Page 1: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

December 18, 2007

TPTF

Early Delivery SystemsStatus

Daryl Cote

Page 2: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

2TPTF12/17/2007 2

EDS Status Update

2007 2008

SCED R5.1 SCED R5.3: RT ICCP SCED R5.4: LMP Post

Sep Oct Nov Dec Jan Feb

SCED R5.2

ICCP Fail-over / P2P

R3: SE / Telemetry Criteria (SE Tuning)

R4: NOMCR / Network Model verification

E1 R2

E2 R3

E2 R4

E3 R5

E3 R6 LFC R6.1: ACE

E3 R7 CRR R7.1

E4 R9 R9

6-month LMP Posting

SE Verification

RT ICCP

NOMCR Checkout Network Model Verification

EDS 1 Exit Criteria % of MPs

% of Points

Comments

MPs have completed PtP checkout and topology review for all submitted Nodal points (MP5)

95%(95%)

99%(99%)

XTend having link problems, RCEC completed 1st phase. Adding Magic Valley (Q1 ‘08) and College Station (Jan ’08) – approximately 1000 points.

ERCOT has completed local failover testing with each MP (MP6) 87%(84%)

n/a Tenaska, AEP QSE in 12/07, BTU and Xtend in 01/08.

ERCOT has completed Alarm Processing Configuration and testing

n/a 10% Alarm processing testing will be phased by category and systems availability.

ERCOT has completed all PtP process documentation to support checkout for new construction / future changes to telemetry

95% n/a Final process handoff and transition to Operations will occur by year end.

Outstanding ICCP issues <= 3% per MP (MP5) 100%(80%)

n/a Overall error rate ~1%. 9 MPs are at a 0% error rate. 15 MPs tested are at or below 1% error rate.

Quality Code Retesting (MP5) 100%(92%)

n/a 36 of 36 MPs regression tested with quality code fix.

Reporting

Legend: % in parentheses are from the 11/26 TPTF update

Page 3: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

3TPTF12/17/2007 3

Alarm Processing Approach – Expected Delivery Schedule

Implementation• EDS 1 by 12/15• EDS 2 by 1/15• EDS 3 by 2/15

MPs• OnCor• CenterPoint• Reliant• Luminant

Participants will perform limit testing and work with ERCOT to verify procedures.

# Category Name Definition EDSPro

cedure

s Cre

ated

Teste

d by

Ops Support

Teste

d by

Operat

ors

Teste

d by

MPs

1 Frequency DeviationWhen frequency deviation is above the RRS recovery limits 3 xWhen RRS is deployed partially and frequency deviation above RRS limit 3 x

If the real time frequency is above defined threshold 3 x

When reserve capacity is below Operator specified limits 3 xWhen un-deployed regulation-up is below Operator entered threshold 3When un-deployed regulation-down is below Operator entered threshold 3When telemetered HSL is higher than Net Dependable Capability 3

When difference between HASL and total energy req < Operator threshold 3When the difference between HDL sum and total energy req < Operator threshold 3If scheduled LAAR and RT LAAR are differed by threshold 3 xNeed to send selected alarms to MIS 3

System Operating Limits When SOL is more than 95% of the limit specified 2 xSCADA and SE Overloads When MVA line or trans flow > 98% dynamic emer rating or 100% normal rating 2

When RT flow close to 95% of SPS triggering condition 2 xIf real time status of SPS goes disabled, alarms shall be generated 2When 345Kv bus voltages are outside specified limits 2 xWhen 138/69 Kv bus voltages are outside specified limits 2 x

4 Resource Control Errors When RE (Resource Error) is outside the limits defined by the Operator 3 x

Forced line/transformer outages for 345Kv 2 x

Forced Bus outages for 345Kv 2 x

Planned line/transformer outages for 345Kv 2 x

Planned Bus outages for 345Kv 2 xSwitching Device Status When 345Kv/unit breakers change status 1 x Start 12/17

Forced line/transformer outages for 138/69Kv 2 x

Forced Bus outages for 138/69Kv 2 x

Planned line/transformer outages for 138/69Kv 2 x

Planned Bus outages for 138/69Kv 2 x

When 138Kv/unit breakers change status 1 x Start 12/17When 69Kv/unit breakers change status 1 x Start 12/17

Forced Outage Detector When FOD detects Forced unit outages 2 xPlanned Outage When FOD detects Planned unit outages 2 x

ICCP Link 1 x

TCM, Dynamic Ratings, SE, NSA, PI 2

LFC, SCED, VSAT, TSAT, FOD 3System Status Generate system alarms for, Site Failover, EMS failover, MMS failover 3 x

