company profile down load

58
Yuekchun Construction Co., Ltd. Company Profile 풍력발전기 운송 및 시공 전문업체 국내 최대규격 크로라크레인 1600톤 운영 HEAVY LIFT AND ENGINEERING Wind Generator Transportation and Construction Operating up to 1600 ton Crawler Crane Transportation and Installation of Heavy Items

Upload: vantuyen

Post on 14-Feb-2017

245 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: Company Profile Down Load

Yuekchun Construction Co., Ltd.

Company Profile

풍력발전기 운송 및 시공 전문업체

국내 최대규격 크로라크레인 1600톤 운영

HEAVY LIFT AND ENGINEERING

Wind Generator Transportation and Construction

Operating up to 1600 ton Crawler Crane

Transportation and Installation of Heavy Items

Page 2: Company Profile Down Load

Yuekchun Construction Co., Ltd

Chairman & CEO KIBON LEE

OFFICE : DOMESTIC

SEOUL

T +82 2 2691 6000 F +82 2 2691 6001

[email protected] M +82 10 6217 6000

YCC Bldg. 822-20 Hwagok-dong, Gangseo-gu Seoul

Facilities and Yard

CHEONAN , YEOCHEON, DAESAN, DANGJIN

OFFICE : OVERSEAS

SAUDI ARABIA : Al Khobar, Riyadh

Contact : +966 50671 5559

Branch Yuekchun Construction Co., Ltd

Limar Al Kaleej Gen. Contracting

P.O.BOX 20706 Al-Khobar, 31952

QATAR : Doha, Al Khor

Contact : +974 5557 5740

Lee Machinery & Trading Co. W.L.L

P.O.BOX 24783 Doha

UAE : Dubai, Abu Dhabi, Ruwais

Contact : +971 50417 6905

YuekChun Construction Co., Ltd

Mohammed bin Zahid City Musafa

MALAYSIA NES YC Construction Sdn Bhd

Lot 12, Block A, Warisan Square, 88000

Kota Kinabalu, Sabah

BUSINESS SECTORS

· Crane Rental & Lifting Services

· Scaffolding Structure Assembly & Disassembly

· Engineering Services

· Wind Power Services

· General Trading

· Steel Construction

· Electrical Construction

Company Profile

Specialized in Wind Power Service &

Heavy Lift and Engineering

2

Page 3: Company Profile Down Load

Table of Contents

04 Concept & Business Sectors CEO Message

05 CEO Message

06 Engineering Service_Rigging Plan

06 Equipment List

07 - 10 Heavy Equipment Introduction

11 - 12 Location

13 - 14 Organization

15 Chronology

16 - 24 Work Experience List

Project

25 - 38 Work Experience– Wind Power Service

39 - 50 Work Experience– Heavy Lifting & Installation

51 - 52 HSE, QA/QC

53 - 55 Certificate for Company and Wind Power Project

56 Press

57 Client List for Wind Power Construction

3

Page 4: Company Profile Down Load

Networking

Intelligence

Professional

Energy-conscious

Worldwide International Services

Multilingual Professional Communication English – German – Japanese – Chinese - Korean

Participation of Construction &

Mechanical Engineer

Wind Power Services

Business

Experience since 1979

Crane Rental & Lifting Services

Engineering Services

Wind Power Services Wind Tower Construction

Wind Turbine Installation

Lifting & Transportation

General Trading Multilingual Business Communication

Korean – Japanese – Chinese - English - German

Crawler Crane 1600T

750T

Truck Crane 650T

Hydraulic Crane 550T

Tower Crane 32T

4

Page 5: Company Profile Down Load

Acknowledgement from Chairman

It is our rising spirit and goal to reach for the better world with high quality

of life by rendering great services to the public and making advanced steps

of business management. With a frontier spirit comes great achievement in

the era of Globalization and eternal glory against difficult situation and

through barriers upon prejudices.

I am grateful to all whom may it concern for encouragement of development which

Yuekchun had established their name as listed on the first for heavy equipment and

Crane usage in the 21 century. Our company is managing Hydraulic Crane, Crawler

Crane, and Tower Crane as a result in multi-crane leasing business corporation in

Korea. As though the time of 70s for the cranes' usage is in for Shipyard or Crane

business part in enterprises, We have been established in 1979 and passing through

150 ton Crane as the biggest one in the era of 80s to 500ton of 90s.

We proudly have introduced the World's largest TRUCK CRANE (800T Mobile Crane

with Tire) and Crawler Crane in capacity of 1600, 750 ton to meet the new era of the

21st Century in domestic field.

The self-confidence and dignity we have made is based on the pride that we are

building one of the basis of industrial development of the nation.

We are trying to do our utmost sincerity and effort to make our clients' profit to be our

first priority. Theses philosophies we always search for result in more rapid work

scope capability and safety first in the Plant Work. Thirty years of experience always

support our mental attitude strictly stand on the motto 'No Loss and No Damage to

Clients' with the united state of mind. In addition, Operator's Manual and the other

supplements will be provided in every crane work places so no mistake can happen

with the mind of the prepared.

In order to utilize a drawing using telescope for distances measurement at the time of

an on-site inspection for the purpose of fulfilling growing needs of social environment,

and the secure a little more exact workability, our company secures a CAD/CAM

system staff, creates RIGGING PLAN and judges work justice beforehand.

Successful recognition and aloft hallmark in the domestic crane business results in

participation of the abroad plant such as Taiwan POMOSA oil-painting housing

complex spot, the China Hainan Inland spot, Africa Engine Plant spot, North Korea

KEDO atomic power spot, Russia Hava gas plant spot, and Qatar Oil plant spot, etc.

