Appendix A
1
KD 1 Pride of Place-Town Centre Regeneration Scheme
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Establish funding committed/ available going forward
Facelift grant process paused to ascertain available budget for potential re-use grants.
Q2 Agreed Final Year programme Final year programme agreed
Q3 Deliver agreed programme Last of buildings completing this financial year
Pride of Place Town Centre Regeneration SchemeWithin the Pride of Place, focus on our population centres to work with others to increase the use of currently empty buildings and encourage greater occupation of current derelict shop buildings.
Q4 Annual review The Building Grants scheme has continued to deliver across the Borough and we have nowAwarded 113 building grants, totalling £318,658. Of those awarded 103 are now complete,with the Council paying out £281,289 in grants across our borough, attracting over £449,403in private match funds.
Corporate Strategy Key Deliverables – Progress made in Q4 of 2019/20
Appendix A
2
KD 2 Pride of Place public – Public Realm schemes
Action Description Quarter Milestone Outcome NoteOverall Progress of Key Deliverable
Q2 Agreed Public Realm schemes for 4 towns
Areas agreed, detailed designs being drawn up, although Whitehaven and Cleator Moor delayed to fit with Future High Street Fund and HAZ timescales.
Q4 Complete Cleator Moor public realm scheme
The scheme for Cleator Moor continues to bediscussed and agreed with the Town Council and Regen NE Copeland for implementationDuring 2020. Millom and Egremont have asked to revisit their schemes linked to theirPotential for Towns Fund and Borderlands.
Complete the improvements to public realm within our four key towns as part of the Pride of Place Initiative including a focus on quality street cleaning and enforcement activity to deliver high quality street scape
Q4 Complete Whitehaven public realm scheme
Whitehaven public Realm Scheme timeframe and composition in line with FHSF bid June 2020.
Appendix A
3
KD 3 High Street Fund
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Agreed Whitehaven Vision EOI submitted with agreed vision. Successful and invited to develop business case for submission in Jan 2020.
Q2 Q2 – Agreed Town Centre priorities in readiness for funding applications
Overview of priorities in place, with testing against deliverability and business case underway
Q4 Draft submission and feedback on progress of funding applications
Draft submission of outline business case now 15th Jan, with feedback anticipated by mid-March
High Street FundStronger Towns FundLEP EngagementTo work on the future role of Town Centres to identify additional resources and partners to engage in developments bespoke to each of our towns.All efforts will be made through partnership activity to identify and use external funding to maintain momentum on town centre improvement activity under the CPoP initiative
Q4 Preparation of delivery plans 2021
Plans submitted June 2020We submitted our draft Business Case for FHSF to MHCLG in January and in March receivedAdditional guidance and feedback to help us steer our final submission due by 5th June 2020.The programme for Whitehaven is
Appendix A
4
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
intended to transform the core of the town centre with aFocus on King Street and its links with the harbour. The projects are grouped under two keythemes “Connecting Whitehaven” which will reshape Whitehaven and improve theexperience of visiting the town; and “Diversifying Whitehaven”, which renews the high streetWith new uses to drive growth and ensure future sustainability.
Appendix A
5
KD 4 Economic Vision for Copeland
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Q1 – Review of existing evidence and drivers
ARUP commissioned. Work commenced and phase 1, to review existing evidence and drivers, completed.
Q3 Socialisation with partners and approval
The stakeholder engagement programme is almost complete and an early draft is being taken to FOG in November.Members briefing planned for Q4 however this was paused due to Covid19 pandemic.
Produce a new Economic Vision for Copeland (with masterplan) on behalf of the Future Opportunities Group.
Q4 Implementation of frameworksome rescheduling
Socialisation of framework paused due to Covid19 pandemic. Vision for Copeland to be rewritten to include post Covid environment and considerations. Outline timeframe is Q2 20-21.
Appendix A
6
KD 5 Community Led Housing Schemes
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Q1 - Identification of potential new projects
identified key project for CLH is about bringing empty homes back into use and working group now working to explore options
Q2 Business Plans for new schemes to Advisory group.
BPs for that period of time were submitted and grants supported e.g. Distington and Ulpha.
Q3 Q3 - Award funds and project milestones agreed – work with Homes England and partners to draw down funds
Small grant awarded to DBL to assist with postal survey. Have discussed change to contract with Homes England to use funds allocated for empty homes community project but funds have not yet been drawn down as are claimed in arrears
KEY DELIVERABLE 5Use and maximise the Council’s community led housing approach and fund to impact our Town Centres and mitigate for any negative impacts of second and empty homes Community Led Housing SchemesIdentify, develop and deliver a number of small Community Led Housing Schemes (2) Q4 Advisory group oversee
delivery against milestonesAdvisory group has continued to meet and oversee budget. New group interest in Millom to be progressed in 2020 with drawdown from HE funding, but progress delayed to due Covid19.
