DC Control & Protection TrainingDC-Protection Functions – DC Busbar Protection
Page 2 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
DC C&P Training – DC-Protection Functions – DC Busbar Protection
DC Busbar Protection Overview
DC-Filter
IdCH
IdCNIdee1
Idee2
UdH
UdNIdLN
HSNBS
MRTB
IdSG
HSGS
IdLH
33
Uac
UsumY
3UsumD
IacY
IacD
HSNBS
Other Pole
MRSIdLN_op
IdMRS
Protection zone
Protection zone
Page 3 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
DC C&P Training – DC-Protection Functions – DC Busbar Protection
HV DC Busbar Differential Protection (87HV)
DC-Filter
IdCH
IdCNIdee1
Idee2
UdH
UdNIdLN
HSNBS
MRTB
IdSG
HSGS
IdLH
33
Uac
UsumY
3UsumD
IacY
IacD
HSNBS
Other Pole
MRSIdLN_op
IdMRS
Page 4 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
Protection Task Faults to ground or neutral within protection zone
Evaluation Principle Abs(IdLH – IdCH) > threshold
Initiated Sequences At rectifier: Converter Block to Pole Control At inverter: Converter Block to Pole Control, Bypass Pair Firing
Inhibit Retarded Protection Task for both stations if firing pulses are blocked: Opening of HSNBS ESOF to Pole Control
Typical settings Threshold = 0.25 p.u. Delay time = 10 ms
DC C&P Training – DC-Protection Functions – DC Busbar Protection
HV DC Busbar Differential Protection (87HV)
Page 5 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
DC C&P Training – DC-Protection Functions – DC Busbar Protection
Neutral DC Busbar Differential Protection (87LV)
DC-Filter
IdCH
IdCNIdee1
Idee2
UdH
UdNIdLN
HSNBS
MRTB
IdSG
HSGS
IdLH
33
Uac
UsumY
3UsumD
IacY
IacD
HSNBS
Other Pole
MRSIdLN_op
IdMRS
Page 6 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
Protection Task Faults to ground or high voltage within protection zone
Evaluation Principle Abs(IdLN – IdCN) > threshold, (2 stages)
Initiated Sequences ESOF to Pole Control Open AC circuit breaker Opening of HSNBS
Typical settings 1st stage: Threshold = 0.25 p.u.; Delay time = 50 ms 2nd stage: Threshold = 0.07 p.u.; Delay time = 500 ms
DC C&P Training – DC-Protection Functions – DC Busbar Protection
Neutral DC Busbar Differential Protection (87LV)
Page 7 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
DC C&P Training – DC-Protection Functions – DC Busbar Protection
DC Differential Back-Up Protection (87DCB)
DC-Filter
IdCH
IdCNIdee1
Idee2
UdH
UdNIdLN
HSNBS
MRTB
IdSG
HSGS
IdLH
33
Uac
UsumY
3UsumD
IacY
IacD
HSNBS
Other Pole
MRSIdLN_op
IdMRS
Page 8 April 2009Copyright © Siemens AG 2008. All rights reserved.
Energy Sector - Power Transmission SolutionsE T PS EN21
Protection Task Earth faults at HV or Neutral DC busbars or pole equipment
Evaluation Principle Abs(IdLH – IdLN) > threshold, (2 stages)
Initiated Sequences ESOF to Pole Control Open AC circuit breaker Opening of HSNBS
Typical settings 1st stage: Threshold = 0.25 p.u.; Delay time = 200 ms 2nd stage: Threshold = 0.07 p.u.; Delay time = 1000 ms
DC C&P Training – DC-Protection Functions – DC Busbar Protection
DC Differential Back-Up Protection (87DCB)