Berth LOA ─ 1,300 ft.

$135k (East)

5 -10,000 cu.yds

Avg. Annual Dredge Costs

PIER 94 / 96

Page 3: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

Berth LOA ─ 1,138 ft.

Berth LOA ─ 2,317 ft.

Berth LO

A ─

1,296 ft.

$500 k (All berths + Approach)

110 - 125,000 cu.yds

Avg. Annual Dredge CostsPIER 80

Page 4: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

Berth LO

A ─

1,300 ft.

- Unknown -

Avg. Annual Dredge Costs

PIER 70

Page 5: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

Berth LO

A ─

1,000 ft.

Berth LOA ─ 1,300 ft.

$0 k ─ (East)

$? k ─ (South)

Avg. Annual Dredge Costs

PIER 50

Page 6: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

Ber th LO

A ─

623 ft.

$0 (East)

Avg. Annual Dredge Costs

PIERS 30 / 32

Page 7: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007
Page 8: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

Ber

th

LO

A

1,35

8 ft

. $750k ─ (East)30 – 40,000 cu.yds

Avg. Annual Dredge Costs

PIER 27

Page 9: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007
Page 10: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

$870k ─ (East)

$480k ─ (West)

50-65,000 cu.yds

Ber

th L

OA

1,

055

ft.

Ber

th L

OA

─ 8

07 f

t.

Avg. Annual Dredge Costs

PIER 35