We think that heavy equipment cranes with high capability can distribute saving of

foreign currency whichleads to development of the country's economy, because

heavy equipments can be produced only by the countries like USA, Germany, and

Japan, etc. Our company has secured the Main Parking Yard for Cranes to provide

our equipment in ONE-DAY leasing capability. We also have established our Joint

Venture Company for the increasing crane needs of the countries like Dubai, Qatar,

and Saudi Arabia. Your warm guidance and encouragement is of our eternal

gratitude and we will be in your service anytime anywhere for the bright future. Thank

you.

Best Regards,

CEO Ki-Bon Lee

CEO Message

5

Page 6: Company Profile Down Load

Rigging Plan

6

Page 7: Company Profile Down Load

Key Equipment

Equipment Capacity Nr. Remarks

Crawler 1600 ton 1 Luffing jib

Crawler 750 ton 2 Luffing jib

Crawler 600 ton 2 Luffing jib

Crawler 550 ton 1 Luffing jib

Crawler 450 ton 3 Luffing jib

Crawler 400 ton 1 Luffing jib

Crawler 320 ton 2 Luffing jib

Crawler 300 ton 1 Fixed jib

Crawler 275 ton 1 Fixed jib

Crawler 250 ton 5 Fixed jib

Crawler 180 ton 1 Fixed jib

Crawler 120 ton 2 Fixed jib

Crawler 100 ton 1 Fixed jib

Crawler 80 ton 2 Tower jib

Hydr. 550 ton 1

Hydr. 470 ton 2 Luffing jib

Hydr. 300 ton 1

Hydr. 250 ton 1

Hydr. 200 ton 2

Hydr. 176 ton 2

Hydr. 160 ton 2

Hydr. 120 ton 1

Hydr. 100 ton 5

Hydr. 90 ton 5

Hydr. 65 ton 2

Hydr. 50 ton 28 ( 55 ton 10Unit )

Hydr. 45 ton 5

Hydr. 35 ton 1

Hydr. 25 ton 1

Hydr. 20 ton 1

Truck 800 ton 1 Luffing Jib

Truck 300 ton 1 Fixed jib

Tower 32 ton 5 T-Type & Luffing

Transporter 200 ton 1 L 15 m * W 5.5 m

Transporter 60 ton 1 L 15 m * W 3.0 m

Trailer 100 ton 3 Low bed

Trailer 60 ton 3 Low bed

Trailer 30 ton 3 High bed

Trailer Trailer(L 30m) 3 Blade & Top Tower Transpo

rtation only

Loader 1 Backet & Forklift

Generator 10 75 Kw

Total 117

Crawler Hydr. Truck Tower Transporter Trailer

CRAWLER CRANE HYDRAULIC CRANE TRUCK CRANE TOWER CRANE TRANSPORTER TRAILER

7

Page 8: Company Profile Down Load

Heavy Equipment

Crawler Crane 1600 ton / DEMAC CC8800-1 introduced 2011

Features: • Max. capacity 1600 t

• Max. load moment 24002 mt

• Super lift radius 19-30 m

• Excellent capacities at the luffing fly jib

• Redundant drivelines

• 400 V power supply

• Optional TWIN-Kit for capacities up to 3200 t

CC8800-1

Upgrade Feasibility

CC8800-1 Twin 3200 ton

8

Page 9: Company Profile Down Load

Heavy Equipment

Crawler Crane 750 ton / Manitowoc 18000

9

Features: • 750 mt (825 ton) Capacity

- No. 55A Boom with MAX-ERTM

• 600 mt (660 ton) Capacity - No. 55 Boom

• 450 mt (500 ton) Capacity - No. 55/79A Boom

• 9 098 m ton-m (65,505 ft-kips)

- Maximum Load Moment with MAX-ER

• 134.1 m No. 55 Main Boom

• 121,9 m - No. 55/79A Main Boom

• No. 79A Luffing Jib (94.5 m)

on No. 55 Boom(91.4 m)

Page 10: Company Profile Down Load

Heavy Equipment

Truck Crane 650 ton / LGD 1800

10

Page 11: Company Profile Down Load

Location 국내 Domestic

Head Office SEOUL

Branch Office/Work Shop CHEONAN

Branch Office/Work Shop DANGJIN

Branch Office/Work Shop YEOCHEON

YCC Bldg.

822-20 Hwagok-dong,

Kangseo-Gu SEOUL,

KOREA 157-900

Site: 559.43(㎡)

Construct: 291.36(㎡)

Gimpo Airport

SEOUL

SEOUL

GWANG

JU

MOKPO

BUSAN

YEOUI-DO

Site: 18,182(㎡)

Construct: 291(㎡)

Site: 661(㎡)

Construct: 66(㎡)

Site: 2,314(㎡)

2

1 3

4

5

Entrance

3

4 2

1 5

Entrance

3 4

Entrance

2

1

5

18,182㎡

661㎡

2,314㎡

1 Material Container 2 Office 3 Crawler Desktop 4 Crawler Counter Weight 5 Hydraulic Crane

1 Material Container 2 Office 3 Crawler Desktop 4 Crawler Counter Weight 5 Hydraulic Crane

1 Material Container 2 Office 3 Crawler Desktop 4 Crawler Counter Weight 5 Hydraulic Crane

11

Page 12: Company Profile Down Load

Location 해외 Overseas

SAUDI ARABIA

QATAR

UAE : Abu Dhabi

MALAYSIA

YuekChun Const. Co., Ltd

P.O.BOX 20706

Al-Khobar 31952

+966 50671 5559

Saudi Arabia

Airport

Airport

INDONESIA

SINGAPORE

Qatar

Lee Machinery & Trading

Co. W.L.L

P.O.BOX 24783 DOHA

+974 5557 5740

YuekChun Const. Co.Ltd.

