design, assembly, and initial operation of a high performance

68
“DESIGN, ASSEMBLY AND INITIAL OPERATION OF A HIGH PERFORMANCE MULTIFUNCTION DEVICE FOR PAVEMENT AND ROAD SAFETY CONDITION MONITORING IN ARGENTINA” Author: Eng. Gustavo D. MEZZELANI Entity: ITYAC, Ing. Tosticarelli y Asociados S.A. Rosario, Argentina October 2010

Upload: hacong

Post on 14-Dec-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design, Assembly, and Initial Operation of a High Performance

“DESIGN, ASSEMBLY AND INITIAL OPERATION OF A

HIGH PERFORMANCE MULTIFUNCTION DEVICE FOR

PAVEMENT AND ROAD SAFETY CONDITION

MONITORING IN ARGENTINA”

Author:Eng. Gustavo D. MEZZELANI Entity:

ITYAC, Ing. Tosticarelli y Asociados S.A.

Rosario, Argentina

October 2010

Page 2: Design, Assembly, and Initial Operation of a High Performance

www.ityac.com.ar

Rosario,

Argentina

Page 3: Design, Assembly, and Initial Operation of a High Performance

THE ARGENTINE REPUBLIC

Page 4: Design, Assembly, and Initial Operation of a High Performance

THE ARGENTINE REPUBLIC

Page 5: Design, Assembly, and Initial Operation of a High Performance

Rosario, Argentina

Page 6: Design, Assembly, and Initial Operation of a High Performance

� Introduction. Overview of pavement

evaluation in Argentina.

� The Transverse Profile

� Distresses and Road Inventory

� The Longitudinal Profile

� Assembly of functions in a multifunction

device

� Applications in our Latin American region

Abstract

Page 7: Design, Assembly, and Initial Operation of a High Performance

PAVEMENT EVALUATION IN ARGENTINA

The 1970s: Acquisition of knowledge, equipments and

beginning of implementation

� Acquisition of 3 BPR Roughmeters, 2 Mu Meters and

5 deflectographs Lacroix

� Incorporation of the subject “Pavement Evaluation”

in the Post-Graduate School at the University

of Buenos Aires (UBA)

� Applications of the Road Needs Study

Page 8: Design, Assembly, and Initial Operation of a High Performance

BPR Roughmeters from the

Argentinian National Road Agency (DNV)

Page 9: Design, Assembly, and Initial Operation of a High Performance

Mu Meter: measures the transverse friction coefficient

DNV: Mu Meter for Friction Measurements

Page 10: Design, Assembly, and Initial Operation of a High Performance

Long Chassis Model LPC-03

First experiencies in the use of the Deflectographe Lacroix in Argentina

DNV: Deflectographe Lacroix

Page 11: Design, Assembly, and Initial Operation of a High Performance

The 1980s: Implementation and practical applications.

� Pavement Evaluation Methodology is established at

network level

� The whole National Network is evaluated anually during

the period 1980-1987

� The state parameters (roughness, rutting, cracking and

ravelling) are incorporated to maintenance contracts –

Toll Concessions

PAVEMENT EVALUATION IN ARGENTINA

Page 12: Design, Assembly, and Initial Operation of a High Performance

ARGENTINA – National Road Agency (DNV)

PAVEMENT EVALUATION METHODOLOGY

20 m

2 km (1983 - 1989) 1 km (1990 - 2003)

Sample section

Page 13: Design, Assembly, and Initial Operation of a High Performance

� at Project Level: maintenance, overlay designs,

rehabilitations, etc.

� for performance prediction and service life estimation

� for HDM III and IV implementation

� to penalise maintenance contracts - Toll concessions

PAVEMENT EVALUATION IN ARGENTINA

The 1990s: Masive, intensive and indiscriminate

applications of the Pavement Evaluation Methodology(DNV, DPVs, OCCOVI, toll entities, etc)

Page 14: Design, Assembly, and Initial Operation of a High Performance

Curva de Calibración

ago_05= -5E-05x2 + 1,0186x + 128,96

R2 = 0,9277

1000

1500

2000

2500

3000

3500

4000

4500

5000

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

UNIDADES PROPIAS DEL EQUIPO (mm/km)

IRI (

mm

/km

)

Longitudinal Profile - Roughness

Response-Type (Bump Integrator)

