Page 1: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Company Profile

Genoa, 1st Feb 2013

Page 2: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

55% 45%

Come sarà:

ipotesi 1Ansaldo Energia group

Ansaldo Energia is a Finmeccanica Group company sub ject to joint direction and coordination by Finmeccanica and Firs t Reserve Power.

Page 3: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI
Page 4: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

All-roundcustomer

value

All-roundcustomer

value

Product Design

ProductInstallation

Services& ProductUpgrading

Product Manufacturing

Our Offer

Page 5: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

1853

1923

1949

1962

1989

1991

1991

1995

2004

2005

2007

2008

2010

2011

Giovanni Ansaldo & Co. established

First Power Plant

GE license for Steam Turbines & Generators

First supercritical 600 MW Power Plant

ABB licence for Steam Turbines & Generators

Ansaldo Energia established

Siemens licence for Gas Turbines

First Combined Cycle plant based on Ansaldo Energia GT

New Global Service Strategy

Total technological independence

OSP™ concept launch

100th Gas Turbine in commercial operation

150th Gas Turbine manufactured

Agreement with First Reserve Corporation

More than 150 years background

Page 6: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Company Products and Services

Equipment: Gas Turbines, Steam Turbines

and Turbogenerators

Open and Combined Cycles Power Plants

Thermal Power Plants

Service on AEN installed fleet

(OEM)

Service on third party installed fleet

(OSP™)

Page 7: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Service

New Units

Nuclear

Renewables

2011 Orders Breakdown by Business Lines

References as of December 2011

Financials and Headcount

201120102009200820072006

Orders2006-2011, M€

Revenues2006-2011, M€

201120102009200820072006

Employees2006-2011, headcount

201120102009200820072006

Page 8: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Full production & repair capabilities

Ansaldo ThomassenRheden (NL) workshop

Ansaldo Thomassen GulfAbu Dhabi (UAE) repair center

Ansaldo Energia Genoa (Italy) manufacturing plant

Page 9: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

CombinedCycle ThermalOpen Cycle

Life Cycle Service ProviderLife Cycle Service Provider

Turn-Key plant

Contractual

Flexibility

Singleequipment

ContractualF

lexibility

Engineering

Generators

BOP and auxiliaries

Civil works

Transportation

Construction

Engineering

Steam Turbines

BOP and auxiliaries

Civil works

Transportation

Construction

Gas Turbines

HRSG

Generators

Engineering

Steam Turbines

BOP and auxiliaries

Civil works

Transportation

Construction

Boilers

Generators

Gas Turbines

Plant commissioning

Plant commissioning

Plant commissioning

Full Engineering Procurement Contractor capabilitie s - Full Service capabilities

Page 10: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Ansaldo Energia in the world

�Company headquarters�Branch Offices

Page 11: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI
Page 12: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Power Plants

Gas Turbines

Steam Turbines

Turbogenerators

OEM Services

OSPTM Services

Nuclear Energy & Service

Our product & service lines

Renewable Energy

Page 13: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Open Cycle Hydroelectric

Combined Cycle Geothermal

Thermal

Solar power

Wind power

Cogeneration

Waste to energy

Installed powerworldwide

about 175,000 MWin more than 90 Countries

57%

Europe& CIS

19%Americas

18%Africa &

Middle East

Far East6%

References as of December 2011

Ansaldo Energia Power Plants

Page 14: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Open Cycle93 units 13,600 MW

Combined Cycle85 units 30,100 MW

Customized configuration

High performance

Low environmental impact

References as of December 2011

Gas Turbine based power plants

Page 15: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Gas Turbines portfolio

Model

Widely proven models

Ansaldo Energia independent technology

Power [MW] Class Reliability

AE64.3A F75

AE94.2

AE94.2K

E

E

170

170

AE94.3A F294

> 98%

Page 16: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Ansaldo Energia Products

Belgium (1)

France (1)

