designing equipment by using cfd benefits and pitfalls geert janssen advanced thermal transfer...

28
Designing equipment by using Designing equipment by using CFD CFD Benefits and pitfalls Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Upload: raymundo-marshman

Post on 15-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Designing equipment by using Designing equipment by using CFDCFD

Benefits and pitfallsBenefits and pitfalls

Geert JanssenAdvanced Thermal Transfer Equipment

A2TE

Page 2: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

CFD - PhoenicsCFD - Phoenics

CORA2 – graduate studiesPhoenics user since 1985

– Analysis• Flow in intake manifolds of IC engines• Flow & heat transfer process industry

– Design from 1990• Heat transfer equipment

– Ovens and furnaces

Page 3: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Applied CFDApplied CFD

Better understanding– Flow– Heat transfer– Mass transfer– Chemics

Sensitivity analysisPriceworthyfast

Page 4: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Why limited CFD usageWhy limited CFD usage

Long learning curveSpecialists required

– Jargon– physics insight and knowledge ?– Standard rules from handbooks?

Design <-> modelling – Communication skills

Page 5: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Example - 1Example - 1

OvenPerforated plates

– Flow distributors

Page 6: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Example - 2Example - 2

Molten metal in tundishTarget

– Continuous casting– No slag inclusions– No bubbles

Page 7: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

TundishTundish

Symmetric inflowSteady state ?No match with

experimental dataBlame on CFD?

Page 8: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Designing equipment & Designing equipment & CFDCFDRules of thumbStandard textbooksSome understanding of physicsCFD ‘tricks’Designers skills or strong

interaction with designer

Page 9: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Example 3 - ageing ovenExample 3 - ageing oven

Continuous belt ovenBase of lamp (automotive)3 lanes: 3 x 800 pcs/hrHeating to 200°C and holding for 4

hrsCooling to 50°CFloorspace approx. 5 m2

Temperature differences < 5°C

Page 10: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - 2Ageing oven - 2

Heat transfer and pressure drop from packed bed relations

Required velocities through belt– Heating section– Cooling section

Fan in holding section identical to those of other sections

Page 11: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - 3Ageing oven - 3

Page 12: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - 4Ageing oven - 4

Page 13: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - 5Ageing oven - 5

Page 14: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - 6Ageing oven - 6

CFD model took 3 daysConceptual design 2 weeks

Page 15: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - Ageing oven - 77

Page 16: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Ageing oven - Ageing oven - 88

Page 17: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Example 4 curing ovenExample 4 curing oven

Contact lensesAutomated processPolypropylene: 95°C ± 3°CAt least 15 minutes at 92°C

(minimum)Heating up in 10 – 12 minutesAluminium trays, 1300 grams

– 1 tray in 40 seconds

Page 18: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - trayCuring oven - tray

Page 19: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - analyticalCuring oven - analytical

Calculation of required heat transfer coefficient (mass – time)

High value needed (75 Wm-2K-1)Multiple jets

One heat-up zone– Costs (fan, controller, cabinet)

Page 20: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - trayCuring oven - tray

Page 21: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - trayCuring oven - tray

Page 22: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - trayCuring oven - tray

Page 23: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing ovenCuring oven

Conclusions from tray calculations– Required air-inlet temperature >

105°C

Page 24: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven – cross Curing oven – cross sectionsection

Page 25: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - power Curing oven - power changechange

Page 26: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven - belt levelCuring oven - belt level

Page 27: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

Curing oven – CFD modelCuring oven – CFD model

CFD models: 2 weeksConceptual design 4 weeks

Page 28: Designing equipment by using CFD Benefits and pitfalls Geert Janssen Advanced Thermal Transfer Equipment A2TE

ConclusionsConclusions

Use of CFD can be very profitableOften CFD alone does not ‘do the

trick’– Handbooks– Rules– Experience