copy of submittal log template1

6
SUBMITTAL STATUS LOG PROJECT TRACKER STATUS SPECIFICATIONS - DESCRIPTION Review Status Reviewer & misc notes Division 1 - General Requirements X Date Date Division 2 - Existing Conditions Division 3 - Concrete Division 4 - Masonry Division 5 - Metals Division 6 - Wood, Plastics, and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 10 - Specialties Division 11 - Equipment Division 12 - Furnishings Division 13 - Special Construction Division 14 - Conveying Equipment Division 21 - Fire Suppression Division 22 - Plumbing Division 23 - HVAC Division 25 - Integrated Automation Division 26 - Electrical SPEC-SECTION Rev . Contractor Transmitta l # Contractor Submittal Date DW Received Date Contractor Target Due Date DW Returned Date DW Turnaround Time Scanned to Tracker Large Size Sent to Duplicating from Duplicatin g Project Tracker Comments

Upload: arun-chandra-babu

Post on 26-Oct-2015

17 views

Category:

Documents


0 download

DESCRIPTION

Submittal Log

TRANSCRIPT

Page 1: Copy of Submittal Log Template1

SUBMITTAL STATUS LOG PROJECT TRACKER STATUS

SPEC-SECTION Rev. SPECIFICATIONS - DESCRIPTION Review Status Reviewer & misc notes Project Tracker Comments

Division 1 - General RequirementsX Date Date

Division 2 - Existing Conditions

Division 3 - Concrete

Division 4 - Masonry

Division 5 - Metals

Division 6 - Wood, Plastics, and Composites

Division 7 - Thermal and Moisture Protection

Division 8 - Openings

Division 9 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - HVAC

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Contractor Transmittal #

Contractor Submittal

DateDW Received

Date

Contractor Target Due

DateDW Returned

Date

DW Turnaround

TimeScanned to

Tracker

Large Size Sent to

Duplicating

Returned from

Duplicating

Page 2: Copy of Submittal Log Template1

SUBMITTAL STATUS LOG PROJECT TRACKER STATUS

SPEC-SECTION Rev. SPECIFICATIONS - DESCRIPTION Review Status Reviewer & misc notes Project Tracker CommentsContractor

Transmittal #

Contractor Submittal

DateDW Received

Date

Contractor Target Due

DateDW Returned

Date

DW Turnaround

TimeScanned to

Tracker

Large Size Sent to

Duplicating

Returned from

Duplicating

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Division 34 - Transportation

Division 35 - Waterway and Marine Construction

Division 40 - Process Integration

Division 41 - Material Processing and Handling Equipment

Division 42 - Process Heating, Cooling, and Drying Equipment

Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment

Division 44 - Pollution Control Equipment

Division 45 - Industry-Specific Manufacturing Equipment

Division 48 - Electrical Power Generation

Other Transmittals

Page 3: Copy of Submittal Log Template1

OPERATIONS AND MAINTENANCE MANUALS LOG

SPEC-SECTION O&M MANUAL Distribution Additional Comments

Division 4 - Masonry

Division 5 - Metals

Division 6 - Wood, Plastics, and Composites

Division 7 - Thermal and Moisture Protection

Division 8 - Openings

Division 9 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - HVAC

Division 25 - Integrated Automation

Date DW Approved

Final

Page 4: Copy of Submittal Log Template1

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Division 34 - Transportation

Division 35 - Waterway and Marine Construction

Page 5: Copy of Submittal Log Template1

SPARE PARTS LOG

SPEC-SECTION SPARE PARTS - DESCRIPTION Date Received Received By Date Distributed Distributed To Additional Comments

Division 4 - Masonry

Division 5 - Metals

Division 6 - Wood, Plastics, and Composites

Division 7 - Thermal and Moisture Protection

Division 8 - Openings

Division 9 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - HVAC

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Page 6: Copy of Submittal Log Template1

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Division 34 - Transportation

Division 35 - Waterway and Marine Construction