  • 7/28/2019 Customer Portfolio A

    1/19

    Beijing South Railway StationTotal 992RT chillers driven by exhausted flue gas of co-generation

    system, equals to every year save 5,633 tons of steam, 2.82 million KW

    electricity, reduce 8,000 tons of CO2

    emission.

    Reportedly the largest in Asia, serves as the terminus for high-speed

    trains to the city, including the BeijingTianjin Intercity Rail, which can

    reach speeds above 350 km/h. The structure spreads out like a ray or

    trilobite and covers 320,000 square meters, Its 24 platforms have the

    capacity to dispatch 30,000 passengers per hour or 241,920,000 a year.

    The 251,000 m2 waiting area can accommodate 10,000 passengers.

    China Well-known Trade Mark

    China Famous Brand

  • 7/28/2019 Customer Portfolio A

    2/19

    Shanghai South Railway StationTotal Evaporation Capacity: 4 T/h

    Shanghai South Railway Station is the first round-shape

    style in the field of world , its also the symbol architec-

    ture of south Shanghai is nontransfer hub for railway,subway, elevated rail and bus lines.

    C o g e n e r a t i o n S o l u t i o n

    Gas Engine Gas Turbine

    Before,flue gasand jacket water

    were exhausted invain,now through

    cogenerationsystem,realize

    cascade utilizationof power.

    ElectricPowerElectricPower

    ElectricPowerElectricPower

    Shuangliang waste heat utilizing solution

    rises fuel utilizing efficiency up to 85%

    As the invisible supporter of 2008 Beijing Olympic Games, Shuangli-ang supplied 100 more units of equipments for venues and reception facilities, In

    2010 Shanghai World Expo, will continue to contribute on energy savingand environmental protection by equipments installed in Pudong International Air-

    port, Shanghai South Railway Station, etc..

    Generator

    2 units of Gas Engines

    Chiller

    2 units of 992USRT Lithium Bromide Ab-

    sorption Chillers driven by both exhausted

    flue gas and jacket water

    Output Power Capacity

    2521KW

    Output Cooling Capacity

    23490KW

    Output Heating Capacity7103KW

    Energy Saving & Environmental

    Protection

    Equals to save 5,633ton steam every year,save power 3MW/hour, 17,000 tons of CO

    2

    emission reduction

    Beijing Conerence Center or 2008 Olympic Games

    Save Investment

    equivalent

    57.6 million tonsofCO2

    85,000 tonsofSO2

    /year22.5 milliontonsofstandardcoal/year

    SaveEnergy

    ReduceDischarging

    Plant Trees

    equivalent

    equivalent

    15600 MWthermalpowerplants

    160,000hectaresforest /year

    25 yearssinc e producingthe 1st absorption chillerOver 20,000 unitsof ShuangliangLithium Bromideabsorption chillersTotalcooling capacity: 30 billion Kcal

    25 yearssinc e producingthe 1st absorption chillerOver 20,000 unitsof ShuangliangLithium Bromideabsorption chillersTotalcooling capacity: 30 billion Kcal

  • 7/28/2019 Customer Portfolio A

    3/19

    BUSINESS1 BUSINESS 02

    gy saving and comfort are the primary factors considered by restaurants and hotels in choosing the air-conditioning system.Central air conditioning is

    f the equipment that consumes most of energy in the restaurants and hotels. Meanwhile, it requires a high level of safety and good ventilation system,

    restaurants and hotels are public place where passenger flow is large. Shuangliang Lithium Bromide chiller(heater) has more than 100 items of pat-

    technology and know-how, which receives a wide recognition owning to its excellent quality. Many world-famous chain hotels, such as, Shangri-La,

    n, Sheraton choose Shuangliang to build up a comfortable and quiet environmental climate.

    BUSINESSDolmen City PakistanTotal Cooling Capacity: 17000 RT.

