Construction Quality Assurance for MSE
Walls By Alex Abraham, P.E.
![Page 2: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/2.jpg)
Typical section & components of MSE structures
![Page 3: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/3.jpg)
Supplier Design • Formal Policy • System Approval • Design Manual, Details • Specifications • Bid Documents • Supplier Design • Review
Design Bid Build
![Page 4: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/4.jpg)
Organization Chart Supplier Design `
Owner
Design Engineer
Construction Inspector
QA Lab
Contractor
Material Suppliers QC Lab
Construction Division Manager
![Page 5: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/5.jpg)
Inspector’s Responsibility
To be thoroughly familiar with • Plans and Specifications • Site Conditions • Construction Materials • Construction Sequence
![Page 6: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/6.jpg)
Inspector’s Tools • Design Drawings • Shop Drawings • Specs • Health and Safety Requirements • Field testing equipment • Trained Staff • CQA Plan • Inspector’s Handbook
![Page 7: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/7.jpg)
Foundation Preparation
![Page 8: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/8.jpg)
Leveling Pads
![Page 9: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/9.jpg)
Facing Panels
Plant Certification Liner Fabrication Drawings Test Panels for Liner and Stain
![Page 10: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/10.jpg)
Panel Storage
Protect Connection Device Protect Panel Face Protect Damage to Panels - Cracks, Chipped Corners
![Page 11: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/11.jpg)
Precast Concrete Panels
Certifications Inspect before the panel is placed on the wall. Place the correct panel at the right location.
![Page 12: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/12.jpg)
Facing Assembly
5
Plumb, vertical tolerance, and horizontal alignment tolerance = ¾” over 10’ Allowable offset in panel joint = ¾” The overall plumb from top to bottom = 0.05 in./ft.
![Page 13: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/13.jpg)
Provide Fall Protection as Required
![Page 14: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/14.jpg)
Filter Fabric
Specifications for filter cloth Placement
![Page 15: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/15.jpg)
Precast Concrete Panels
Specifications for filter cloth Exposure to direct sunlight Placement
![Page 16: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/16.jpg)
Precast Concrete Panels
![Page 17: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/17.jpg)
Strips Stockpiled on site
![Page 18: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/18.jpg)
Reinforcing – Type, Length, Spacing
![Page 19: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/19.jpg)
A 4
L 6
![Page 20: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/20.jpg)
Connections
![Page 21: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/21.jpg)
Catch Basin
![Page 22: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/22.jpg)
Offset Reinforcements Using Strongbacks at Large Obstructions
Reinforcements bolted to strongback
![Page 23: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/23.jpg)
Parallel Pipes
![Page 24: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/24.jpg)
Parallel Pipes
![Page 25: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/25.jpg)
Reinforcement Strip Skew
![Page 26: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/26.jpg)
Accommodating Deep Foundations
![Page 27: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/27.jpg)
Existing Drainage Structures
![Page 28: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/28.jpg)
Drainage Penetrations
![Page 29: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/29.jpg)
Select Granular Fill Structure Backfill, Type 3 (excludes No. 30)
• Approved Source • Approved Testing Lab • Laboratory Testing:
• Gradation • Unit Weight (Compaction Control) • Friction Angle • Organic Content • Permeability • Resistivity and pH
![Page 30: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/30.jpg)
Compact Backfill (only walk-behind compactor close to wall)
![Page 31: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/31.jpg)
Select Granular Fill Structure Backfill, Type 3 (excludes No. 30)
• Field Testing for No. 4 size: • Criteria – 95% • Tests Defined - Section 203.24(b) -
Nuclear Density, Sand Cone and One Point Proctor
• Moisture Content
![Page 32: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/32.jpg)
Select Granular Fill Structure Backfill, Type 3 (excludes No. 30)
• Field Testing for all sizes other than No. 4 size:
• No density tests • 4 passes with a vibratory roller and 1
pass with the same roller in the static mode.
![Page 33: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/33.jpg)
B-Borrow (Triangular Wedge of Fill Behind Select Fill)
• Source approved by tests • Testing:
• Gradation ( no more than 10% passing No. 200 sieve)
• Suitably graded • Frequency of testing (1 per 2,000 t or two per
contract)
![Page 34: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/34.jpg)
Fill in front of the wall • Backfilled as soon as practically
possible • A strong rainstorm could cause
heavy flow along the wall. This could cause soil erosion and undermining of the leveling pad and wall.
![Page 35: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/35.jpg)
Drainage Section 718.03 for underdrains Location as per plans
![Page 36: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/36.jpg)
Walls subject to Flooding Select Backfill - limited to No. 8 stone
![Page 37: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/37.jpg)
Ancillary Items • Barriers
• Cast-in-place barrier • Guard rail
• Coping • Precast coping • Cast-in-place coping
• Abutments
![Page 38: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/38.jpg)
Precast Concrete Panels
![Page 39: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/39.jpg)
Cast-in-Place Coping
![Page 40: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/40.jpg)
Precast Coping
Precast Coping
![Page 41: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/41.jpg)
Skew Top Level of Reinforcements To Clear Guide Rail Post Locations
![Page 42: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/42.jpg)
Guard rails
![Page 43: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/43.jpg)
Interface at CIP
![Page 44: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/44.jpg)
Interface at CIP
![Page 45: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/45.jpg)
Slip Joints
![Page 46: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/46.jpg)
Slip Joint
![Page 47: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/47.jpg)
Construction Phasing
![Page 48: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/48.jpg)
Acute Corners
![Page 49: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/49.jpg)
Acute Corners
![Page 50: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/50.jpg)
MSE WALL ASSETS SUPPORT OTHER ASSETS
Highways, ramps, embankments
Bridge abutments
Traffic barriers, noise barriers, lighting, signs, signals
Drainage pipes, culverts (penetrations)
Planters & plantings
We know how to manage these assets
![Page 51: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/51.jpg)
When Should We Evaluate Retaining Wall Assets?
• During construction (QA/QC) • Periodic (routine) performance inspections • Extreme events (seismic, flood, impact) • Before widening, load changes,
rehabilitation • As part of plan to extend useful life – as
part of asset management
![Page 52: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/52.jpg)
Core Questions About MSE Walls
What is the current state of my MSE walls ? • What do I own? • Where is it? • What condition is it in? • What is its remaining useful life? • What is its remaining economic value?
![Page 53: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/53.jpg)
More Core Questions • Which assets critical for sustained performance?
• How do they fail?
• How can they fail?
• What is the likelihood of failure?
• What will it cost to repair?
• What are the consequences of failure?
![Page 54: Construction Quality Assurance for MSE Walls](https://reader030.vdocuments.net/reader030/viewer/2022012522/6195eddd038205227c4f7ca2/html5/thumbnails/54.jpg)
Core Questions - Paraphrased
What are my best investment strategies for "Moving Indiana into a Prosperous New World" ?