Appendix A
7
KD 6 Strategic Asset Management Plan
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Strategic Asset Management Plan (SAM) - Review of existing assets.
The strategic assets available for CAT have been reviewed within the full asset list. Other asset categories are still in review.
Q2 Sports Centre Development Whitehaven Sport Strategy and deliverables agreed.
Procurement exercise carried out and tender awarded for production of Sports Strategy and deliverables.
Q2 Revised SAM Plan agreed. Agreed by Executive September 19 - referred to Full Council for adoption
Q3 Implementation of SAM Plan Working to Asset Management Plan
KEY DELIVERABLE 6To agree a Strategic Asset Management Plan to facilitate growth in the borough and generate investment opportunities in the borough. -Asset Management Plan-Sports Centre Development -Castle Park Management Plan
Q4 Castle Park Management Plan agreed partial
Baseline quality assessment completed against Green Flag Standard
Park User Survey undertaken
Love Parks Week Event held to promote the park, engage local residents and stakeholders, and
Appendix A
8
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
support corporate health & wellbeing objectives
Tree pruning works completed and felling / crown lifting works to completed by end of March
Trading position advertised and awaiting notes of interests
Draft management plan prepared - pending next steps
Overall good foundations work and progress made however this was paused in Q4 due to Business Continuity Plan taking priority during Covid 19 pandemic
Q4 Sports Centre Development Completion of Sports Centre Development
delayed Progress paused due to Covid 19 pandemic and Business Continuity Plan taking priority.
Appendix A
9
KD 8 Commercial Infrastructure
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Formalisation of Commercial priorities and review of current operational commercial activity
Draft Commercial Strategy approved by CLT and on Exec agenda 19th AugustCouncil has given approval for restructure to recruit a Head of Commercial Services position (Q2)
Q2 Assess opportunities for commercial investment and diversification in other trading and non-trading and commercial activates.
Commercial engagement group established with governance arrangements and structure in place. Inaugural meeting scheduled for Q3 for initial appraisal of commercial leads and opportunities.
Q2 Extract cost savings achieved through procurement and contract mgmt.
Ongoing monitoring and reporting now in place to capture cost savings made on renewal of contracts
Commercial InfrastructureTo continue to operate existing key trade services on a commercial basis with regards to value for money, quality and competitiveness.Improve our commercial infrastructure to support potential for commercial activity and support increased income.
Q4 Commercialisation of website and use of customer portal.
Website refit completed. Customer’s able to make payments and purchases of both statutory and commercial services offered.
Appendix A
10
KD 9 Beacon 5 year Business Plan
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Beacon 5 year Business PlanTo agree and implement second five year collaborative commercial business plan for the Beacon Museum (2019-2024)
Q4 5 year business plan agreed and in place. Based on a Trust model which maximises benefits regarding NNDR.
partialOngoing steering group recognition and planning with staff and key partners to ensure draft picks up all new requirements. Working with LGA to finalise in Q3 20/21
Appendix A
11
KD 10 SL Social Impact Plan
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q3 Grant arrangements and Annual Programme Agreed
Annual Social Impact Plan grant received against agreed action plan for 19-20
To agree social value programme with our industrial partnersSellafield Social Impact Plan alignment with Council’s Corporate Priorities.TOMS (SL Social Impact Themes, Outcomes and Measures TOMs)
Q4 TOMS Framework in-place and adopted by the Council in relation to community benefits plans
delayedWork still progressing with SL. Impacted by Covid 19
Appendix A
12
KD 11 Beacon Portal for Learning
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Education Programme for 2019/20 agreed and implemented
Learning programme has been set up to end December 2019. Jan to March 2020 will be arranged in winter term (Oct to Dec 2019
Q2 Delivery of Summer programme
Successful delivery with positive feedback received.
Q3 Virtual Museum Learning Initiative
Contractor commissioned for phase one of virtual Beacon Museum.Expansion of Quantum Leap delivery product to be planned for March 2020
Maintain the Beacon education and learning approach for schools and lifelong learning for residents and visitors and the importance of arts, culture and creative thinking and skills to underpin wellbeing and STEAM (science, technology, engineering arts and maths).Beacon Portal for Learning - Using the Beacon Portal as a Portal for Learning and maintaining the education programme with schools
Q4 Development of 2020/21 programme.
Learning programme for 20/21 developed. Beacon closed to public and programme paused due to Covid19 Pandemic.