Class III: IRI is estimated by correlation

Page 15: Design, Assembly, and Initial Operation of a High Performance

Response-Type (Bump Integrator)

MAYS-JMF

Longitudinal Profile - Roughness

Page 16: Design, Assembly, and Initial Operation of a High Performance

Bumps Integrators from

different provincial departments

Harmonization of Roughness measurement devices in Argentina - Rosario, 1996

Longitudinal Profile - Roughness

Page 17: Design, Assembly, and Initial Operation of a High Performance

MANUAL-VISUAL METHODOLOGY

Cracking and distresses

20 m

2 km (1983 - 1989) 1 km (1990 - 2003)

Sample section

Page 18: Design, Assembly, and Initial Operation of a High Performance

Rutting Determination with straight-edge and graduated wedge:

• Reference Length: 1,20 meters

Transverse Profile - Rutting

MANUAL-VISUAL METHODOLOGY

Sample section

Page 19: Design, Assembly, and Initial Operation of a High Performance

The 2000s:

� In the specifications of the 2003/2008 concessions contracts,

it is mentioned for the first time and as an alternative to the use

of high performance equipments, and it is reduced to a sample

every 200 m, i.e. 5 per Km; in some special cases as in the

Access Network to Buenos Aires it is performed every 100

meters.

� DNV purchased high performance equipment for road

evaluation: MRM, SCRIM, FWD, ECODYN, radar

PAVEMENT EVALUATION IN ARGENTINA

20 m

100 m / 200 mSample section

Page 20: Design, Assembly, and Initial Operation of a High Performance

The 2000s

SCRIM – TEX

Friction-texture

measurements

Multifunction Road

Monitor MRM from

WDM, UK

GPR (radar)

Page 21: Design, Assembly, and Initial Operation of a High Performance

Falling Weight

Deflectometer (FWD)

KUAB from DNV

FWD Carl Bro from

the Santa Fe province

Retro-reflectance

ECODYN -Vectra,

France from DNV

The 2000s

Page 22: Design, Assembly, and Initial Operation of a High Performance

The 2010s: New Concessions Contracts for the Principal

National Network

� The use of high performance equipment is given priority:

“…the equipments to be used for measurements shall be

preferably high performance equipments, namely those which

perform a great number of on- the-spot tests and causing the

minimum traffic interference

The sampling intervals shall be every 200 m, 5 per Km”

PAVEMENT EVALUATION IN ARGENTINA

Page 23: Design, Assembly, and Initial Operation of a High Performance

2010: Principal National

Network under new toll

concessions contracts

Page 24: Design, Assembly, and Initial Operation of a High Performance

� Introduction. Overview of pavement

evaluation in Argentina.

� The transverse profile

� Distresses and inventory

� The Longitudinal Profile

� Assembly of functions in a multifunction

device

� First applications in our region

Abstract

Page 25: Design, Assembly, and Initial Operation of a High Performance

Transverse Profile deformations

The Transverse Profile

TUS, Ultrasonic Profiler, mlpc France

Page 26: Design, Assembly, and Initial Operation of a High Performance

TUS Ultrasonic Profiler

The Transverse Profile

• A temperature sensor mounted at the front of the vehicle

• A distance measurement instrument (DMI) connected to an electronic unit

• 13 ultrasonic sensors separated 20 cm from each other, cover a 2.40 m meters width and simultaneously measure the distance between pavement and straightedge

• Measurement interval: 3.50 mts

Page 27: Design, Assembly, and Initial Operation of a High Performance

Post-processing

software with virtual

1.20 m length

straightedge

Ancho de Carril

Equipo TUS Sensores

1 2 3 4 5 6 7 8 9 10 11 12 13

Bo

rde

Ext

ern

o d

e C

arri

l

Bo

rde

Inte

rno

de

Car

ril

Banquina

The Transverse Profile

Page 28: Design, Assembly, and Initial Operation of a High Performance

Comparación entre Pasadas

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

0,1 0,3 0,5 0,7 0,9 1,1 1,3 1,5 1,7 1,9 2,1 2,3 2,5 2,7 2,9 3,1 3,3 3,5 3,7 3,9 4,1 4,3 4,5 4,7

Progresivas (km)

Ahue. Pro

medio

(m

m)