Germany (3)

Italy (42)

Spain (4)

UK (4)

Albania (1)

Finland (3)

Greece (3)

Hungary (1)

Poland (2)

Russia (15)

Turkey (2)

Algeria (13)

Tunisia (1)

Congo Rep (2)

Ghana (2)

Egypt (7)

Bolivia (2)

Chile (1)

USA (1)

UAE (3)

Jordan (2)

Lebanon (2)

Syria (2)

Oman (5)

Other M.E. (44)

Bangladesh (3)

India (2)

Pakistan (1)

175 Gas Turbines / 30,300 MW soldCumulated 7,000,000 EOH

87 in Combined Cycle - 88 in Open Cycle

Gas Turbines references & performance

References as of December 2011

Page 17: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

• Thermal Fossil-firedSteam Cycles

• Combined Cycle• Cogeneration Plants• Solar Plants

• Thermal Fossil-firedSteam Cycles

• Combined Cycles• Cogeneration Plants• Solar Plants

Geothermal Cycles

0 200100 300 1,000

Type and application Series

Reheat Turbines

Non-Reheat Turbines

Geothermal Turbines

150

RT (3 to 5-cylinder) RT30, R70

90 350

MT-RH (2-cylinder) MT15

150

MT-TC (2-cylinder) MT20

40 250

MT-SC (1-cylinder) ): MT10

20 150

GT

Steam Turbines portfolio

Power Output [MW]

Page 18: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Hundreds ofSteam Turbines

Application Units MW

Thermal Fossil-fired 421 69,500

Combined Cycles 88 10,600

Geothermal 107 2,200

Nuclear 11 6,100

TOTAL 627 88,400

of which:75 Reaction units

with OH > 1,900,000

References as of December 2011

Steam Turbines references & performance

Ansaldo Energia started STs production in 1912.

References since 1950:

Page 19: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Type Unit Power MVA UnitsTotal Power

MVAGas

TurbinesSteam

Turbines

Air cooled up to 350 516 55, 000

H2 cooled up to 600 161 25,300

H2 / H2O cooled (2 poles)

up to 1,100 58 26,800

H2 / H2O cooled (4 poles)

up to 1,300 4 4,200

Total 739 111,300

References as of December 2011

Turbogenerators portfolio & references

Ansaldo Energia started Turbogenerator production i n 1920’s.References since 1950:

Page 20: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI
Page 21: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

SERVICEon Third party

equipment

SERVICEon Third party

equipment

New Units Service

Original Equipment Manufacturer

Gas Turbines, Steam Turbines & Generators

OEM ServiceAll Ansaldo Energia products & plants

Two service families

Page 22: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

OSP™ Field of expertise

Center of Excellence for Gas Turbine Repairs

Repair shop focused on HGP components Ansaldo Energia,

GE and other technologies

Gas Turbine Specialist

Over 40 years of experience with Field Services, Repairs, Spare Parts, Upgrades, Service Agreements & Training; GE-type Heavy Duty Specialist; Know-how from building over 300 GE-type Gas Turbines

Third Party Service Provider

Steam Turbine, Gas Turbine & Generator Specialist

Page 23: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI
Page 24: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Facility - Three Large AreasTotal Area: 219,000 sqm

Covered Area 131,000 sqm712 Machine tools and equipment, 159 of which Remotely Controlled, 1200 workers

Campi 1

• Large Machines (Steam Turbines, Gas Turbinesand Generators) Manufacturing

• Steam Turbines and Gas Turbines Assembly

• Warehouse

Fegino

• Blades Manufacturing • Gas Turbines / SteamTurbine Rotors andParts Machining

• Manufacturing OfTool Parts

Campi 2

• Generators manufacturing and testing• Stator Generators assembly

Ansaldo Energia Workshop & Offices

Page 25: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Ansaldo Energia Workshop & Offices

19) Stator winding area

20) Impregnation autoclaves

21) Stator assembly

22) Generator test facility

23) Maintenance facilities / Factory Offices and Training

School

24) Service warehouse

25) Vacuum overspeed cell

26) Warehouse

27) Spare parts and jigs production dept.

