Coolum Sports Complex Master Plan

Page 2: Coolum Sports Complex Master Plan

© Sunshine Coast Regional Council 2011. www.sunshinecoast.qld.gov.au [email protected] T 07 5475 7272 F 07 5475 7277 Locked Bag 72 Sunshine Coast Mail Centre Qld 4560 Acknowledgements Council wishes to thank all contributors and stakeholders involved in the development of this document. Disclaimer Information contained in this document is based on available information at the time of writing. All figures and diagrams are indicative only and should be referred to as such. While the Sunshine Coast Regional Council has exercised reasonable care in preparing this document it does not warrant or represent that it is accurate or complete. Council or its officers accept no responsibility for any loss occasioned to any person acting or refraining from acting in reliance upon any material contained in this document.

Page 3: Coolum Sports Complex Master Plan

TABLE OF CONTENTS 1.  STUDY FRAMEWORK.............................................................................................................................. 1 

1.1.  PROJECT BACKGROUND ......................................................................................................................... 1 1.2.  METHODOLOGY...................................................................................................................................... 1 

2.  BACKGROUND RESEARCH.................................................................................................................... 3 

2.1.  LITERATURE REVIEW ............................................................................................................................. 3 

3.  SITE INVESTIGATION AND CONSTRAINTS...................................................................................... 8 

3.1.  SITE OVERVIEW ..................................................................................................................................... 8 3.2.  SITE ASSESSMENT AND UTILISATION ..................................................................................................... 9 

3.2.1.  Coolum Beach Cricket Club ....................................................................................................... 11 3.2.2.  Coolum Croquet Club................................................................................................................. 11 3.2.3.  Coolum Football Club ................................................................................................................ 12 3.2.4.  Coolum and District Netball Association ................................................................................... 12 3.2.5.  Coolum Colts Junior Rugby League Club .................................................................................. 13 3.2.6.  Coolum Tennis Club ................................................................................................................... 13 3.2.7.  Coolum Touch Football Club ..................................................................................................... 13 3.2.8.  Coolum RSL ................................................................................................................................ 14 3.2.9.  Coolum Baptist Church .............................................................................................................. 14 

3.3.  SITE USAGE SUMMARY......................................................................................................................... 16 3.4.  SITE CONSTRAINTS............................................................................................................................... 19 

4.  COUNCIL CONSULTATION.................................................................................................................. 23 

5.  CATCHMENT ANALYSIS ...................................................................................................................... 24 

6.  CONCEPT PLAN DESIGN ...................................................................................................................... 26 

6.1.  DEVELOPMENT OF OPTIONS ................................................................................................................. 26 6.2.  OPTION 1 – RELOCATION OF TOUCH FOOTBALL, EXPANSION OF TENNIS AND MAXIMISATION OF PLAYING FIELDS................................................................................................................................................ 27 

6.2.1.  Option 1 – Benefits/ Constraints................................................................................................. 28 6.3.  OPTION 2 - RETENTION OF TOUCH FOOTBALL, AND MAXIMISATION OF PLAYING FIELDS, NO TENNIS EXPANSION........................................................................................................................................................ 29 

6.3.1.  Option 2 – Benefits/ Constraints................................................................................................. 30 6.4.  OPTION 3 – RELOCATION OF TOUCH FOOTBALL TO UNDEVELOPED LAND, EAST OF CREEK ................ 31 

6.4.1.  Option 3 – Benefits/ Constraints................................................................................................. 32 6.5.  CONSULTATION ON DESIGN OPTIONS................................................................................................... 32 

6.5.1.  Consultation Outcomes............................................................................................................... 32 6.6.  ASSESSMENT OF OPTIONS .................................................................................................................... 34 

7.  FINAL MASTER PLAN DESIGN ........................................................................................................... 35 

7.1.  DESIGN ELEMENTS............................................................................................................................... 35 7.2.  ENVIRONMENTAL PLANNING ADVICE AND APPROVALS....................................................................... 36 7.3.  FINAL PROPOSED MASTER PLAN.......................................................................................................... 38 7.4.  MASTER PLAN SECTION ....................................................................................................................... 39 

8.  MANAGEMENT ANALYSIS................................................................................................................... 40 

8.1.  CURRENT ARRANGEMENT.................................................................................................................... 40 8.2.  FUTURE MANAGEMENT CONSIDERATIONS........................................................................................... 41 

8.2.1.  Shared Playing Fields................................................................................................................. 41 8.2.2.  Advisory Group........................................................................................................................... 42 

9.  FUNDING OPPORTUNITIES ................................................................................................................. 43 

9.1.  SPORTS FIELD MAINTENANCE FUNDING PROGRAM ............................................................................. 43 9.2.  COMMUNITY GRANT PROGRAM ........................................................................................................... 43 9.3.  COMMUNITY FUNDRAISING.................................................................................................................. 44

Page 4: Coolum Sports Complex Master Plan

 9.4.  EXTERNAL FUNDING SOURCES............................................................................................................. 44 

9.4.1.  Federal Government ................................................................................................................... 44 9.4.2.  Queensland State Agencies ......................................................................................................... 45 9.4.3.  Non-Government Organisations................................................................................................. 46 

9.5.  COMMERCIAL SOURCES ....................................................................................................................... 47 

Page 5: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

1 Sunshine Coast Council

1. STUDY FRAMEWORK 1.1. PROJECT BACKGROUND

The Coolum Sports Complex is an important facility to the Coolum community, providing key sport, recreation, community and active living opportunities and contributing to the social fabric of the area. It is also a key contributor to the broader hierarchy of sport and recreation facilities across the Sunshine Coast Region.

The site has some critical expansion limitations resulting from its location within the Noosa National Park, and being surrounded by significant vegetation and wetlands. Given the inevitable growth of the tenant user groups, in line with the broader Sunshine Coast population growth, council has engaged the Strategic Leisure Group to undertake a Master Plan to determine the long-term vision for the site. The Master Plan is an important step in determining how the Coolum Sports Complex can continue to service its user groups and continue to provide a valuable community resource into the future given its location and environmental constraints.

The Master Plan considers the interrelationships between:

The functionality, configuration, usage and capacity of the site and the neighbouring schools The current character and functionality of the landscape Needs across various sports, including current & future tenants Emerging trends and issues Priorities, levels of service and resources Catchment area and population demographic demands (present and future) Events and sports delivery Car parking and traffic movement/ management requirements Public expectations and needs The realities of the economic, social, environmental and legislative context of the time Alignment with council’s Sunshine Coast Sport and Active Recreation Plan and Open Space

Strategy.

1.2. METHODOLOGY The study was conducted in four distinct stages which enabled the research and consultation to be undertaken in a logical and progressive fashion and recommendations to be presented within an agreed framework. These stages were:

Stage 1: Situational Analysis Reception Review background and planning documents Catchment analysis Site investigation Management analysis Community engagement

Stage 2: Developing Options* Design brief Design options Management options

Page 6: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

2 Sunshine Coast Council

Funding and partnership opportunities Stage 3: Draft Master Plan

Detailed Master Plan Draft report

Stage 4: Final Master Plan Public review process Final Master Plan

*NB: Additional consultation initiatives were undertaken in Stage 2 to obtain stakeholder, community and internal council feedback on preliminary options. This included media releases, web page promotion, one-on-one meetings with user groups and a “Meet us at the Complex” session for the wider community.

Figure 1: Coolum Sports Complex

Page 7: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

3 Sunshine Coast Council

2. BACKGROUND RESEARCH 2.1. LITERATURE REVIEW

The following documents were reviewed as part of the background research process to set the study in context and to ensure study outcomes are aligned with council’s corporate direction:

Sunshine Coast Sport and Active Recreation Plan 2011-2026 Sunshine Coast Aquatic Plan 2011 – 2026 Draft Planning Scheme Overlays Sunshine Coast Council Corporate Plan 2009 - 2014 Sunshine Coast Community Plan: Looking Forward to 2030 Healthy Neighbourhoods Report, 2009 Central Access Policy and Action Plan SCRC Place Making Charter: People, Place and Partnerships Sunshine Coast Council - Capital Works Program Listing 2011/2012 - 2020/2021 Maroochy Plan 2000 – Planning Area no 11 – Coolum Beach Coolum Sports Complex – Operational Works in the Coastal Management District & Marine Plants

Removal Reports Sunshine Coast Council, Coolum Access Bridge, Feasibility Phase Concept Design Options Report Sunshine Coast Sustainable Transport Strategy/ Sunshine Coast Active Transport Plan Sunshine Coast Open Space Strategy 2011

Those issues, needs or opportunities specifically relevant to the Coolum Sports Complex or relevant to master planning of sport and recreation facilities are documented in Table 1.

Table 1:  Key issues, needs or opportunities emerging from background literature 

ISSUE/ STRATEGY RELEVANT TO COOLUM SPORTS COMPLEX SOURCE To design and build all new council buildings and facilities to provide non-discriminatory access.

Central Access Policy and Action Plan

To ensure that public use toilets intended for use by people with disability are available for that purpose.

Central Access Policy and Action Plan

A core objective of place making is to preserve and enhance the unique character of each place, which reflect the values of the local community. Infrastructure contributes significantly to the character of a place, the design of which requires a context sensitive approach that balances unique design solutions with standardised treatments.