Pasada 1

Pasada 2

Pasada 3

• TUS – Mean Rut Depth every 100 m

• Results in a range lower than 2/3 mm

1. TUS Repetibility 18,000 m Testing Section

The Transverse Profile

Dispersión

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

0,1 0,3 0,5 0,7 0,9 1,1 1,3 1,5 1,7 1,9 2,1 2,3 2,5 2,7 2,9 3,1 3,3 3,5 3,7 3,9 4,1 4,3 4,5 4,7

Progresivas (km)

Ahue. Pro

medio

(m

m)

Page 29: Design, Assembly, and Initial Operation of a High Performance

2. TUS Accuracy vs transverse leveled profiles

(Rod and Level)

PERFIL 5 Asc.Pr. 50510Rango Alto

EJE

de C

ALZ

ADA

0 20 300

Lado Derecho

Fecha de Medición02/10/2002

20 mm19 mm

16010040 60 80 120 140 200180 220 260240 280 360320 340

Carril Ascendente

19.8 mm

19.3 mm

22.2 mm

Campaña de Verificación TUS - RP Nº 6 (Tramo; RN Nº 19 - Franck)

PERFILES NIVELADOS vs. TUS (huella interna)

Ahuellamiento - Comparación

Regla y Cuña Promedio TUS TUS - Pasada 1

TUS - Pasada 2

TUS - Pasada 3

Vert. Scale 1:1

Horiz. Scale 1:20

The Transverse Profile

Page 30: Design, Assembly, and Initial Operation of a High Performance

3. Reliability or accuracy vs Manual measurements with 1.20 m edge

• TUS – Mean Rut Depths every 10 m

• Manual Rut Depths determinations with edge and wedge every 10 m

Comparación TUS vs. Regla 1,20 m y Cuña

0

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

50000 50080 50160 50240 50320 50400 50480 50560 50640 50720 50800 50880 50960 51040 51120 51200 51280 51360 51440 51520 51600 51680 51760 51840 51920 52000

Progresivas (m)

Ah

ue

lla

mie

nto

(m

m)

Valores TUS

Valores Regla 1,20 m y Cuña

The Transverse Profile 18,000 m Testing Section

Page 31: Design, Assembly, and Initial Operation of a High Performance

� Introduction. Overview of pavement

evaluation in Argentina.

� The transverse profile

� Distresses and inventory

� The Longitudinal Profile

� Assembly of functions in a multifunction

device

� First applications in our region

Abstract

Page 32: Design, Assembly, and Initial Operation of a High Performance

ASTRA

System

Road Inventory

Cracking and distress

evaluation

Distresses and Inventory

Page 33: Design, Assembly, and Initial Operation of a High Performance

Distresses and Inventory

Page 34: Design, Assembly, and Initial Operation of a High Performance

SYSTEM APPLICATIONS

I. ROAD INVENTORY

Distresses and Inventory

Color environmental videos by digital cameras: creation of bank of images digitized in realtime JPEG

format.

Page 35: Design, Assembly, and Initial Operation of a High Performance

PENDIENTE LONGITUDINAL

(PENDLONG)Tipo

P1-P2-P3

CICLOVÍA (CICLOVIA)

Estado

B-R-M

SEÑALIZACIÓN HORIZ EJE

(SHEJE)Estado

B-R-M-F

CUNETA REVESTIDA (CUNREV)

Limpieza / Estado

FUN-DET-TAP CJ-TR-ML-SM

TERRENO - PEND. TRANS. (PENDTRANS)

Tipo

OND-MON-ESC

Erosión

B-R-M

SECCIÓN (SECCION)

Tipo

OBSERVACION (OBSCON)

TALUDES (TALUDES)

Estado

CO-PO-F

CUNETA SIN REVESTIR

(CUNSINREV)

ZANJA COR. REVESTIDA

(ZJREV)

ZANJA COR. SIN REVESTIR

(ZJSINREV)

Estado

B-R-M-F

SEÑALIZACIÓN HORIZ BORDES

(SHBORDES)

BERMA PAVIMENTADA

(BERPAV)

BERMA NO PAVIMENTADA (BERNOPAV)

ACERA (ACERA)

Estado

B-R-M

Estado

B-R-M

TECLADO DERECHO

VEGETACIÓN MAYOR

(VEGMAY)

Limpieza / Estado Limpieza

FUN-DET-TAP FUN-ERS-TAP-F

Limpieza

FUN-ERS-TAP-F

Estado

B-R-M

B-R-M

Estado

B-R-M

BARANDA DEF METAL

(BARMET)