28) EDM machining and Gas Turbine blades grinding

29) Steam and Gas Turbine blades workshop

30) Quality control offices

31) FMC - Flexible machining cell

32) Medium size machining

33) Gas Turbine disks machining

34) Combustion chamber assembly and diaphragms

35) Rotor machining

36) Rotor welding

37) Gas Turbine subassembly area

38) Gas Turbine rotor stacking

39) N.D.T. - Not Destructive Test area

40) Workshop warehouse

41) Fegino Tool room

42) Service warehouse

43) Ansaldo Nucleare (Entrance1

and Offices – C.so Perrone 25)

44) Heat treatment

45) Laboratories

46) R&D offices

47) Voltage Endurance test room

48) R&D

49) Laboratories

1) Main entrance - Via Lorenzi 8

2) Goods entrance - C.so Perrone 71 R

3) Fegino entrance - C.so Perrone 73 R

4) Management and Engineering Offices

5) Steam Turbine assembly

6) Steam Turbine pre-assembly

7) Gas Turbine assembly

8) Large Machining

9) Generator Rotor coil area

10) Clean Area for rotor winding assembly

11) Hydro polar coil insulation

12) Hydro polar coil winding

13) Campi Tool room

14) Control Centre and Gas Turbine Lance Tests

15) Generator rotor overspeed tunnel

16) Shearing area

17) General warehouse

17 bis) Cutting dept.

18) Stator coil work

1

4

6

7

9

1011

12 13

8

4 15

17

16

2 1726

22

4

23

24

27

14

17 bis

45

25

14 37

36

40

39

2829

29

4135

34

3331

28

42

43

3

47

44

21

19

18 46

20

455

30

38

32

49

48

Page 26: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Organization chart

Chief Executive Officer

ZAMPINIChairmanGIULIANI

Internal AuditingCAPRILE

Senior AdvisorAndrea Aparo

ANSALDO NUCLEAREADINOLFI (CEO)

Human Resources and Organization

DEL CHICCA

Legal AffairesBARONTINI

Quality, Environment and Safety

FILIPPI

Corporate Affairs, Risk MGT, Facility & IT

REPETTO

institutional RelationsA.I. ZAMPINI

Administration, Finance, and Control

MILITE

ServiceGIANATTI

Marketing and SalesMAESTRI

Innovation &Product Development

GENTILE

Chief Technical Officer

(F.Rosatelli)General Manager

NUCCI

ProcurementPIGA

Production & Technology

REBORA

Project ManagementMONTANARI

Constraction and Commissioning

BORASIO

Renewable & Distributed Energies

GALLO

Project Control & Competitiveness

LAZZINI

New Markets Project Management

GIACOMELLI

ASPL

Senior AdvisorLuca Manuelli

1st January 2012

Page 27: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Along the Whole Life-Cycle Plant Management

FromTraditional Services Provider

(Repairs, Spare Parts, Field Services)

ToIntegrated Partner

(Long-Term Service Agreements, Solutions, Rehabs, BOP, OSP TM )

Full after-sale support

Focused on Customer Satisfaction

OriginalEquipment

Manufacturer

IndependentServiceProvider

Page 28: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Long-Term Service AgreementsSolutions and Upgrades

Training

Field Service, Operation & Maintenance

Spare Parts

Repairs

OEMORIGINAL EQUIPMENT

MANUFACTURER

Focused on Customer SatisfactionAlong the Whole Life-Cycle Plant Management

Service portfolio

Page 29: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI
Page 30: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2011 TurkeyYeni Elektrik Uretim S.A.

