    It is important to define success for ERP

    Optimal cost and risk of these valuable

    technological investments vis-a-vis the potentialpayoffs.

    Optimal success measured against a portfolio ofproject, early operational and long-term businessmetrics.

    Optimal success measured for readiness towardsdynamic business.

  • 8/13/2019 CSF s for ERP Implementation

    4/27

  • 8/13/2019 CSF s for ERP Implementation

    5/27

  • 8/13/2019 CSF s for ERP Implementation

    6/27

    Source: Holland and Light (1999)

  • 8/13/2019 CSF s for ERP Implementation

    7/27

  • 8/13/2019 CSF s for ERP Implementation

    8/27

  • 8/13/2019 CSF s for ERP Implementation

    9/27

    ERP implementation : matter of repositioning thecompany and transformingthe business practices

    Top management needs to identify the project as a

    top priority publicly and explicitly, to set up thesuitable and competent project team, to share therole of new systems and structures through the

    whole organization.

    Two issues that should be emphasized in thefunction of top management support.

    Business plan Financial budgets

  • 8/13/2019 CSF s for ERP Implementation

    10/27

  • 8/13/2019 CSF s for ERP Implementation

    11/27

    Business fit - An organization will try to purchase the packagethat fits best into its business process.

    Modifying the software to fit the business means that it is

    possible that any potential benefits from reengineering businessprocesses will not be achieved

    The extentof customization determines the length of theimplementation. Custom modification may be an option to reduce the gap

    between the system capability and the business practice, whichallows the customer to enhance the capability of the system Too much modification leads to a complex system difficult to

    support and virtually impossible to upgrade to the newest

    version of the software

  • 8/13/2019 CSF s for ERP Implementation

    12/27

    When should we implement the ERP systems and howlong shall we expect the installation job will be done?

    Managers should consider its own business implications

    and organizational resources, and then make areasonable schedule of implementation plan.

    The length of implementation is affected to a great extentby the

    1. number of modules being implemented2. the scope of the implementation (different functional

    units or across multiple units spread out globally)

    3. the extent of customization

    4. the number of interfaces with other applications

  • 8/13/2019 CSF s for ERP Implementation

    13/27

    Encapsulates the existing business processes,organisation structure culture and informationtechnology Determines the amount of IT and organisationalchange required to successfully implement an ERP

    system

    Business and IT legacy are not separate problems

    since many components of a business (e.g. work

    flow and processes) are bound up in the design and

    operation of the existing IT systems.

  • 8/13/2019 CSF s for ERP Implementation

    14/27

    Project schedule/plans is the formal definition of the project in

    terms of milestones, critical paths and a clear view of the

    boundary of the project.

    Poorly planned schedules growth in the scale of the project (to

    include all parts of the business) and the geographic complexity

    of designing common systems across could cause delay

    A clear business vision for the project - give the project direction

    and scope. Without this, implementation is likely to be lengthy, costly and the

    result misaligned with the organisation's overall strategic vision

    Also ensures that an appropriate ERP strategy is selected

  • 8/13/2019 CSF s for ERP Implementation

    15/27

  • 8/13/2019 CSF s for ERP Implementation

    16/27

  • 8/13/2019 CSF s for ERP Implementation

    17/27

    Companies at the beginning of ERP Project

    ERP Software Configuration different from CustomizedSystem

    Software not to be modified as it reduces s/wfunctionality and increase in error possibility

    Process to be simplified to eliminate redundant activities

    IT systems

    Current Business

    Process withexisting ITsystems

    Business processcontained within

    ERP system

  • 8/13/2019 CSF s for ERP Implementation

    18/27

    Focus Areas for ERPs success:-

    2 1 Team Composition

    Multidisciplinary, dedicated teams

    IT specialists + key users & operations

    personnel + consultants with process redesign

    & change mgmt skills

    Requires time & effort

  • 8/13/2019 CSF s for ERP Implementation

    19/27

  • 8/13/2019 CSF s for ERP Implementation

    20/27

    User Resistance

    Reengineered workers-grievance process

    Changes in staff relationships

    Requirement of managers soft skills

    Users should take part in the activities of project

    selection

    Companies develop formal communication plans and

    issue regular reports to achieve a higher level of

    acceptance on ERP project.

  • 8/13/2019 CSF s for ERP Implementation

    21/27

    ERPs greatest challenge is to find and retain

    individuals with ERP skills.

    Projects require multiple skill sets, includingfunctional, technical, and interpersonal skills.

    Recruitment & career development of experiencedemployee

  • 8/13/2019 CSF s for ERP Implementation

    22/27

    Consultants & IT vendors role

    1.To remove knowledge barrier between various level of

    management within

    a company by making blueprint of their business process

    2.Recommend which hardware and software that is most suitable

    3.Assist companies in implementation management

    4.Lead to valuable knowledge transfer in both directions

    5.Act as knowledge providers that lower the knowledge deficiencies

    existing within companies

    6.Provide training as a valuable resource to develop skills that are

    lacking in house

  • 8/13/2019 CSF s for ERP Implementation

    23/27

    1. Greater vendor participation in implementation and

    support2. Higher rating of user capabilities by vendor

    3. Higher rating of user skills by MIS management.

    A highly skilled workforce is important for asuccessful ERP implementation.

  • 8/13/2019 CSF s for ERP Implementation

    24/27

    To eliminate major system glitches

    Needed to identify any alignment problems thatmay have occurred

    By appointing an executive-level individual withextensive knowledge of the organizationsoperational processes as the project leader

    Team morale is a vital component for the success ofthe project.

    Continuous evaluation required

    Honest and open communication, cooperationamong all parties needed

  • 8/13/2019 CSF s for ERP Implementation

    25/27

    Bugs in the system & troubleshooting

    Modified System would increase its possibility

    Quick response

    patience Perseverance Manage

    problem solving Troubleshooting

    firefighting capabilities

    Hands on cooperation with vendors & consultants

    Vigorous and sophisticated software testing easesimplementation

  • 8/13/2019 CSF s for ERP Implementation

    26/27

    1. A Critical Success Factors Model ForEnterprise Resource PlanningImplementation

    Christopher P. Holland and Ben Light, Manchester Business School

    2. Critical Success Factors in ERP

    Implementation Li Fang and Sylvia Patrecia