BARANDA DEF CONCRETO (BARCON)

Estado

CANALES (CANALES)

Limpieza / Estado

FUN-DET-TAP

VEGETACIÓN MENOR

(VEGMEN)Altura

CO-RO-F

Auxiliary configurable keyboards

Sistema ASTRA

Distresses and Inventory

Page 36: Design, Assembly, and Initial Operation of a High Performance

Field data collection

Distresses and Inventory

Page 37: Design, Assembly, and Initial Operation of a High Performance

Distresses and Inventory

Once field data collection has been carried out, the

inventary can be visualized and reviewed at the

office.

If necessary, new events can be entered and

corrections can be made, if necessary

Page 38: Design, Assembly, and Initial Operation of a High Performance

Distresses and Inventory

Page 39: Design, Assembly, and Initial Operation of a High Performance

Surface measurements

Width measurements

Distresses and Inventory

Page 40: Design, Assembly, and Initial Operation of a High Performance

SYSTEM APPLICATIONS

II. ROAD SAFETY AUDITS (RSA)

Distresses and Inventory

Page 41: Design, Assembly, and Initial Operation of a High Performance

Distresses and Inventory

Road Safety Audits (RSA)

Page 42: Design, Assembly, and Initial Operation of a High Performance

Distresses and Inventory

Road Safety Audits (RSA)

Page 43: Design, Assembly, and Initial Operation of a High Performance

Distresses and Inventory

Road Safety Audits (RSA)

Page 44: Design, Assembly, and Initial Operation of a High Performance

SYSTEM APPLICATIONS

III. SURFACE DISTRESS EVALUATION

Page 45: Design, Assembly, and Initial Operation of a High Performance

Argentinian DNV Methodology

SHRP LTPP Methodology

Distresses and Inventory

Others…VIZIR, etc

Page 46: Design, Assembly, and Initial Operation of a High Performance

Sistema ASTRACracking evaluation – Asphalt pavement

DNV Methodology

Distresses and Inventory

Page 47: Design, Assembly, and Initial Operation of a High Performance

� Introduction. Overview of pavement

evaluation in Argentina.

� The transverse profile

� Distresses and inventory

� The Longitudinal Profile

� Assembly of functions in a multifunction

device

� First applications in our region

Abstract

Page 48: Design, Assembly, and Initial Operation of a High Performance

NEW LASER PROFILER: LASERPROF (Greenwood Eng.)

The Longitudinal Profile

Inertial profilometer Class I:

Laser+Accelerometer

Measures long. Profile + macrotexture

Page 49: Design, Assembly, and Initial Operation of a High Performance

The Longitudinal Profile

Profile IRI results in 100 m intervals

IRI and MPD

Page 50: Design, Assembly, and Initial Operation of a High Performance

The Longitudinal Profile

0,00

0,50

1,00

1,50

2,00

2,50

Pista 35 Pista 45 Pista 46 Pista 47 Pista 48

IRI (m

/Km

)

0,00

0,50

1,00

1,50

2,00

2,50

Laser Prof Mays JMF Romdas (Dipstick)

CALZADA ASCENDENTE - CARRIL EXTERNO

1,00

1,50

2,00

2,50

3,00

3,50

4,00

4,50

5,00

5,50

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

IRI (

m/k

m)

IRI Mays JMF

IRI Laser Prof

Compared IRI results

Page 51: Design, Assembly, and Initial Operation of a High Performance

� Introduction. Overview of pavement

evaluation in Argentina.

� The transverse profile

� Distresses and inventory

� The Longitudinal Profile

� Assembly of functions in a multifunction

device

� First applications in our region

Abstract

Page 52: Design, Assembly, and Initial Operation of a High Performance

ITYAC’s Modular Multifunction device: ASTRA

Rutting (13 US)

Long Profile and texture

(laser +accelerometer)

Keyboards for

data entry

2 high definition

digital cameras

Industrial rack-

mounted

computer

DGPS

Page 53: Design, Assembly, and Initial Operation of a High Performance

ASTRA Multifunction

general dashboard

ITYAC’s Modular Multifunction device: ASTRA

Page 54: Design, Assembly, and Initial Operation of a High Performance

ITYAC’s Modular Multifunction device: ASTRA

Page 55: Design, Assembly, and Initial Operation of a High Performance

� Introduction. Overview of pavement

evaluation in Argentina.

