Cost-Based Tradeoff Analysis of Cost-Based Tradeoff Analysis of Standard Cell Designs Standard Cell Designs Peng Li Pranab K. Nag Wojciech Maly Electrical and Computer Engineering Carnegie Mellon University Pittsburgh, PA 15213 {pli, pkn, maly}@ece.cmu.edu

Upload: elizabeth-santana

Post on 02-Jan-2016

20 views

Category:

Documents


0 download

DESCRIPTION

Cost-Based Tradeoff Analysis of Standard Cell Designs. Peng Li Pranab K. Nag Wojciech Maly Electrical and Computer Engineering Carnegie Mellon University Pittsburgh, PA 15213 {pli, pkn, maly}@ece.cmu.edu. Motivations. Necessity for Evaluation of Designs’ Cost Effectiveness - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Cost-Based Tradeoff Analysis of Standard Cell Designs

Cost-Based Tradeoff Analysis of Cost-Based Tradeoff Analysis of Standard Cell DesignsStandard Cell Designs

Peng LiPranab K. NagWojciech Maly

Electrical and Computer EngineeringCarnegie Mellon University

Pittsburgh, PA 15213{pli, pkn, maly}@ece.cmu.edu

Page 2: Cost-Based Tradeoff Analysis of Standard Cell Designs

2 P. Li, SLIP’2000

MotivationsMotivations Necessity for Evaluation of Designs’ Cost Effectiveness

– Tendency of Manufacturing Cost Increase

– Selection of Technology Which Yields the Least Cost

Emergence of Fabless Design Houses

– Choice of Manufacturing Technologies

– Consideration of Manufacturing from Design Perspective

Importance of Early-Stage Predictions

– Reduction of Number of Design Iterations

– Facilitation of Early-Stage Decision

Page 3: Cost-Based Tradeoff Analysis of Standard Cell Designs

3 P. Li, SLIP’2000

ObjectiveObjective

Cost Prediction for Standard Cell Designs

– Quickly Predict Die Size & Interconnect Yield

As a Function of Number of Metal Layers

Based On a Given Placement

– Predict Die Cost Based on a Wafer Cost Model

– Forecast Optimal Selection of Number of Metal

Layers In Terms Of Die Cost

Page 4: Cost-Based Tradeoff Analysis of Standard Cell Designs

4 P. Li, SLIP’2000

Why Number of Metal Layers MattersWhy Number of Metal Layers Matters Affect Die Size and Yield An Important Cost Factor

Die Area

1.50

2.50

3.50

4.50

5.50

# of Metal Layers

Are

a

Cost of Die

0.0020.0040.0060.0080.00

100.00

# of Metal LayersD

ie c

ost

Page 5: Cost-Based Tradeoff Analysis of Standard Cell Designs

5 P. Li, SLIP’2000

ApproachApproach

Given PlacementGiven Placement

Stochastic Pseudo-Routing(Routing Estimation)

Stochastic Pseudo-Routing(Routing Estimation)

Die Height EstimationDie Height Estimation

Die Width EstimationDie Width Estimation

Size Estimate Stable?

Size Estimate Stable?

Interconnect Critical Area Analysis

Interconnect Critical Area Analysis

Interconnect Yield Prediction

Interconnect Yield Prediction

Cost PredictionCost Prediction

Page 6: Cost-Based Tradeoff Analysis of Standard Cell Designs

6 P. Li, SLIP’2000

Stochastic Pseudo RoutingStochastic Pseudo Routing

Stochastic Pseudo-Routing

Defects

Expanded/Compacted Placement

Given Placement

Estimated Routing Utilization

Interconnect Yield Prediction

Wafer Cost Model

Page 7: Cost-Based Tradeoff Analysis of Standard Cell Designs

7 P. Li, SLIP’2000

Layout Representation Layout Representation Grid Routing Model

– Horizontal Routing Layers: Metal1, Metal3, Metal5 etc.

– Vertical Routing Layers: Metal2, Metal4, Metal6 etc.

Cell height defined by cell library

Channel GridsCell-Row Grids

Channel height to be estimated

Chip width to be estimated

Grid width

Page 8: Cost-Based Tradeoff Analysis of Standard Cell Designs

8 P. Li, SLIP’2000

Stochastic Pseudo Routing of Two-terminal NetsStochastic Pseudo Routing of Two-terminal Nets Restrict routing estimation within

the bounding box of the net.

Only consider Manhattan paths

having no more than two vias.

There are totally PNUM =

(M+N-2) path candidates.

Assume each path candidate

has a probability of 1/PNUM of

being selected.

N

M

Page 9: Cost-Based Tradeoff Analysis of Standard Cell Designs

9 P. Li, SLIP’2000

Stochastic Pseudo Routing of Two-terminal NetsStochastic Pseudo Routing of Two-terminal Nets From Probabilities To Routing Utilization Estimates

p1

p2

p1

p2p3

p4

p1

p2

p1

p2

p4p3

Page 10: Cost-Based Tradeoff Analysis of Standard Cell Designs

10 P. Li, SLIP’2000

Extension of Pseudo Routing of Two-Terminal Nets– Find A Minimum Spanning Tree

– Pseudo Route Each Edge of The MST

– Consider wiring sharing among MST Edges Assume Pseudo-Routing of MST edges are independent of each

other:

Stochastic Pseudo Routing of Multi-Terminal NetsStochastic Pseudo Routing of Multi-Terminal Nets

Pin1

Pin5

P4

Pin2

Pin3

)0.1(0.1 iPP

Merged Segment

Merged Region

p1

p2

p4

p5

p3

Page 11: Cost-Based Tradeoff Analysis of Standard Cell Designs

11 P. Li, SLIP’2000

Die Size EstimationDie Size Estimation

Stochastic Pseudo-Routing

Defects

Expanded/Compacted Placement

Given Placement

Estimated Routing Utilization

Interconnect Yield Prediction

Wafer Cost Model

Page 12: Cost-Based Tradeoff Analysis of Standard Cell Designs

12 P. Li, SLIP’2000

Die Height EstimationDie Height Estimation Lower Bound of Total Channel Density

– Based on horizontal routing utilization estimation.– “Switchable Routing Demand”

Analogy to switchable net segments

– Assign “switchable routing demand” to proper channels to minimize total channel density.

