42A89SW8888 21 CARR 010 DIAMOND DRILLING TWP/ARKA Carr REPORT NO.* 21 WORK I'KliKORMRD KOR.-G.E. Parsons RECORDED HOLDER: SAMK AS ABOVE ^ ] : OTHER[ J CLAIM NO. HOLE NO. Si Lot 1 Con II DDK 91 D1 Si Lot 1 Con II DDK 91 D2 Si Lot 1 Con II DDK 91 D3 FOOTAGE 556' 246' 345' DATE Aug/91 Aug/91 Aug/91 NOTE 1 1 1 NOTES: 1. Report of work #W9380.00159 FILED July 6/93

Upload: dangtram

Post on 10-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

42A89SW8888 21 CARR 010

DIAMOND DRILLING

TWP/ARKA Carr REPORT NO.* 21

WORK I'KliKORMRD KOR.-G.E. Parsons

RECORDED HOLDER: SAMK AS ABOVE ^ ] : OTHER[ J

CLAIM NO. HOLE NO.

Si Lot 1 Con II DDK 91 D1

Si Lot 1 Con II DDK 91 D2

Si Lot 1 Con II DDK 91 D3

FOOTAGE

556'

246'

345'

DATE

Aug/91

Aug/91

Aug/91

NOTE

1

1

1

NOTES:

1. Report of work #W9380.00159

FILED July 6/93

CARR TOWNSHIP PROJECT

D. D. H. 91 D l

Location : S|- Lot l, Con. II, Carr Twp.- 1410 ft. west of Carr-Beatty boundary- 1365 ft. north of Lands St Forest cairn for

Con. I-Con. II, Lot l, Carr Twp.- 1300 ft. north of farmer's corner post

Erg. : Due north Dip Collar 80 degrees g) 500 do Length: 556 ft.Started August 21, 1991 Completed August 24, 1991 Drilled by Heath 8* Sherwood Logged by G. E. Parsons

(Note: all measurements in feet except where noted in inches)

0-111 Casingclay except for large boulders and silt at bedrock

111-125 Andesitealtered, light grey-green colour, numerous thinchlorite-filled fractures, some narrow carbonateseams(^113 l in. of qtz. plus 5 "fo f ine specularite @

15 degrees to core @113|- j in. of white quarte-carb. , l^o pyrite,

slips @ 45 degrees @115^ j i n. seam @ 20 degrees to core; clear to

slightly blue qtz. plus white qtz. -carb;l 5 0t'o pyrite; moly on slips

l'j'117^ thin seam of light bluish qtz. with scattered pyrite, 8t chalcopyrite @ 30 degrees to core

@117 3/4 thin fracture filled with above mineralizationparallel to above seam

@123 fault cleancut slips @ 60 degrees to core;minor rusting; grey qtz. -carb, over 3",trace pyrite and chalco.

125-208 Andesitedark green, fine to fine-med. grained; last 10 ft. fine to dense, massive, very uniform; last foot of core broken up

-2-

208-215 Felspar Porphyry

good type; equidimensional small white felspars in a deep reddish brown matrix; lO^o fine acicular ferromags; distinct dark founded inclusions; first contact in broken core; last contact 45 degrees to core with trace of pyrite 209-210;| inclusion of andesite

215-40l| Andesite

dark green, fine to dense; by 279 locally definiteamygdules especially 286-296 ft.231-232j Fault Zone starts on strong chlorite clip @

40 degrees to core followed by 3/4 ft. of highly fractured, brecciated, and hematized andesite with seams of light coloured pyrite; some granulated qtz. seams; fractures filled with pink carbonate; last 3/4 ft. strongly sheared, possibly mud at 30 degrees to core; some core as washers; some pink carb.

