GCF31/32AA306) manually from local SVB

    Other On-off valves are closed

    Flow rate: 20.0 m3/hr

    Duration: 15 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    54/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 54 of 71 09 Jan., 06 Rev. A

    11.) Service

    Purpose: To further polish demin water

    Operation:

    Keep Booster pump A/B (10GCK21/22AP001) running to feed demin water through

    Anion Exchanger A/B (10GCF21/22AT001)

    Keep On-off valve (10GCF21/22AA302) open

    Open On-off valve (10GCF31/32AA302) manually from local SVB

    Other On-off valves are closed

    Flow rate: 41.0 m3/hr

    Duration: 10,080 minutes

    Illustration:

    ANION EXCH A/B

    (10GCF21/22AT001)

    AA806

    DEMIN WATER

    TANK A/B

    (10GCL11/12BB01)

    PI

    REGEN PUMP A/B

    (10GCK31/32AP001)

    NaOH FEED PUMP

    1A/B

    AA305

    10UGV10BB001

    AA804

    AA302

    AA306

    AA803

    AA801

    AA805

    AA802

    MIXED BED

    EXCH A/B

    (10GCF31/32

    AT001)

    FI

    (10GCK63CF001)

    FI (10GCK62CF503)

    10GCK62AA804

    10GCN90AA801

    FI (10GCN90CF501)

    FI (10GCK62CF501)

    10GCK62AA802

    FI (10GCN77CF501)

    10GCN77AA801

    HCl FEED PUMP 1A/B

    (10GCN11/12AP001)

    AIR RECEIVER

    (10QEF10BB001)

    10GCF21/22AA302

    PI

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    55/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    56/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 56 of 71 09 Jan., 06 Rev. A

    2.) WWTP Clarifier Tank

    Purpose: To separate sludge and clear water

    Operation:

    Keep Wastewater pump (10GNK21/22AP001) running

    Keep Chemical feed pumps simultaneously running

    o Coagulation feed pump 2A/B (10GNN11/12AP001) = 100 mg/L

    o HCl feed pump 2A (10GNN30AP001) = 50 mg/L

    o NaOH feed pump 3A (10GNN50AP001) = 100 mg/L

    o Polymer feed pump 2A/B (10GNN21/22AP001) = 1 mg/L

    Start WWTP Clarifier tank agitators (10GND10AM001) when wastewater level is

    over the blades of agitator

    Start Thinner sludge pump A/B (10GNK41/42AP001) manually from LOP to

    transfer partially thickened sludge to Sludge receiver tank (10UGT10BB001)

    Flow rate: 70 m3/hr

    Duration: Continuous

    Illustration:

    M

    WWTP CLARIFIER TANK

    AGITATOR (10GND10AM001)

    MIXING PIT

    (10UGP20BB001)

    CLARIFIED WASTEWATER

    PIT (10UGR10BB001)

    WWTP CLARIFIER TANK(10UGQ10BB001)

    THINNER SLUDGE PUMP

    A/B (10GNK41/42AP001)

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    57/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    58/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 58 of 71 09 Jan., 06 Rev. A

    Steps of A/C Filter WWTP (10GNB10AT001) Manual Backwash Operation:

    1.) Soaking

    Purpose: To saturate the carbon with water in order to optimize backwashing

    Operation:

    Open manhole MH manually

    Start Clarified water transfer pump A/B (10GNK31/32AP001) manually from LOP

    Open On-off valve (10GNB10AA301) manually from local SVB, then close valve

    when water reaches top distributor level by looking through the manhole MH

    Other On-off valves are closed

    Close manhole MH manually

    Duration: 1 hour or until activated carbon is fully saturated

    (Note: If some carbon still found floating on water surface, use any wooden paddle to

    sweep or disturb floating carbon so that water may enter into the available pores)

    Illustration:

    AA301

    CLARIFIED WATER

    TRANSFER PUMP A/B

    (10GNK31/32AP001)A/C FILTER WWTP

    (10GNB10AT001)