M1,ME10, Mohammed

bin Zahid City Musafa, U.A.E

+971 50417 6905

NES YC

Construction Sdn Bhd

Lot 12, Block A,

Warisan Square, 88000

Kota Kinabalu, Sabah

+60 10 951 4654

VIETNAM

Airport

12

Page 13: Company Profile Down Load

Organization

Board of Directors

이사회

CEO

사 장

Corporate

Planning

Division

Domestic

Business

Division

Overseas

Business

Division

Business

Supporting

Division

Administrative

Accounting

Division

Public

Relations

Division

경영지원부 관리회계부 홍보부 기획경영부 국내사업부 해외사업부

Heavy Equipment Division

중장비사업부

Construction Division

건설사업부

Crawler/

Hydraulic/

Truck Crane/

Tower Crane

Equipment

Maintenance

Crane Sales

Domestic

/Overseas

Equipment

Rental

장비관리

장비매매

장비임대

크로라/

하이드로/

트럭크레인/

타워크레인

Wind

Generator

Transportation

& Installation

Project

Management

Engineering

Service

Site

Management

프로젝트관리

건설기술서비스

현장관리

풍력발전기

운송 &설치

Safety

Management

안전관리

13

Page 14: Company Profile Down Load

Task Position Name Number

Generalization CEO Ki-bon Lee 1

Board of Directors Director

Ki-bon Lee

4 Tae-hoon Lee

Ki-hwal Lee

Duk-im Mo

Overseas Department Managing Director Tae-hoon Lee

2 Director Hye-mi Lee

Domestic Department

General Manager Suk Yun

4 Department head Su-geun Kwoag

Chung-hun Lee

Assistant Hee-ok Sou

Technical Department Assistant Sung Kim

2 Dong-joo Ryu

Construction Department Vice Chairman Bon-sin Gu

2 Section Chief Hyoung-sub Kwon

Account Department

Chief A/C Manager Gee-hwal Lee

4 Section Chief Sung-hang Jung

Jin-suk-Seo

A/C Assistant Jin-young Kim

publicity department Managing Director Jin-gyeong seong

2 Director Dae-hyeon Kim

Heavy Equipment Department

Director Jung-hyeong Yun

4

24 110

Department Head Hyeon-gi Yun

Section Chief Seung-duk Gang

Employment Yong-sun Sin

Mechanic ( Included Overseas ) Operator ( Included Overseas )

Total 159

Staff List

14

Page 15: Company Profile Down Load

Chronology

Established Dongyang Crane Company for crane rental service 1979

1985

1993

1996

Acquired the rental business License for construction machinery,

Established Yuekchun Construction Equipment Company Capital USD163,000

Changed the name of company to YuekChun Construction Co., Ltd.

Increased Capital to ₩500,000,000 Korean Won. Nov. 1996

Acquired the License of Scaffolding Work, License No. 96-Seoul-07-15 Additional Main Facility Yard for Cranes in Cheonan

Additional Parking Yard established in Yeochun(13,305.80m2) Acquired the License for Construction for Steel Structure

Acquired the rental business License for construction machinery, License No.43

Established Branch Office at Cheon-an City, Korea

Introduced crawler crane 750t

Completed of Construction of Main Office Building in Seoul (501,93 m2, 5 floors)

Established Qatar Branch ( Lee Machinery & Trading Co., W.L.L.)

1997

2005

2006

2007

2008

2009

2011

Acciona(Spain) Wind generator 41unit Transportation & Installation project

Introduced special trailer 7 unit for wind generator transportation

Established Saudi Branch, Yuekchun Const. Co., Ltd.(Special construction)

