doc.: ieee 802.15-12-0442-00 submission july 2012 robert f. heile, zigbee allianceslide 1 79th...
DESCRIPTION
doc.: IEEE Submission July 2012 Robert F. Heile, ZigBee AllianceSlide 3 San Diego Session Objectives July 15-21, 2012 TASK GROUP-4j MBAN PHY Amendment 1.Comment Resolution 2.Update Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring 1.Final first draft for Letter Ballot 2.Update Project Plan/Timeline TASK GROUP-4m : TVWS PHY for 15.4 (4TV) 1.Review responses to CFP 2.Update Project Plan/TimelineTRANSCRIPT
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 1
79th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks
July 15-21, 2012
Grand Hyatt Manchester, San Diego, California, USA
Closing Report
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 2
802.15 Organization Chart802.15WG Chair
Bob Heile, ZigBee Alliance802.15 Vice Chairs
Rick Alfvin, VeriLANPat Kinney, Kinney Consulting
Task Groups
SecretaryPat Kinney, Kinney Consulting
Assistant SecretaryMike McInnis, Boeing
Working Group Technical EditorJames Gilb
New Projects (WNG), Interpretations, Rules
Pat Kinney, Kinney Consulting
TG4j MBAN 15.4 PHYRay Krasinski, Philips
Chair
TG8 Peer Aware Communcations Miung Lee, CUNY
Chair
TG4k Low Energy Critical InfrastructurePat Kinney, Kinney Consulting
Chair
TG9 Key Management ProtocolRobert Moskowitz, Verizon
Chair
Study Groups/Interest Groups
TG4m 15.4 TV White Space PHYSangsung Choi, ETRI
Chair
TG4n 15.4 China MBAN PHYArt Astrin, Astrin Radio
Chair
TG4p 15.4 Positive Train Control (PTC)Chair: Jon Adams, Lilee Systems
Chair
Study Groups:
15.4 Ultra Low Power (ULP)Chair: Shahriar Emami, Samsung
Interest Groups
Spectrum Resource Use (SRU)Chair: Shoichi Kitazawa,
ATR Wave Engineering Laboratories
TeraHertz (THZ)Chair: Thomas Kürner,
Technische Universität Braunschweig
Visible Light Comm follow-on (LED)Chair: Yeong Min Jang
Kookmin University
Layer 2 Routing (L2R)Chair: Clint Powell
To add your name to the WG/TG/SG/IG reflectors
please go to www.ieee802.org/15
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 3
San Diego Session ObjectivesJuly 15-21, 2012
TASK GROUP-4j MBAN PHY Amendment1. Comment Resolution2. Update Project Plan/Timeline
TASK GROUP-4k Low Energy Critical Infrastructure Monitoring
1. Final first draft for Letter Ballot2. Update Project Plan/Timeline
TASK GROUP-4m : TVWS PHY for 15.4 (4TV)1. Review responses to CFP2. Update Project Plan/Timeline
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 4
San Diego Session ObjectivesJuly 15-21, 2012
TASK GROUP4n –China MBAN1. Review response to the CFA2. Update Project Plan/Timeline
TASK GROUP-4p Positive Train Control1. Review preliminary technical proposals2. Update Project Plan/Timeline
TASK GROUP-8 Smart Utility Networks• Work on Application Matrix and
Technical Guidance Document• Update Project Plan/Timeline
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 5
San Diego Session ObjectivesJuly 15-21, 2012
TASK GROUP 9 –Key Management Protocol:1. Work on draft2. Update Project Plan/Timeline
Study Group: 15.4 Ultra Low Power Amendment1. Work draft PAR on 5C- target for Nov
Spectrum Resource Use (SRU) Interest Group:1. Hear Contributions2. Discuss future of the Committee
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 6
San Diego Session ObjectivesJuly 15-21, 2012
THz Interest Group:1. Hear Contributions2. Discuss future of the CommitteeVisible Light Comm follow-on(LED) Interest
Group:1. Hear Contributions2. Discuss future of the CommitteeLayer 2 Routing (L2R) Interest Group:1. Hear Contributions2. Discuss future of the Committee
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 7
NEW PROJECTS SUBCOMMITTEE1. Report on WNG progress2. Hear new presentations
San Diego Session ObjectivesJuly 15-21, 2012
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 8
79th IEEE 802.15 WPAN MEETINGGrand Hyatt Manchester, San Diego, CA, USAJuly 15-20, 2012
The graphic below describes the weekly session of the IEEE P802.15 WG in graphic format.