Sunshine Coast Council Place Making Charter

Prepare a Master Plan for the Coolum Peregian Sports Complex which incorporates the following: Relocation of netball to undeveloped land south of tennis, east of creek Expansion of netball courts to 10 Expansion of tennis courts into eastern end of former netball courts Potential indoor sporting facility at this locality or surrounding locality Upgraded lighting of playing fields Upgraded drainage of playing fields Expanded car parking including conversion of western end of existing

netball courts to car parking after club is relocated Improved vehicular & pedestrian access with particular emphasis on safety Active play space

Sunshine Coast Sport and Active Recreation Plan

Page 8: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

4 Sunshine Coast Council

ISSUE/ STRATEGY RELEVANT TO COOLUM SPORTS COMPLEX SOURCE Undertake a feasibility study to determine the need, viability, site location, facility mix, indicative capital cost, concept plans, financial projections, and management arrangements for the development of a 2-3 court indoor sporting facility (including flexible programming space, health & fitness area, and potentially dedicated gymnastics training space – refer (3) below) in the Coolum Locality. This facility would also cater for adjoining Localities and accommodate unmet demand at the Noosa Leisure Centre. Potential site location options are: Coolum Peregian Sports Complex (co-located with relocated netball courts

to the south of the existing tennis courts) Coolum Beach SHS (if so, consider negotiating transfer of land from the

school to council ownership with guaranteed access to the school during school hours)

Potential new land in Coolum/ Peregian (refer to Open Space Plan)

Sunshine Coast Sport and Active Recreation Plan

The report investigated the infrastructure improvement works within the Coolum Sports Complex to address problems onsite associated with flooding occurring at low Average Recurrence. The works relating to the augmenting of existing drainage infrastructure (i.e. new stormwater pipeline and headwalls) are proposed to rectify current problems onsite associated with flooding. Proposed maintenance works on the existing drainage infrastructure include the removal of debris and minor repairs.

Coolum Sports Complex – Operational Works in the Coastal Management District & Marine Plants Removal Reports

The Corporate Plan 2009-2014 is a key planning document outlining the priorities and strategies council will pursue over time to achieve its vision to become Australia’s most sustainable region. One of the key themes of the Plan is in the area of “Health and Well-being” which aims to be an active and healthy community is resilient and enhances people’s quality of life. Council plays a role in community well-being through safety initiatives, preventative health and education programs, provision of community sport and recreational opportunities and facilitating community interaction. It also has responsibility for ensuring the region’s preparedness to deal with natural disasters. The emerging priorities are: Safe and healthy communities - Adopt and encourage ‘crime prevention

through environmental design’ principles in the design of public and private spaces

Active lifestyles - Promote physical activity and recreation & Support community-based sport and recreation organisations and programs

Sunshine Coast Council Corporate Plan 2009 - 2014

The Sunshine Coast Aquatics Plan was developed to inform and guide the planning, development and management of the aquatics network across the Sunshine Coast region through to 2026. The Plan included the following recommendation for the Coolum Aquatic Centre (located at the Coolum Sports Complex site): Provision of leisure water (with potential for delivery through Public-Private

Partnership); Upgraded program pool; Improved landscaping; and Natural or built shade options.

A Concept Plan was developed (refer figure below). The development of the proposed new facilities would likely increase activity within the Aquatic Centre and may further load existing car parking and access arrangements.

Sunshine Coast Aquatic Plan 2011 - 2026

Page 9: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

5 Sunshine Coast Council

ISSUE/ STRATEGY RELEVANT TO COOLUM SPORTS COMPLEX SOURCE Council’s Capital Works Program has identified some funding for implementation of master plan components in 2011/ 12.

Sunshine Coast Council - Capital Works Program Listing

The Sunshine Coast Sustainable Transport Strategy outlines the emerging priorities and key strategies council will pursue to deliver a sustainable transport system. Any parking and access solution for the Coolum Sports Complex will need to ensure the goals of this Strategy are addressed. The role of the Strategy is to: Influence – To influence critical decision making and planning. Inform – To inform council planning and operational activities and the

development and implementation of the Sunshine Coast Council Planning Scheme

Guide – To guide council decision making and community initiatives Drive – To drive a range of policies and actions that will deliver the vision Engage – To engage the community and key stakeholders to build and

strengthen partnerships that will be required in order to bear sufficient resources to make a difference

The Strategy provides a user hierarchy as detailed below:

Sunshine Coast Sustainable Transport Strategy/ Sunshine Coast Active Transport Plan

Page 10: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

6 Sunshine Coast Council

ISSUE/ STRATEGY RELEVANT TO COOLUM SPORTS COMPLEX SOURCE

The Strategy maps the proposed hierarchy and function of transport corridors for the Sunshine Coast for 2031 and beyond and guides the planning and implementation of transport to achieve the sustainable transport vision. The Strategy identifies a fundamental objective in active transport planning is to improve community mobility and amenity by providing connected networks and facilities based on people’s needs and location. The goal within the Strategy is to provide pedestrians and cyclists with safe, comfortable, direct connections to where they want to go including homes, schools, work places, shopping areas, services, recreational opportunities and public transport. The Strategy outlines that planning will support and encourage walking and cycling as an alternative to private car use and as healthy recreational activity for all ages. The Strategy incorporates the Sunshine Coast Active Transport Plan 2011-2031 (Active Transport Plan) which provides additional detail and guidance in support of this Strategy. Maroochy Plan 2000 – Planning Area no 11 – Coolum Beach has the following intent for the Coolum-Peregian Recreation Precinct (which includes the Coolum Sports Complex): Land in this precinct is intended to be developed and used for recreation

and community facilities, and any related and compatible special uses. Access to and around the Complex precinct needs to be improved. A safe

and secure area near the sporting facilities needs to be provided to store bicycles while users are engaged in sporting activities. This area should then be linked to pedestrian and cycling path network serving the wider area. Increased accessibility across Stumers Creek also needs to be investigated, particularly the possibility of the construction of a narrow bridge that adequately provides for safe and convenient pedestrian and cyclist access.

Any development in this precinct is to have proper regard to protecting or enhancing the environmental and landscape values of the waterways which run through the precinct.

The preferred uses within this precinct are recreation and community facilities, provided any development respects the area’s environmental values and provides for adequate infrastructure services.

Maroochy Plan 2000 – Planning Area no 11 – Coolum Beach Statements of Desired Character for Planning Areas and Precincts – Coolum Beach

GHD developed concept design options and cost estimates for the construction of an access bridge over Stumers Creek at Coolum Sports Complex. This included a steel truss structure that caters for pedestrians and emergency vehicles. [As part of the research for the Coolum Sports Complex Master Plan the need to accommodate maintenance vehicles was identified]

Sunshine Coast Council, Coolum Access Bridge, Feasibility Phase Concept Design Options Report (February 2011)

Page 11: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

7 Sunshine Coast Council

ISSUE/ STRATEGY RELEVANT TO COOLUM SPORTS COMPLEX SOURCE The Development Information Report provided by council identifies that the site as a whole is affected by the following Planning Scheme overlays (it should be noted that in many cases these overlays apply to areas that are within the site boundary but not used for sport or recreation purposes): Acid Sulphate Soils Areas Area 1 Bushfire Prone Areas Fire Risk Zones Flood Prone Land Aboriginal Cultural Areas Koala Protection Areas V1P2 Koala SPP Habitat Value V1P2 Nature Conservation Management Areas Of Concern / Not Of Concern; Waterways Buffer Wetland Buffer Erosion Prone Areas Affected High Value Regrowth Veg v2 (site is a Least Concern regional ecosystem) Local Law 19 VPA 2008 (of Concern) National Estate Wallum Noosa - Maroochy Wallum Area Adjacent Protected Areas - Noosa National Park Regional Ecosystems Qld Herbarium v6 (Regrowth/ Of Least Concern).

Planning Scheme Overlays

The Sunshine Coast Open Space Strategy 2011 concentrated on the council controlled and managed open space and identified the key challenges and issues shaping open space on the Sunshine Coast and provides policy direction to grow and enhance parks, sports grounds, recreation trails and reserves. The actions relevant to this study include: Identify recreation parks, sports grounds and amenity reserves that have

suitable attributes or capacity to support biodiversity outcomes and link core habitat areas.

Prepare design guidelines that promote the utilisation of existing sports grounds for recreation space for the local communities, outside sports usage times (e.g. shade, seating and paths).

Identify park locations with opportunities for public transport, cycle links and integration into transport planning.

Integrate ‘whole of life’ costs into open space planning, landscape development and infrastructure selection.

Apply resource efficient and effective strategies in park and sports ground development (e.g. water reuse and native planting).

Sunshine Coast Open Space Strategy 2011

Page 12: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

8 Sunshine Coast Council

3. SITE INVESTIGATION AND CONSTRAINTS 3.1. SITE OVERVIEW

The Coolum Sports Complex precinct incorporates:

Lot No 800 SP118715 is the major land parcel (approx 15.87 ha) and accommodates the swimming pool, playing fields for cricket/ rugby league/ soccer/ touch football, tennis courts, netball courts, and car parking.