Introduced crawler crane 400t, 275t

Increased Capital ₩ 700,000,000

Established Malaysia Branch NES YC Const. Sdn. Bhd

Introduced crawler crane 1600t (CC8800-1), 750 t

15

Page 16: Company Profile Down Load

No. Contract Project Remarks

1 94.03 ~ 96.01 New Hangju Bridge Installation

2 94.12 ~ 95.02 Nonsan Outside Highway Box Installation

3 94.04 ~ 95.02 Ilsan Steam Power Plant Steel Structure Installation

4 95.09 ~ 97.02 Taean Steam Power Plant Steel Structure Installation

5 95.09 ~ 96.03 Han River North Riverside Highway Installation

6 95.10 ~ 96.03 Riverside Highway Steel Beam Installation

7 95.10 ~ 97.06 Bucheon-Ansan Highway Box Installation

8 95.10 ~ 96.04 Junnung-chun Highway Steel Structure Installation

9 95.04 ~ 06.02 Ilsan Power Plant Turbin Installation

10 95.05 ~ 96.01 Taean Steam Power Plant Boiler Installation

11 95.06 ~ 95.06 Pyungtaek LNG Power Plant – Installation

12 95.06 ~ 96.06 West-Seoul Transformer – Installation

13 95.07 ~ 96.10 Ilsan Incinerator Installation

14 95.09 ~ 95.11 Dongyang Magic Factory

15 95.07 ~ 96.10 Chungju LG Semiconductor Factory – Installation

16 96.11 ~ 97.01 Siheung-Ansan Highway Steel Structure Installation

17 96.10 ~ 97.05 Yeonyeuk Bridge Steel Structure Installation

18 96.02 ~ 96.11 Seogang Bridge Steel Structure Installation

19 96.04 ~ 06.06 Hongrundong-bukak Tunnel Highway Installation

20 96.04 ~ 96.08 Incheon Terminal Steel Structure Installation

Heavy Lifting & Installation

Domestic

Work Experience

16

Page 17: Company Profile Down Load

No. Contract Project Remarks

21 96.11 ~ 97.03 Hanbo Steel Structure Installation

22 96.11 ~ 97.02 LG Chemical Steel Structure Installation

23 96.09 ~ 97.02 Busan Shinho Bridge Installation

24 96.10 ~ 97.12 Guri Bridge Installation

25 96.08 ~ 96.10 LG Oil Steel Structure Installation

26 96.08 ~ 97.03 West-Incheon Steam Power Plant Steel Structure

27 96.05 ~ 96.09 West-Sea Highway Box Installation

28 96.01 ~ 97.05 West-Incheon Steam Power Plant Boiler Installation

29 96.03 ~ 97.05 Yeocheon Samnam Chemical Tank Installation

30 96.09 ~ 96.11 Hadong Steam Power Plant Turbin Installation

31 96.09 ~ 96.11 Gimpo Airport A/S Factory Construction

32 96.10 ~ 97.01 Sungdong Transformer Building –Installation

33 03.02 ~ 03.09 KEDO Korean Peninsula Energy Development Organization

34 2002 SEOUL World Cup Stadium Construction Work

35 2003 Cheongyechun Steel Box Dismantling Work

36 2005 Paju LG-Phillips LCD Cluster Installation

37 2005 Taean Thermal Power Generation

38 06.07~ 07.04 GS Revamping Project in Daesan

39 07.10~ 08.05 Lotte Daesan Petrochemical Corp.