YENI (GEBZE)Combined Cycle(2+1 configuration)

850(1 x 850)

Turn Key supply with:- 2 Gas Turbines, AE94.3A model- 1 Steam Turbine- 3 Generators

LTSA

2011 RussiaOJSC Enel OGK-5

SREDNEURALSKAYACombined Cycle(1+1 configuration)

450(1 x 450)

Component supply with:- 1 Gas Turbines, AE94.3A model- 1 Steam Turbine- 2 Generators

-

2011 Algeria

Sociéte Algérienne de production de l'Eléctricite (SPE)

AJN DJASSER II 1-2Open Cycle

340(2 x 170)

Turn Key supply with:- 2 Gas Turbines, AE94.2 model- 2 Generators

-

2011 Algeria

Sociéte Algérienne de production de l'Eléctricite (SPE)

LABREG 1-2Open Cycle

340(2 x 170)

Turn Key supply with:- 2 Gas Turbines, AE94.2 model- 2 Generators

-

(*)LTSA = Long Term Service Agreement

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 31: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2011 Egypt

Cairo Electricity Production Company (CEPC)

GIZA NORTH 1-2Combined Cycle(2x(2+1) configuration)

1600(2 x 800)

Component supply with:- 2 Steam Turbines (280 MW)- 2 Generators

-

2011 Egypt

Middle Delta Electricity Production Company (MDEPC)

BANHA 1-2Combined Cycle(1x(2+1) configuration)

800(1 x 800)

Component supply with:- 1 Steam Turbine (280 MW)- 1 Generator

-

2011Italy

ENEL

PIANCASTAGNAIO 3-4-5Geothermal Power Plant

60(3 x 20)

Turn Key Component supply with:- 3 Steam Turbines- 3 Generators

-

2011, Total 2800 MW

78

15

Gas TurbinesSteam TurbinesTurbogenerators

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 32: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2010 Syria PEEGT

DEIR ALI IICombined Cycle(2+1 configuration)

800(1 x 800)

Turn Key supply with:- 2 Gas Turbines, AE94.3A model- 1 Steam Turbine- 3 Generators

-

2010 Tunisia STEG

SOUSSECombined Cycle(Single Shaft configuration)

424(1 x 424)

Turn Key supply with:- 1 Gas Turbines, AE94.3A model- 1 Steam Turbine- 1 Generator

LTSA

2010 Egypt

Cairo Electricity Production Company

6th OCTOBER 1-4Open Cycle

680(4 x 170)

Turn Key supply with:- 4 Gas Turbines, AE94.2 model- 4 Generators

SA

2010 Finland FingridFORSSA 1-2Open Cycle 332

(2 x 166)

Turn Key supply with:- 2 Gas Turbines, AE94.2 model- 2 Generators

SA

(*)LTSA = Long Term Service AgreementSA = Service Activities

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 33: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2010 Bangladesh

Shanghai Electric Group Co., LTD (SEC) / Bangladesh Power Development Board

SYLHETOpen Cycle

168(1 x 168)

Component supply with:- 1 Gas Turbine, AE94.2 model- 1 Generators

-

2010 Italy Enel Green Power

LARDERELLO- RANCIA 1-2- LE PRATAGeothermal Power Plant

60(3 x 20)

Turn Key Component Supply with:- 3 Steam Turbines- 3 Generators

-

2010 Italy ENELNOVEHydro Power Plant

72(1 x 72)

Component supply with:- 1 Hydrogenerator -

2010, Total 2500 MW

105

141

Gas TurbinesSteam TurbinesTurbogeneratorsHydrogenerator

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 34: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2009 Italy Sorgenia

APRILIA Combined Cycle(2+1 configuration)

800(1 x 800)

Turn Key supply with:- 2 Gas Turbines, AE94.3A model- 1 Steam Turbine- 3 Generators

LTSA

2009 Italy Iride Energia

TORINO NORDCombined Cycle(1+1 configuration)

400(1 x 400)