SUNDAY07:00-07:30 07:30-08:0008:00-08:3008:30-09:0009:00-09:3009:30-10:0010:00-10:3010:30-11:0011:00-11:3011:30-12:0012:00-12:3012:30-13:0013:00-13:3013:30-14:0014:00-14:3014:30-15:0015:00-15:3015:30-16:00 Break16:00-16:3016:30-17:0017:00-17:3017:30-18:0018:00-18:3018:30-19:0019:00-19:3019:30-20:0020:00-20:3020:30-21:0021:00-21:3021:30-22:0022:00-22:30
LEGEND
TG4J MBANj Task Group 15.4j FCC Medical Band Amendment WNG 802.15Wireless Next Generation Standing CommitteeTG4k LECIM Task Group 15.4k -LOW ENERGY CRITICAL INFRASTRUCTURE MONITORING TUT IEEE 802 Tutorials 1, 2, 3 and 4TG4m 4TV Task Group 15.4m on a TVWS amendment for 15.4 EC 802 EXECUTIVE COMMITTEETG4n CMB Task Group 15.4n for China Medical Band AC 802.15 ADVISORY COMMITTEETG4p PTC Task Group 15.4p for POSITIVE TRAIN CONTROL P&P Standing Committee on WG RulesTG8 PAC Task Group 15.8 on Personal Space Communication SC-M Standing Committee on MaintenanceTG9 KMP Task Group 15.9 -KEY MANAGEMENT PROTOCOL Interest Group IG L2R INTEREST GROUP -LAYER 2 ROUTING
IG LED Interest Group LED-ID system for 15.7SG4q ULP Study Group Ultra Low Power 15.4 IG SRU Spectrum Resource Utilization Interest Group
IG THZ INTEREST GROUP-TERRAHERTZ
SC-M
WIRELESS LEADERSHIP
MEETINGTG8 PAC
TG9 KMP
TG4j MBAN
802EC Smart Grid SG802.15 AC
MEETING Break Break
Break
TG4m 4TV
TG4k LECIM
TG4k LECIM
TG4pPTC
TG4pPTC
TG4j MBAN
TG4j MBAN
TG4j MBAN
TG8 PAC
Dinner on your own
802.15 WG CLOSING
Social
Break
Break
TG4k LECIM
TG4j MBAN
TG4j MBAN
TG4k LECIM
SG4q ULP
802EC Smart Grid SG
IG THZTG4k
LECIMSG4q ULP
TG8 PAC
802EC Smart Grid SG
Dinner on your own
TG4k LECIM
SG4q ULP
SG4q ULP
TG4k LECIM
Lunch on your own
TG4j MBAN
TG4k LECIM
TG4m 4TV
TG8 PAC
Lunch on your own
802EC Arch &
Ovrview
TG4k LECIM
SG4nCMB
TG8 PAC
802.15 WG Midweek
WNG
R1MONDAY TUESDAY THURSDAY FRIDAY
TG4j MBAN
TG4k LECIM
TG4m 4TV
TG8 PAC
SG4nCMB
TG8 PAC
IGL2R
TG4k LECIM
TG4k LECIM
802.15 AC MEETING
IG SRUIG
L2RTG4pPTC802 EC
MEETING
BreakBreak BreakBreak
802.15 WG Opening
Tutorial 1THz Update Dinner on your own
Tutorial 2802.3
Tutorial 3802.16
TG4m 4TV
TG4m 4TV
TG8 PAC
TG9 KMP
TG4j MBAN
802EC Arch &
Ovrview
Lunch on your own
802 EC MEETING
TG4pPTC
TG4pPTC
TG4pPTC
SG4nCMB
SG4nCMB
IG THZ
IG THZ
IG LED
Tech Editors
Lunch on your own
Break
TG4m 4TV
TG9 KMP
TG9 KMP
TG4m 4TV
TG4m 4TV
TG4k LECIM
TG4j MBAN IG THZ
doc.: IEEE 802.15-12-0442-00
Submission
San Diego Session Results
July 2012
Robert F. Heile, ZigBee AllianceSlide 9
doc.: IEEE 802.15-12-0442-00
Submission
Raymond Krasinski, PhilipsSlide 10
IEEE 802.15.4j Task GroupMedical Body Area Networks
Ray Krasinski, PhilipsChair
Closing Report10th Meeting of the MBAN Task Group
San Diego, CAJuly 15-20, 2012
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
Scope of MBAN Task Group
• Draft an amendment of 802.15.4 for MBAN– This amendment defines a physical layer for IEEE
802.15.4 in the 2360 to 2400 MHz band which complies with Federal Communications Commission (FCC) MBAN rules. This amendment defines modifications to the MAC needed to support this new physical layer.