40 2007 Hyundai Steel Corex Dismantling Work

Heavy Lifting & Installation

Domestic

Work Experience

17

Page 18: Company Profile Down Load

Contract Equipment Project Client Location

2009.01 ~ 2009.12

CCH2500 / 7250-2F/SC2500

Shipbuilding & Manufacture Hyundai Heavy

Industries Co., Ltd Pohang, KOREA

2009.02 ~ 2009.06

LGD1800/ LTM1400/ LTM1225/ NK1225

Chemical Plant LG Chem Daesan, KOREA

2009.03 ~ 2009.11

LTM1400 Chemical Plant, Revamping LG Chem Seosan, KOREA

2009.01 ~ 2009.12

7250-2F Hyundai Mipo Dockyard Hyundai Mipo

Dockyard Co., Ltd Ulsan, KOREA

2009.10 ~ 2009.12

HC278 Shipbuilding & Manufacture Hyundai Samho

Heavy Industries Co., Ltd

Mokpo, KOREA

2009.03 ~ 2009.12

Transporter Shipbuilding & Manufacture Samho Shipbuilding Geoje, KOREA

2009.08 ~ 2009.09

LTM1400 The Federation of the Korean Industries Bldg.-Wrecking

Sungdo Construction Co., Ltd

Yeouido, KOREA

2009.11 ~ 2009.12

M18000 Orient Shipyard Dongbang Yeosu, KOREA

2009.09 ~ 2009.12

SCX2800-2 Nuclear Power Plant STECO Ulsan, KOREA

2009.01 ~ 2009.10

M18000 Shipbuilding & Manufacture Hyundai Heavy

Industries Co., Ltd Gunsan, KOREA

2009.04 ~ 2009.06

SCX2800-2 Nuclear Power Plant STECO Ulsan, KOREA

2009.05 ~ 2009.05

CKE4000 Thermoelectronic Power Plant Halla Energy & Environment

Boryeong, KOREA

Heavy Lifting & Installation

2009

Domestic

Work Experience

18

Page 19: Company Profile Down Load

Contract Equipment Project Client Location

2010.01 ~ 2010.12

CCH2500 / 7250-2F / SC2500

HYMS Pohang Factory Hyundai Heavy

Industries Co., Ltd Pohang, KOREA

2010.01 ~ 2010.03

LGD1800/ LTM1400/ AC300/ LTM1160/2

Chemical Plant GS E&C Daesan, KOREA

2010.01 ~ 2010.09

M16000 Iron-foundry Plant Hyundai Heavy

Industries Co., Ltd Ulsan, KOREA

2010.06 ~ 2010.06

LGD1800 Hyundai Steel Plant Hyundai Steel Dangjin, KOREA

2010.03 ~ 2010.11

LGD1800/ LTM1400/AC300/LTM1160/2

Chemical Plant Daesin Plant

Const. Co. Ltd Daesan, KOREA

2010.03 ~ 2010.03

LGD1800 SK Energy Plant Sungdo ENG Ulsan, KOREA

2010.01 ~ 2010.12

HC278 Shipbuilding & Manufacture Hyundai Samho Heavy Industries

Co., Ltd Mokpo, KOREA

2010.01 ~ 2010.12

7250-2F Hyundai Mipo Dockyard Hyundai Mipo

Dockyard Co., Ltd Ulsan, KOREA

2010.01 ~ 2010.12

Transporter Shipbuilding & Manufacture Samho Shipbuilding Geoje, KOREA

2010.02 ~ 2010.10

LTM1400 Kintex : Korea International Exhibition Center

Samjin Industries & Steel Structure

Ilsan, KOREA

2010.02 ~ 2010.08

SCC3200 Hyundai Steel Plant Hyunchang Industry Dangjin, KOREA

2010.05 ~ 2010.11 SC800-2/

SCX2800-2 Nuclear Power Plant STECO Ulsan, KOREA

2010.01 ~ 2010.07

2010.01 ~ 2010.05

M18000 Osong Station Dongbang Osong, KOREA

2010.01 ~ 2010.05

M18000 Orient Shipyard Dongbang Yeosu, KOREA

2010.07 ~ 2010.10

M18000 Samsung Electronics Factory Shinwoo Tangjung, KOREA

2010.06 ~ 2010.07

M250S-2 Power Plant Hanyang EMC Incheon, KOREA

2011.04 ~ 2011.08

M18000 LGD1800 LTM1160/2 SC800 LW500-1

Young Heung Power Plant site - Wind Farm

Doosan Heavy Indust.. ,

Samsung Heavy Indust.. Unison

YoungHeungDo, KOREA

Heavy Lifting & Installation

Domestic

Work Experience

19

Page 20: Company Profile Down Load

Contract Equipment Project Client Location

2012.03~ 2012.04

LGD1800 Ulsan Tongsuh Petrochemical Tongsuh

Petrochemical Corp. Ltd

Ulsan

2012.08~ 2012.09

M18000 750T Gwangyang steel factory HanChang Crane Gwangyang,

Junnam

2012.12~ 2013.01

CC8800-1 1600T, M16000-2 450T

Dang Jin Power Plant #9,10 construction Project

Samjin Industries & Steel Structure

Dang Jin

2012.07~ 2012.08

LR1450K 450T

Taebaek Wind power plant Sam-il Taebaek

2012.06~ 2012.07

CC8800-1 1600T

SMD Y-Project Samsung Engineerin

g Asan-si,

Tangjung

2012.06~ 2013.10

CC8800-1, M250 1600T

Young-Heung Power plant #5,6 construction Project

Yoo-a Industrie Co., Ltd

Young-Heung

2012.01~ 2012.12

CCH2500 /7250-2F /SC2500

HYMS Pohang Factory Project HYMS Pohang

2012.01~ 2013.12

Heavy Lifting & Special Heavy generator Transportation

ChangJuk Wind farm construction Project

Hyundai Heavy Industries Co., Ltd

ChangJuk

2012.05~ 2012.10

CC8800-1 1600T

Oil Bank #2 BTX Project Hyundai Heavy Ind

ustries / Korea Daesan

2011.12~ 2012.01

750T, 470T, 250T 160T, 100T, 50T cargo crane, forklift

Daesan LG Chemical Factory Project

LG Serveone Daesan,

Chungnam

2012.02~ 2012.07

650T, 450T, 150T

Gocheok Dome Stadium Samjin Gocheok, Seoul

Heavy Lifting & Installation

Domestic

Work Experience

20

Page 21: Company Profile Down Load

Overseas

Work Experience

Contract Equipment Project Client Location

2005 7100 Nakilat ship repair yard project

DAEWOO Nakilat, Qatar

2006, 2007 LR1550 Ras Abu Fontas Project Belleli Energe S.p.A

Ras Abu

2009.01 ~ 2009.12

AC300 AC205 HL760-7

Gas Power Plant Poonglim Sakhalin, RUSSIA

2009.05 ~ 2009.12

M16000 Chemical Power Plant Doosan Cebu,

PHILIPPINES

2009.01 ~ 2009.11

LGD1800 LTM1090-1

Madagascar Ambatovy Power Plant Project

Keangnam Madagascar,

AFRICA

2010.09 ~ 2010.12

M16000 G8 Conference Hall JRC CROCUS Vladivostok,

RUSSIA

2010.01 ~ 2010.04

M250S-2 Thermoelectronic Power Plant Doosan Cebu,

PHILIPPINES

2010.07 ~ 2010.12

H-300 Vinashin Shipyard Doosan Vietnam

2010 AC120 NK1600 SC50H-2

Doha North Sewerage Treatment and Associated Works Interceptor Sewers

DONGAH Doha, Qatar

2010

CCH2500 LTM1080 LTM1225 RK450

QAFCO 5 Project (Ammonia & UREA Plant)

HYUNDAI Messaid, Qatar

2010 LR1550 Pipe_Conveyor_Supporting_ Structure_Column_Bridges_ Critical_Erection

DANEM

2011 ~

SL7700 LR1350 LR1300 LTM1200 ATF160G-5 35Units

Equipment Supplying for Rabigh Power Plant

Doosan Rabigh, Saudi

Heavy Lifting & Installation

21

Page 22: Company Profile Down Load

Wind Generator Construction Performance

Project

Name

YEOUNGHEUNG

Domestic

Wind power

Construction

DOOSAN

Heavy Industries

& Construction

Test instrument

Installation

YEOUNGYANG

Wind Farm

Transportation

Installation

SHINAN

Wind Power

Generator

Transportation

Installation

MT.MAEBONG

Wind power

the third

Transportation

Installation

Construction year

2010~2011 2009 2008 2008 2006

client KEPC Doosan industries,.

Co.Ltd Acciona Dongkuk snc. Taebaek City Hall

Constructor GS E&C Doosan industries,.

