TRAC Request: • Tier II • $5 million for further investigation DEL IR 71 at US 36/SR 37 Interchange Modification

Upload: adrienne-conway

Post on 31-Dec-2015

25 views

Category:

Documents


2 download

DESCRIPTION

DEL IR 71 at US 36/SR 37 Interchange Modification. TRAC Request: Tier II $5 million for further investigation. PROBLEM/ISSUE. Safety Concern at Morning/Afternoon Rush hour Common Sight to see Vehicles at a standstill on the Interstate as traffic speeds by at 65 mph. PROBLEM/ISSUE. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DEL  IR  71 at US 36/SR 37 Interchange Modification

TRAC Request:• Tier II• $5 million for further investigation

DEL IR 71 at US 36/SR 37 Interchange Modification

Page 2: DEL  IR  71 at US 36/SR 37 Interchange Modification

PROBLEM/ISSUE

Safety Concern at Morning/Afternoon Rush hour

Common Sight to see Vehicles at a standstill on the Interstate as traffic speeds by at 65 mph.

Page 3: DEL  IR  71 at US 36/SR 37 Interchange Modification

PROBLEM/ISSUE

•Congestion•Crashes Elevated Traffic Volumes •20 Year Projections Show Traffic Increase•Delaware County one of the Fastest Growing in the State of Ohio

Page 4: DEL  IR  71 at US 36/SR 37 Interchange Modification

WHY NOW

•Improve Safety

•Increase Capacity

•Work with Municipalities/ Developers

Page 5: DEL  IR  71 at US 36/SR 37 Interchange Modification

WHY NOW

•Safety Project Underway

•Short Term Improvements

•Reduce Crashes

•Begin 2012

Page 6: DEL  IR  71 at US 36/SR 37 Interchange Modification

WHY NOW

Median in the Center

Consolidate Access Points

Reconfigure Lanes on Bridge

Page 7: DEL  IR  71 at US 36/SR 37 Interchange Modification

WHY NOW

•Improve Access to Local Streets•Safer/More Efficient •Surrounding Areas Zoned Commercial/Residential•Improve Connectivity to Delaware/Sunbury/Galena Communities

Page 8: DEL  IR  71 at US 36/SR 37 Interchange Modification

OPPORTUNITY

•Value Capture Financing of Improvements

•Local Road Network

•Reduce/Replace Future TRAC Request

Page 9: DEL  IR  71 at US 36/SR 37 Interchange Modification

BENEFITS/SUPPORT

Partnership with County Engineer •Chris Bauserman. P.E., P.S.

Partnership with Developers •Robert Weiler/Nationwide Realty Investors•Northgate Development

Page 10: DEL  IR  71 at US 36/SR 37 Interchange Modification
Page 11: DEL  IR  71 at US 36/SR 37 Interchange Modification

Planning in Place-US 36/SR37 Access Management Plan Delaware County-Delaware County Thoroughfare Plan-Delaware Regional Planning Commission: Berkshire and Berlin Township Master Plans

Page 12: DEL  IR  71 at US 36/SR 37 Interchange Modification

I71/US36 Interchange Economic Impact StudyFunded by the Delaware County Commissioners

Purpose: Economic and Fiscal Analysis

•Aggregate economic and fiscal impact estimates

•Information on potential tax generation

Page 13: DEL  IR  71 at US 36/SR 37 Interchange Modification

Delaware County Logistics = Business Retention/Attraction

These companies represent over 2500 employees and 2500 trucks per day. All are expanding operations and employment.

Kroger, for example, owns about 400 food manufacturing plants around the US. When they relocate/expand, we’d like for them to consider Delaware County or central Ohio.

AHP just closed a Vancouver, Washington, facility to move operations to Delaware because of a logistical advantage.

Page 14: DEL  IR  71 at US 36/SR 37 Interchange Modification

• Increased Service along 36/37 Corridor

• Additional Connection to COTA Service

• Linkage to 3-C Rail Service

Project a Potential Catalyst for:

Page 15: DEL  IR  71 at US 36/SR 37 Interchange Modification

REQUEST/COST

$5 Million for further investigation

TRAC Tier II Status