design and installation of quality catering...
TRANSCRIPT
Design and installation of
quality catering equipment. Come hell or high water.
At Scobie McIntosh, we never fall out of our depth in undertaking challenging projects. � at’s why we were awarded the contract to manage the design, development and installation of catering facilities aboard an o� shore oil facility in the North Sea.
www.scobiemcintosh.com
Solutions Worldwide
Project Overview
Scobie McIntosh were awarded the contract to design, develop and install the catering facilities on board an o� shore oil facility situated in the North Sea.
Scobie’s management approach and the breadth of its service capabilities were critical factors in the client awarding us the contract.
� e Scobie team are fully conversant with the specialised require-ments relating to working within an o� shore environment. Accus-tomed as we were to operate in a logistically challenging environ-ment with demanding security and safety requirements.
Business Challenge
� e Scobie team overcame signi� cant challenges including adopting extensive health and safety standards and utilising the limited space available. Since the Piper Alpha incident, there are particular challenges to o� shore projects in that every aspect of supplying the required equipment is subject to extensive health and safety requirements.
Despite the logistical constraints of delivering this project on board an oil rig, the project team was able to draw on experience from earlier projects to successfully deliver the project.
Scobie McIntosh also encountered other challenges. Electricity sup-plies can vary depending on which sector of the North Sea the rig is positioned, and the nationality of the company that operate the rig. We had to ensure that this was taken into account when design-ing and installing.
To further complicate ma� ers, our team had to take into considera-tion the expected yaw and pitch of a rig when it is being moved or operated which can be quite considerable.
Scobie McIntosh designed,
created and managed a team of
highly skilled engineers who
equipped the oil platform with
high quality galleys. The team
were responsible for successfully
installing high quality equipment
while undergoing some of the
most rigorous health and safety
checks
Case Study:Offshore Oil Rig, North Sea
WWW.SCOBIECATERING.COM
Solutions Worldwide
Deliverable
Design management
Project management
Stainless steel manufacturing
Installation of galley and catering equipment
Production of detailed O&M manuals with recommended spare parts packs
Compliance with advanced health and safety, and environmental policies
Solutions
Design and Project Management
Full project management delivering seamless transition from design to installation
Safety was the utmost importance on site. Scobie worked carefully to ensure compliance with all the health and safety requirements
Supply and Installation
Manufacture and installation of the bespoke galley
Supply and installation of market leading equipment
The Result
Project Delivery
� e project presented challenges to time and cost, but teamwork, dedication and the capabilities of the Scobie McIntosh team delivered this project on schedule and within target spend.
a complete cateringsolution from inception to completion
WWW.SCOBIECATERING.COM
Scobie McIntosh
London Head OfficeGothic House, 3 The Green, RichmondSurrey TW9 1PLt: +44 (0)20 8614 7770f: +44 (0)20 8940 1593
Edinburgh 1 Broomhills Steading45 Frogston Road East, Edinburgh, EH17 8RTt: +44 (0)131 672 9220f: +44 (0)131 672 1094
LeedsOakwell Business Centre, Dark LaneBirstall, West Yorkshire, WF17 9LWt: +44 (0)1924 432 940 f: +44 (0)1924 432 942