Lot No 2 SP114925 incorporates the undeveloped land west of the RSL (approx 2.43 ha) Lot No 3 RP181210 incorporates the croquet club which occupies approximately 0.46ha of this

parcel. Lot No 3 SP183002 is freehold site owned by the RSL club (approx 0.19ha). Lot No 1 SP183002 is a freehold site owned by the Coolum Beach Baptist Church (approx 0.38ha).

Lot No’s 800SP118715 and 2SP114925 are the focus of the Master Plan and occupy a total of approx 18.3ha. These lots are state government land under the auspices of the Department of Environment and Resource Management (DERM) with council as the Trustee. The total precinct is designated as Special Purpose – Recreation. Any use of the site must be consistent with the conditions of “Secondary Use of Trust Land” administered by DERM.

Stumers Creek passes through the southern portion of the site and a smaller waterway cuts through the north. The Complex is bound by the Noosa National Park (Coolum Section) to the north and west, David Low Way to the east, and Springfield Avenue to the south.

Historically council has afforded tenure to clubs based at the Complex via a lease. Upon expiration of lease terms, lease agreements are currently being extended periodically in the interim of council completing its review into “Tenure Arrangements for Not-for-Profit Clubs”. The Clubs located at the Complex, include:

Coolum Beach Cricket Club Coolum Croquet Club Coolum Football Club Coolum and District Netball Association Coolum Colts Junior Rugby League Club Coolum Tennis Club; and Coolum Touch Association.

Council has a separate lease with Swim Fit for the Coolum Aquatic Centre located at the eastern entrance of the site. The Coolum Beach Baptist Church and Coolum RSL both own freehold land fronting David Low Way.

Clubs are responsible for the development, maintenance and management of their individual leased areas. Council is investigating the implementation of a funding program where clubs can access funding towards some of the costs of maintaining club facilities. Historically, the majority of site improvements have been funded by the individual clubs, sometimes with the aid of government funding. Water is accessed by a mix of town water and via underground bores for some clubs.

Page 13: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

9 Sunshine Coast Council

The Complex currently services predominately district level competitions, events and training. The majority of facilities are used over the entire year with peak usage during the winter competition periods. Football (soccer) usage is concentrated over the winter months; however usage is increasing over the summer off-season period as social, reduced player number competitions (6-a-side) are increasing in popularity.

All clubs have a strong reliance on volunteers in an environment where their attraction and retention is becoming increasingly difficult. Council facilitates an Advisory Group comprising representatives of all clubs. This group meets on a quarterly basis and endeavours to avoid conflicts between groups and address whole of complex issues.

3.2. SITE ASSESSMENT AND UTILISATION Outlined below is a site assessment summary for the Complex based on site inspections undertaken by the study team.

Table 2:  Coolum Sports Complex Site Assessment 

Site attributes, constraints, functionality for purpose, visual amenity

Located to the north of Coolum’s urban footprint, surrounded by Noosa National Park

The 2 lots which are the subject of the master plan comprise approximately 18.3 ha of which 2.43ha west of the RSL is undeveloped. The croquet club occupies a further .46ha on a separate allotment

Some land within the northern and western boundaries of the site are affected by vegetation constraints which constrain further expansion

Development within certain areas would trigger a number of planning scheme codes and needs to be taken into account in future site layout

Currently 9 users with approx 2,900 members (soccer, rugby league, cricket, netball, tennis, croquet, touch football, RSL club and church)

The aquatic centre is leased to Swimfit Site largely flat, however within flood prone area Each individual Club is responsible for the maintenance and management

of their playing fields and associated facilities Good standard of tennis and netball courts Football (soccer) fields recently upgraded Turf cricket pitch recently installed between the two rugby league fields No lighting to cricket practice wickets Aging clubhouse facilities for football, touch football & cricket/ rugby league Reasonable standard clubhouse facilities for tennis and netball Aging grandstand within football (soccer) grounds No water harvesting infrastructure on site Minimal directional signage Majority of clubs appear to be nearing capacity but this needs confirmation

from club participation data The existing touch football fields do not comply with recommended

standards for distance from field of play to light towers. Licenses have been granted to those clubs with expired leases pending

finalisation of an internal council review of tenure arrangements

Page 14: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

10 Sunshine Coast Council

Water catchment/ Hydrology

Site prone to flooding (up to half the site inundated by 0.5m of water and the remainder greater than 0.5m during a 20 year flood event)

The flood immunity of the Complex is Q2 (council’s new open space policy will seek Q20 for future playing fields and Q100 for buildings)

Water use is a combination of bore and town water There have been flooding issues since fill was added to the vacant area

south of the tennis courts Drainage between tennis and netball and at the rear of the rugby league

field was recently upgraded Potential for on site water treatment for nutrient management and water

reuse to be evaluated consistent with the Open Space Plan 2011 which identified the need to apply resource efficient and effective strategies in park and sports ground development (e.g. water reuse and native planting).

Facilities (Condition, presentation, standard etc)

Shared car parking Aquatics, tennis, football and netball; and Cricket/ rugby league and football (soccer)

Aquatic Centre 25m outdoor pool Enclosed, heated learn-to-swim pool First-aid room Reception/ kiosk

Football (soccer) Clubhouse, including canteen, toilets and change rooms 2 full sized and 2 junior football fields Lighting Grandstand west of main senior field Storage sheds

Tennis 4 lit hard courts. 2 lit synthetic grass courts Clubhouse/ amenities/ meeting room

Netball 5 lit hard courts Clubhouse/ amenities Covered area

Cricket/ Rugby League 2 rugby league fields/ 1 cricket field Lighting Clubhouse/ amenities Practice cricket wicket Turf cricket wicket Storage sheds

Croquet 3 croquet greens Clubhouse/ amenities Storage sheds

Touch Football 4 lit touch football fields Clubhouse/ amenities

Page 15: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

11 Sunshine Coast Council

3.2.1. COOLUM BEACH CRICKET CLUB

The Cricket Club lease expires 31/03/2018. The club has increased from 40 senior and 55 junior members three years ago, to a current membership of 55 seniors and 80 juniors. This increase is attributed to the development of a turf cricket wicket and the formation of a junior sub-committee that concentrates on the promotion and growth of cricket at a junior level. The venue is used between September and March (shared facilities with rugby league) on mid-week afternoons for training and weekends for matches. The majority of facility improvements have been jointly funded by the cricket and rugby league clubs. Priority development for the club is for additional grounds for junior cricket, lighting and power to the training nets and storage sheds. Other desired future improvements include:

Turf pitch for senior ground Drainage of oval Sightscreens Field lighting Water harvesting Turf training nets.

Other considerations include:

Shared access with rugby league limits opportunities for field maintenance and resting Playing fields subject to flooding Insufficient space for increasing junior membership training and matches Shared car park with football in poor condition Site largely surrounded by protected vegetation.

3.2.2. COOLUM CROQUET CLUB

The Croquet Club lease expires 30/06/2011. Council has advised that the lease will be periodically extended until the finalisation of council’s review into tenure arrangements for not-for-profit clubs. The club has increased from 18 senior members three years ago, to a current membership of 26 seniors. This increase is attributed to recent publicity and membership drives. The venue is used Sunday, Monday and Friday afternoons and Wednesday and Saturday mornings. The majority of facility improvements have been funded by the club itself.

Priority development for the club is to develop a storage shed, however other identified future improvements include:

Improved maintenance of lawns Re-capping clubhouse stumps Improving grade of drain on south side of access Upgrade lawn 3 The gravel access road requires upgrading Add two more competition lawns Replace asbestos roof.

Other considerations include:

Separate access from other clubs is off David Low Way past the Seacove Resort The croquet fields are subject to flooding

Page 16: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

12 Sunshine Coast Council

Stumers Creek bounds the site on the west Further development of the Complex may further expose the croquet facilities and potentially

increase opportunities for vandalism.

3.2.3. COOLUM FOOTBALL CLUB

The Football Club lease expires 30/06/2011. Council has advised that the lease will be periodically extended until the finalisation of council’s review into tenure arrangements for not-for-profit clubs. The club has increased from 85 senior and 318 junior members three years ago, to a current membership of 115 seniors and 460 juniors. A further 200 players participate in the club’s summer 6-a-side competition. This increase is attributed to improved standard of playing surfaces, improved administration and reduced pricing structure for the summer competition. The venue is used mid-week afternoons and evenings and Saturday all day. The majority of facility improvements have been funded by the club itself and government funding.

Future improvements desired by the club include:

Increase fields to service growing junior membership New clubhouse, including gymnasium and indoor court Improve safety issues at club, including development of a chemical store shed Improve all facilities at club.

Other considerations include:

Shared parking with rugby league/ cricket car park Playing field layout has the minimum space between playing areas and lighting poles Good standard of playing surfaces and lighting.

3.2.4. COOLUM AND DISTRICT NETBALL ASSOCIATION

The Netball Association lease expires 31/10/2019. The club has increased from 96 senior and 252 junior members three years ago, to a current membership of 124 seniors and 307 juniors, however there has been an overall decrease in total membership since 2010 of 102 members. This decrease is attributed to a difficult economic climate, with structured sport competing with other spending priorities of persons residing within the catchment. The venue is used mid-week afternoons and evenings, however St Andrews College uses the courts on a regular basis for curriculum and interschool purposes. The majority of facility improvements have been funded by the club itself and government funding.