    Located at the Clifton Beach of Karachi.Dolmen City consists of two

    18-floors towers and two 40-floors executive towers and one shopping

    mall. Now the two 18-floor towers were completed and air-conditioned

    by two units of Shuangliang chillers.

    Radisson Hotel Shanghai New World

    Total Cooling Capacity: 2505 RT

    With unique design Radisson Hotel Shanghai New World is the largest hotel of "Radis-

    son" brand that is managed by Carlson Hotels Asia Pacific in China.

    The hotel is located at the business street on Nan Jing Road, adjacent the People's Plaza.

    Neighbor of the hotel is a 10-story New World Shopping Mall, which provides the hotel

    with an unmatchable convenience.

  • 7/28/2019 Customer Portfolio A

    4/19

    BUSINESS3 BUSINESS 04

    ay Resort & Spa Lago di Garda (Gargnano, Lake Garda, Italy)

    oling Capacity: 700kw

    del: HSB-231, driven by both biomass boiler and flue gas of 2 units of micro turbines

    dern sustainable design meets sheer indulgence at Lefay Resort & Spa Lago di Garda where unadulterated pam-

    ng goes hand-in-hand with the most stunning lake views. This elegant resort, in Gargnano, is nestled within 27

    s of gentle hills and natural terraces, adorned with olive groves and woodland on the Riviera dei Limoni.

    Migros Regional Headquarterin Bern (Switzerland)Cooling Capacity: 1000kw

    Model: ST-284, driven by unusable wood fired boiler

    Migros is the biggest retailer in Switzerland with 590

    shops and 83,000 employees a turnover of chf 22 Bil-

    lions.

    The Project was in the Regional Headquarter of Bern,

    having administration, distribution and the second big-

    gest shopping centre in Switzerland.

  • 7/28/2019 Customer Portfolio A

    5/19

    Kunshan Business & Traders Hotel(Member of Shangri-La)

    Total Cooling Capacity: 1169 RT

    Kunshan Business & Trading Hotel is the ninth hotel of Shangri-Laof brand "Traders". The hotel is located in the downtown of Kunshan,

    east of the international metropolitan Shanghai and west of the his-

    torical city Suzhou, having an easy traffic.

    05

    BUSINESS 06

    Russian President Hotel In Sochi(Hotel & Sanatorium Complex "Rus", Russia)

    Total Cooling Capacity: 2 x 1400KW

    Hotel & Sanatorium Complex "Rus" is one of the luxury resorts of Sochi belongs to the Office of the President of Russia.

    located on the shore of the Black Sea, in the center city of Sochi with an area of 22 hectares.

    Sheraton Karachi Hotel, Pakistan

    Total Cooling Capacity: 2040kw

    Sheraton Karachi Hotel is the only internationally managed

    five-star hotel in Pakistan.

  • 7/28/2019 Customer Portfolio A

    6/19

    Persian Gul Commercial ComplexTotal Cooling Capacity: 14,000RT. (For shopping center only), 12 units of DF-1157H3 Gas Fired

    Absorption Chillers

    PePersian gulf Commercial Complex is located in shiraz with an area about 500,000 sq meters, isthe greatest, most modern and advanced commercial complex in Iran, composed by more than 2,500

    shops including welfare facilities.

    Hyper market in 15,000 sq meters , access via automatic ramps and escalators. Indoor entertainments

    in 28,000 sq meters including bowling-alleys. Billiards and the most advanced amusement equip-ments Payper room , emergency, restaurant and coffee shops.

    6 cinemas , each one contains 180 seats based on the high-tech sound technology.(Dolby Digital)

    Highly equipped outdoor amusement park with about 37,000 sq meters area. Indoor parking with

    capacity of 5,500 cars including numerous entrances and exits. Green landscape around market ,

    amusement park and artificial lake. International hotel , including helicopter landing place.