� The transverse profile

� Distresses and inventory

� The Longitudinal Profile

� Assembly of functions in a multifunction

device

� First applications in our Latin-American

region

Abstract

Page 56: Design, Assembly, and Initial Operation of a High Performance

Road Maintenance Planning System

(SIPLAM)

Inventory, Evaluation and Monitoring System

(SIEM)

Maintenance Planning Models (MPM)

SIPLAM FUNCTIONAL MODULES

WHAT IT

SHOULD BE LIKE?

ACCEPTABILITY

STANDARDS

(SERVICE LEVELS)

WHAT WE HAVE ?WHAT IT IS LIKE ?

ROAD

INVENTORY

AUSCULTATION

EVALUATION

BUDGET

MODELS

(DETERIORATIONS, PRIORITIES,

STRATEGIES, COSTS)

MPM

WHAT TO DO,

WHEN AND WHERE ?

WORKS PLAN

(INVESTEMENTS)

PROJECT

CONSTRUCTION

MAINTENANCE

Page 57: Design, Assembly, and Initial Operation of a High Performance

VERY IMPORTANT

NO DATA = NO MANAGEMENT SYSTEM

Every Road Management System (RMS) requires data and

must be periodically and continuously fed with updated data

to obtain valid and confident results

Page 58: Design, Assembly, and Initial Operation of a High Performance

LONG EVENNESS IRI

RUTTING

CRACKING AND DISTRESSES

FRICTION AND TEXTURE

DEFLECTIONS

ROAD INVENTORY

Data Acquisition scheme for Inventory and Road Evaluation

Page 59: Design, Assembly, and Initial Operation of a High Performance

Ride - Longitudinal evenness

Province of Chaco, Argentina

Page 60: Design, Assembly, and Initial Operation of a High Performance

Province of Chaco, Argentina

Transverse Profile, Rut Depths

Page 61: Design, Assembly, and Initial Operation of a High Performance

Fundamental Road Network from the

Republic of Bolivia (ABC)

Inventory and Evaluation of 16,000 Km

Page 62: Design, Assembly, and Initial Operation of a High Performance

Monitoring of State Rate

Rosario-Santa Fe Highway, Argentina

Page 63: Design, Assembly, and Initial Operation of a High Performance

Itinerary scheme

RN 7 Province of Mendoza, Argentina

Page 64: Design, Assembly, and Initial Operation of a High Performance

THE COLOMBIAN

REPUBLIC

DEPARTAMENT OF

CUNDINAMARCA

2004/05

Paved

SAMR

TRIAL PLAN 1500 Km

Routine Maintenance Administration System (SAMR)

Unpaved

Page 65: Design, Assembly, and Initial Operation of a High Performance

It’s possible to make different

simulations, to establish an

annual plan of activities and its

programming in terms (monthly,

etc)

X =

X =

X =

/ =

DECISIONTREE-LIKEDIAGRAMS

ROUTINE ACTIVITIES

PLAN

STATE, INVENTORYAND EVALUATION

ACTIVITY PLAN

WORK QUANTITIES

WORK QUANTITIES

UNIT PRICES BUDGET

AVAILABLERESOURCES

RM ACTIVITIES PRIORIZATIONBUDGET

COMPUTINGCRITERIA

Department of Cundinamarca, Colombia

Planning of Routine maintenance activities

Page 66: Design, Assembly, and Initial Operation of a High Performance

Planning of Routine maintenance activities

Department of Cundinamarca, Colombia

Page 67: Design, Assembly, and Initial Operation of a High Performance

• We have designed, assembled and tuned up a multifunction device

for Automated Pavement Evaluation and Road Inventory in

Argentina.

• Our aim was to produce a substantial improvement in terms of

objectivity, accuracy, performance and safety in the production and

administration of information for pavement management in order to

conform to the new requirements established in maintenance

contracts.

• The ASTRA system has characteristics of a multifunction device, but

at the same time it is capable of evolution, flexible and modular.

• ASTRA has already been used with satisfactory results in Argentina

and other Latin-American countries, and is therefore available for use

in the region.

FINAL CONSIDERATIONS

Page 68: Design, Assembly, and Initial Operation of a High Performance

….THANK YOU VERY MUCH FOR YOUR ATTENTION !