Co.Ltd Acciona Dongkuk snc. Hyosung

Construction area

Yeongheung-myeon, Ongjin-gun,

Incheon, Korea

Gujaeup Bukjeju-gun Jeju, Korea

Yeongyang Gun Gyeongsangbuk-do,

Korea

Bigeum-myeon, Sinan-gun,

Jeollanam-do, Korea

Mt.maebong TaebaekGwang won

Installation type

2MW=3units. 2.5MW=4units. 3.0MW=2units

3MW 1.5MW 1MW 850KW

Generator Capacity

9units(22MW) 1unit 41units 3units 3units

Construction Site In charge

GS E&C. Doosan industries

co,.Ltd Acciona Dongkuk snc. Hyosung

Construction Registered or

Non registered

Registered Registered Registered Registered Registered

Electricity Registered

or Non registered

Registered Registered Registered Registered Registered

Put into equipment Breakdown

C/C 750ton C/C 100ton H/C 100ton

T/C 800ton H/C 200ton

T/C 800ton H/C 200ton C/C 450ton H/C 470ton

H/C 550ton, H/C 200ton

H/C 300ton M/B 50ton

2011 -2006

Domestic

Work Experience

22

C/C H/C T/C M/B

CRAWLER CRANE HYDRAULIC CRANE TRUCK CRANE MOBILE CRANE

Page 23: Company Profile Down Load

Wind Generator Construction Performance

Project Name

YANGYANG

Wind power

Transportation

Installation

DAEGWAN-

RYUNG

Wind power

Transportation

Iinstallation

YEONGDEOK

Wind power

Transportation

Installation

MT.MAEBONG

Wind power

Transportation

Iinstallation

JEJU

Wind power

Ttransportation

Iinstallation

Construction year

2006 2005 2004~2005 2003~2004 2003~2004

client KEPC Gwangwon Wind

power Yeongduk Taebaek cityhall KEPCO

Constructor Dongkuk snc. Vestas Hyosung

Construction area

Yangyang Gwangwon

Daegwanryeoung Gwangwon

Yeongdeok-gun, Gyeongbuk, Korea

Mt.maebong Taebaek-si Gwang

wondo Jeju

Installation type

1.5MW 2MW 1650KW 850KW 1500KW

Generator Capacity

2units 14units(28MW) 24units ( 39.6MW) 2units 4units

Construction Site In charge

Dongkuk snc. Vestas Hyosung

Construction Registered or

Non registered

Registered Registered Registered Registered Registered

Electricity Registered

or Non registered

Registered Registered Registered Registered Registered

Put into equipment Breakdown

T/C 800ton H/C 200ton

C/C 550ton, H/C 200ton

C/C 550ton H/C 200ton

H/C 300ton M/B 50ton

H/C 470ton

Domestic

Work Experience

23

2006 -2004 C/C H/C T/C M/B

CRAWLER CRANE HYDRAULIC CRANE TRUCK CRANE MOBILE CRANE

Page 24: Company Profile Down Load

Wind Generator Construction Performance

Project

Name

KANGWON

Wind power

Transportation

Installation

JEJU

Wind power

Transportation

Installation

JEJU

Wind power

Transportation

Installation

ULLEUNGDO

Wind power

Transportation

Installation

Construction year

2004 2003 2002 1999

client Gwangwondo Jeju Jeju Gyeongsangbuk-do

Constructor vestas Vestas Vestas Vestas

Construction area

Daegwanryeong Gwangwondo

Jeju Jeju hangwon Ulleung-gun, Gyeongbuk,

Installation type

660KW 660KW 750KW 600KW

Generator Capacity

4units 3units 3units 1unit

Construction Site In charge

Construction Registered or

Non registered

Registered Registered Registered Registered

Electricity Registered

or Non registered

Registered Registered Registered Registered

Put into equipment Breakdown

H/C 300 H/C 300ton H/C 300ton H/C 300ton

Domestic

Work Experience

24

C/C H/C T/C M/B

CRAWLER CRANE HYDRAULIC CRANE TRUCK CRANE MOBILE CRANE 2004 -1999

Page 25: Company Profile Down Load

Project Name Yeonghueng Domestic Wind power Commercialize area Construction

Business Year 2010~2011

Client KEPC

Constructor GS E&C

Business area Yeongheung-myeon, Ongjin-gun, Incheon, Korea

Installation Type Unison2MW=3Units Samsung 2.5MW=4Units Doosan 3.0MW=2Units

Generator Capacity 9 Units (22MW)

Construction Site In charge GS E&C

Construction Industry Registered Registered

Electricity Construction Industry Registered

Registered

Mobilized Equipment CRAWLER CRANE 750T CRAWLER CRANE 100T H/C 100ton

Wind Generator Transportation & Installation

Domestic

Work Experience

25

Page 26: Company Profile Down Load

2011 Yeonghueng Domestic Wind power Construction work

UNISON(2.0MW) Transportation & Installation

Transportation 1

Blade Assembling

Embedment Installation Iron Arrangement of bar Concrete Placing

Transportation 2 Transportation 3

No.

1

No.

2

No.

3

No.

4 No.

5

No.

6

No.

7

No.

8

No.

9

1Phase(3 Unit Installation) : 2010.05.30

2Phase(6Unit Installation) :

2011.07.30

Transportation Rout

Domestic

Work Experience

26

Page 27: Company Profile Down Load

2011 Yeonghueng Domestic Wind power Construction work

UNISON(2.0MW) Transportation & Installation

Equipment Stopover Bottom Installation Middle-1 Installation

Middle-2 Installation Nacelle Installation Top Installation

Blade Assembling

Blade Installation Installation completion

Domestic

Work Experience

27

Page 28: Company Profile Down Load

2011 Yeonghueng Domestic Wind power Construction work

DOOSAN Heavy Industries & Construction (3.0MW)

Embedment Installation Iron Arrangement of bar Concrete Placing

Tower Transportation-1 Tower Transportation-2 Nacelle Transportation-3

Nacelle Instalation

Bottom Installation Middle-1 Installation

Domestic

Work Experience

28

Page 29: Company Profile Down Load

2011 Yeonghueng Domestic Wind power Construction work

DOOSAN Heavy Industries & Construction (3.0MW)

Blade Installation

Blade Instalation

Installation Completion

Nacelle Installation Middle-2 Installation Top Installation

Domestic

Work Experience

29

Page 30: Company Profile Down Load

Certificate

Construction Performance Certificate from GS Construction Co. Ltd.

- Yeong Heung Wind-Power Construction

2011

2011 Yeonghueng Domestic Wind power Construction work

30

Page 31: Company Profile Down Load

Wind Generator Transportation & Installation

Domestic

Work Experience

31

Project Name Doosan Heavy Industries

Test instrument Installation

Construction year 2009

Client Doosan Heavy Industries & Construction

Constructor Doosan

Business area Gujaeup Bukjeju-gun, Jeju

Installation Type 3MW

Generator Capacity 1unit

Construction Site In charge Doosan

Construction Industry

Registered

Registered

Electricity Construction

Industry

Registered

Registered

Mobilized Equipment TRUCK CRANE 800ton,

H/C 200ton

Page 32: Company Profile Down Load

2011 Yeonghueng Domestic Wind power Construction work

DOOSAN Heavy Industries & Construction (3.0MW)