Component supply with:- 1 Gas Turbines, AE94.3A model- 1 Generators

LTSA

2009 Italy Isab Energy

PRIOLO GARGALLO 1Combined Cycle(1+1 configuration)

540(2 x 270)

Component supply with:-1 Gas Turbine, AE94.2K model-1 Generators -

2009, Total 1300 MW

4

1

4

Gas Turbines

Steam Turbine

Turbogenerators(*)LTSA = Long Term Service Agreemen

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 35: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2008 Italy Sorgenia

TURANO LODIGIANO Combined Cycle(2+1 configuration)

800(1 x 800)

Turn Key supply with:- 2 Gas Turbines, AE94.3A model- 1 Steam Turbine- 3 Generators

LTSA

2008 France 3CB SAS (Atel)

BAYETCombined Cycle(Single shaft configuration)

400(1 x 400)

Turn Key supply with:- 1 Gas Turbine, AE94.3A model- 1 Steam Turbine- 1 Generators

LTSA

2008 ItalyEn Plus S.p.A. (Atel)

SAN SEVEROCombined Cycle(Single shaft configuration)

400(1 x 400)

Turn Key supply with:- 1 Gas Turbine, AE94.3A model- 1 Steam Turbine- 1 Generator

LTSA

2008 GreeceThisvi PGP S.A. (Edison)

THISVICombined Cycle(1+1 configuration)

420(1 x 420)

Component supply with:- 1 Gas Turbine, AE94.3A model- 1 Steam Turbine- 2 Generators

-

2008 Belgium

Marcinelle Energie (Enel/Duferco)

MARCINELLECombined Cycle(Single shaft configuration)

400(1 x 400)

Component supply with:- 1 Gas Turbine, AE94.3A model- 1 Steam Turbine- 1 Generator

-

2008 HungaryDunamenti Erőmű zrt. (Electrabel)

DUNAMENTICombined CycleRepowering(1+1 configuration)

400(1 x 400)

Component supply with:-1 Gas Turbine, AE94.3A model-1 Generator FA

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 36: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2008 RussiaPower Machines

ADLER: 1-4Combined Cycle(4x(1+1) configuration)

400(4 x 100)

Component supply with- 4 Gas Turbines, AE64.3A model- 4 Generators

SA

2008Rep.

CongoEni Congo / Congo Republic

POINTE-NOIRE 1-2Open Cycle

332(2 x 166)

Component supply with:- 2 Gas Turbines, AE94.2 model- 2 Generators

SA

2008 Chile Posco / AESANGAMOS 1-2Thermal Power Plant

544(2 x 272)

Component supply with:- 2 Steam Turbine- 2 Generators

-

2008 Chile Posco / AESCAMPICHEThermal Power Plant

280(1 x 280)

Component supply with:- 1 Steam Turbine- 1 Generator

-

2008, Total 4300 MW

13

9

19

Gas Turbines

Steam Turbines

Turbogenerators

(*)LTSA = Long Term Service AgreementFA = Frame AgreementSA = Service Activities

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 37: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2007 Algeria Sonelgaz

M'SILA 1-2

Open Cycle570

(2 x 285)

Turn Key supply with:

- 2 Gas Turbines, AE94.3A model

- 2 Generators

SA

2007 Algeria Sonelgaz

LARBAA 1-4

Open Cycle664

(4 x 166)

Turn Key supply with:

- 4 Gas Turbines, AE94.2 model

- 4 Generators

SA

2007 Algeria Sonelgaz

BATNA 1-2

Open Cycle

332

(2 x 166)

Turn Key supply with:

- 2 Gas Turbines, AE94.2 model

- 2 Generators

SA

2007 Spain Enel Produzione

ALGECIRAS 2

Combined Cycle,

Repowering

(2+1 configuration)

800

(1 x 800)

Component supply with:

-1 Gas Turbine, AE94.3A model

-1 GeneratorFA

2007 Russia Stroytransgaz

ST. PETERSBURG 1-5

Combined Cycle

(5x(1+1) configuration)