    NEUTRALIZATION PIT

    (10UGU10BB001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GNK21CF501)

    CP501

    CP502

    MH

    WASTEWATER PIT

    (10UGN10BB001)

    BACKWASH PUMP A/B

    (10GNK61/62AP001)

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    59/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 59 of 71 09 Jan., 06 Rev. A

    2.) Washing

    Purpose: To wash away foreign particles from gravel

    Operation:

    Keep Clarified water transfer pump A/B (10GNK31/32AP001) running

    Open On-off valve (10GNB10AA301) manually from local SVB

    Open On-off valve (10GNB10AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 70 m3/hr

    Duration: 10 minutes or until effluent is clear

    Illustration:

    AA301

    CLARIFIED WATER

    TRANSFER PUMP A/B

    (10GNK31/32AP001)A/C FILTER WWTP

    (10GNB10AT001)

    NEUTRALIZATION PIT

    (10UGU10BB001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GNK21CF501)

    CP501

    CP502

    MH

    WASTEWATER PIT

    (10UGN10BB001)

    BACKWASH PUMP A/B

    (10GNK61/62AP001)

    AA501

    Note: Open Air Vent valve (10GNB10AA501) once a day, anytime of the day, to releasesome air trapped in vessel

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    60/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    61/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 61 of 71 09 Jan., 06 Rev. A

    4.) Stop

    Purpose: To allow floating filter media to settle by gravity

    Operation:

    Stop Backwash pump A/B (10GNK61/62AP001) manually from LOP

    Close On-off valve (10GNB10AA303, 10GNB10AA304) manually from local SVB

    Other On-off valves are closed

    Flow rate: 0 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    CLARIFIED WATER

    TRANSFER PUMP A/B

    (10GNK31/32AP001)A/C FILTER WWTP

    (10GNB10AT001)

    NEUTRALIZATION PIT(10UGU10BB001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GNK21CF501)

    CP501

    CP502

    MH

    WASTEWATER PIT

    (10UGN10BB001)

    BACKWASH PUMP A/B(10GNK61/62AP001)

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    62/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 62 of 71 09 Jan., 06 Rev. A

    5.) Washing

    Purpose: To remove foreign particles remaining in the bottom of filter bed

    Operation:

    Start Clarified water transfer pump A/B (10GNK31/32AP001) manually from LOP

    Open On-off valve (10GNB10AA301, 10GNB10AA305) manually from local SVB

    Other On-off valves are closed

    Flow rate: 40 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    CLARIFIED WATER

    TRANSFER PUMP A/B

    (10GNK31/32AP001)A/C FILTER WWTP

    (10GNB10AT001)

    NEUTRALIZATION PIT(10UGU10BB001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GNK21CF501)

    CP501

    CP502

    MH

    WASTEWATER PIT

    (10UGN10BB001)

    BACKWASH PUMP A/B(10GNK61/62AP001)

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    63/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 63 of 71 09 Jan., 06 Rev. A

    6.) Service

    Purpose: To filtered wastewater

    Operation:

    Keep Clarified water transfer pump A/B (10GNK31/32AP001) running

    Keep On-off valve (10GNB10AA301) open

    Close On-off valve (10GNB10AA305) manually from local SVB

    Open On-off valve (10GNB10AA302) manually from local SVB

    Other On-off valves are closed

    Flow rate: 70 m3/hr

    Duration: 10 minutes

    Illustration:

    AA301

    CLARIFIED WATER

    TRANSFER PUMP A/B

    (10GNK31/32AP001)A/C FILTER WWTP

    (10GNB10AT001)

    NEUTRALIZATION PIT

    (10UGU10BB001)

    P

    AA304

    AA302

    AA305

    AA303

    P

    FI

    (10GNK21CF501)

    CP501

    CP502

    MH

    WASTEWATER PIT

    (10UGN10BB001)

    BACKWASH PUMP A/B

    (10GNK61/62AP001)

    AA501

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    64/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 64 of 71 09 Jan., 06 Rev. A