    07

    BUSINESS 08

  • 7/28/2019 Customer Portfolio A

    7/19

    Beijing Hotel

    Total Cooling Capacity: 868 RT

    Beijing Hotel located in the center of Beijing City was con-

    structed in 1900. It is a grand hotel of long history, being one

    of the most deluxe hotels in Beijing and even all over the coun-

    try. There are 2 sets of Shuangliang water-cooled screw chiller.

    09

    BUSINESS 10

    Urumqi Hilton Hotel

    Total Cooling Capacity: 4008 RT

    Urumqi Hilton Hotel will be totally designed and decorated based

    on super five-star standard of Hilton, each guest room is more than

    42 square meters. The hotel will be open on May 1, 2006 at Friend-

    ship Business Walking Street, and after operation it will be one of

    the highest-grade and most luxurious hotels in Xinjiang.Beijing Ever BrightInternational CenterTotal Cooling Capacity: 3340 RT

    A landmark business complex of

    Beijing consisting of one 5-star ho-

    tel, two 5-star office buildings and

    one Meilanfang Theater, located

    on the extension line of Beijing Fi-

    nancial Street. It will start operationbefore the 2008's Olympic Games.

  • 7/28/2019 Customer Portfolio A

    8/19

    Ningbo MetroTotal Cooling Capacity: 1002 RT

    Metro Group is world's largest C&C (Cash & Carry) commercial group,

    Metro Jinjiang Ningbo Supermarket is a large-scale retail distribution

    center featuring storage, membership and chain operation in Ningbo.

    It occupies about 5.2 hectares.

    Red-star Macalline National Chain(9 chains in Beijing, Tianjin, Shanghai)

    Total Cooling Capacity: 16032 RT

    Red-star Furniture Group is a large furniture and building ma-

    terials chain enterprise, the furniture supermarkets established

    features large-scale, high grade and standard style.

    11

    BUSINESS 12

    Beijing China Central PlazaTotal Cooling Capacity: 13360 RT

    Beijing Huamao Center is composed of three 5A intelligence mansions with over

    100 meters. The area of the Center is about 39 hectare, It is a world class building

    complex embodying the outstanding wit of world famous masters. It contains the

    CBD and two deluxe 5-star hotels (Riz-Carlton and Marriott)

  • 7/28/2019 Customer Portfolio A

    9/19

    13

    BUSINESS 14

    Guiyang Walmart National Chain(Guiyang, Yuxi)

    Total Cooling Capacity: 668 RT

    Walmart is world's largest retail super-market, the area of

    Walmart in Guiyang is about 17,000 Square Meter.

    B&Q National Chain(Shanghai, Chongqing, Xian, Wuxi)

    Total Cooling Capacity: 2922 RT

    B&Q is one of the largest professional non-food retail

    investment groups of the world. B&Q Chongqing locatesat Dijinmoer of Nanping, Chongqing, it is the first shop of

    B&Q in west China.

    Guangzhou International Convention & Exhibition Center (Pazhou)Total Cooling Capacity: 6680 RT

    Guangzhou International Convention & Exhibition Center (Pazhou) is the biggest exhibition center in Asia at

    present. It is located in Ba Zhou Isle-the southeast part of Guanzhou City. With unique design, good environ-

    ment and multiple functionalities for conference, exhibition and business negotiation, it has been an extension

    of Canton Fair.

  • 7/28/2019 Customer Portfolio A

    10/19

    INDUSTRY5

    / 16

    Air conditioning is great importance in textile, chemical, pharmaceutical and other industrial plants where

    ir contamination, humidity, and temperature affect manufacturing processes and final quality.

    huangliang provides various types of Lithium Bromide absorption chiller/heater with high efficiency and

    erfect after sales service to meet the requirements of manufacturing processes and guarantee the quality

    n different industies.

    INDUSTRYShanghai Jinshan Petro-chemicalTotal Cooling Capacity: 1670 RT

    Jinshan Petro-chemical is a large-scale petro-chemical enterprise

    belonged to Sinopec Group, it locates at National Chemical Indus-

    try Base named Shanghai Jinshanwei which has beautiful scene.