EMS Security For unauthorized logins to EMS system 2

Application Status8

Switching Device Status

7

6

Forced Outage Detector

Planned Outage

SPS3

Voltage Limits

Forced Outage Detector

5Planned Outage

2 Ancillary Service Capacity

1 Frequency Deviation

Page 4: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

4TPTF12/17/2007 4

R4: NOMCR / Network Model verification

Release 3 – State Estimator and Telemetry

2007 2008

SCED R5.1 SCED R5.3: RT ICCP SCED R5.4: LMP Post

Sep Oct Nov Dec Jan Feb

SCED R5.2

ICCP Fail-over / P2P

R3: SE / Telemetry Criteria (SE Tuning)

E1 R2

E2 R3

E2 R4

E3 R5

E3 R6 LFC R6.1: ACE

E3 R7 CRR R7.1

E4 R9 R9

6-month LMP Posting

SE Verification

RT ICCP

NOMCR Checkout Network Model Verification

EDS 2 Release 3 Exit Criteria % Complete

Comments

TSP/QSE data points reasonably conform to Telemetry Performance criteria

40% SCADA Mappings for Generation in progress – see next slide324 unobservable points (communicated to TSPs) + ~170 loads to be mapped by ERCOT; polarity correction with one TSPQuality of MW and GMW provided by QSEs remains at ~40%

ERCOT Operations have operating procedures in place to address performance issues

30%(30%)

8 of 27 procedures have been updated. The remaining will be completed when Release 3 processes are verified.

Network Security Analysis functions are verified and ERCOT Operations have procedures in place to manage

76%(76%)

SE STAT is 95% tested; Contingency Analysis is 95% tested; Dynamic Ratings is 30% tested; RTMONI is 90% tested.

ERCOT SE is tuned and meets performance criteria 50%(9%)

See detailed slide for SE Convergence rates over time.MW/MVar tolerance is 50, SE convergence varies.

Load Modeling restructured, load adaptation and bus load forecast verified

50%(25%)

Schedules have been successfully load and have been verified. Load Adaptation cannot be tested until a bug is fixed.

EDW reports correctly post to MIS and can be accessed 0% SE and Performance Report Schedule is being re-planned.

EDW reports have been verified within ERCOT and by MPs 0% Telemetry and State Estimator standards in stakeholder process.

Reporting

Legend: % in parentheses are from the 11/26 TPTF update

Page 5: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

5TPTF12/17/2007 5

EDS 2 – Generation Verification Status

Verifying the following: Breaker Status Combine-cycle Configuration High Emergency Limit High Sustained Limit Low Emergency Limit Low Sustained Limit Plant Auxiliary Load Resource Status

‘Complete’ indicates ERCOT mapping is complete and does not reflect data quality

Page 6: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

6TPTF12/17/2007 6

Release 3 – State Estimator Convergence Rate Status

Convergence Rate

0.0010.0020.0030.0040.0050.0060.0070.0080.0090.00

100.00

Novem

ber 2

6th

Novem

ber 2

7th

Novem

ber 2

8th

Novem

ber 2

9th

Novem

ber 3

0th

Decem

ber 1

st

Decem

ber 2

nd

Decem

ber 3

rd

Decem

ber 4

th

Decem

ber 5

th

Decem

ber 6

th

Decem

ber 7

th

Decem

ber 8

th

Decem

ber 9

th

Decem

ber 1

0th

Decem

ber 1

1th

Decem

ber 1

2th

Convergence

Co

nve

rgen

ce P

erce

nta

ge

0

50

100

150

200

250

300

350

To

lera

nce

Convergence Rate (%) Tolerance

No Convergence due to System Problems

Page 7: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

7TPTF12/17/2007 7

EDS 2 – State Estimator and Telemetry Criteria

Telemetry Criteria Status Comment

Data Quality (MW/MVar Tolerance) At 50 Standard is 15 MV/MVar

Telemetry Availability tbd Need EDW Report

Critically Important Telemetry tbd Need EDS Report

Availability for Critically Important Telemetry tbd Need EDW Report

Requests for Redundant Telemetry tbd Need Critical Measurement functionality

State Estimator Criteria Status Comment

SE Convergence Stable at 50MW variance when application is running (e.g. not down due to hardware or database loads)

Transmission Element SE Accuracy tbd Need EDW Report

Critical Transmission Element SE Accuracy tbd Need EDW Report

Critical Bus Voltage Accuracy tbd Need EDW Report

SCADA Measurement Accuracy tbd Need EDW Report

Status of SE and Telemetry Criteria

Page 8: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

8TPTF12/17/2007 8

Observability Status

Observability Status

Oncor 147 104 Y Y N N N N 12/31/2007 Initial response receivedAEP 134 134 Y Y N N N N tbd Initial response. Sent e-mailTexas New Mexico Power 22 22 Y Y N N N N 12/15/2007 Questions resolved.STEC 16 4 Y Y N N N N 12/15/2007 Questions resolved.Rayburn Country Electric 15 15 Y Y N N N N 12/15/2007 Initial response receivedLCRA 15 15 Y Y Y N N N 12/10/2007 Questions resolved.Brownsville 11 11 Y Y N N N N 12/15/2007 Resent dataCenterPoint Energy 11 11 Y Y N N N N 12/15/2007 Initial response. Sent e-mailBrazos 10 8 Y Y Y N N N 12/15/2007 Initial response received

Total Points 381 32485%

Observability Status147

134

22 16 15 15 11 11 10

104

134

22

415 15 11 11 8

0

20

40

60

80

100

120

140

160

TSP

Po

ints

(N

o.)