Future improvements desired by the club include:

Upgrade current clubhouse and supporters area Car parking and access requires improvement and expansion Provide indoor netball facilities.

Other considerations include:

Sufficient number of courts exist for a manageable competition The Netball Association is seeing access to an indoor court required for wet weather and finals

purposes Confirmation of liability and access arrangements to the mobile telephone tower located at the rear of

the netball facility is required.

Page 17: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

13 Sunshine Coast Council

3.2.5. COOLUM COLTS JUNIOR RUGBY LEAGUE CLUB

The Rugby League Club lease expires 08/04/2018. The club has increased from no senior and 190 junior members three years ago, to a current membership of 35 seniors and 300 juniors. This increase is attributed to the growing local population and increased awareness of the club within the community. The venue is used between April and September Monday - Thursday afternoons and evenings, Friday evenings and all day Saturdays. The majority of facility improvements have been jointly funded by the rugby league and cricket clubs.

Future improvements desired by the club include:

Dedicated playing fields to improve maintenance/ resting opportunities 1 additional senior, 2 modified and 2 mini fields Lighting to back corners of fields Storage shed and gym.

Other considerations include:

Fields subject to flooding Any future separation of playing areas will have an adverse impact on canteen turnover which is a

major revenue source for the club Shared usage prevents resting of fields to improve standard of playing surfaces Cricket and rugby league require different mowing heights.

3.2.6. COOLUM TENNIS CLUB

The Tennis Club lease expires 30/06/2011. Council has advised that the lease will be periodically extended until the finalisation of council’s review into tenure arrangements for not-for-profit clubs. The club has increased from 60 senior and 40 junior members three years ago, to a current membership of 90 seniors and 30 juniors. This increase in senior membership is attributed to the growth of retirees residing in the Coolum area, whilst junior membership has decreased as existing members have new job/ university responsibilities. The venue is used for competition Monday, Tuesday and Thursday evenings and social hire most days/ evenings. The majority of facility improvements have been funded by the club with some government funding assistance.

Future improvements desired by the club include:

Increase the number of courts by a further 4-6; Improve pathways and access to support wheelies competitions.

Other considerations include:

The Tennis Club advised existing courts are at capacity primarily through growth of social hire Grass courts recently upgraded to hard courts.

3.2.7. COOLUM TOUCH FOOTBALL CLUB

The Touch Football Club lease expires 30/06/2016. The touch football club currently has approximately 480 members which participate in Tuesday or Thursday evening competitions. There are currently four floodlit touch football fields within the club’s lease. These fields have less than the desirable standard for clearance between playing areas and light towers under AS2560.2.3 (Sports Lighting).

Page 18: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

14 Sunshine Coast Council

Council recently rejected, on planning grounds, an application from the developer of the adjacent retirement village to extend into the existing touch football playing fields - principally due to the fact the proposed development conflicts with the Planning Scheme’s strategic and precinct intent for the site for recreation purposes. This matter is currently under appeal. It is understood that, irrespective of the outcome of the appeal, access to the existing touch football fields through the retirement village land will be lost when that land is further developed.

Council is currently seeking to secure long term access to the existing touch football fields via the construction of a bridge over Stumers Creek. Due to insufficient land area and/ or environmental issues, the construction of the bridge will not allow any parking on the touch football side of the Complex. The touch football club indicated a strong preference for parking to be as close to their playing fields and clubhouse as possible to support effective competition management and to ensure access for emergency services, injured players and persons with a disability. In addition, the club highlighted the need to ensure the bridge is of sufficient capacity to ensure loading restrictions are able to support access by maintenance/ refuse trucks and machinery.

Touch football is seeking to secure sufficient land whereby access to a minimum of 4 full-sized touch football fields is provided in the one location to support effective competition management.

3.2.8. COOLUM RSL

The Coolum RSL Club has a freehold site located to the east of the undeveloped area under the trusteeship of council and adjacent to David Low Way. The RSL club previously had lease tenure access direct with DERM to its existing site, the church site and the undeveloped site to the west. The RSL have advised that some time ago a large portion of this land was excised to council to provide an area for the relocation of touch football across Stumers Creek in return for allowing further development of the retirement village into the existing touch football fields. At this time, the RSL purchased freehold the existing RSL and church sites from the State and later on-sold the existing church site to the Coolum Beach Baptist Church. As outlined above, the planning application of the retirement village developer to develop into the existing touch football area is currently under appeal.

The RSL club has approximately 200 members which has grown from approximately 70 members 3 years ago and attracts upwards of 6,000 persons to its ANZAC Day ceremonies. This patronage excludes regular external hire events.

Future improvements desired by the club include:

Additional space for increased parking to support a future application liquor license; Additional space for the future potential development of a services club (licensed club); Access to open space areas for ANZAC ceremonies.

3.2.9. COOLUM BAPTIST CHURCH

The Coolum Beach Baptist Church has a freehold site located to the north of the RSL club. This site was purchased from the Coolum RSL club several years ago. The church has increased from 225 senior and 100 youth patronage three years ago, to a current patronage of 250 seniors and 130 youth. This patronage excludes regular external hire events.

Future improvements desired by the church include:

Acquire additional land for the expansion of car parking which is also used as an activity space (i.e. markets, skateboarding programs); and

Page 19: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

15 Sunshine Coast Council

Acquire additional land to support the future development of multi-purpose indoor areas to expand men’s health and youth programs.

Other considerations include:

Further development of the Complex, particularly in the undeveloped area behind the church, should consider the impact of competition for car parking, security/ vandalism and noise, damage and lighting impacts.

Page 20: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

16 Sunshine Coast Council

3.3. SITE USAGE SUMMARY An assessment of the current usage of the Complex for each user group was conducted over the seven days of the week. This data was conducted via direct interviews with each club and summaries the estimated number of people from each user group on site. A summary of the site usage is outlined in the table below:

Day Time Cricket (Summer)

Croquet Football Netball Rugby League (Winter)

Tennis Touch Football

Aquatics RSL Church TOTAL

Monday 9.00am - 3.00pm 20 25 165 30 240 3-4pm 40 20 20 15 75 170 4-5pm 40 20 162 20 30 15 70 357 5-6pm 40 262 20 60 15 15 412 6-7pm 140 60 20 7 227 7-8pm 40 30 20 90 8-9pm 40 20 60 9pm+ 0 TOTAL 120 60 644 60 180 130 0 332 30 0 1,556

Tuesday 9.00am - 3.00pm 10 65 120 195

3-4pm 50 69 15 75 209 4-5pm 50 157 120 15 70 412 5-6pm 50 223 240 15 20 548 6-7pm 175 75 240 20 80 5 595 7-8pm 50 75 240 20 120 505 8-9pm 50 75 120 20 120 385 9pm+ 60 80 140 TOTAL 150 10 724 225 1,020 170 400 290 0 0 2,989

Page 21: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

17 Sunshine Coast Council

Day Time Cricket Croquet Football Netball Rugby League

Tennis Touch Football

Aquatics RSL Church TOTAL

Wednesday 9.00am - 3.00pm 25 165 60 250 3-4pm 50 30 15 75 170 4-5pm 50 114 30 30 15 70 309 5-6pm 50 185 30 60 15 15 355 6-7pm 115 30 60 20 7 100 332 7-8pm 50 30 30 20 100 230 8-9pm 50 20 100 170 9pm+ 100 100 TOTAL 150 0 514 150 180 130 0 332 460 N/A 1,916

Thursday 9.00am - 3.00pm 65 80 120 40 305

3-4pm 60 15 75 150 4-5pm 60 120 35 120 15 70 420 5-6pm 60 205 90 240 15 20 630 6-7pm 140 100 240 20 80 5 585 7-8pm 70 90 240 20 120 540 8-9pm 70 35 120 20 120 365 9pm+ 60 80 140 TOTAL 180 0 605 350 1,020 170 480 290 40 N/A 3,135 Friday 9.00am - 3.00pm 20 25 80 165 290 3-4pm 60 20 50 15 75 220 4-5pm 60 20 100 15 70 265 5-6pm 60 70 90 15 3 238 6-7pm 60 220 180 20 90 570 7-8pm 60 200 180 20 90 550 8-9pm 200 180 20 90 490 9pm+ 200 90 90 380 TOTAL 300 60 1,040 0 720 130 80 313 360 N/A 3,003

Page 22: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

18 Sunshine Coast Council

Day Time Cricket Croquet Football Netball Rugby League

Tennis Touch Football

Aquatics RSL Church TOTAL

Saturday 8-9am 45 10 120 90 20 90 15 390 9-10am 45 10 150 180 20 60 15 480 10-11am 45 10 150 180 20 70 15 490 11am-12pm 45 10 150 180 20 15 15 435 12-1pm 45 150 180 20 15 15 425 1-2pm 45 120 90 10 10 15 290 2-3pm 45 60 90 10 10 15 230 3-4pm 45 60 90 10 10 15 230 4-5pm 45 60 90 10 15 220 5-6pm 45 60 50 10 165 6-7pm 60 60 7-8pm 60 60 8-9pm 60 60 TOTAL 450 40 1,260 0 1,220 150 0 280 135 N/A 3,535 Sunday 8-9am 10 10 9-10am 10 30 40 10-11am 10 25 35 11am-12pm 10 25 35 12-1pm 10 15 25 1-2pm 10 15 25 2-3pm 10 10 10 30 3-4pm 10 10 10 30 4-5pm 10 10 20 5-6pm 10 10 6-7pm 0 TOTAL 0 30 0 0 0 100 0 130 0 N/A 260 GRAND TOTAL 1,350 200 4,787 785 4,340 980 960 1,967 1,025 N/A 16,394

Page 23: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

19 Sunshine Coast Council

3.4. SITE CONSTRAINTS The major site constraints for consideration in this study include:

Restrictions to removal of protected vegetation; Development buffers from Stumers Creek require on-site vegetation off-sets; Flooding immunity; Insufficient and unsafe parking and access; and No existing access across Stumers Creek.