500

(5 x 100)

Component supply with:

- 5 Gas Turbines, AE64.3A model

- 5 GeneratorsSA

2007 RussiaPower

Machines

PERVOMAISKAYA 1-4

Combined Cycle

(4x(1+1) configuration)

400

(4 x 100)

Component supply with:

- 4 Gas Turbines, AE643A model

- 4 GeneratorsSA

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 38: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project

(Plant Type)

MW

(Unit x

MW)

Scope of Supply

(Main Component)

Service

(*)

2007 Russia Power Machines

TJUMEN'

Combined Cycle

(1+1 configuration)

100

(1 x 100)

Component supply with:

- 1 Gas Turbine, AE64.3A model

- 1 Generator

SA

2007 Finland Fortum

ESPOO

Combined Cycle, Heat

& Power

(1+1 configuration)

240

(1 x 240)

Component supply with:

- 1 Gas Turbine, AE94.2 model

- 1 Generator-

2007 Albania Maire Eng.

VLORE

Combined Cycle

(Single shaft

configuration)

110

(1 x 110)

Component supply with:

- 1 Gas Turbine, AE64.3A model

- 1 Steam Turbine

- 1 Generator

LTSA

2007 Egypt W.D.E.P.Co

SIDI KRIR

Combined Cycle

(2+1 configuration)

800

(1 x 800)

Component supply with:

- 1 Steam Turbine (275 MW)

-1 Generator

SA

2007Egypt

W.D.E.P.Co

EL ATF

Combined Cycle

(2+1 configuration)

800

(1 x 800)

Component supply with:

- 1 Steam Turbine (275 MW)

- 1 Generator

SA

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 39: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Year Country Client Project(Plant Type)

MW(Unit x MW)

Scope of Supply(Main Component)

Service (*)

2007 Italy EdisonGANDA 1-2

Hydro Power Plant

71.4

(2 x 35.7)

Component supply with:

- 2 Hydrogenerators-

2007 Italy EdisonBELVISO 1-2

Hydro Power Plant

71.4

(2 x 35,7)

Component supply with:

- 2 Hydrogenerators-

2007 Italy Endesa Italia

MONTE ARGENTO 1-3

Hydro Power Plant

71.4

(3 x 23.8)

Component supply with:

- 3 Hydrogenerators -

2007 ItalyFranco Tosi /

Endesa Italia

NARNI 1-2

Hydro Power Plant

46.8

(2 x 23.4)

Component supply with:

- 2 Hydrogenerators-

2007, Total 4100 MW

213

269

Gas TurbinesSteam TurbinesTurbogeneratorsHydrogenerators

(*)LTSA = Long Term Service AgreementFA = Frame AgreementSA = Service Activities

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 40: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Award

Year

Total Plant

Equipment

Related

[MW]

Gas

Turbines

[nr.]

Steam

Turbines

[nr.]

Turboge-

nerators

[nr.]

Hydroge-

nerators

[nr.]

Total

Machines

[nr.] LTSA FA SA Total

2011 2.800 7 8 15 30 1 1

2010 2.500 10 5 14 1 30 1 2 3

2009 1.300 4 1 4 9 2 2

2008 4.300 13 9 19 41 3 1 2 6

2007 4.100 21 3 26 9 59 1 1 8 10

TOTAL 15.000 55 26 78 10 169 8 2 12 22

Scope of Work Related Service Contracts (*) [nr.]

(*)LTSA = Long Term Service AgreementFA = Frame AgreementSA = Service Activities

References as of December 2011

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 41: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Country(2011-2007

Awards)

Total Plant EquipmRelated

[MW]

GasTurbines

[nr.]

Steam Turbines

[nr.]

Turboge-nerators

[nr.]

Hydroge-nerators

[nr.]