    2.2. ELECTRICAL & INSTRUMENT EQUIPMENT PRE-COMMISSIONING

    1. MCC POWER ENERGIZEProcedure:1. Prior to energizing the MCC, the operator should check selector switches of each MCC module for

    equipments such as pumps, blowers, agitators, etc., if they are in OFF position. Release to Local signal fromMMI shall not be activated (Logic = 0). Below is a list of equipments with their respective local control panels:

    NO KKS NO EQUIPMENT NAME LOP NO

    1 10GBN11AP001 COAGULATION FEED PUMP 1A 10GBY10CX101

    2 10GBN12AP001 COAGULATION FEED PUMP 1B 10GBY10CX101

    3 10GNN11AP001 COAGULATION FEED PUMP 2A 10GBY10CX101

    4 10GNN12AP001 COAGULATION FEED PUMP 2B 10GBY10CX101

    5 10GBN10AM001 COAG DISSOLVING TANK AGITATOR 10GBY10CX101

    6 10GBN21AP001 NaOCl FEED PUMP 1A 10GBY10CX1027 10GBN22AP001 NaOCl FEED PUMP 1B 10GBY10CX102

    8 10GRN11AP001 NaOCl FEED PUMP 2A 10GBY10CX102

    9 10GRN12AP001 NaOCl FEED PUMP 2B 10GBY10CX102

    10 10GBN31AP001 POLYMER FEED PUMP 1A 10GBY10CX103

    11 10GBN32AP001 POLYMER FEED PUMP 1B 10GBY10CX103

    12 10GNN21AP001 POLYMER FEED PUMP 2A 10GBY10CX103

    13 10GNN22AP001 POLYMER FEED PUMP 2B 10GBY10CX103

    14 10GBD11AM001 CLARIFIER TANK A AGITATOR 10GBY10CX104

    15 10GBD12AM001 CLARIFIER TANK B AGITATOR 10GBY10CX105

    16 10GBK21AP001 UNDERFLOW SLUDGE PUMP A 10GBY10CX10617 10GBK22AP001 UNDERFLOW SLUDGE PUMP B 10GBY10CX106

    18 10GBK31AP001 FILTERED WATER PUMP A 10GBY10CX106

    19 10GBK32AP001 FILTERED WATER PUMP B 10GBY10CX106

    20 10GBC11AN001 AIR BLOWER A 10GBY10CX106

    21 10GBC12AN001 AIR BLOWER B 10GBY10CX106

    22 10GBK11AP001 BACKWASH WATER PUMP A 10GBY10CX107

    23 10GBK12AP001 BACKWASH WATER PUMP B 10GBY10CX107

    24 10GBK41AP001 FILTERED WATER TRANSFER PUMP A 10GBY10CX107

    25 10GBK42AP001 FILTERED WATER TRANSFER PUMP B 10GBY10CX107

    26 10GKA11AP001 PORTABLE WATER PUMP A 10GBY10CX108

    27 10GKA12AP001 PORTABLE WATER PUMP B 10GBY10CX108

    28 10GCK21AP001 BOOSTER PUMP A 10GCY10CX101

    29 10GCK22AP001 BOOSTER PUMP B 10GCY10CX101

    30 10GCH11AN001 DEGASIFIER BLOWER A 10GCY10CX101

    31 10GCH12AN001 DEGASIFIER BLOWER B 10GCY10CX101

    32 10GCN11AP001 HCl FEED PUMP 1A 10GCY10CX102

    33 10GCN12AP001 HCl FEED PUMP 1B 10GCY10CX102

    34 10GNN30AP001 HCl FEED PUMP 2A 10GCY10CX102

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    65/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 65 of 71 09 Jan., 06 Rev. A