The following maps indicate:

Known underground services (Map 1); Site constraints (Map 2); Site contours (Map 3); and Lease boundaries (Map 4).

Map 1:  Known Underground Services – Coolum Sports Complex 

Page 24: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

20 Sunshine Coast Council

Map 2:  Coolum Sports Complex Site Boundaries and Constraints 

Page 25: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

21 Sunshine Coast Council

Map 3:  Coolum Sports Complex Site Contours 

Page 26: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

22 Sunshine Coast Council

Map 4:  Coolum Sports Complex Leased Areas  

Page 27: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

23 Sunshine Coast Council

4. COUNCIL CONSULTATION Further to the direct consultation with Coolum Sports Complex clubs, interviews were conducted with Cr Vivien Griffin and several internal council officers as part of the consultation process. The key themes and considerations from this council consultation include:

The study should consider impacts of further development of the retirement village adjacent to the touch football fields, including reduced access bridge over Stumers Creek to the current touch football site.

The area of land to the north of the housing development on David Low Way (SE end of the precinct) is designated as “road reserve”.

Traffic management considerations include: Consistency with the Sustainable Transport Strategy and Active Transport Plan; A mix of parking, public transport and walk/ cycle access; Event management arrangements; and High levels of car parking to cater for one-off events will not be supported.

Parking and access into the precinct are major issues. It was noted that touch has at least 50 cars parked on competition evenings.

There have been flooding issues since fill was added to the vacant area south of the tennis courts. Council will be facilitating an expression of interest process for sporting clubs seeking access to the

new sporting fields within Peregian Springs, including two rectangular fields and a central cricket pitch.

Council is currently undertaking a review into tenure arrangements for not-for-profit clubs, however this study is not anticipated to be finalised before the end of 2011. In the interim, council is approving periodical extensions of leases until finalisation of the review.

There may be insufficient space at the Complex to meet the future needs of all existing users of the site.

Any upgraded/ new access onto David Low Way will require Department of Main Roads approval as it is a “declared main road”.

Any development within the waterways and wetlands buffer will require assessment by the council development assessment team and must demonstrate sufficient planting off-set within the site.

Page 28: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

24 Sunshine Coast Council

5. CATCHMENT ANALYSIS Based on 2006 Census data and information supplied by Coolum Sports Complex clubs, the map below demonstrates where the membership catchment for the site is derived from.

Map 2:  Coolum Sports Complex Membership Catchment  

Page 29: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

25 Sunshine Coast Council

By applying these catchment rates to the estimated 2026 population (supplied by council for the Sunshine Coast Sport and Active Recreation Plan 2011-2026), a projected number of future users from these areas can be calculated. This would be considered to be a maximum figure because it assumes:

A linear projection of age breakdown (when in fact it is known that the median age of the Sunshine Coast is predicted to rise from 41 as at 2006 to 44 by 2026 – both figures being higher than the state average of 36 and 41 respectively); and

No new playing areas are developed within the catchment which, if they were developed, would reduce pressure on utilisation of the complex

Table 3:  Coolum Sports Complex Membership Catchment Projections* 

POPULATION 2006

CURRENT CATCHMENT MEMBERSHIP

PROJECTED POPULATION

(2026)

PROJECTED CATCHMENT MEMBERSHIP

CATCHMENT LOCALITIES

TOTAL NO OF USERS % TOTAL NO OF USERS % Coolum Beach/ Mt Coolum/ Yaroomba/ Point Arkwright

13,267 1,203 57.2% 23,404 1,977 57.2%

Peregian Beach/ Peregian Springs

4,671 376 17.9% 11,395 619 17.9%

Sunshine Beach/ Sunrise Beach/ Marcus Beach/ Castaways

7,658 173 8.3% 10,159 287 8.3%

Marcoola/ Twin Waters/ Pacific Paradise/ Mudjimba

10,012 294 14.0% 13,621 484 14.0%

Other 56 2.6% 89 2.6% Total: 35,608 2,102 100% 58,579 3,456 100%

* These figures exclude users of the Coolum Aquatic Centre. Figures are based on membership data supplied by existing clubs. Some users may be a member of multiple clubs and therefore could be counted more than once.

It should be noted that an age breakdown of population projections by locality is not available.

Page 30: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

26 Sunshine Coast Council

6. CONCEPT PLAN DESIGN

6.1. DEVELOPMENT OF OPTIONS Following completion of site analysis, usage analysis, background research, population and catchment analysis, council consultation and stakeholder consultation three design options were developed. These options together with a summary of the benefits and constraints of each are set out in sections 6.2, 6.3 and 6.4.

In summary these options were:

Option 1: Relocation of Touch Football, Expansion of Tennis and Maximisation of Playing Fields

Option 2: Retention of Touch Football, and Maximisation of Playing Fields, No Tennis Expansion

Option 3: Relocation of Touch Football to Undeveloped Land, East of Creek

Page 31: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

27 Sunshine Coast Council

6.2. OPTION 1 – RELOCATION OF TOUCH FOOTBALL, EXPANSION OF TENNIS AND MAXIMISATION OF PLAYING FIELDS

Page 32: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

28 Sunshine Coast Council

6.2.1. OPTION 1 – BENEFITS/ CONSTRAINTS

Benefits:

Provides additional playing field opportunities for junior rugby league/ cricket on former touch fields Provides additional playing field opportunities for soccer/ rugby league on undeveloped land south of

tennis courts Footbridge location maximises connectivity to existing rugby league/ cricket clubhouse and car

parking Footbridge creates link to informal recreation opportunities on eastern side of Stumers Creek for

residents on the western side of the creek Enables future potential expansion of RSL Enables future expansion of 3 tennis courts Improves traffic connectivity between northern and southern precincts and access to spillover parking Increased parking accessibility for northern and southern precinct users Introduces second entry into the site at southern end Introduces recreational elements for the community through proposed recreational park Flexible design to adapt to any future change in demand for playing fields Does not ‘design out’ the potential long term expansion of the aquatic centre if required

Constraints:

Touch football must relocate off site to an alternative location, and associated cost No additional car parking at either end of footbridge – may exacerbate parking pressures Some potential management issues regarding maintenance/ access to former touch fields No expansion of church or croquet greens

Page 33: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

29 Sunshine Coast Council

6.3. OPTION 2 - RETENTION OF TOUCH FOOTBALL, AND MAXIMISATION OF PLAYING FIELDS, NO TENNIS EXPANSION

Page 34: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

30 Sunshine Coast Council

6.3.1. OPTION 2 – BENEFITS/ CONSTRAINTS

Benefits:

Touch football remains on site in its current location – cost of relocation avoided Touch football southern fields repositioned to support relocation of clubhouse closer to new

footbridge entry Improved traffic connectivity between northern and southern precincts and access to spillover parking Car parking in close proximity to footbridge for touch football participants Provides additional playing field opportunities for soccer/ rugby league on undeveloped land south of

tennis courts Enables future potential expansion of RSL Increased parking accessible to northern and southern precinct users Introduces second entry into the site at southern end of the site Introduces recreational elements for the community through proposed recreational park Flexible design to adapt to any future change in demand for playing fields Does not ‘design out’ the future potential expansion of the aquatic centre

Constraints:

Safety zones to light towers continue to not meet desired standards Cost associated with relocation of touch football clubhouse and moving light towers Some management issues regarding maintenance/ access to former touch fields No expansion of tennis, church or croquet No additional cricket pitch on the site unless the undeveloped land is configured for junior football

fields (not single senior football field) Less land area available for playing fields on undeveloped land due to road/ car parking constraints

Page 35: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

31 Sunshine Coast Council

6.4. OPTION 3 – RELOCATION OF TOUCH FOOTBALL TO UNDEVELOPED LAND, EAST OF CREEK

Page 36: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

32 Sunshine Coast Council

6.4.1. OPTION 3 – BENEFITS/ CONSTRAINTS

Benefits:

Touch football retained on site – cost of relocation avoided New touch football fields meet desired safety zones to light towers and between fields Parking provided for touch adjacent to playing fields Enables former touch fields to accommodate future shared use junior rugby league/ cricket/ soccer Footbridge location maximises connectivity to existing rugby league/ cricket clubhouse and car parking Footbridge creates link to informal recreation opportunities on eastern side of Stumers Creek for

residents on the western side of the creek Introduces recreational elements for the community through proposed recreational park Does not ‘design out’ the future potential expansion of the aquatic centre if required

Constraints:

Cost of relocating touch football Length of a touch football field(s) may need to be adjusted to accommodate required dimensions No expansion of tennis, church or croquet Some management issues regarding maintenance/ access former touch fields Proximity of southern touch fields to residences considered likely to generate objection to lighting of

fields. Possible lighting at northern end of fields onto tennis courts No potential for relocation of RSL memorial Access to touch football clubhouse will impact on croquet requiring some road realignment and

drainage work No connectivity between northern and southern precincts and access to spillover parking and southern

entry provides access for touch football and croquet only

6.5. CONSULTATION ON DESIGN OPTIONS

6.5.1. CONSULTATION OUTCOMES

All three options were discussed in face to face meetings with existing user groups to seek their feedback. Option 3 was not viewed as favourably by the majority of user groups as Options 1 and 2 due to a range of disadvantages. The three options were also discussed with council’s Project Management Group. Rather than short list a single preferred option on which to seek public feedback at a “Meet us at the Complex” display at Coolum Sports Complex on Saturday 9th July 2011 (and via council’s website) it was decided, in consultation with council’s Project Management Group, to seek public comment on options 1 and 2. The outcome of public and user group feedback on these options is summarised below.