249^-250 shearing and brecciation some discolouration of rock f rags, in qtz. carb, trace of pyrite, slips at 30 degrees to core

@ 341 l" of qtz. along shearing at 30 degrees trace pyrite

@ 376. 2 3" narrow grey qtz. carb. strs. @ 55 degrees to core

@ 380 2" peridotite dike ? at 50 degrees to core,dark, bright green, fairly soft, med-grained

@ 383. 5 2" of grey qtz. carb at 85 degrees to core@ 397 sharp slip @ 50 degrees preceded by some

crushing and silicification399|-401^ Mineralized Shear Zone 60 degrees to core;

dark fine sulphides along shear slips; white to light blue qtz. seams along shear slips; intersitual grey qtz. carb, and hairline filled fractures; 2fo disseminated pyrite

Sample 8553 399|-40l| 2^ ft. of 0. 010 oz. Au/ton

401^--402 Diabasefirst contact on slip; last contact sharp but irregular; med. grained; hard, massive

91D1 . 3 .

402-485 Andesitecontinuation of above andesite but more dense

415-427 a number of narrow epidote-bearing zones;still amygs.

439-440 irregular breccia zone; light yellow kangular dark green frags, in a glassy qtz, matrix

@ 457 tight shearing @ 25 degrees over if"; somequartz and pyrite

457-460 uniformly scattered small soft black crystals;appears micaceous probably chlorite and/orserpentine

465-485 core broken; hairline fractures filled with qtz.locally epidotized zones; still odd amyg.

@ 475^ shear slip @ 25 degrees; some granularsilicification over if"

481-48lf yellowish green epidotized frags, plus darkgreen frags, in qtz. ; massive

485-488 3/4 Grey Porphyrysmall white felspars in a grey green matrix; hard,

massive, uniform.

488 3/4-526 Andesite

fractured andesite; core fairly solid504-526 fractures filled with black serpentine-chlorite,

and/or hematite and/or qtz. -carb.

526-544f Destor-Porcupine Fault Zone526-536 six feet of .lost (ground) core; two feet of solid

core; two feet of schist-gravel. 536-544^ fissile schist approx. 35 degrees to core but

variable; locally contorted; soft; a mix ofbright green serpentine and black choriteplus carb.

@ 544f if in. of hard compact greenish mud

544f-556 Andesite

End hard, massive, hair line fractures 544^-551 slight brownish tinge551-552 some shearing and crushing; some grey carb;

black chlorite and serpentine-filled fractures552-556 grey green; some amygs; some fine fractures

91D1 . 4 .

Sludges Assayed

110-116 Nil116-126 Nil

226-236 0.005 check 0. 006

386-396 Nil396-406 0. 002406-416 0.002

516-526 Nil526-536 Nil536-546 Nil

Oct. 1/91

CARR TOWNSHIP PROJECT

D. D. H. 91 D 2

Location: S|-, Lot l, Con. II, Carr Twp.- 1410 ft. west of Carr-Beatty boundary- 1338 ft. north of Lands fe Forests cairn for Con. I-Con. II,Carr;

27 ft. S of hole D lErg: Due north Dip @ Collar 80 degrees Length 246 ft. Started August 24, 1991 Completed August 25, 1991 Drilled by Heath k Sherwood Logged by G. E. Parsons

(note: all measurements in feet except where noted in inches)

0-114 Casingclay except for last few feet with large boulders and silt

114-217.5 Andesitegrey-green fine-grained, hard, massive, very uniform; first five feet lighter coloured144-145 -f-" glassy qtz. vein, trace pyrite @ 15 degrees

to core(o) 187. 5 as above @ 20 degrees to core @ 202 2" semi-granular siliceous zone with l^o

pyrite and l "fo fine specularite; light mauve colour; hard; 25 degrees to core

217. 5-224. 5 Felspar Porphyrygood reddish type identical to that in hole DI @ 208-215 starts in broken core and ends in fault zone

224. 5-2?6 Fault Zone

first inch bluish siliceous material with patches of pyrite 5^o; dry looking chlorite and carbonate with 4" of fissile schists with rust @ 30 degrees o,lit (o. J3Z) l f'% fr

226-246 AndesiteEnd same massive unfirom unit as above; amygs. loccally present

Sludge Assays

216-226 0.042 check 0. 038 226-236 0.008

Oct. 1/91

CARR TOWNSHIP PROJECT

D. D. H. 91 D 3

Location: S|- Lot l, Con. II, Carr Twp.- 850 ft. west of Carr-Beatty boundary- 1603ft. north Con. I-Con. II cairn

Brg: N 9 degrees E Dip (^ collar 80 degrees Length 345 ft.