    NO KKS NO EQUIPMENT NAME LOP NO

    35 10GNN40AP001 HCl FEED PUMP 2B 10GCY10CX102

    36 10GCN21AP001 NaOH FEED PUMP 1A 10GCY10CX10337 10GCN22AP001 NaOH FEED PUMP 1B 10GCY10CX103

    38 10GBN41AP001 NaOH FEED PUMP 2A 10GCY10CX103

    39 10GBN42AP001 NaOH FEED PUMP 2B 10GCY10CX103

    40 10GNN50AP001 NaOH FEED PUMP 3A 10GCY10CX103

    41 10GNN60AP001 NaOH FEED PUMP 3B 10GCY10CX103

    42 10GCK51AP001 NEUT WATER DISPOSAL PUMP A 10GCY10CX104

    43 10GCK52AP001 NEUT WATER DISPOSAL PUMP B 10GCY10CX104

    44 10GCK41AP001 DEMIN WATER TRANSFER PUMP A 10GCY10CX105

    45 10GCK42AP001 DEMIN WATER TRANSFER PUMP B 10GCY10CX105

    46 10GCK31AP001 REGENERATION PUMP A 10GCY10CX105

    47 10GCK32AP001 REGENERATION PUMP B 10GCY10CX105

    48 10GCK11AP001 DEMIN FEED PUMP A 10GCY10CX107

    49 10GCK12AP001 DEMIN FEED PUMP B 10GCY10CX107

    50 10GNK11AP001 OILY WASTEWATER PUMP A 10GNY10CX101

    51 10GNK12AP001 OILY WASTEWATER PUMP B 10GNY10CX101

    52 10GNC11AN001 MIXING BLOWER A 10GNY10CX102

    53 10GNC12AN001 MIXING BLOWER B 10GNY10CX102

    54 10GNK41AP001 THINNER SLUDGE PUMP A 10GNY10CX102

    55 10GNK42AP001 THINNER SLUDGE PUMP B 10GNY10CX102

    56 10GNK71AP001 THICKER SLUDGE PUMP A 10GNY10CX103

    57 10GNK72AP001 THICKER SLUDGE PUMP B 10GNY10CX103

    58 10GNK21AP001 WASTEWATER PUMP A 10GNY10CX103

    59 10GNK22AP001 WASTEWATER PUMP B 10GNY10CX103

    60 10GNK61AP001 BACKWASH PUMP A 10GNY10CX104

    61 10GNK62AP001 BACKWASH PUMP B 10GNY10CX104

    62 10GNK51AP001 TREATED WATER PUMP A 10GNY10CX104

    63 10GNK52AP001 TREATED WATER PUMP B 10GNY10CX104

    64 10GNK31AP001 CLARIFIED WATER TRANSFER PUMP A 10GNY10CX104

    65 10GNK32AP001 CLARIFIED WATER TRANSFER PUMP B 10GNY10CX104

    66 10GNS10AM001 SLUDGE RECIEVER TANK AGITATOR 10GNY10CX105

    67 10GND10AM001 WWTP CLARIFIER TANK AGITATOR 10GNY10CX106

    68 10GNE10AM001 pH ADJUSTMENT PIT AGITATOR 10GNY10CX107

    69 10GNE20AM001 MIXING PIT AGITATOR 10GNY10CX107

    70 10GNE30AM001 NEUTRALIZATION PIT AGITATOR 10GNY10CX107

    71 10GRK11AP001 DWWTP SLUDGE PUMP A 10GNY10CX108

    72 10GRK12AP001 DWWTP SLUDGE PUMP B 10GNY10CX108

    73 10GRC11AN001 BLOWER A 10GNY10CX109

    74 10GRC12AN001 BLOWER B 10GNY10CX109

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    66/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 66 of 71 09 Jan., 06 Rev. A

    2. Energizing the MCC Refer to separate manual of MCC for energizing procedure Select the following motor starter modules to remote mode operation