CONSULTATION GROUP CONSULTATION ADVICE General Public Option 1 results in centralisation of sports and provides connectivity with the

proposed footbridge Option 1 results in increased playing areas for sports, including soccer and cricket

which have a need for more playing space Option 2 offers the most parking Any future plans to introduce live entertainment or other amplified activities should

be subject to noise planning considerations based on the large number of residential areas surrounding the Complex

School grounds should be better utilised on weekends

Page 37: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

33 Sunshine Coast Council

CONSULTATION GROUP CONSULTATION ADVICE Future development should consider drainage impacts on the adjacent National

Park and surrounding residential areas The current 80km speed limit at the main entrance of the Complex is too high and

unsafe based on the large volume of vehicles travelling along David Low Way competing with vehicles into/ out of the Complex

The Coolum Bridge Club could develop a new shared clubhouse with its own funds should land be made available on the Complex site

There is a need for more cricket wickets within the Options The options do not provide sufficient car parking in consideration of the pressure

on the existing car parks The connectivity of the existing touch football fields with the remainder of the

Complex is a good outcome Complex User Groups Cricket and football supported the provision of additional playing fields in the

options Rugby league raised concerns that the proposed shared rugby league/ cricket

fields in the current touch football location was segmented from other rugby league facilities and amenities

The entry into the proposed car park behind the RSL is via the Church car park which is privately owned, freehold land

The Baptist Church would benefit from access to additional land for the potential development of a multi-purpose indoor meeting/ activity space

The options do not support any future potential expansion of the croquet club to assist in attracting events

Option 2 may provide some opportunity for croquet to expand with up to two additional courts in the triangular area, south of the proposed shared use playing fields within the undeveloped land

Other options for the expansion of croquet may include one court south of the playing fields within the undeveloped land and the expansion of the existing croquet court 3

The proposed relocated touch football clubhouse to the east in Option 2 may necessitate some land clearing to ensure sufficient playing field space

Option 2 does not support any future expansion of touch football Option 2 provides better car parking outcomes for the Complex Option 2 allows touch football to remain on site, however there are no car parks

immediately within the touch football site Lighting in Option 2 may affect neighbouring residents The proposed bridge does not appear to be able to support sufficient load for

waste management and machinery for repairs and maintenance Consideration needs to be given to the access and maintenance of the proposed

shared fields The use of the undeveloped land for increased playing fields is supported The options do not impede on the northern wetlands The western car park does not require upgraded lighting Despite the additional playing fields proposed within the options, there will remain

a shortage of playing space over the longer term The tennis club is seeking to increase the number of courts to ten, based on this

number being the minimum number required to host Tennis Australia junior and senior events

Consideration should be given to parking adjacent to David Low Way Directional signage and a large illuminated signage at the entrance promoting all

users should be considered

Page 38: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

34 Sunshine Coast Council

6.6. ASSESSMENT OF OPTIONS Criteria were established to assess Master Plan options 1 and 2 to determine the preferred concept design for the Complex. The criteria outlined below were used by council’s Project Steering Committee, with input and assistance from the Consultants, to determine the preferred option.

CRITERIA Strategic Context Improves the capacity of the site Addresses identified future needs across sports Considers the catchment area and population in terms of current and future demand Improves car parking, traffic, pedestrian and active transport opportunities Economic and Environmental Sustainability Likely to increase operating efficiency Has minimum impact on environmental areas Social Equity Benefits multiple community/ user groups Infrastructure Provision and Club Sustainability Maximises use of an existing facility Improves the functionality of land (eg drainage, lighting, amenities, parking) Addresses safety/ risk management considerations Minimal planning approval constraints Capital Cost High, medium or low cost Other Positive community feedback Positive club feedback Marries well with other planning (eg Sport & Active Recreation Plan) Low risk to council if option is adopted

Option 1 was deemed to be the preferred Master Plan design for the Coolum Sports Complex. The Project Steering Committee did note however, that Option 1 will have a higher short term cost to council due to the costs associated with relocating touch football to suitable alternative site. However this option has longer term benefits and better accommodates future growth. Following further discussion, the following additions/ amendments to Option 1 were decided:

Seek Department of Transport and Main Roads approval to reduce the speed limit of David Low Way adjacent to and along the length of the Complex to 60kmph

Seek Department of Transport and Main Roads approval to install a pedestrian refuge on David Low Way near the bus stops to allow bus passengers to more easily and safely cross the road

Amend Note ‘N’ on the plan in relation to tennis court expansion to…”Monitor demand for an additional 3 tennis courts. Should demand not be confirmed, improve parking and access through the development of additional car parks within this area.”

Amend the entry into the proposed future car parking behind the RSL to be via the undeveloped land as opposed to its current location from within the privately owned Church car park; and

Upgraded lighting not required for Western car park Clarification of wording to reflect the fact that the recreation park south of the pool would not impact on

potential long term expansion of the swimming pool

Page 39: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

35 Sunshine Coast Council

7. FINAL MASTER PLAN DESIGN 7.1. DESIGN ELEMENTS

The elements of the proposed final Master Plan for Coolum Sports Complex are described at Table 3 below and illustrated at sections 7.3 & 7.4. The time frame for these recommended elements has been assessed as either:

Immediate (within 2 years) Short Term (2 – 5 years) Medium Term (6 – 10 years) Long Term (11 – 15 years).

Indicative only capital cost estimates are included. A reliable estimate of capital cost will be known only after detailed designs are prepared.

Table 3:  Proposed final Master Plan – time frame and indicative cost 

MASTER PLAN IMPROVEMENT REFERENCE TIMEFRAME INDICATIVE COST Shared use rugby league/ cricket fields – upgrade lighting to obtain even distribution

A Medium Term $180k

Develop sight screens for cricket B Medium Term $10k Upgrade lighting to cricket practice nets C Short Term $5k Western car park – upgrade surface, signage and bike parking facilities

D Immediate $490k

Football “soccer” playing fields E N/a N/a Football “soccer” clubhouse – space for future expansion/ redevelopment

F Long Term Not costed

Site entry G N/a N/a Footbridge to maximise connectivity to existing rugby league/ cricket clubhouse and shared fields and provide local community access to Complex

H Immediate To be costed by council

Netball courts – upgrade clubhouse I Medium Term $105k Eastern car park – upgrade lighting, surface, signage and bike parking facilities

J Short Term $370k

Aquatic Centre – additional leisure water (100m2) and shade/ new program pool – as per separate Sunshine Coast Aquatic Plan 2011

K Medium Term $1.0m

Upgrade pathways to tennis courts for improved PWD access

L Short Term $20k

Existing touch football clubhouse retained as satellite kiosk/ clubhouse for use by sports accessing the playing fields

M Immediate Nil

Touch fields converted to shared use junior rugby league/ soccer/ cricket fields. After allowance for clearance zones to light towers and between fields/ cricket pitch, maximum playing area for rectangular fields is approx 85m x 66m per field. Touch relocated to an alternative site and given security of tenure.

N Immediate $145k

Monitor demand for an additional 3 tennis courts. Should demand not be confirmed, improve parking and access through the development of additional car parks within this area

O Long Term $450k (tennis)

Page 40: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

36 Sunshine Coast Council

MASTER PLAN IMPROVEMENT REFERENCE TIMEFRAME INDICATIVE COST Recreation park between aquatic centre and church, including water themed play features, seats, shelters and natural shade. Access from northern part of site via walk/ cycle pathway

P Medium Term $225k

Central road spine allowing better traffic flow through site

Q Short Term $100k

Two way connection linking northern and southern precincts heading south only, between tennis courts and netball courts. Drainage works required. Road will also improve access to utility building south of netball courts

Q2 Short term for road between tennis/ netball and nth car parks.