  • 7/28/2019 Customer Portfolio A

    11/19

    PT Bukit Kapur Reksa IndonesiaTotal Cooling Capacity: 4500 RT

    PT. Bukit Kapur Reksa is subsidiary of Wilmar Internationa Limited in Indonesia, the later was founded in

    1991 as a palm oil trading company, is today Asias leading agribusiness group. amongst the largest listed

    companies by market capitalization on the Singapore Exchange,business activities include oil palm cultivation,edible oils refining, oilseeds crushing, consumer pack edible oils processing and merchandising, specialty fats,

    oleochemicals and biodiesel manufacturing, and grains processing and merchandising. Headquartered in Sin-

    gapore, operations are located in more than 20 countries across four continents, with a primary focus on Indo-

    nesia, Malaysia, China, India and Europe. Backed by a staff force of about 70,000 people, over 170 processing

    plants and an extensive distribution network, products are delivered to more than 50 countries globally.

    PT Indorama Synthetics Tbk.,IndonesiaTotal Cooling Capacity: 2628KW

    Subsidiary of Indorama Group, which is a leading

    manufacturer of petrochemicals and associated

    downstream products up to textile raw materials, In-

    dorama Corporation is a multinational organisation

    with products being shipped to over 90 countries

    across the globe.

    INDUSTRY7 INDUSTRY 18

    ly Alatherm S.P.Aoling Capacity: 800kw

    del: HSB-231, driven by jacket

    er of gas engine

    therm is an international market

    er in the calendering of rigid,

    i-rigid and flexible PVC film and

    ets. A dynamic, innovative and

    hly specialised group, capable of

    ing the most diverse areas and

    mmodities sectors such as packag-

    stationery, furniture and technicalducts.

    PT Indah Kiat Pulp & Paper, IndonesiaTotal Cooling Capacity: 2314USRT

    Subsidiary of Sinar Mas Group, which is one of the largest conglom-

    erates in Indonesia, owning one of the world's leading pulp and paper

    companies and is ranked one of the largest vertically integrated pulp

    & paper producer in Asia, excluding Japan.

  • 7/28/2019 Customer Portfolio A

    12/19

    INDUSTRY9 INDUSTRY 20

    ang'an Ford Auto (Nanjing Factory)al Cooling Capacity: 8350 RT

    ng'an Ford takes advantage of world-class equipment or production, development and tests, with advanced technology,

    cess and system which play an important role among the World Top 500 enterprises. The project is a tracking project after

    t success for Ford China in 2004.

    Toyota (Sichuang) FactoryTotal Cooling Capacity: 1058RT

    Qinshan Nuclear Power PlantTotal Cooling Capacity: 1488RT

    This station is the first nuclear power station with a 300MW pressurized water reactorwhich has been designed, constructed, operated and managed by China it's own. It

    was connected to the grid on Dec. 15th, 1991. It's success ended the no-nuclear-power

    history in Chinese Mainland, and it has acted as the important milestone in China's

    peaceful use of nuclear power.

    Chashma Nuclear Power Plant PakistanTotal Cooling Capacity: 5360 RT

    The Chashrna Nuclear Power Plant (CNPP) has been designed and built in collabora-

    tion with China, delivering full power of 300 Mew to the national grid since September

    15, 2000. Shuangliang provided 4 sets of steam-operated LiBr absorption chillers for

    this project in 1995.

    April 8, 2005 the groundbreaking ceremony of phase II of Chashma Nuclear Power

    Plant was held at the construction site. Shuangliang provided absorption chillers for

    Chashma-2 again due to the excellent performance of Shuangliang chillers of phase I

    of CNPP.

  • 7/28/2019 Customer Portfolio A

    13/19

    21

    INDUSTRY 22

    ina Capital Steel Group

    China Capital Steel GroupTotal Cooling Capacity: 3674RT

    Capital Steel was first built in 1919 and now has

    been one of top ten steel enterprises in China.