    RAW WATER TREATMENT SYSTEM

    NO KKS NO EQUIPMENT NAME

    1 10GBK31AP001/10GBK32AP001 FITERED WATER PUMP A/B

    2 10GBK11AP001/10GBK12AP001 BACKWASH WATER PUMP A/B

    3 10GKA11AP001/10GKA12AP001 PORTABLE WATER PUMP A/B

    4 10GBK21AP001/10GBK22AP001 UNDERFLOW SLUDGE PUMP A/B

    5 10GBC11AN001/10GBC12AN001 AIR BLOWER A/B

    6 10GBK41AP001/10GBK42AP001 FILTERED WATER TRANSFER PUMP A/B

    7 10GBD11AM001/10GBD12AM001 CLARIFIER TANK A/B AGITATOR8 10GBN10AM001 COAGULATION DISOVING TANK AGITATOR

    9 10GBN11AP001/10GBN12AP001 COAGULATION FEED PUMP 1A/1B

    10 10GBN21AP001/10GBN22AP001 NaOCl FEED PUMP 1A/1B

    11 10GBN31AP001/10GBN32AP001 POLYMER FEED PUMP 1A/1B

    12 10GBN41AP001/10GBN42AP001 NaOH FEED PUMP 2A/2B

    DEMINERALIZATION SYSTEM

    NO KKS NO EQUIPMENT NAME

    1 10GCK11AP001/10GCK12AP001 DEMIN FEED PUMP A/B2 10GCH11AN001/10GCH12AN001 DEGASIFIER BLOWER A/B

    3 10GCK21AP001/10GCK22AP001 BOOSTER PUMP A/B

    4 10GCK41AP001/10GCK42AP001 DEMINERALIZED WATER TRANSFER PUMP A/B

    5 10GCK31AP001/10GCK32AP001 REGENERATION PUMP A/B

    6 10GCN11AP001/10GCN12AP001 HCl FEED PUMP 1A/1B

    7 10GCN21AP001/10GCN22AP001 NaOH FEED PUMPS 1A/1B

    8 10GCK51AP001/10GCK52AP001 NEUTRALIZED WATER DISPOSAL PUMP A/B

    WASTEWATER TREATMENT PLANT

    NO KKS NO EQUIPMENT NAME

    1 10GNK11AP001/10GNK12AP001 OILY WASTEWATER PUMP A/B

    2 10GNC11AN001/10GNC12AN001 MIXING BLOWER A/B

    3 10GNK21AP001/10GNK22AP001 WASTEWATER PUMP A/B

    4 10GNK31AP001/10GNK32AP001 CLARIFIED WATER TRANSFER PUMP A/B

    5 10GNK61AP001/10GNK62AP001 BACKWASH PUMP A/B

    6 10GNK51AP001/10GNK52AP001 TREATED WATER PUMP A/B

    7 10GNK41AP001/10GNK42AP001 THINNER SLUDGE PUMPS A/B

    8 10GNK71AP001/10GNK72AP001 THICKENER SLUDGE PUMPS A/B

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    67/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 67 of 71 09 Jan., 06 Rev. A

    NO KKS NO EQUIPMENT NAME

    9 10GNN30AP001/10GNN40AP001 HCl FEED PUMP 2A/2B

    10 10GNN50AP001/10GNN60AP001 NaOH FEED PUMP 3A/3B11 10GND10AM001 CLARIFIER TANK AGITATOR

    12 10GNE10AM001 pH ADJUSTMENT PIT AGITATOR

    13 10GNE20AM001 MIXING PIT AGITATOR

    14 10GNE30AM001 NEUTRALIZATION PIT AGITATOR

    15 10GNS10AM001 SLUDGE RECEIVER TANK AGITATOR

    16 10GNN11AP001/10GNN12AP001 COAGULATION FEED PUMP 2A/2B

    17 10GNN21AP001/10GNN22AP001 POLYMER FEED PUMP 2A/2B

    18 10GRC11AN001/10GRC12AN001 BLOWER A/B

    19 10GRK11AP001/10GRK12AP001 SLUDGE PUMP A/B

    20 10GRN11AP001/10GRN12AP001 NaOCl FEED PUMP 2A/2B

    3. Energize each equipment in the MCC as per following requirementsFor equipment with auto-mode/ manual-mode, select of each equipment via MMI Operation mode of each equipment shall be selected to the following;