$150k

Future car parking including bike parking facilities with potential connectivity to church car park subject to negotiations with the church

Q3 Medium to Long Term

$350k

Current undeveloped land to be developed as shared use soccer/ rugby league fields. Space can accommodate a full sized soccer field or modified fields for junior competition. Amenities building developed to the south of the undeveloped land

R Medium Term $390k

Baptist Church S N/a N/a Seek DTMR approval to reduce the speed limit of David Low Way adjacent to and along the length of the Complex to 60kmph and to install a pedestrian refuge on David Low Way near the bus stops to allow bus passengers to more easily and safely cross the road

T Immediate $5k

Possible extension of RSL U Long Term Privately Funded Croquet courts – upgrade drainage south of access road/ upgrade standard of Court 3 and replace roof of clubhouse

V Medium to Long Term

$80k

New southern entry to the site off existing croquet access road

W Medium Term $275k

RSL Memorial relocated south of the existing site X Long Term $50k New picnic area with shelter and regeneration planting along creek

Y Medium Term $30k

New footpath connections Z Medium Term $170k

The staged indicative costs of the Master Plan are:

Immediate - $640,000 (excluding bridge); Short Term - $645,000; Medium Term - $2,425,000; Long Term - $500,000; Total - $3,210,000.

Page 41: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

37 Sunshine Coast Council

7.2. ENVIRONMENTAL PLANNING ADVICE AND APPROVALS From discussions with council officers, the project potentially triggers permits and approvals under various pieces of legislation. These could include:

Prescribed Tidal Works (PTW) Application

For works that extend below Mean High Water Springs in Stumers Creek or go over tidal waters (Stumers Creek)

Coastal Protection and Management Act

Only if works occur below highest astronomical tide (HAT)

Vegetation Management Act 1999 (VMA)

Clearing of remnant vegetation in mapped areas

Nature Conservation Act 1992 (NCA)

Clearing of any native vegetation (not just mapped remnant vegetation). Clearing of least concern vegetation is generally approved with a 1:1 offset.

Disturbance to Marine Plants

Works in the tidal areas that have the potential to damage marine plants trigger a development application

State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils (SPP 2/02)

The site is in an area of mapped Acid Sulfate Soils. SPP may apply depending on the scale of the proposed works.

Aboriginal Cultural Heritage Act 2003

The Cultural Heritage Duty of Care Guidelines need to be followed

Resource Entitlement

Works on State owned land trusted to council, must obtain a resource entitlement prior to lodgement of an IDAS development application.

Sustainable Planning Act 2009 (SPA)

Construction and raising of a waterway barrier would require development approval.

Wetland

Areas mapped as a wetland management area on the ‘map of referable wetlands’ trigger DERM as an advice agency for development applications involving high impact earthworks

Contaminated Land Register

From a search of undertaken by Strategic Leisure, the undeveloped land west of the RSL (Lot No 2 SP114925) is not listed on DERM’s Environmental Management Register or Contaminated Land Register

Page 42: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

38 Sunshine Coast Council

7.3. FINAL PROPOSED MASTER PLAN

Page 43: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

39 Sunshine Coast Council

7.4. MASTER PLAN SECTION  

Page 44: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

40 Sunshine Coast Council

8. MANAGEMENT ANALYSIS 8.1. CURRENT ARRANGEMENT

Tenure is currently allocated to Coolum Sports Complex clubs by Sunshine Coast Council via formal leases. The standard terms of the lease agreements has varied with differing expiration dates. Club leased areas include buildings and playing fields/ courts. In the case of the car park between the football and rugby league/ cricket fields, this area is leased to football. In all other cases, the car parking and common access areas remain the responsibility of council.

An informal Advisory Group comprising representatives of all clubs based at the Complex meets on a quarterly basis with council undertaking the role of facilitator. The aim of the Advisory Group is to “Provide a district level, multi use facility, that meets the needs of Coolum sporting and recreational organisations, residents and visitors to the area”. The Advisory Group provides an opportunity for lessees to liaise directly with council, whilst addressing any whole-of-site matters. Council is currently undertaking a review of tenure arrangements for not-for-profit clubs, however at the time of this report there was no detail available in terms of the likely future arrangements to be implemented.

Development and maintenance of facilities, including playing fields/ courts has generally been undertaken by individual lessees. There are minimal economies of scale savings generated by Coolum Sports Complex clubs sharing like equipment and resources used for maintenance and upkeep purposes.

Council has recently launched the Sports Field Maintenance Funding Program which aims to provide consistent, equitable and appropriate support for sports field maintenance across the region. This allocation is a contribution towards, and not a full reimbursement of, field maintenance costs. The intent of the program is to partner with sporting organisations maintaining facilities to a district competition standard and recognise the challenge many organisations face balancing increasing maintenance costs and intensity of use of such facilities across the region. Further, council’s Community Funding Partnership Program provides for the ongoing operational maintenance of specialised surfaces (eg croquet, tennis, netball).

The funding program supports the following objectives:

Acknowledge the contribution of community sport and active recreation clubs and their volunteers to the community in line with council’s vision for the future

Actively engage with community organisations to contribute to and achieve council’s Corporate Plan; Encourage long term planning for cost effective facility development Ensure that funding is provided to eligible organisations on an equitable basis Encourage and work with organisations to become more sustainable.

The funding amount is intended to be a contribution towards the club’s costs of maintaining the facility. Within the total budget allocation, calculations have been made to equitably distribute funds to the various eligible organisations. Funding is based on a percentage of the contractor rate for mown playing surfaces (full contractor rate includes 20 grass mows, 1 x aeration, 2 x wick wiping, 2 x fertiliser, 1x soil test, 1 x 5mm top dress per year applicable to size of field and sport played). All clubs which currently lease facilities at the Complex are eligible to apply for funding under this program.

Page 45: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

41 Sunshine Coast Council

8.2. FUTURE MANAGEMENT CONSIDERATIONS As council has determined to continue with periodical extensions of the existing leases over playing areas and buildings to individual clubs at the Coolum Sports Complex pending its review into the tenure arrangements of not-for-profit clubs being finalised, any future management model introduced for the Complex must be consistent with the outcomes of this review.

The current management arrangement at the Coolum Sports Complex, whereby council leases all playing areas and buildings, has been successful in terms of encouraging individual clubs to develop and maintain their own facilities. On this basis, it is recommend that council continue with this full leasing model, however as the Master Plan identifies opportunities for increased sharing of facilities between users, it will be necessary to ensure that future lease agreements make provision for shared use of certain areas.

8.2.1. SHARED PLAYING FIELDS

The recommended Master Plan contains opportunities for shared use playing fields to service the current and future demand of clubs. Most existing clubs are at or close to capacity, and from time to time the capacity to host expanded competitions may require access to playing fields over and above their existing leased areas. It is recommended that:

1. When playing fields are developed on the existing undeveloped land, they be leased to Coolum Football Club.

2. The former touch football fields, including the existing touch football clubhouse, be managed on the same basis as the existing shared use rugby league/ cricket fields ie leased to Coolum Colts Junior Rugby League Club in the winter season and Coolum Cricket Club in the summer season.

In respect of the undeveloped land and former touch football fields it is further recommended that:

1. The clubs afforded a lease will be responsible for maintenance of playing fields and will be eligible to apply for funding under council’s Sports Field Maintenance Funding Program.

2. The clubs afforded a lease will also be responsible for all ancillary costs (eg water and electricity) for the term of the lease in accordance with council’s future land tenure policy.

3. Other Coolum Sports Complex clubs will be eligible to apply for use of these areas subject to adequate notice being given, their availability, and the payment of a hire fee to be negotiated directly with the lessee club.

4. The hire fee should be based on the reasonable cost of maintenance and ancillary costs associated with the event/ activity.

5. Where the application (in 3 above) to use these playing areas involves higher order events/ competitions, the lessee club must negotiate in good faith to make the playing areas available.

6. Should the clubs be unable to agree on access arrangements or hire fees the matter shall be referred to the Advisory Group to seek consensus.

7. Any club that seeks to access the former touch fields or future playing fields on the undeveloped land will need to ensure its insurances cover these areas.

To ensure car parking and access is maintained at a safe and presentable standard, council should consider not granting tenure over car parks at the complex (subject to the outcome of council’s not-for-profit tenure review). However, it is noted that this recommendation will result in the football club relinquishing part of its lease area (shared use western car park) and on this basis any future requirements for additional car parking at the Complex to service football would become the responsibility of council.

Page 46: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

42 Sunshine Coast Council

8.2.2. ADVISORY GROUP

It is not considered necessary for council to create a formal entity for the Coolum Sports Complex Advisory Group (Coolum Multi-sports Management Group). However, it is recommended that the existing Coolum Sports Complex Terms of Reference be expanded to further articulate the role and responsibilities of the Advisory Group. These could include:

1. Nominate a representative to act as Chair. 2. Any dispute between clubs will be resolved by the Advisory Group in the first instance, and if

unresolved council will act as final arbitrator. 3. Collectively identify, develop and implement strategies to increase the sustainability of the Coolum

Sports Complex and its clubs. 4. Support funding applications lodged by individual clubs. 5. Act as the communicative link between clubs and council. 6. Explore new revenue, event and cost minimisation opportunities for individual clubs and/ or for the

benefit across the Coolum Sports Complex.

It is anticipated that this model will:

1. Encourage continued involvement and support from volunteers to maintain a cost effective delivery outcome.

2. Not largely rely on significant increases in council operational funding. 3. Stimulate future sharing of capital development, maintenance and volunteer resourcing across

multiple clubs. 4. Provide clear direction in terms of access, maintenance, management and development of shared

facilities. 5. Support identification of increased event and other usage opportunities. 6. Increase opportunities for sponsorship revenues and grant funding. 7. Reduce capital development and operating costs through economies of scale savings achieved with

an improvement in shared strategic decision making and through sharing of facilities and other resources.