Slide 11 Raymond Krasinski, Philips
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
Accomplishments for July Meeting
• Resolved all remaining comments received in response to Letter Ballot
• Discussion with IEEE 11073– Participation by TG4n and 802.15.6 members
• TG vote to ask WG to start Recirculation– And form BRC
Slide 12 Raymond Krasinski, Philips
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
TG4J motion 1
Slide 13
Approve the resolution of all comments of: 15-12-0218-13-004j-lb81-comment-register related to Subclause 5 and Subclause 6 as resolving comments on d1P802-15-4j_Draft_Standard.
Moved: Dave EvansSecond: Paul Chilton
Vote: Approved by Unanimous Consent
Jul 2012
Raymond Krasinski, Philips
doc.: IEEE 802.15-12-0442-00
Submission
TG4J motion 2
Slide 14
That 802.15.4j Task Group approves d2802-15-4j_Draft_Standard.pdf and requests that 802.15 WG recirculate d2802-15-4j_Draft_Standard.pdf.
Moved: Dave EvansSecond: Liang Li
Vote: Approved by Unanimous Consent
Jul 2012
Raymond Krasinski, Philips
doc.: IEEE 802.15-12-0442-00
Submission
TG4J motion 3
Slide 15
Move that the 802.15.4j Task Group seek 802.15 WG approval of the formation of a Ballot Resolution Committee for the Recirculation Letter Ballot of d2P802-15-4j_Draft_Standard. The committee will be chaired by Ray Krasinski.
Moved: Dave EvansSecond: Art Astrin
Vote: Approved by Unanimous Consent
Jul 2012
Raymond Krasinski, Philips
doc.: IEEE 802.15-12-0442-00
Submission
WG motion 1
Slide 16
Move that the WG approve the start of a recirculation ballot to forward the d2802-15-4j_Draft_Standard.pdf to Sponsor Ballot.
Moved: Liang LiSecond: Ray Krasinski
Vote:
Jul 2012
Raymond Krasinski, Philips
doc.: IEEE 802.15-12-0442-00
Submission
WG motion 2
Slide 17
Move to authorize Raymond Krasinski, David Evans, Shannon Park, Suhwook Kim, James Gilb, and Paul Chilton as the 802.15.4j Ballot Resolution Committee chaired by Raymond Krasinski; said committee to expire at the beginning of the September 2012 802.15 Wireless Interim Session. The Ballot Resolution Committee is authorized to approve the resolutions to comments received from recirculation of the 15.4j draft and to approve the start of another recirculation of the 15.4j draft on behalf of the Working Group. Comment resolution on Recirculations between sessions will be conducted via reflector email and via teleconferences announced to the reflector at least 7 days in advance.