Nacelle Installation

Transportation 2 Transportation 3 Transportation-1

Nacelle Installation Blade Installation

Installation Completion

Domestic

Work Experience

32

Page 33: Company Profile Down Load

Project Name Yeongyang Wind Farm Transportation & Installation

Construction year 2008 ~ 2010

Client Acciona

Constructor Acciona

Construction area Yeongyang-gun Gyeongsangbuk-do

Installation Type 1.5MW

Generator Capacity 41units

Construction Site In charge Acciona

Construction Industry Registered

Registered

Electricity Construction Industry Registered

Registered

Mobilized Equipment

TRUCK CRANE 800ton H/C 200ton CRAWLER CRANE 450ton H/C470ton

Installation Completion

2008-2010 Yeongyang Wind Farm Transportation & Construction

ACCIONA (1.5MW) Domestic

Work Experience

33

Page 34: Company Profile Down Load

Equipment Transportation

2008-2010 Yeongyang Wind Farm Transportation & Construction

ACCIONA (1.5MW)

N

1

0

Yeongyang Wind Farm Wind Power Generator 41Units : Plan

Domestic

Work Experience

34

1 UNIT 10 UNIT 20 UNIT 30 UNIT 40 UNIT TOTAL

41 UNIT

Page 35: Company Profile Down Load

Equipment Installation

2008-2010 Yeongyang Wind Farm Transportation & Construction

ACCIONA (1.5MW)

Installation Completion

Domestic

Work Experience

35

Page 36: Company Profile Down Load

Certificate

Construction Performance Certificate from Acciona Wind Power.

- Yeongyang Wind-Power Construction.

2008-2010

2008-2010 Yeongyang Wind Farm Transportation & Construction

36

Page 37: Company Profile Down Load

Project Name Sinahn Wind Power Generator Transportation & Installation

Construction year 2008

Client Dong kuk snc.

Generator Manufacturer Mitsubishi

Business area Bigeum-myeon, Sinan-gun, Jeollanam-do, Korea

Installation Type 3MW

Generator Capacity 3units

Construction Site In charge Dong kuk .

Construction Industry Registered or Non registered

Registered

Electricity Construction Industry Registered or Non registered

Registered

Mobilized Equipment H/550ton,H/C 200ton

Installation Completion

2008 Shinan Wind Power Generator Transportation & Construction

Domestic

Work Experience

37

Page 38: Company Profile Down Load

Transportation - 1 Transportation - 2 Transportation - 3

Installation - 1 Installation - 2

Installation - 3

Installation - 4

2008 Shinan Wind Power Generator Transportation & Construction

Domestic

Work Experience

38

Page 39: Company Profile Down Load

Heavy Lifting & Installation

Incheon (Airport) International Transportation Center

Construction , Crawler Crane 450 ton, Korea

Removing the Old Governor-General Building, Hyd.

Crane 300 ton, Korea ,1995

Domestic

Work Experience

39

Page 40: Company Profile Down Load

Heavy Lifting & Installation

Seoul World Cup Stadium

Hyd. Crane 300 ton, Korea ,2002

Domestic

Work Experience

40

Page 41: Company Profile Down Load

Heavy Lifting & Installation

The National Assembly Building Renovation

Hyd. Crane 400 ton/300 ton, Seoul, Korea

Gwangjin Bridge Dismantling Work

Mobile Crane 50 ton/25 ton, Seoul, Korea

Domestic

Work Experience

41

Page 42: Company Profile Down Load

Heavy Lifting & Installation

Cheongyechun Steel Box Dismantling Work

Hyd. Crane 400 ton/ 300 ton, Seoul, Korea, 2003

Hyundai Steel Corex Dismantling

Truck Crane 650 ton, Korea ,2007

Domestic

Work Experience

42

Page 43: Company Profile Down Load

Heavy Lifting & Installation

Chemical Plant

Truck Crane 650, Hyd 400 ton, Korea ,2009

Thermoelectronic Power Plant

Crawler Crane 400 ton, Boryung, Korea ,2009

Samsung Electronics Factory

Truck Crane 650 ton, Tangjung, Korea ,2010

Domestic

Work Experience

43

Page 44: Company Profile Down Load

Heavy Lifting & Installation

Floating Island Construction

Crawler Crane 750 ton, Seoul, Korea, 2010

Gwangjin Bridge Dismantling Work

Mobile Crane 50 ton/25 ton, Seoul, Korea

Domestic

Work Experience

44

Page 45: Company Profile Down Load

Heavy Lifting & Installation

Oil Bank #2 BTX Project

Crawler Crane 1600 ton, Daesan, Korea , 2012

Domestic

Work Experience

45

Page 46: Company Profile Down Load

Heavy Lifting & Installation

Samsung Y-Project

Crawler Crane 1600 ton, Tangjung, Korea , 2012

Domestic

Work Experience

46

Page 47: Company Profile Down Load

Heavy Lifting & Installation

Ulsan Tongsuh Petrochemical

Crawler Crane 750 ton, Ulsan, Korea, 2012

Gocheok Dome Stadium

650, 450, 150 ton, Seoul, Korea ,2012

Domestic

Work Experience

47

Page 48: Company Profile Down Load

Heavy Lifting & Installation

QAFCO 5 Project (Ammonia & UREA Plant)

LR1550/CCH2500/LTM1080/LTM1225/RK450

Musayid, Qatar, 2010

Doha North Sewerage Treatment and Associated Works

Interceptor Sewers

AC120/NK1600/SC50H-2, Doha, Qatar, 2010

Nakilat ship repair yard project

Crawler Crane 100 ton,

Nakilat, Qatar, 2005

Overseas

Work Experience

48

Page 49: Company Profile Down Load

Heavy Lifting & Installation

QAFCO 5 Project (Ammonia & UREA Plant)