Total Machines

[nr.] LTSA FA SA Total

Italy 2 840 7 9 14 10 40 4 4

Albania 110 1 1 1 3 1 1

Algeria 2 250 12 12 24 3 3

Bangladesh 170 1 1 2

Belgium 400 1 1 1 3

Chile 820 3 3 6

Egypt 2 070 4 5 9 20 3 3

Finland 500 3 3 6 1 1

France 400 1 1 1 3 1 1

Greece 420 1 1 2 4

Hungary 290 1 1 2 1 1

Rep. Congo 330 2 2 4 1 1

Russia 1 400 15 1 16 32 4 4

Spain 290 1 1 2 1 1

Syria 800 2 1 3 6

Tunisia 420 1 1 1 3 1 1

Turkey 850 2 1 3 6 1 1

Other 610 1 4 5

Total 15 000 55 26 78 10 168 8 2 12 22

Scope of Work Related Service Contracts (*) [nr.]

Ansaldo Energia New Units: Most Important Contracts in the Last Five Years 201 1-2007

Page 42: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

Steam Turbines

91,000 MW

Gas Turbines

30,300 MW

Turbogenerators

111,300 MVA

Hydrogenerators

26,600 MVA

Awarded Capacity Worldwide: 184,300 MW (As of Dec. 2011)

ThermoelectricPower Plants138,600 MW

Hydroelectric Power Plants

45,700 MW

References as of December 2011

Europe101,700 MW

Africa / Middle East37,100 MW Asia / Pacific

11,600 MW

Americas33,900 MW

Worldwide References

Page 43: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

2003

ITALY - ROSIGNANOC.C. 400 MW

2004

ITALY - SPARANISEC.C. 800 MW

2005

ITALY - LEINÌC.C. 400 MW

2005ITALY - NAPOLI LEVANTE

C.C. Rep. 400 MW

2005

ITALY - MONCALIERIC.C. Rep. 400 MW

2005

ITALY - VADO LIGUREC.C. Rep. 800 MW

2006

ITALY - RIZZICONIC.C. 800 MW

2008

ITALY - TURANO LODIGIANOC.C. 800 MW

2008

ITALY - SAN SEVEROC.C. 400 MW

2009

ITALY - APRILIAC.C. 800 MW

2010

EGYPT - 6TH OCTOBERO.C. 600 MW

2008

FRANCE - BAYET

C.C. 400 MW

References as of December 2011

2007

ALGERIA - M'SILA

O.C. 500 MW

2007

ALGERIA - LARBAA

O.C. 600 MW

2007

ALGERIA - BATNA

O.C. 300 MW

2011

ALGERIA – AJN DJASSER II

O.C. 300 MW

2011

ALGERIA - LABREG

O.C. 300 MW

2011

TURKEY - YENI GEBZEC.C. 800 MW

Ansaldo Energia EPC Contract in the world

Succeeding on the global market as “Turn-key” Power Plant contractor in the last years

2010

TUNISIA – SOUSSE

C.C. 440 MW

Page 44: Company Profile - Keele University · Year Country Client Project (Plant Type) MW (Unit x MW) Scope of Supply (Main Component) Service (*) 2011 Turkey Yeni Elektrik Uretim S.A. YENI

• A worldwide recognized brand in Power Generation wi th an installed capacity of more than 176 GW over 1,800 projects completed, in over 90 countries

• Headquartered in Genoa (Italy) with major regional offices, branches and subsidiaries in Europe, USA, Africa, Gulf, India w ith more than 3,400 employees

Fossil Fuel Business lines

References as of December 2011

Power Plants Equipment

’11 Orders: 963 M€’11 Revenues: 892 M€

Service NuclearRenewables & Distr. Gen.

‘11 Orders: 639 M€’11 Rev.: 340 M€

’11 Orders: 20 M€’11 Rev.: 45 M€

’11 Orders:20 M€’11 Rev.: 50 M€

Company Profile