    RAW WATER SYSTEM

    NO EQUIPMENT NAME AUTO MANUAL STAND-BY LOP NO.1 COAGULATION DISSOLVING TANK

    AGITATORN/A 10GBN10AM001 - 10GBY10CX101

    2 COAGULATION FEED PUMP1A/1B

    10GBN11AP001 SELECTABLE 10GBN12AP001 10GBY10CX101

    3 NaOCl FEED PUMP 1A/1B 10GBN21AP001 SELECTABLE 10GBN22AP001 10GBY10CX102

    4 POLYMER FEED PUMP 1A 10GBN31AP001 SELECTABLE - 10GBY10CX103

    5 POLYMER FEED PUMP 1B 10GBN32AP001 SELECTABLE - 10GBY10CX103

    6 NaOH FEED PUMP 2A/2B 10GBN41AP001 SELECTABLE 10GBN42AP001 10GCY10CX103

    7 CLARIFIER TANK AAGITATOR

    10GBD11AM001 SELECTABLE - 10GBY10CX104

    8 CLARIFIER TANK BAGITATOR

    10GBD12AM001 SELECTABLE - 10GBY10CX105

    9 FILTERED WATER PUMP A/B 10GBK31AP001 SELECTABLE 10GBK32AP001 10GBY10CX106

    10 AIR BLOWER A/B 10GBC11AN001 SELECTABLE 10GBC12AN001 10GBY10CX106

    11 UNDERFLOW SLUDGEPUMP A/B

    10GBK21AP001 SELECTABLE 10GBK22AP001 10GBY10CX106

    12 BACKWASH WATER PUMP A/B 10GBK11AP001 SELECTABLE 10GBK12AP001 10GBY10CX10713 FILTERED WATER TRANSFERPUMP A/B

    N/A 10GBK41AP001 10GBK42AP001 10GBY10CX107

    14 POTABLE WATER PUMP A/B N/A 10GKA11AP001 10GKA12AP001 10GBY10CX108

    DEMINERALIZATION SYSTEM

    NO EQUIPMENT NAME AUTO MANUAL STAND-BY LOP NO.1 DEGASIFIER BLOWER A 10GCH11AN001 SELECTABLE - 10GCY10CX101

    2 DEGASIFIER BLOWER B 10GCH12AN001 SELECTABLE 10GCH12AN001 10GCY10CX101

    3 BOOSTER PUMP A 10GCK21AP001 SELECTABLE - 10GCY10CX101

    4 BOOSTER PUMP B 10GCK22AP001 SELECTABLE - 10GCY10CX101

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    68/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 68 of 71 09 Jan., 06 Rev. A

    NO EQUIPMENT NAME AUTO MANUAL STAND-BY LOP NO.5 HCl FEED PUMP 1A/1B 10GCN11AP001 SELECTABLE 10GCN12AP001 10GCY10CX102

    6 NaOH FEED PUMP 1A/1B 10GCN21AP001 SELECTABLE 10GCN22AP001 10GCY10CX103

    7 NEUTRALIZED WATER DISPOSALPUMP A/B

    10GCK51AP001 SELECTABLE 10GCK52AP001 10GCY10CX104

    8 DEMINERALIZED WATERTRANSFER PUMP A

    N/A 10GCK41AP001 - 10GCY10CX105

    9 DEMINERALIZED WATERTRANSFER PUMP B

    N/A 10GCK42AP001 - 10GCY10CX105

    10 REGENERATION PUMP A/B 10GCK31AP001 SELECTABLE 10GCK32AP001 10GCY10CX105

    11 DEMIN FEED PUMP A/B 10GCK11AP001 SELECTABLE 10GCK12AP001 10GCY10CX107

    WASTEWATER TREATMENT PLANT

    NO EQUIPMENT NAME AUTO MANUAL STAND-BY LOP NO.