  • 7/28/2019 Customer Portfolio A

    14/19

    PUBLIC FACILITY3 PUBLIC FACILITY3 PUBLIC FACILITY 24

    the development of economy, more than 100 million square meters of public architecture will be built each year in city. Statistics shows that the power

    -conditioning accounts for 55% of total energy consumption. Especially in summer, almost one third of electricity loading is used for cooling. So

    gy saving is key to the public architecture.ngliang Lithium Bromide Absorption Chiller adopts innovative recycling technology, the heat efficiency COP is high and reaches world level. At the

    time, the government should pay attention to the brand reputation when selecting the equipment suppliers, only the excellent equipment can be part

    blic architecture.

    PUBLICFACILITY

    Beijing West Railway StationTotal Cooling Capacity: 3373 RT

    The architectural area of Beijing West Railway Station is 1.3 million squaremeters, it is the destination station of Kowloon -Beijing Railway and known

    as the No.1 railway station in Asia.

    Nanjing Railway StationTotal Cooling Capacity: 3474 RT

    Nanjing Railway Station mainly deals with

    transportation services for passengers and

    packages passing through Jinghu (Beijing-

    Shanghai), Ningtong (Nanjing-Tongling),

    Wangan (Anhui-Jiangxi) railways. It is the

    1st level passenger transportation stationdirectly belongs to Shanghai Railway Bureau,

    and also is one of main passenger transpor-

    tation stations of East China railway hinge,

    usually called "Land Gate" and "Window" of

    Jiangsu province and Nanjing city.

    Shanghai Metro BuildingTotal Cooling Capacity: 2004 RT

    The Shanghai Metro Building is located at the south square of the Railway Sta-

    tion of Shanghai which is one of symbol building in Shanghai, and the largest

    multifunctional control center for railway transportation in China.

  • 7/28/2019 Customer Portfolio A

    15/19

    PUBLIC FACILITY5 PUBLIC FACILITY 26

    tional Olympic Sports Centerl 3100 USRT direct fired chiller, during games saved 30000 kW electricity, reduced 30 tons of CO

    2

    ssion. National Olympic Sports Center is located at south section of Olympic Park, covering an

    of 97.5 hectares. As one of 2008 Olympic main stadium, hosted Olympic games: Football, Hand-

    Field Hockey, Water Polo, Modern Pentathlon, Synchronized swimming, etc.Tianjin Haihe Water Sports WorldTotal Cooling Capacity: 3006 RT

    The project is one of the key constructions for Haihe rebuild

    project in Tianjin, with total area of one million square me-

    ters, after construction the Water Sports World will feature

    supermarket, department store, office building, hotel, high-grade apartment and waterfront harbor, total investment of

    the project is 0.35 billion US dollars.

    TianJin BinHai International AirportTotal Cooling Capacity: 3960Rt

    13.3 km from Tianjin Railway Station, covering 7 million square meters, TianJin BinHai International Airport has a terminal building

    of 20,000 square meters and a cargo storage of 16,000 square meters. With a 3,200 meter long, 50-meter wide runway, the flight

    zone grading 4D, it can take off and land Boeing 757 and 767, MD-82 and below-level aircrafts. During 2008 Olympics Games it will

    be in full operation.

    Milan Linate InternationalAirportCooling Capacity: 22000kw

    Model: 2HAS-569, driven by hot water gen-

    erated by flue gas of 3 units of gas engines.

    The airport is managed by Italy SEA group, ajoint stock company controlled by the Mu-

    nicipality of Milan with a 84.56% share. Theremaining shares are held by ASAM (14.56%)

    and other minor public and private sharehold-

    ers (0,88%).