LR1550/CCH2500/LTM1080/LTM1225/RK450

Musayid, Qatar, 2010

Overseas

Work Experience

49

Page 50: Company Profile Down Load

Focus site

Management

Site Management

Goal

Coordination Local Engineering

Cost reduction through minimizing unnecessary procedure

Analysis on inefficient process and Improving procedure

and method through regular engineering meeting

Process

Management

Accurate management for project completion with procedure plan

Systematic erection management with team by team

Checking the erection schedule

with daily and weekly order

Erection

Management

Equipment, 4,211ton, has being installed successfully

Keep up the master schedule through accurate process plan

Process management of procedure chart with quality

and safety management

Obeying the method and procedure

based on the drawing for quality

Non-disaster through a close measure and thorough

safety activities

Friendly- environment field management

Quality/Safety Environment Management

HSE, QA/AC

50

HSE, QA/QC POLICY

Page 51: Company Profile Down Load

Environment

management plan

▣ to build up clean and friendly–environment

▣ field operation harmony with friendly–environment

Purpose of

environment

management

▣ developing the consciousness of staff by friendly field

environment

▣ fulfill the efficient and systematic environment management

▣ enforce the quality of field and improve quality level

▣ through the friendly environment building up,

safety maintenance and improve the staff desire of working

Purpose of

quality control

▣ Maintaining the best quality on the project

▣ Satisfaction of customer through project execution

▣ Improving quality of material and installation

▣ Reduction of cost with preventing from re-work

▣ Managing the best quality of the products under operation

Step of

quality control

▣ Quality management manual

▣ Procedure and design manual

▣ Quality specification

▣ Brief quality instruction and guide

▣ Quality management system achievement

HSE, QA/AC

HSE, QA/QC POLICY

51

Page 52: Company Profile Down Load

⊙ Be responsible for planning for industrial accident prevention and implementing overseeing. ⊙ Appoint suitable person as safety manager and education ⊙ Checking working environment on the site as well as improvement. ⊙ Set up the plan related to the disaster and danger prevention And Non-disaster movement improvement and target achievement ⊙ Compile safety management budget and execution ⊙ Organizing & operating safety management council. ⊙ Safety education and health management

1) Chief manager

⊙ Be responsible for planning of safety and disaster ⊙ Prevention and improving, and counter plan. ⊙ Judgment of Dangerous factor as per procedure and improvement ⊙ Report while accident happening , factor investigation and analysis ⊙ Keeping the original data from the field related to safety ⊙ Carry out all kinds of safety education as well as safety examination.

2) Safety manager (chief manager dual role)

3) Safety supervisor

⊙ Safety procedure implement ⊙ Examine and supervise the safety manager’s work ⊙ Analysis on safety accident and improvement plan ⊙ Safety Matters related on the other site

4) Safety officer team leader

⊙ Examine and checking dangerous equipment and tools ⊙ Checking safety facilities as well as correction plan ⊙ Make the decision for safety working and supervise the behavior on the site ⊙ Checking whether wear garments, protective or not ⊙ Supervise the safety signs

Safety Management (Duty)

Safety

52

Construction Site

(safety)

Transportation team

Operation team

Constructor

Yuekchun Const

Construction team

Safety Management (Emergency Contact)

Page 53: Company Profile Down Load

Certificate

ISO9001: 2008 Certificate of BusinessRegistration : 1993

No. 109 – 81 - 39058

Certificate of Membership <Korea International

Trade Association> : 2002 Electric Construction Registration : 2009

53

Page 54: Company Profile Down Load

Certificate

SAUDI :Certificate of Construction Industry :2009 SAUDI : Certificate of Construction

Industry :2009

Commercial Registration-MALAYSIA Branch,

2011

Commercial Registration-MALAYSIA Branch,

2011

54

Page 55: Company Profile Down Load

Certificate

Certificate of Construction Industry : 2005 Certificate of Rental Business for

Construction Equipment : 2005, Cheonan

KECA Korea Electrical Contractors Association

Membership Certificate, 2009

Certificate of Rental Business for

Construction Equipment : 2005, Jeollanamdo

55

Page 56: Company Profile Down Load

Press

Construction Heavy Equipment Industry Sector

2006-09-05 Tuesday, <Seoul Newpaper>

2008 Korea Construction Technology Award

2008-07-16

Review of Construction

Works- Korean

Outstanding

Construction

Company/CEO

900-ton crane contributes

to the domestic

construction technology.

Korean Technical

Innovation Company-

Leading Construction

Equipment rental for

domestic steel structures,

distribution market.

2008 대한민국 건설기술 상

건설장비 부문 (주) 육 천 건 설

대표이사 이 기 본

귀사는 우수한 기술력과 탁월한

경영능력을 바탕으로 대한민국

건설산업의 국가경쟁력 향상을

도모하고 건설 혁신과 선진화에

이바지한 점을 높이 평가하여

"2008 대한민국 건설기술 상"

수상기업으로 선정되었기에

이 패를 드립니다.

2008년 7월 16일

The "Republic of Korea Construction Technology Award 2008"

is awarded to appreciate companies, which contribute to the construction industry in the Republic of

Korea based on superior technology and excellent management skills to enhance competitiveness and

to promote innovation and advancement of construction.

56

Page 57: Company Profile Down Load

List of Client for Wind-Power Construction Wind Generator Transportation & Installation

Daesin Plant Const. Co. Ltd

Sungdo ENG

Hyundai Samho Heavy Industries Co., Ltd

Hyundai Mipo Dockyard Co., Ltd

Samho Shipbuilding

Samjin Industries & Steel Structure

Samsung Heavy Indust..Unison

Jeju-do

KEPCO

Unison

Hyundai Steel ,

Halla Energy &Environment

Sungdo Construction Co., Ltd

Hyunchang Industry

STECO

Dongbang

Shinwoo

Gyeongbuk

Gangwondo

Taebacksi

Mitsubishi

Doosan Heavy Indust..

57

Client

Page 58: Company Profile Down Load