Started Aug. 21/91 Completed Aug. 24/91Drilled by Heath St Sherwood Logged by G. E. Parsons

0-80 Casing0-60 - clay 60-80 boulders

80-111. 5 Andesitefine grained, varies from light to dark green, fragment white carbonate filled fractures and slips

111.5-139 Altered Andesite

light green, core in short lengths, hard, cut by narrow

qtz. carb, seams and filled fracturesSample 8554 126|-128^ O, 044 oz Au/ton

over l 3/4 ft; check 0. 048 oz@ 127j ^ in. of near massive pyrite at 80 degrees

followed by if in. of disjointed dark pyrite seams; rest of section with qtz. carb, filled fractures and minor pyrite

139-161.5 Andesite

139-143 core broken, partly as gravel along a fault at small to core; rusty quartz-carb; hematite on slips

143^161. 5 variable, fine grained tends to be a darker green than that before

161. 5-163 3/4 Syeniterelatively fine grained, hard, massive, green ferromags.

in a light grey green matrix; first part altered to pink

colour contacts @ 55 degrees

1633/4-164^ ?purplish siliceous zone; 201*0 hematite

91D3 - 2 -

I64f-170 Andesitevariously altered

170-173;! Syenitesalmon-pink colour with hairline black chlorite-filled fractures

173-1-189 Andesitevariously altered188-188| pinkish qtz. carb seams with black chlorite

188JT-189 broken core partly as gravel

189-226 Destor-Porcupine Fault Zone

189-196 Fault Breccia angular andesite fragments ina black chloritic matrix

196-196.6 foliated qtz. carb and black chlorite @ 55 degrees 196.6-198 Fault Breccia as 189-196198-199 Syenite dark uniform granitic texture; massive

l*fo pyrite, first contact indefinte last at 55 degrees199-201 Fault breccia as before201-202 Syenite as above202-206.5 shear slips @ 35 degrees followed by foliated

carb, with black chlorite, foliation at 30 degrees plus206.5-209.5 Syenite dark, very fine grained, massive,

granitic texture209.5-211.5 mostly qtz. carb.211.5-217.5 ? light grey-green, dense, hard217. 5 - 2 2 6 Fault^ B r ec c ia as before, core broken changing

down hole to chloritized andesite 226-256.5 Andesite

medium dark grey, massiveexcept locally broken with hairline fractures.filled black chlorite and/or carbonates @ 236 l| in. of a hard siliceous pink breccia @ 237 6 in. of foliated qtz. carb and chlorite @ 50 degrees 240|-243 Syenite dark, fine-grained as 206. 5-209. 5,

contacts in broken core250-251 foliated qtz. carb in shearing at 30 degrees251-256.5 core partly to badly broken

256. 5-276 Andesitemedium grey green, massive scattered hairline fracturesfilled with carb.268 3/4-270 foliated qtz. carb and chlorite at 60 degrees plus

some clear white qtz. with trace of pyrite @ 2 74 l" qtz. carb, at 30 degrees, shearing plus

some pyrite

91D3 - 3-

276-320;| Andesite

med. to dark green, hard, unaltered276-290 core somewhat broken along unsealed slipsfrom 290 locally amygs.