Appendix A
13
KD 12 Work and Skills Programme
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Q1- Funding application for new Work and Skills Partnership Programme
SL funding secured. CCF funding application submitted.
Q2 Q2 – Design and implementation of new Work and Skills Programme
Work and Skills Programme Ensure we sustain and develop our leadership and facilitation of the Copeland Work and Skills Partnership and its continuously developing programme of complementary partnership delivery to meet the known gaps in service to assist Copeland residents develop skills and access work opportunities.
Q4 Q4 – Annual review. Annual review presented to full Council as part of Mayors Report in May 2020
Appendix A
14
KD 13 Enterprise Initiatives
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q3 To agree a programme based approach and recruit or procure delivery resource.
Commissioned CRED to support development of programme and multi-agency steering group set up for the project.
KEY DELIVERABLE 13 Working in partnership to facilitate innovation, entrepreneurialism and new enterprises. Establish joint programme with range of partners to drive a package of enterprise initiatives, supporting sector development.
Q4 Agreed priorities/ projects in 3 year plan and project measures. Implement, monitor and review
Delayed Delayed due to Covid pandemic
Appendix A
15
KD 14 Domestic Abuse Prevention Project
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Q1 - 1 additional unit into use & deliver outreach services from new women’s centre.
Additional unit now secured, totalling three units and women’s centre opened in July 2019
Q2 Q2 Improve networking and partnership holistic approach through women’s centre
Sessions were held to identify appropriate sessions for partner agencies to maximise holistic approach for client. Manager has been recruited and is now in post and will raise the profile of the centre and improve the offer.
Q3 Q3 - Funding bid from any external resources available
Funding successfully secured from Copeland Community Fund to cover officer for three years Jan 2020 to Dec 2022. Funding from County Council to continue into next financial year.
KEY DELIVERABLE 14Tackle domestic abuse & other exploitations through our domestic abuse project aimed at victims and residents at risk. Domestic Abuse ProjectBid for and secure funding to continue project delivery. Supporting residents experiencing or at risk of Domestic Abuse.
Q4 Q4 - Extend Project formally – dependent on above
New project started Jan 2020 to run to Dec 2022
Appendix A
16
KD 15 Copeland Health and Wellbeing Priorities
Action Description Q Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Agreed plan for Copeland Health and Wellbeing Forum in response to Cumbria Public Health Strategy
CBC and the Copeland HWB Forum have fully engaged in the strategy and implementation action plan. The Copeland actions integrated into implementation plan.
Q2 Develop and initiate priority projects against three priority themes
Funding awarded through CCF for Social Prescribing Project.Healthy Weigh Project being delivered in partnership through GLL contract.Empty Homes Strategy agreed in support of Healthy Towns and Places.
Q3 Project monitoring Social Prescriptions funding confirmed and team recruitment started. Health weight deliverables via out GLL contract.ICC and GPs have established a team to work with professional medical /care provision to promote effective cross sector working.
Copeland Health and Wellbeing PrioritiesKEY DELIVERABLE 15To be a strong partner in the Copeland Health and Wellbeing Forum and demonstrate our essential role in supporting the Health and Wellbeing of our residents.
Key Projects• Healthy Weight Project • Social Prescribing Project • Healthy Towns And Places Project
Q4 Q4 – Annual review of projects.
Annual report to Executive 16th March 2020
Appendix A
17
KD 16 Strategic Housing Offer
Action Description Q Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Approval Housing Strategy and Action Plan.
Housing Strategy approved by Full Council and action plan still with Director of Growth and Inclusive Communities for final approval
Q3 Implementation of the Housing Strategy Action Plan.
Strategy been approved by full council, action plan currently being socialised and refined in line with new strategy
KEY DELIVERABLE 16Ensure that our housing offer meets the need of residentsExtra Care (Housing Proposals)Better Care FundPlanning Permission Local Plan and KPIsDFGs
Q4 Review of Housing needs and DFG provision.
Housing Needs Survey commissioned and final report due back July 2020 (delayed due to COVID). Housing Renewals team restructured to put a team leader in place to manage team and oversee DFG delivery and performance. Approval granted By Exec in March 2020 to raise discretionary limit on DFGs from £5k to £10k where full cost is over £30k; conduct a means test for child cases where cost is over £30k and to apply a 5% management charge to all grants to cover administration costs.
Appendix A
18
KD 17 Work Force Development Plan
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q2 Q2 – Workforce Review Workforce Review complete and Strategy in Draft. To gain approval at CLT, Personnel Panel and Executive.
Q3 Work Force Development Plan agreed & in place.