    1 COAG FEED PUMP 2A/2B 10GNN11AP001 SELECTABLE 10GNN12AP001 10GBY10CX1012 POLYMER FEED PUMP 2A/2B 10GNN21AP001 SELECTABLE 10GNN22AP001 10GBY10CX103

    3 NaOCl FEED PUMP 2A/2B N/A 10GRN11AP001 10GRN12AP001 10GBY10CX102

    4 HCl FEED PUMP 2A 10GNN30AP001 SELECTABLE - 10GCY10CX102

    5 HCl FEED PUMP 2B 10GNN40AP001 SELECTABLE - 10GCY10CX102

    6 NaOH FEED PUMP 3A 10GNN50AP001 SELECTABLE - 10GCY10CX103

    7 NaOH FEED PUMP 3B 10GNN60AP001 SELECTABLE - 10GCY10CX103

    8 OILY WASTEWATER PUMP A/B 10GNK11AP001 SELECTABLE 10GNK12AP001 10GNY10CX101

    9 MIXING BLOWER A/B 10GNC11AN001 SELECTABLE 10GNC12AN001 10GNY10CX102

    10 THINNER SLUDGEPUMP A/B

    N/A 10GNK41AP001 10GNK42AP001 10GNY10CX102

    11 WASTEWATER

    PUMP A/B

    10GNK21AP001 SELECTABLE 10GNK22AP001 10GNY10CX103

    12 THICKER SLUDGEPUMP A/B

    N/A 10GNK71AP001 10GNK72AP001 10GNY10CX103

    13 CLARIFIEDWATER TRANSFERPUMP A/B

    10GNK31AP001 SELECTABLE 10GNK32AP001 10GNY10CX104

    14 BACKWASH PUMP A/B 10GNK61AP001 SELECTABLE 10GNK62AP001 10GNY10CX104

    15 TREATED WATERPUMP A/B

    10GNK51AP001 SELECTABLE 10GNK52AP001 10GNY10CX104

    16 SLUDGE RECEIVER TANKAGITATOR

    10GNS10AM001 SELECTABLE - 10GNY10CX105

    17 WWTP CLARIFIER TANKAGITATOR

    10GND10AM001 SELECTABLE - 10GNY10CX106

    18 pH ADJUSTMENT PIT

    AGITATOR

    10GNE10AM001 SELECTABLE - 10GNY10CX107

    19 MIXING PIT AGITATOR 10GNE20AM001 SELECTABLE - 10GNY10CX107

    20 NEUTRALIZATION PIT AGITATOR 10GNE30AM001 SELECTABLE - 10GNY10CX107

    21 DWWTP SLUDGEPUMP A/B

    10GRK11AP001 SELECTABLE 10GRK12AP001 10GNY10CX108

    22 BLOWER A/B N/A 10GRC11AN001 10GRC12AN001 10GNY10CX109

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    69/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    Pre-Com and Commissioning Manual Page 69 of 71 09 Jan., 06 Rev. A

    2. MCC FUNCTION TEST

    Refer to Appendix __

    3. MOTOR NO-LOAD TEST

    ProcedureThe procedure of pre-commissioning works for the above check-items of Electrical andInstrument Equipment shall be based on GKC Standard Procedure. Electric motors ofequipments subject for Motor no-load test are listed in table below.