Channel Density: 4

ChannelsCell Rows

Page 13: Cost-Based Tradeoff Analysis of Standard Cell Designs

13 P. Li, SLIP’2000

Die Width EstimationDie Width Estimation Expand/Compact based on difference between

routing demand and capacity.

Iterate on updated cell locations.

Compaction

Expansion

Estimated Vertical Routing Utilization

Page 14: Cost-Based Tradeoff Analysis of Standard Cell Designs

14 P. Li, SLIP’2000

Interconnect Yield PredictionInterconnect Yield Prediction

Stochastic Pseudo-Routing

Defects

Expanded/Compacted Placement

Given Placement

Estimated Routing Utilization

Interconnect Yield Prediction

Wafer Cost Model

Page 15: Cost-Based Tradeoff Analysis of Standard Cell Designs

15 P. Li, SLIP’2000

Interconnect Yield PredictionInterconnect Yield Prediction Traditional Methods

– Layout Based Critical Area Extraction Requires final layouts Accurate but time consuming: Mapex, Dracula

– High-Level Interconnect Model Relates the yield to netlist characteristics

Our Approach– Based On Routing Utilization Estimation

Empirical Routing Heterogeneity Model Closed-Form Critical Area Expression

– Linear Time Algorithm

Page 16: Cost-Based Tradeoff Analysis of Standard Cell Designs

16 P. Li, SLIP’2000

Cost PredictionCost Prediction

Stochastic Pseudo-Routing

Defects

Expanded/Compacted Placement

Given Placement

Estimated Routing Utilization

Interconnect Yield Prediction

Wafer Cost Model

Page 17: Cost-Based Tradeoff Analysis of Standard Cell Designs

17 P. Li, SLIP’2000

Cost PredictionCost Prediction Wafer Cost Model of 0.25 m CMOS Process Prediction of Cost As Function of Number of

Metal Layers– Number of Good Dies Per Wafer:

Ngood(M) = Awafer / Adie(M) ·Yield(M)

– Cost of A Good Die:

Cdie(M) = Cwafer(M) / Ngood(M)

Page 18: Cost-Based Tradeoff Analysis of Standard Cell Designs

18 P. Li, SLIP’2000

Experimental ResultsExperimental Results Experiment Setup

– Six Standard Cell Designs Portions of Industrial DSP circuits

Design Name # of Cells # of Nets1 Sync2 3440 34672 Cdgc2 2751 34033 Fifo2 2390 24294 Ifagc2 382 5345 Prescale 2021 28266 Hnyq 2608 3806

– Comparison With Data Based On Layouts 2-4 metal layers Our method : die size, routing utilization and yield Cadence tools: layout generation, critical area

extraction(Dracula) and yield calculation

Page 19: Cost-Based Tradeoff Analysis of Standard Cell Designs

19 P. Li, SLIP’2000

Experimental ResultsExperimental Results Die Size Estimation

32 4 65

-0.1 -5.5

5.0

-7.9

3.1

6.6

-5.5 -19.7

13.4

17.0

3.714.0

2.8 -1.7

3.6

6.2

3.5-0.3

Design

Area CadenceEstimated% Error

2 Metal3 Metal4 Metal

1 2 3 4 5 6

Page 20: Cost-Based Tradeoff Analysis of Standard Cell Designs

20 P. Li, SLIP’2000

Experimental ResultsExperimental Results

Estimated Routing Distribution

Distribution Generated by Route Tool

Heavily Routed Areas

Routing Utilization Distribution

Page 21: Cost-Based Tradeoff Analysis of Standard Cell Designs

21 P. Li, SLIP’2000

Experimental ResultsExperimental Results Yield Prediction

Design

CadenceEstimated2 Metal

3 Metal4 Metal

1 2 3 4 5 6

Yield

Page 22: Cost-Based Tradeoff Analysis of Standard Cell Designs

22 P. Li, SLIP’2000

1.9

2

2.1

2.2

2.3

2.4

2.5

2.6

1 2

2 Metal3 Metal4 Metal

Experimental ResultsExperimental Results

Optimal Number of Metal LayersDesign Est. Optimal Number of Metal Layers Est. Optimal Cost($)

1 4 2.512 3 2.473 3 2.134 2 .2255 4 2.156 4 2.34

Design3 Design5

Cost As a Function of Metal Layers

Cost($)

Page 23: Cost-Based Tradeoff Analysis of Standard Cell Designs

23 P. Li, SLIP’2000

SummarySummary Fast Routing Estimation Technique

– Die Size– Routing Utilization Distribution– Interconnect Yield Prediction

Cost Prediction– Prediction of Optimal Number of Metal Layers

Directions– A Priori Wire Distribution/Placement Estimation

Standard cell design style Realistic wiring density distribution

– Consideration of Circuit Performance Issues