KEY DELIVERABLE 17Implementing our new ten-year Workforce Development Plan with its focus on quality training and succession planning and our commitment to be an employer of choice in our local area.Work Force Development PlanApproval and implementation of the year 1 action plan for work force development
Q4 Q4 – Monitoring and review of action plan.
Workforce plan and monitoring by CLT in place.
Appendix A
19
KD 18 ICT Strategy
Action Description Q Milestone Outcome Note
Overall Progress of Key Deliverable
Q3 ICT Strategy - Final draft agreed
[1-JAN] Draft ICT Strategy was circulated to CLT for review at end of NOV-2019. Awaiting formal CLT review session.ICT Strategy put back to Q3 due to prioritisation in Q1 and Q2 on PSN achievement of PSN Compliance and staff restructuring.ICT Strategy is in process of being drafted. Key research into hosted and cloud options has been underway to consider IT architecture options for future platforms.IDOX project in contractual dispute. Priorities informed by new ICT Strategy.
KEY DELIVERABLE 18Deliver the implementation plan of our ICT strategy Approval and implementation ofICT Strategy.Digital PortalsWebsiteIDOX
Q4 ICT Programme Plan agreed and implemented
A draft action plan was delayed due to the BCP operating for Covid.Plan implementation resumed in Q2 20/21. Implementation of a number of elements have already started to action as a direct consequence of the changes forced upon us by the coronavirus response.
Appendix A
20
KD 19 Sustainable Financial Strategy
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q3 Q2 - Develop and draft Financially sustainable options for sustainable Long Term Financial Strategy, Capital Programme for discussion with the Executive.
Finance update provided to the September Executive. Working with the Mayor on his budget to present to the Executive in January 2020 and approved by Council in Feb.
To Develop a financially sustainable Medium Term Financial Strategy for 2020/21-2023/24Capital Programme and Treasury Management Strategy. Q4 Respond to any Fair Funding or
Business Rates technical consultations and lobby Government setting out the clear financial case for improved funding for CBC.
Completed as far as possible by CBC. Review paused by Central Government due to Covid19 pandemic.
Appendix A
21
KD 20 Bereavement Services Expansion Programme
Action Description Q Milestone Outcome Note
Overall Progress of Key Deliverable
Q1 Planning permission for refurbishment of Crematorium and Installation of second cremator commenced.
Planning application submitted Installation of second cremator completed in July 2019.
Q2 Installation of second cremator completed. Whitehaven Cemetery expansion plans for decision.
Installation of new second cremator now completed and operational Executive Report on expansion plans for Whitehaven Cemetery completed with input from CLT and due to be considered and approved by Executive on 7 October – funding already approved and within 2019/20 Capital Programme
KEY DELIVERABLE 20To deliver the investment and development of our Bereavement Services. Bereavement Services Expansion ProgrammeRefurbishment of the Crematorium, installation of second cremator and expansion of Whitehaven Cemetery
Q4 Refurbishment of Crematorium completed
some rescheduling
Current programme suspended due to Coronavirus pandemic. A refreshed programme of building improvements being prepared to align with new building survey
Appendix A
22
KD 21 Accommodation Strategy
Action Description Quarter Milestone Outcome Note
Overall Progress of Key Deliverable
Q2 Q2 Accommodations Strategy milestones met
PFI termination planned for Q4Deliver the councils accommodation strategy to ensure CBC accommodation is fit for purpose and affordable.
Q4 Q4 Accommodations Strategy milestones met
At the end of March 2020 the Copeland Building became part of the Copeland Borough Council Estate. Work on building renovations planned to commence in Q1 2020
Appendix A
23
Code Title Status Progress
KD 1 Pride of Place-Town Centre Regeneration Scheme Completed
KD 2 Pride of Place public – Public Realm schemes Completed
KD 3 High Street Fund Completed
KD 4 Economic Vision for Copeland Delayed (Covid19)
KD 5 Community Led Housing Schemes Completed
KD 6 Strategic Asset Management Plan Delayed (Covid19)
KD 8 Commercial Infrastructure Completed
KD 9 Beacon 5 year Business Plan Overdue
KD 10 SL Social Impact Plan Delayed (Covid19)
KD 11 Beacon Portal for Learning Completed
KD 12 Work and Skills Programme Completed
KD 13 Enterprise Initiatives Delayed (Covid19)
KD 14 Domestic Abuse Prevention Project Completed
KD 15 Copeland Health and Wellbeing Priorities Completed
KD 16 Strategic Housing Offer Completed
KD 17 Work Force Development Plan Completed
KD 18 ICT Strategy Completed
KD 19 Sustainable Financial Strategy Delayed (Covid19)
KD 20 Bereavement Services Expansion Programme Some rescheduling
KD 21 Accommodation Strategy Completed