    RAW WATER TREATMENT SYSTEM

    NO KKS NO EQUIPMENT NAME

    1 10GAF10AP001 FRESHWATER SUPPLY PUMP

    2 10GBK31AP001/10GBK32AP001 FITERED WATER PUMP A/B

    3 10GBK11AP001/10GBK12AP001 BACKWASH WATER PUMP A/B

    4 10GKA11AP001/10GKA12AP001 POTABLE WATER PUMP A/B

    5 10GBK21AP001/10GBK22AP001 UNDERFLOW SLUDGE PUMP A/B

    6 10GBC11AN001/10GBC12AN001 AIR BLOWER A/B

    7 10GBK41AP001/10GBK42AP001 FILTERED WATER TRANSFER PUMP A/B

    8 10GBD11AM001/10GBD12AM001 CLARIFIER TANK A/B AGITATOR

    9 10GBN10AM001 COAGULATION DISOVING TANK AGITATOR

    DEMINERALIZATION SYSTEM

    NO KKS NO EQUIPMENT NAME

    1 10GCK11AP001/10GCK12AP001 DEMIN FEED PUMP A/B

    2 10GCH11AN001/10GCH12AN001 DEGASIFIER BLOWER A/B

    3 10GCK21AP001/10GCK22AP001 BOOSTER PUMP A/B

    4 10GCK41AP001/10GCK42AP001 DEMINERALIZED WATER TRANSFER PUMP A/B

    5 10GCK31AP001/10GCK32AP001 REGENERATION PUMP A/B

    6 10GCK51AP001/10GCK52AP001 NEUTRALIZED WATER DISPOSAL PUMP A/B

    WASTEWATER TREATMENT PLANT

    NO KKS NO EQUIPMENT NAME

    1 10GNK11AP001/10GNK12AP001 OILY WASTEWATER PUMP A/B

    2 10GNC11AN001/10GNC12AN001 MIXING BLOWER A/B

    3 10GNK21AP001/10GNK22AP001 WASTEWATER PUMP A/B

    4 10GNK31AP001/10GNK32AP001 CLARIFIED WATER TRANSFER PUMP A/B

    5 10GNK61AP001/10GNK62AP001 BACKWASH PUMP A/B

    6 10GNK51AP001/10GNK52AP001 TREATED WATER PUMP A/B

    7 10GNK41AP001/10GNK42AP001 THINNER SLUDGE PUMP A/B

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    70/71

  • 8/10/2019 Commissioning Manual- Water and Waste Water Treatment

    71/71

    Uong Bi 300MW Extension Power Plant Goshu Kohsan Co., Ltd.M4/5/6 Water and Wastewater Treatment

    3. COMMISSIONING

    GKC and Lilama Staffs shall together perform the Commissioning Work, or if necessary, withEVN Staff also. GKC Staff shall explain the operation of the Water Treatment Plant and trainLilama and EVN Staffs, as well.

    3.1. PERFORMANCE TEST

    General:Performance Test shall be done by running the plant for two cycles. Demineralized andCondensate water quality shall be checked with conductivity meters. Commissioning resultsshall be recorded in the Commissioning Result form. Period of commissioning shall be

    referred to the Table below;

    Table: Commissioning PeriodITEMS

    SYSTEM Treating Capacity xCycle

    Analysis(Raw/Treated)

    Mechanical Electrical

    Gravity Filter 105 m3/hr x 2 2 x 2 x 2 x

    Carbon Filter (Potable) 90 m3/day x 2 2 x 2 x 2 x

    Carbon Filter (Demin) 41 m3/hr x 2 2 x 2 x 2 x

    Demineralizer Trains 41 m3/hr x 2 2 x 2 x 2 xCarbon Filter (WWTP) 70 m3/hr x 2 2 x 2 x 2 x

    Procedure:1. Run the plant for 24 hours per day for 2 days.2. Take data of influent flowrates for Clarifier Tank, Gravity Filter, Carbon Filter, Cation

    Exchanger, Anion Exchanger, and Mixed Bed Exchanger every hour.3. Take data of pressures for Gravity Filter, Carbon Filters, Cation Exchanger, Anion

    Exchanger, and Mixed Bed Exchanger every hour.4. Take data of conductivity for Anion Exchanger and Mixed Bed Exchanger every hour.5. Take data of pH in Clarifier Tank every hour.6. Take sampling at sampling cocks of Gravity Filter, Carbon Filters, Anion Exchanger, and

    Mixed Bed Exchanger every 4 hours for analysis. GKC and Lilama will take sampling atthe same time and perform internal analysis for comparison purposes.

    7. Take note of the running time of first on-line Demineralizer train following switched-over ofthe standby train.

    8. Take note of the duration of regeneration period in every regeneration cycle.