Number of points

Revised number of points

Status as of 12/14

Page 9: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

9TPTF12/17/2007 9

Release 4 – NMMS / NOMCR

2007 2008

SCED R5.1 SCED R5.3: RT ICCP SCED R5.4: LMP Post

Sep Oct Nov Dec Jan Feb

SCED R5.2

ICCP Fail-over / P2P

R3: SE / Telemetry Criteria (SE Tuning)

R4: NOMCR / Network Model verification

E1 R2

E2 R3

E2 R4

E3 R5

E3 R6 LFC R6.1: ACE

E3 R7 CRR R7.1

R9

6-month LMP Posting

SE Verification

RT ICCP

NOMCR Checkout Network Model Verification

EDS 2 Release 4 Entry Criteria % Complete

Comments

NMMS Phase 2A has completed FAT Testing 0% Planned release of NMMS 2A on January 2, 2008

MIS/NMMS link has completed ITest and is installed in EDS 47%(25%)

9 of 17 TSPs have successfully connected through Citrix to notepad (not all the way to NMMS)

NMMS is installed in EDS 0% Hardware build in progress

EMS Nodal Importer has completed ITest and is installed in EDS 0% EMS 4 FAT end scheduled for 2/15; will not migrate to EDS until MMS importer also available

NMMS database has been successfully loaded with:•ERCOT NOM database; ICCP modeling point database; Ownership / operatorship data

0% Currently working with TSPs/MPs (and ERCOT working groups) on data information for loading. Waiting on NMMS 2A delivery to install and configure data

NMMS database is placed under full change control 0% Once data is loaded and verified by MPs, DB will be under ERCOT change control.

Reporting

Any direct communication with John Hall or John Webb should be sent to [email protected] effective immediately

Legend: % in parentheses are from the last update

Page 10: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

10TPTF12/17/2007 10

Release 5 - SCED

2007 2008

SCED R5.1 SCED R5.3: RT ICCP SCED R5.4: LMP Post

Sep Oct Nov Dec Jan Feb

SCED R5.2

ICCP Fail-over / P2P

R3: SE / Telemetry Criteria (SE Tuning)

R4: NOMCR / Network Model verification

E1 R2

E2 R3

E2 R4

E3 R5

E3 R6 LFC R6.1: ACE

E3 R7 CRR R7.1

E4 R9 R9

6-month LMP Posting

SE Verification

RT ICCP

NOMCR Checkout Network Model Verification

EDS 3 Release 5 Exit Criteria % Complete

Comments

QSEs w/ Resources able to submit COP & TPO for entire portfolio

100% •Known issues with Output Schedules and Performance issues (root cause analysis done on performance issues and passed to teams)

SCED Inputs verified: HRL, LRL, SURAMP, SDRAMP, HDL, LDL; GTBD, ICCP

40%(40%)

See next slide

SCED Outputs verified: QSE’s ability to receive Resource Base Points and LMPs via ICCP

10%(10%)

Verifications began November 1st. A number of QSEs have reported receiving Base Points and LMPs – ERCOT reviewing SCADA mapping.

Base Point and LMP calculation verified for Resources with Offer Curves or Output Schedules

0% Verifications to begin in January.

Reports 50%(0%)

Reports related to SCED are available in draft form on MIS and nodal.ercot.com

LMPs verified for Reasonability and posted to MIS for Market Participant review 0%

See next slide

Reporting

Legend: % in parentheses are from the 10/22 TPTF update

Page 11: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

11TPTF12/17/2007 11

SCED Issues

1. EMS Hardware insufficient for user base and functionality– INF prioritized production hardware for EMS – will use for EMS 3B

2. SCADA mapping resulted in all Combined Cycles MW telemetry levels set to 0– Corrected in SCADA load on Friday 12/14; still needs to be verified

3. Interface table for Constraint Names incorrect so SCED is not able to process constraint names & shift factors

4. MPs sending Incorrect values for CC configuration causes SCED failure– Working with EMS team to implement data check and MPs to send valid

configuration values5. MPs sending HSL < LSL resulting in SCED failure

– Working with MPs to resolve and adding validation in EMS to set LSL = HSL when telemeter HSL<LSL