  • 7/28/2019 Customer Portfolio A

    16/19

    27

    PUBLIC FACILITY 28

    Beijing Capital International AirportTotal Cooling Capacity: 6012 RT

    As one of the key symbol projects for 2008's Olympic Games, the cooperation agree-

    ment of central air conditioning system for Capital Airport was signed officially in

    Beijing. Jiangsu Shuangliang Air-conditioning Equipment Co., Ltd. becomes again the

    cooperative partner for the projects of Olympic Games.

    Energy Saving & Environmental Protection: Save 8MW electricity per hour, save 20,000tons of coal and reduce 52,000 tons of CO2 emission every year.

  • 7/28/2019 Customer Portfolio A

    17/19

    Zurich University Hospital(Switzerland)Total Cooling Capacity: 2000kw

    The University Hospital (Universitaetspital) is

    the largest and best-equipped hospital in the city

    and is open to all as a publicly owned hospital.

    Every year, almost 130,000 patients look to the

    University Hospital for outpatient treatment. Every

    year, more than 34,000 persons are treated as

    in-patients. The University Hospital combines 29medical units.

    The Inselspital (Bern University Hospital),SwitzerlandTotal Cooling Capacity: 1500KW from special double effect hot waterchiller, hot water inlet/outlet temperature is 175/150

    The Inselspital (Bern University Hospital) is the teaching and academic medi-

    cal center at the University of Bern, Switzerland. The hospital is operated

    by a charitable foundation. With more than 6700 employees, the Inselspital

    provides care for more than 250 000 patients per year and represents one of

    the countrys leading medical institutions.

    PUBLIC FACILITY9 PUBLIC FACILITY 30

    Government Campus Plaza,Trinidad & TobagoTotal Cooling Capacity: 3700 RT

    Landmark project in Port of Spain, one 22-floor

    tower for Board of Inland Revenue, another

    22-floor tower for Legal and consumer affairs, the

    rest 3 buildings for Customs & Exercises, Minis-

    try of Education Respectively.

    Pfzer Asia Pacifc Pte.Ltd.,SingaporeTotal Cooling Capacity: 2330 KW

    Pfizer Asia Pacific Pte. Ltd. is subsidiary of Pfizer

    Inc., which is the worlds largest research-based

    pharmaceutical company. Pzer (Germany)

    factory also is our customer, running

    2040kw steam chiller.

  • 7/28/2019 Customer Portfolio A

    18/19

    PUBLIC FACILITY1 PUBLIC FACILITY 32

    Beijing PlanetariumTotal Cooling Capacity: 1169 RT

    Beijing Planetarium is a nation-level science museumspecializing in the field of natural science with total

    architectural area of 20,000 square meters.

    Zee TV StationTotal Cooling Capacity: 820RT,Flue Gas + Jacket Water Driven

    Chiller

    Zee Telefilms Limited (Zee) is India's

    largest vertically integrated media

    and entertainment company. Zee has

    an integrated range of businesses,

    encompassing the content-to-

    consumer value chain of media and

    entertainment business.

    Art College o The University oMelbourne, AustraliaTotal Cooling Capacity: 1100kw, driven by solar hot

    water at day time, back up by direct fired burner at night.

    The University of Melbourne is a public university located

    in Melbourne, Victoria. Founded in 1853, it is the second

    oldest university in Australia and the oldest in Victoria. Themain campus is located in Parkville, an inner suburb just

    north of the Melbourne CBD.

  • 7/28/2019 Customer Portfolio A

    19/19

    SHUANGLIANG ECO-ENERGY SYSTEMS CO., LTD

    Cat. No.: SL-IT-K01011(E) New Release

    2011 Copyright Reserved Information subject to change without prior notice

    Add: Shuangliang Industr y Park in Ligang, Jiangyin Cit y, Jiangsu Provine, China

    Tel: +86-510-86638824 86632095

    Fax: +86-510-86634678

    Post Code: 214444

    Email: [email protected]

    www.shuangliang.com

    State-level EnterpriseTechnology Center

    Postdoctoral Programme