  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Community Outreach / Input Process

    Community Workshop No. 1 Establishing the Need and Understanding Stakeholder Question, Suggestions, and Concerns:

    Tuesday, April 16, 2013 6:30 8:00 pm

    Community Workshop No. 2 Existing Conditions and Program Requirements (scope) Tuesday, April 30, 2013 6:30 8:00 pm Community Workshop No. 3 Concept Options (quality)

    Tuesday, May 14, 2013 6:30 8:00 pm

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Community Outreach / Input Process

    Community Workshop No. 4

    Revised Options and Preliminary Costs Wednesday, May 29, 2013 6:30 8:00 pm Community Workshop No. 5 Recommended Options, Costs and Phasing Tuesday, June 11, 2013 6:30 8:00 pm Community Workshop No. 6 Scope, Quality, Cost Final Recommendation, Implementation and Final Basis of Design Tuesday, June 25, 2013 6:30 8:00 pm

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Workshop #2 Agenda

    1. Review of Experience and Critical Design Issues

    a.Swimming Pools

    b.Performing Arts Facilities

    2. Review of Existing Conditions of Site and Building

    3. Review of Preliminary Building Space Program

    4. Stakeholder Suggestions, Questions and Concerns

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    This natatorium was constructed to upgrade the school corporations aging pool. It is used for PE classes, lap swimming, recreation swimming, exercise classes and championship style swim meets.

    This facility also plays host to IHSAA boys and girls sectional, MIC Conference Championships, and

    numerous USS swim meets throughout the year.

    Review of Experience and Critical Design Issues - Swimming Pools

    North Central High School, Indianapolis, Indiana

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Key Features: 50 Meter by 25 Yard pool Deck level gutter system Ceramic tile finish Two movable bulkheads Two 1-Meter springboards One 3-Meter springboard Colorado timing system Ultraviolet light treatment system

    North Central High School, Indianapolis, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    We asked you to give us something Warren Township could be proud of, that is functional, and that is within our budget and our best hopes were exceeded

    Mr. Frank Hancock, Former Vice President Warren Township Board

    This project was the keystone of the program that Warren Township implemented to address the rapid growth of its student population. The addition included four new ninth grade houses, each with classrooms, science labs, a computer lab, project room and common area. A major component of the project was a new natatorium and field house.

    Warren Central High School, Indianapolis, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Northridge High School, Middlebury, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    This natatorium is one of the finest high school natatoriums in Indiana and was constructed as part of the new high school. Along with being a first class facility, it plays host to IHSAA boys and girls sectional, NLC Conference Championships, numerous USS swim meets and serves as the key training venue to NASA swim club. Spear Corporation design paid attention to the smallest of details and has hit a home run with swimmers, coaches, officials and parents. Joe Keller, Aquatics Director/ Swim Coach.

    Northridge High School, Middlebury, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    10 lane stretch by 25 Yard pool Deck level gutter system Ceramic tile finish One movable bulkheads Two 1-Meter springboards

    Northridge High School, Middlebury, Indiana

    One 3-Meter springboard Two Daktronics full color matrix scoreboards Relay take off platforms Defender regenerative media filter system Ultraviolet light treatment system

    Key Features:

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Columbus East High School, Columbus, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    The existing natatorium was completely gutted back to the steel shell and the old six lane 25 yard pool was removed. In its place, a new energy efficient eight lane 25 yard competition pool was constructed. This pool is used for PE classes, lap swimming, recreation swimming, exercise classes and high school swim meets.

    Columbus East High School, Columbus, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Key Features: 8-lane 25 Yard pool Deck level gutter system Ceramic tile finish Two 1-Meter springboards Daktronics full color matrix

    scoreboard Defender regenerative media filter

    system Ultraviolet light treatment system

    Columbus East High School, Columbus, Indiana

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Spire Institute, Geneva, Ohio

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    This world class aquatic center has a 54-Meter pool and a 25-yard recreation/warm up pool. The 54-Meter pool has approximately 1.2 million gallons of water with 10 competition lanes. The venue has seating for up to 2,300 spectators.

    Spire Institute, Geneva, Ohio

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Key Features: Myrtha Pool Construction Two 2-Meter flow through bulkheads Deck level ceramic tile gutter system Two 2-Meter head walls Two 1-Meter springboards Two 3-Meter springboards Daktronics full color matrix scoreboard Defender regenerative media filter system Ultraviolet light treatment system

    Spire Institute, Geneva, Ohio

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    2012 US Trials, Omaha, Nebraska

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Transformation of the Century Link Center in a world class natatorium by installing two temporary 50-Meter pools in just 10 days. 2,400 sheets of plywood, 68,000 anchors, bolts, 1.7 million gallons of water and 15,000 man hours to construct.

    2012 US Trials, Omaha, Nebraska

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Key Features:

    Two temporary 50-Meter Myrtha Pools

    Four 2-Meter head walls

    Omega timing system

    Defender regenerative media filter system

    Ultraviolet light treatment system

    All items installed to be removed

    2012 US Trials, Omaha, Nebraska

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Critical Design Issues for High School Swimming Pools

    Size of pool Water depth Acoustics Indoor air quality Energy efficiency ADA accessibility Sustainability with new equipment

    Review of Experience and Critical Design Issues - Swimming Pools

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    CSO Architects Recent Experience

    The Palladium at the Center for the Performing Arts, Carmel, Indiana This cornerstone of the Carmel City Center is the only true concert hall in the region.

    1600 seats 160,000 Square Feet Construction Cost $110,000,000

    Review of Experience and Critical Design Issues Performing Arts Facilities

  • Central High School Auditorium and Swimming Pool Project - April 30, 2013

    Jones & Phillips Associates Recent Experience

    Mona Shores High School - Norton Shores, Michigan

    The project included a new facility addition to the existing high school.

    The plans included a new theatre, drama lab, shops, dressing, music classrooms and rehearsal facilities. The space also serv