Sample 8555 318-320^ 0. 008 oz. Au/ton over 2 ft.318^-3183/4 crushed light coloured foliated qtz. few

speck of chalco.3183/4-319^ sheared with pyrite along shearing at 45 degrees 319^-320^ sheared at 40 degrees semi-crushed, seams and

nodules of qtz. 2 "lo fine pyrite

320^-323-} Grey Porphyryabundant fine white felspars in a grey-green matrix; first contact indefinite, last in broken core

323^-345 Andesite

End medium grey-green, massive, hard, unaltered, no amygs. noted

Sludges

126-136 0.002136-146 "146-156 "156-166 "166-176 "176-186 Nil186-196 0.002196-206 Nil206-216 "216-226 "226-236 "236-246 "246-256 "

316-326 0.002326-336 Nil

Oct. 1/91

N

SECTION of

P.D.H. 91 DI i 3I"D2.

3/t Lot \ CenD CARR Twpl i'n * 100 Pt.

S/o-oozy/o'

SECTIONof

P.UH.91D3 S'/*. UoTl Con H

l ir\ r lOOfT-

s/ Jet

., o

dr-

*o nr

— o D

85 Z5

-zU3

00

oo

ZIZ

n "~ T

t H —V

r~

o H

•D

av

vi

CA

RR

ot vn * n Tl n >

i.O (D O" -~

o.

o\f

0 w a ••i

VP

AT

TY

a o

E

0- oenx

a

Ministry ofNorthern Developmentand Mines

Ontario

Report of Work Conducted After Recording Claim

Mining Act

Transaction Number

Personal information collected on this form is obtained under the authority of the l this collection should be directed to the Provincial Manager, Mining Lands, Mi Sudbury, Ontario, P3E 6A5, telephone (705) 670-7264.

42A09SW8888 2 1 CARR 300

instructions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining

Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.

Recorded Holder(s)

G. e. / Client No. 214 2 41

AddressDR.

Telephone No.- 5/SS

Mining Division

LAKETownship/Area M or Q Plan No.

Performed J??/

Work Performed (Check One Work Group Only)

Total Assessment Work Claimed on the Attached Statement of Costs zoj 7 74Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address

P.O.

d s

(attach a schedule If necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse side1 certify that at the time the work was performed, the claims covered In this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.

Date

7 J vat, 93Recorded Holder or Agent (Signature)

S ' fr ̂S&, r . /^ttLstfsi.

Certiflcation of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after its completion and annexed report is true.

0241 (03/91)

400 -J

00 en

o

N ui Cs

Ui

00 ro O

4 10 ft

IIm

|f

M -^?

I ir i Total

Value

Woric

Applfod

Q Nl * o 0

i

00 o 0

1

CO 0

1 o D

f 00

O 0

M o 0 * i

.

II- nil

lV* Vi

^^ ( \ .y ^ - w

^T

l ^

**.^ h,

a x,

k 1 1

"̂c *s

i J i

Ul

' "c ^^ ^, J i j

\. u

t i i \

~- )L ^

fS. O

r c s* *s •s 40 ) ? J i ^ 3

3 J*

55* 3

*S ^

OO

iS*^

3 a

iiff

si*f

Saff*

|

*

Cred

its y

ou a

re c

laim

ing

in th

is re

port

may

be

cut b

ack.

In or

der t

o m

inim

ize th

e ad

vers

e ef

fect

s of

suc

h de

letio

ns, p

lease

indi

cate

from

wh

ich c

laim

s yo

u wi

sh to

prio

rize

the

dele

tion

of c

redi

ts.

Plea

se m

ark

(^)

one

of th

e fo

llowi

ng:

1. D

Cre

dits

are

to b

e cu

t bac

k st

artin

g wi

th th

e cla

im li

sted

last,

work

ing

back

ward

s.2.

D C

redi

ts a

re to

be

cut b

ack

equa

lly o

ver a

ll cla

ims

cont

aine

d in

this

repo

rt of

wor

k.3.

D C

redi

ts a

re to

be

cut b

ack

as p

rloriz

ed o

n th

e at

tach

ed a

ppen

dix.

In th

e ev

ent t

hat y

ou h

ave

not s

pecif

ied

your

cho

ice o

f prio

rity,

opt

ion o

ne w

ill be

imple

men

ted.