Page 47: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

43 Sunshine Coast Council

9. FUNDING OPPORTUNITIES There are a number of ways council’s fund capital works associated with the development of community infrastructure such as community sports facilities. The nature of the project will influence the eligibility, scope and level of external funding that can be achieved. The following information is supplied as a guide that is (to the best of our knowledge) current at the time of writing this report. Sunshine Coast Council should not rely on any of the following information without first making its own investigations into the relevance, suitability and currency of the funding strategies, grants and subsidies described here.

9.1. SPORTS FIELD MAINTENANCE FUNDING PROGRAM By way of assistance to Coolum Sports Complex clubs, council recently launched the Sports Field Maintenance Funding Program which aims to provide consistent, equitable and appropriate support for sports field maintenance across the region. Funding is a contribution towards field maintenance costs. The intent of the program is to partner with sporting organisations to maintain their facilities to district competition level.

The primary purpose of the program is to provide greater funding certainty to sporting organisations that partner with council to assist in meeting council’s corporate vision. The program provides sporting organisations with surety of financial support to deliver specified outcomes which meet identified community needs. It provides on-going funding (up to three years) as a contribution for the maintenance of sports fields. Those clubs situated on the Coolum Sports Complex that have lease tenure with council are eligible for funding under this program.

9.2. COMMUNITY GRANT PROGRAM Further funding is potentially available to Coolum Sports Complex clubs from council’s Community Grant Program is a strategic investment tool, assisting the community to meet and respond to council’s priorities and vision as outlined in its Corporate Plan. This assists to enable council to support and stimulate diverse and dynamic projects, programs and events, encourage engagement and participation in the community and facilitate stronger, more resilient communities. The key priorities of the Community Grant Program are:

Community Focus – support projects that provide significant long-term outcomes for the Sunshine Coast community and region

Partnership – work with groups to help them to become financially independent and to build long-term links and partnerships

Equity – transparent, fair and accountable process

Grant types include:

Individual development grants – up to $500 Minor grants – up to $2,000 Major grants – over $2,000 and up to $50, 000

Clubs situated at Coolum Sports Complex are eligible to apply for funding under the Community Grants Program within the Sport and Recreation category.

Page 48: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

44 Sunshine Coast Council

9.3. COMMUNITY FUNDRAISING There are many examples from around Australia where the community has been the catalyst to raising significant amounts of money for specific community projects through community events and grant applications and community co-operatives. Such fund raising also endorses the community support for projects and can influence the availability of other grants and subsidies when applications are lodged.

9.4. EXTERNAL FUNDING SOURCES Possible external funding sources are summarised below.

9.4.1. FEDERAL GOVERNMENT

The Commonwealth Government through GrantsLINK provides a comprehensive website maintained by the Commonwealth Department of Infrastructure, Transport, Regional Development and Local Government offering direct links to existing information on Commonwealth Government grants programs. GrantsLINK © may assist councils to find suitable and relevant grants for community projects from the many Commonwealth grants that are available. The Community Portal provides information for community groups in Australia including a selection of links to sources of grants and funding.

REGIONAL DEVELOPMENT AUSTRALIA FUND 

The Regional Development Australia Fund (RDAF) is a national program to support Australia’s regions and enhance the economic development and livability of their communities. The program is administered by the Department of Regional Australia, Regional Development and Local Government (the Department). It is designed to ensure that new investments are targeted to reflect the characteristics, and to address the opportunities and challenges, of Australia’s diverse regions. The program aims to support localism, and to leverage and better coordinate state, commonwealth, local government and private (including not for profit) investments for the long term benefit of communities.

The RDAF commenced 1 July 2011 with the first funding round contributing up to $100 million of Commonwealth funding to approved projects. Round 2 of the program is expected to take place in late 2011. Advice on when Round 2 will open and close will be provided through Regional Development Australia committees and on the Department’s website: www.regional.gov.au. Funding of between $500,000 and $25 million per project is available for projects that are “investment ready”. Outcomes that the Fund is seeking to achieve include:

Identification of regional priorities by local communities and investment in those priorities Support for regional economic development by assisting regions to develop and implement projects

with broad based local support and which have identified potential to deliver lasting economic and community benefits

Sustained increases to the economic output of local and regional economies Increased social capital, amenity and/or liveability within the community Communities which achieve sustainable growth Integrated Australian, state and local government programs, activities and investment

Page 49: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

45 Sunshine Coast Council

New opportunities for private sector participation and partnerships Removal of barriers and/or a direct incentive for business investment in regional locations; and Addressing specific areas of disadvantage faced by regional Australia.

The following organisations are eligible to apply for funding:

Local government bodies; and Incorporated not�for�profit organisations.

These organisations can apply in their own right or as a member of a consortium. For-profit organisations can participate in applications for funding where they are a member of a consortium.

9.4.2. QUEENSLAND STATE AGENCIES

The Queensland State Government has links to funding sources for community groups and projects from federal, state and local government as well as some philanthropic funds and companies. These can be found at www.smartservice.qld.gov.au/services/grants/discoverbywizard.action.

SPORT AND RECREATION INFRASTRUCTURE PROGRAM 

The Sport and Recreation Infrastructure Program provides contributions towards the development or construction of infrastructure for participation in structured and unstructured sport or recreation. Funding is available for:

New spaces and places that support an increase in sport and active recreation participation New or upgrading essential player and official’s amenities Shade structures over participation spaces New playing surfaces Flood and cyclone affected facilities where additional work is required to enable a return to full levels

of activity or use.

The Program aims to:

Increase participation in sport and active recreation Increase the number of volunteers involved in sport and active recreation Support capacity building in the sport and active recreation industry Increase opportunities to groups with inequitable access to sport and active recreation activities and

infrastructure, including: o Children, youth and families at risk o Aboriginal people, Torres Strait Islander people o Culturally and linguistically diverse people o People with a disability.

Funding availability is outlined in the table below:

Page 50: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

46 Sunshine Coast Council

Funding Levels Total eligible project costs ($) Maximum funding contribution from Dept ($)

Maximum funding contribution from the department (%)

Councils 60 Category 1 (Minor) Up to $400,000 Up to $300,000 Other organisations 75

Category 2 (Medium) $400,001 - $1.25 million $240,000 - $750,000 60

GAMBLING COMMUNITY BENEFIT FUND 

Funding assists not-for-profit community groups to provide services and activities through the provision of a one-off grant. Funding may be provided for the following purposes:

Equipment needed to carry out activities Special one-off events Community and organisational development projects Minor capital works Motor vehicle purchase costs

Applications for up to $30,000 are encouraged, but applications for larger grants will be considered. Unincorporated organisations can attract a maximum $5,000 in funding.

9.4.3. NON-GOVERNMENT ORGANISATIONS

A range of non-government philanthropic funding programs exist. While generally not appropriate for large capital projects, by working with community groups council could possibly obtain smaller amounts of funding for specific elements of pool upgrades.

Tennis Australia has the National Court Rebate Scheme which provides funding towards developing or upgrading courts and associated infrastructure.

ANZ Trustees provides a listing of a wide number of funds and foundations providing grants in different areas.

Commonwealth Bank Staff Community Fund Local Grants Program aims specifically to assist community groups with projects that improve the health and well being of children and young people nationally.

Fosters Community Grants for specific projects run by community groups and charities. The Foundation for Rural and Regional Renewal aims to take a leadership role in assisting regional,

rural and remote communities to respond to social, cultural and economic change. The FRRR administers a number of funding programs and grants.

The Foundation for Young Australians is a not-for-profit organisation committed to investing in excess of $3 million each year on providing opportunities for young people with specific funding for projects involving Indigenous youth.

The Givewell site provides a comprehensive database of Australian charities, giving strategies, bequests, charitable trusts and corporate philanthropy, as well as links to charities and related sites.

Optus Connecting Communities Grants Program provides grants to organisations to help reduce social isolation and to reconnect disengaged youth.

Peter Brock Foundation provides funding and support for community groups and organisations with a focus on welfare services, social issues and community programs.

Page 51: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan   

47 Sunshine Coast Council

The Reichstein Foundation funds projects aimed at assisting disadvantaged communities. The Telstra Foundation provides community development grants for projects particularly aimed at

children and young people. They also provide assistance through their Indigenous Community Development program and Social Innovation Grants.

Wesfarmers makes contributions to community-benefiting activities through its corporate office and through subsidiary businesses.

Woolworths provides support to local community organisations and charities.

9.5. COMMERCIAL SOURCES A number of commercial enterprises provide assistance and advice on grant availability via subscription services to databases and printed materials. These include:

Grantsearch Australia who publish the Grants Register. Easygrants newsletter published by ourcommunity.com.au. Pathways Australia provides a database of corporate and government fundraising opportunities for

not-for-profit organisations. Philanthropy Australia publishes the Australian Directory of Philanthropy.

Page 52: Coolum Sports Complex Master Plan

Coolum Sports Complex Master Plan

Fill in File>Properties>Title, Select text F9 Fill in File>Properties>Subject, Select text F9