DAPC Rules Update. DAPC Program Update Seminar December 7, 2010. Today's Topics. The Rule Process – an Overview Using the Guidance Documents 2010 – Year in Review In the Hopper SIP Conduit. The Rule Process – an Overview. Ohio Revised Code = Laws/Statutes - PowerPoint PPT PresentationTRANSCRIPT
DAPC Program Update SeminarDecember 7, 2010
DAPC RULES UPDATE
TODAY'S TOPICS
The Rule Process – an Overview
Using the Guidance Documents
2010 – Year in Review
In the Hopper
SIP Conduit
THE RULE PROCESS – AN OVERVIEW
Ohio Revised Code = Laws/Statutes
Ohio Administrative Code = Rules/Regulations
DAPC Makes Rules!
469 Rules in Chapter 3745 of the Administrative Code
THE RULE PROCESS – AN OVERVIEW
Two Paths – 5 year review and Non-5yr
5 Year Review What is it? – ORC 119.032 Determine if rule is....
• Necessary: Changes or No Change
• Unnecessary: Rescission
Must review whole rule.
• Make content changes, but also;
• Fix Typos, Admin Data, IBR’s, etc...
Non-5yr: typically just a content change
THE RULE PROCESS – AN OVERVIEW
Typical Rule Schedule (180 – 255 Days) Content Development – Prior to rule path Draft Rule (IP) Comment Period Proposal Period
• Public Hearing
• JCARR jurisdiction - 65 days Regular, 90 Days No-change JCARR = Joint Committee on Agency Rule Review JCARR jurisdiction includes JCARR hearing No public hearing for no-change rules
THE RULE PROCESS – AN OVERVIEW
Typical Rule Path – continued Final File Package• Package Review and Sign-off (15-30 days)• Final file (can be done first day after JCARR jurisdiction is over)• First possible effective date is 10 days after final filing
Revising (if necessary)• If change necessary within the first 35 days of JCARR
jurisdiction• Does not lengthen timeframe
Refiling (if necessary)• If change necessary after the first 35 days of JCARR jurisdiction• Could lengthen timeframe considerably (30 day JCARR
extension) Also Emergency and No-Change
USING THE GUIDANCE DOCUMENTS
DAPC has developed many guidance documents
“Rule Generating and Processing Guidance”
“Rule Drafting and Formatting Guidance”
Rule package document templates
Additional outside guidance available
LSC Rule Drafting Manual
RAS/ERF Training Manuals
USING THE GUIDANCE DOCUMENTS
Where can I get this guidance?
J:\SHARED\rules\Rule Guidance
RAS/ ERF Library (aka the top of my file cabinet)
http://www.lsc.state.oh.us/rules/index.html
Contact [email protected]
2010 – YEAR IN REVIEW
New Rules None
Notable Adoptions OAC Rule 3745-21-25 – Plastic Composites
Manufacturing RACT, Submitted to USEPA 11/10/10 OAC Rules 3745-14-(01, 06) – Facilitated Transition
of Facilities from NOx SIP Call to CAIR OAC Rule 3745-31-03 – Mid-size printing PBR and
Emergency Generators Rescinded Rules
OAC Chapter 3745-108 – Clean Air Mercury Rules (CAMR)
RULE ACTIONS – 5 YR REVIEWS2005 - 2010
2005 2006 2007 2008 2009 20100
50
100
150
200
250
175
246
15
69
112
140
Rule Actions
5 Yr Reviews
RULE ACTIONS – NEW RULES2005 - 2010
2005 2006 2007 2008 2009 20100
20
40
60
80
100
120
30
24
117
39
17
0
Rule Actions
New Rules
TOTAL RULE ACTIONS2005 - 2010
2005 2006 2007 2008 20090
50
100
150
200
250
300
350
Rule Actions
Number of Rule Actions5 Yr ReviewsNew Rules
COMING UP IN 2011
5 Year review: The “Busy Season” continues....... 215 Rules Started in 2010 (Most not Done Yet) 121 Rules to Start in 2011
New Rules
CTG RACT – Phase 3 (New CTG rules for Automotive Industry, Industrial Adhesives, Boat Manufacturing, Misc Metal/Plastic Parts)
IN THE HOPPER – WHAT ARE WE WORKING ON AS OF 12/7/10
GHG Tailoring Rule – Draft Comment Period Ended 8/24
Total Reduced Sulfur (3745-73): Mostly Minor Changes for 5-yr Review, Public Hearing on 12/20/10
Sulfur Dioxide Regulations(3745-18): Removing Shut-down Facilities as Part of 5 yr review, Public Hearing 1/7/11
About a Dozen other packages for 5-year review, Mostly minor changes
MORE ON-GOING ITEMS
Cleveland VOC RACT (Ch 21): “Phase 3” package to be sent to IP draft mid December, 2009
Title V 5 yr Review (Ch 77): Proposed as of 11/24/09, Public hearing on 12/30/09
3745-31 PM 2.5 Updates: Changes still being made to draft. Proposal in 2010.
SIP APPROVALS IN 2010
AAQS Reorganization (Ch 25): Approved 10/26/10, 75 FR 65572 – Consolidation of AAQS from various chapters
Particulate Matter Standards (Ch 17): Approved 10/26/10, 75 FR 65569 – Incorporates 5-yr review changes, does not include Martin Marietta in rule 3745-11
3745-31 NSR Reform: Originally submitted in Oct. 2004, approved 2/25/10, 75 FR 8496
VOC RACT – Various (Ch 21): Originally Submitted is Stages Back to 2000, approved 7/21/10, 75 FR 34939
WHAT’S GOING ON WITH RULE 3745-21-07
Effective 2/18/08
Submitted to USEPA 4/7/08
Additional Information Submitted on 4/27/10 and 10/25/10: 110(l) Demonstration
OAC Rule 3745-21-25: Amendments Submitted to SIP on 11/10/10
The Plan: USEPA will rulemake on OAC rule 3745-21-25. Once that is finished, they will consider rule 3745-21-07.