6. MPs sending resource status of off when actual telemeter MW output is > 0– SCED sets basepoint = 0

7. MPs sending invalid resource status (e.g. 050)– SCED ignores the unit

8. DC TIE Telemetry missing and DC Tie calculation not working– Adding telemetry and EMS team resolving calculation function

Joint effort between ERCOT and MPs to resolve most of these will enable reasonableness declaration

Page 12: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

12TPTF12/17/2007 12

Release 6 - LFC

2007 2008

R5.3 SCED R5.4: LMP Post

Jan Feb Mar Apr May Jun

R4: NOMCR / Network Model verificationE2 R4

E3 R5

E3 R6 R6.1: ACE

E3 R7 R7.1

E4 R9

6-month LMP Posting

EDS 3 Release 6.1 Entry Criteria % Complete

Comments

ICCP and the Generation Subsystem (LFC, RLC and Resource Qualification Testing) has passed FAT and completed acceptable portions of the ITEST.

0% EMS 3B FAT expected to complete 12/21 (revised from 12/7)

ERCOT has validated that the RLC outputs and Emergency Base Point calculator values are calculated in the ERCOT Nodal system as expected per the Nodal EMS Design documents.

0% Same as above

QSEs with Resources have submitted the 6.1 test form to ERCOT

0% ERCOT expects to distribute the form on January 2. QSEs complete the form and send it back to ERCOT 2 business days before their scheduled 6.1 testing date.

Legend: % in parentheses are from the 10/22 TPTF update

R6.2: QSE Testing R6.3: TST

R7.2 R7.3 R7.4

Any direct correspondence with Brain Davison should be directed to [email protected] effective immediately

Page 13: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

13TPTF12/17/2007 13

EDS 3 – LFC Testing Schedule

Page 14: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

14TPTF12/17/2007 14

EDS 3 – LFC Testing Schedule

Page 15: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

15TPTF12/17/2007 15

Release 7 - CRR

• Kick-off meeting scheduled for January 18th from 1-3pm– http://www.ercot.com/calendar/2008/01/20080118-EDS3.html

• Working on 7.0 activities– Discrepancies between CRR Account Holder forms and emails

to eds3 indicating intention to participate• See next slide

• Planning to present an updated version of CRR handbook to TPTF at the January 21-23rd meeting. Updated version available at http://nodal.ercot.com/docs/pd/eds/index.html#oth

Page 16: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

16TPTF12/17/2007 16

Release 7 - Participants

Page 17: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

17TPTF12/17/2007 17

EDS 4 – Release 9.1

• MMS, EIP, and INT teams working aggressively to support a January 15th start of Release 9.1– Will schedule support calls similar to SCED– Might have to start with QSEs desiring to use Web Services first

if ERCOT developed UI not available by January 15th • Scheduled a Release 9.1 kick-off WebEx for Thursday 12/20

from 9-11 am: http://www.ercot.com/calendar/2007/12/20071220-EDS4.html

• Significant number of QSEs have missed deadline to submitted intent emails to [email protected].– See next slide

Page 18: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

18TPTF12/17/2007 18

EDS 4 Release 9

• QSEs expected for EDS4, but not yet registered

– Affordable Power Plan– Alcoa Power Marketing– Alliance Power Company– Ambit Energy– Ambridge Energy– Amigo Energy– Andeler Corporation– APN Starfirst– APNA Holding– Aquila – Barclays Bank– Bear Energy– Blu Power of Texas– Brilliant Energy

– Cargill Power Markets– Citadel Energy Products– Clearview Electric– ConocoPhillips Company– Constellation NewEnergy– DPI Energy– Duke Energy Ohio– Eagle Energy Partners– Econnergy Energy Company– Electric Now– First Choice Power– Formosa Utility Venture– Freedom Power– Fulcrum Power Service– Glacial Energy– Himalaya Power

Page 19: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

19TPTF12/17/2007 19

EDS4 Release 9

• QSEs expected for EDS4, but not yet registered (continued)

– Integrys Energy Services– JP Morgan Ventures Energy

Corporation– Just Energy Texas– Kansas City Power and Light– Keystone Energy Partners– Lehman Brothers Commodity Services– Liberty Power– Merrill Lynch Commodities– Mirant Energy Trading– National Power Company– North American Energy Credit and

Clearing Delivery– NRG– ONPAC Energy– PEPCO Energy Services– Pre Buy Electric– Repower

– Scurry County Wind– Sitara Energy– Spark Energy– Stream Gas and Electric– Tara Energy– Texas Retail Energy– Texas Star Energy– Texpo Energy– Topaz Power Management– Trieagle Energy Supply– Urban Energy Source– Viasyn– WCW International– Xtend Energy

Page 20: December 18, 2007 TPTF Early Delivery Systems Status Daryl Cote

20TPTF12/17/2007 20

Questions?