Not

e 1:

Ex

ampl

es o

f ben

efic

ial I

nter

est a

re u

nrec

orde

d tr

ansf

ers,

opt

ion

agre

emen

ts, m

emor

andu

m o

f agr

eem

ents

, etc

., w

ith re

spec

t to

the

min

ing

clai

ms.

Not

e 2:

If

wor

k ha

s be

en p

erfo

rmed

on

pate

nted

or

leds

ed l

and,

ple

ase

com

plet

e th

e fo

llow

ing:

l cer

tify

that

the

reco

rded

hol

der h

ad a

ben

efici

al in

tere

st in

the

pate

nted

or

leas

ed la

nd a

t the

tim

e th

e wo

rk w

as p

erfo

rmed

.Si

gnat

ure

Date 7

Ontario

Ministry ofNorthern Developmentand Mines

W"Develo

ttere duveloppement du Nord

et des mines

Statement of Costs for Assessment CreditEtat des coQts aux fins du credit d'evaluation

Mining Act/Loi sur les mines

Transaction No./N 0 de transaction

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands, Ministry of Northern Development and Mines, 4th Floor, 159 Cedar Street, Sudbury, Ontario P3E 6A5, telephone (705) 670-7264.

Les renseignements personnels contenus dans la presents formule sont recueillis en vertu de la Lo! sur les mines et serviront h tenir a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministers du Developpement du Nord et des Mines, 159, rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

Wages Salalres

Contractor's and Consultant's FeesDrolts de ('entrepreneur t de I'expert- consell

Supplies Used Fournltures utilities

Equipment Rental Location de materiel

Description

Labour C&rc- Gr&kbn*' Main-d'oeuvre

Field Supervision Supervision sur le terrain

Type

yitirrior\d

Pr, '//inj

Type

Type

Amount Montan!

1 4#o®oo

H./54f

Total Direct Costs Total des couts directs

Totals Total global

/ZOO

nM

. I : - :V:

njM

2. Indirect Costs/CoQts indlrects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work.Pour le remboursement des travaux de rehabilitation, ies couts indirects ne sont pas admissibles en tant que travaux d'evaluation.

Type

Transportation Transport

Food and Lodging Nourrlture et hebergementMobilization and Demobilization Mobilisation et demobilisation

Description

Type

TrveK

J f) d d y 4a- VD

Amount Montant

1ZO

Sub Total of Indirect Costs Total partial des couts Indlrects

Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'axcedant pas 20 H das couts directs)Total Value of Assassmant Credit Valeur totale du crMtt (Total of Direct and Allowable d 'evaluation Indirect coital fToUI du coott dlracU

Totals Total global

iWflP*A ' '*?!J^V-'•.'••;'SiE

if.lip-mjbIIP

M bicHrecte MmlMlbws

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted. '

Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present etat des coOts dans les 30 jours suivant une demands a cet effet. Si la verification n'est pas effectuee, le minlstre peut rejeter tout ou une partie des travaux devaluation presentes.

Filing Discounts Remises pour depot

1. Work filed within two years of completion is claimed at 1000xb of the above Total Value of Assessment Credit.

1. Les travaux deposes dans les deux ans suivant leur achievement sont rembourses fi 100 *ft de la valeur totale susmentionnee du credit d'evaluation.

2. Work filed three, four or five years after completion is claimed at SOIfa of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimedx 0.50 -

2. Les travaux deposes trols, quatre ou cinq ans apres leur achievement sont rembourses a 50 (ft de la valeur totale du credit d'evaluation susmentionne. Volr les calculs ci-dessous.

Valeur totale du credit d'evaluationx 0,50

Evaluation totale demandee

Certification Verifying Statement of Costs

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

that as

to make this certification

, Position in Company)

Attestation de I'etat des couts

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

l am authorized Et qu'a litre de je suis autorise(titulaire enregistre, represented, poste occupe dans la compagnle)

a faire cette attestation.

Signature Date

0212 (04/91) Nota : Dans cette formule, lorsqu'il designs des personnes, le masculin est utilise au sens neutre.