Digital Project Delivery on Bonham Quay, GalwayCitA’s Online Regional Event 13th Nov. 2020
John Sisk & Son 2020
Agenda
• Digital Project Delivery (DPD)• Information Management• Innovative Technology• Building Information Modelling (BIM)
• Bonham Quay, Galway Project Overview• BIM for Project Delivery – 3D, 4D & 5D• Innovative Tech. for Project Delivery• Digital Changes Implemented due to Covid-19
• Digital Project Delivery Benefits
John Sisk & Son 2020
Digital Project Delivery (DPD)
Sisk DPD key objectives:
✓ Consistent approach in using BIM and
IM across all of our projects.
✓ Enhance staff digital capabilities and
knowledge
✓ Provide the staff with the right tools and
procedures to fully adopt DPD.
“Digital Project Delivery (DPD) enables the
digitisation of the processes in which our
projects are designed, constructed and
handed over through collaboration and
innovative technology.”
John Sisk & Son 2020
Information ManagementCommon Data
Environment (CDE)
Information Management
Field Data Capture
(FDC)
On site management
Common Data Environment (CDE)
Field Data Capture (FCD)CDE
John Sisk & Son 2020
Innovative Technology
Immersive Technology
Interactivity screens
Setting-out Using BIM
AR TabletsPhotogrammetry
Virtual Reality (VR)
Drones360 Cameras
John Sisk & Son 2020
Building Information Modelling (BIM)FULLY COORDINATED
DESIGN
3D MODELS
4D PLANNING
& CONSTRUCTION
SEQUENCING
ADVANCE
COMMUNCIATION &
VISUALISATION
John Sisk & Son 2020
Bonham Quay, Galway Project Overview
• Client: Edward Developments
• 35,000m² campus (over 2 Phases)
• Phase 1:• Block B: 8 Stories
(5,340m²)• Block C: 9 Stories
(8,710m²)• Basement (B&C):
3,414m²
John Sisk & Son 2020
BIM for Project Delivery – 3D BIM
Federated 3D BIM
Model • Design Reviews
• Clash Detection
• Logistic Planning
• H&S Reviews &
Hazards
Identification
• Visualisation &
Walkthroughs
Comments/Changes/
Feedbacks
Suppliers Sisk Digital ActivitiesSuppliers
Structural
Architectural
MEP
John Sisk & Son 2020
BIM for Project Delivery – 3D BIM
• BIMCollab BCF Manager is implemented by Sisk across all BIM projects to monitor, track and report on BIM coordination.
• BIMCollab is an online platform with plug-ins for Revit and Navisworks
John Sisk & Son 2020
BIM for Project Delivery – 4D Planning4D BIM applications:
✓ Construction Sequence and
Simulations
✓ Progress reviews (Actual vs
Planned)
✓ Method Statements
✓ Traffic management
✓ Visualisation &
Walkthroughs
✓ H&S reviews and hazard
identification
John Sisk & Son 2020
BIM for Project Delivery – 5D Quantification
• General Info to be added
Dig to Formation Level (Excl. Pads) 10,684.03m³
Dig to Formation Level (Incl. Pads) 14,929.58m³
Total Dig (inc. over dig) 15,199.92m³
Rock Breaking 581.49m³
Group Item Length (m)
Block B Link Stair SB1 - UB356x171x45 304.758
Block B Link Stair SB4 - UB356x171x67 8.550
Block B Link Stair SB2 - UB203x133x30 93.517
Block B Link Stair SB3 - UB203x133x25 34.128
Block C Stair SB2 - UB203x133x30 44.581
Block C Stair SB3 - UB203x133x25 18.641
Block C Stair SB4 - UB356x171x67 59.009
5D BIM applications:
✓ Generate usable Quantities
from the model for a more
Accurate Cost Estimation
✓ Detailed Take-Offs
✓ A more Efficient Quantity
Take-Off during Design
Changes
✓ Faster Decision Making and
Procurement Process
Bulk Dig Calculations
Structural Steel Take-Off
John Sisk & Son 2020
Innovative Tech. for Project Delivery
• Interactive touch Screens Utilised for Daily Whiteboards and logistics Planning
• Time-Lapse Cameras - Evercam• Drone Footage – Third Party
John Sisk & Son 2020
Digital Changes Implemented due to Covid-19
• Sisk Supported CIF Guidance Documents• SOP (Safety Operating
Procedures)• VDC Remote working
• Setup changes Required due to Covid-19
• MS teams:• Coordination
Meetings • Virtual Site Walks
John Sisk & Son 2020
Digital Project Delivery Benefits
Cost Savings/
AvoidanceOnsite Clashes Avoided
Programme
Certaintyusing 4D BIM
Public
Engagement3D Visualisations
Delay
AvoidanceWork Hours Saved
Increase
ProductivityBetter Project
understanding
Collaborative Single source of
Information
John Sisk & Son 2019
Thank You.BIM Lead IRL [email protected]