Moved: Dave EvansSecond: Art Astrin
Vote:
Jul 2012
Raymond Krasinski, Philips
doc.: IEEE 802.15-12-0442-00
Submission
TG4J Schedule
Slide 18 Raymond Krasinski, Philips
Jul 2012
• Proposal Effort– Call for Proposals Mar 2011– Preliminary Proposals May 2011– Final Proposals July 2011– Begin Draft Amendment Nov 2011
• Drafting– Preliminary draft Amendment Jan 2012
• Balloting– Letter ballot Mar 2012– Comment Resolution May 2012– Recirculation I (& 2) Jul 2012– Sponsor Ballot Sep 2012
doc.: IEEE 802.15-12-0442-00
Submission
Plan for Sept Meeting
• Resolve all comments received in response to recirculation of Letter Ballot
• Move to Sponsor Ballot
Slide 19 Raymond Krasinski, Philips
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
Pat Kinney, Kinney ConsultingSlide 20
IEEE 802.15.4k Task GroupLow Energy Critical Infrastructure Monitoring
Pat Kinney, Kinney ConsultingChair
Closing ReportSan Diego, CA
July 15-20, 2012
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
<July 2012>
<Pat Kinney>, <Kinney Consulting LLC>Slide 21Slide 21
TG4k PAR Scope of Proposed Standard This standard is an amendment to IEEE 802.15.4. It addresses principally those applications such as critical infrastructure monitoring. It defines an alternate PHY and only those MAC modifications needed to support its implementation. The amendment supports:•Operation in any of the regionally available licensed, license exempt, and special purpose frequency bands.•Simultaneous operation for at least 8 co-located orthogonal networks•Application data rate of less than 40 kbits per second•Propagation path loss of at least 120 dB•> 1000 endpoints per mains powered infrastructure•Asymmetric application data flow•Extreme difference in capabilities and performance between endpoint devices and coordinating devices (collectors)
– Coordinator may support all standardized modulations (MCS) and data rates– Coordinator may be required to support antenna diversity or antenna beam steering– End point must be able to conserve energy
•Reliable operation in dramatically changing environments (no control over environment). This amendment also provides mechanisms that enable coexistence with other systems in the same band(s) including IEEE 802.11, 802.15, and 802.16 systems
doc.: IEEE 802.15-12-0442-00
Submission
<July 2012>
<Pat Kinney>, <Kinney Consulting LLC>Slide 22Slide 22
Purpose of Proposed StandardThe purpose of this amendment is to facilitate point to multi-thousands of points communications for critical infrastructure monitoring devices. The amendment addresses the application’s user needs of minimal network infrastructure, and enables the collection of scheduled and event data from a large number of non-mains powered end points that are widely dispersed, or are in challenging propagation environments. To facilitate low energy operation necessary for multi-year battery life, the amendment minimizes network maintenance traffic and device wake durations. In addition, the amendment addresses the changing propagation and interference environments.
doc.: IEEE 802.15-12-0442-00
Submission
<July 2012>
<Pat Kinney>, <Kinney Consulting LLC>Slide 23Slide 23
Meeting Goals (Agenda 15-12-309-01)
Review preliminary draft document 15-12-0089-06 Review and resolve comments from preliminary
draft review Review coexistence document Resolve comments from coexistence review Joint meeting with 802.19 Coexistence Motion to approve preliminary draft, edited as per
comment resolution document, as 802.15.4k draft Motion to request 802.15 WG to ballot 802.15.4k
draft
doc.: IEEE 802.15-12-0442-00
Submission
Overview of 437 Comments (15-12-348-07)
• Clause 3 1• Clause 4 31• Clause 5 200• Clause 6 71• Clause 8 20• Clause 9 13• Clause 19 83• Annex D 3• Annex P 15
<July 2012>
<Pat Kinney>, <Kinney Consulting LLC>Slide 24
doc.: IEEE 802.15-12-0442-00
Submission
TG4k Schedule• Proposal Effort
– Final Proposals Sep 2011– Adopt Baseline Nov 2011
• Drafting– Circulate preliminary document for comments May 2012– Final draft editing (ready for WG Letter Ballot) July 2012
• Ballot Comment Resolution– Letter ballot comment resolution Sep/Nov 2012– Recirculation I comment resolution Jan 2013– Recirculation II comment resolution Mar 2013– Recirculation III comment resolution May 2013– Sponsor Ballot (release draft for ballot) July 2013– SB Recirculation I comment resolution Sep 2013– SB Recirculation II comment resolution Nov 2013
<July 2012>
<Pat Kinney>, <Kinney Consulting LLC>Slide 25
doc.: IEEE 802.15-12-0442-00
Submission
TG4k Motions• TG4k approves the resolutions contained in
document 15-12-0348-07 and empowers the technical editor to modify 15-12-0089-06 as per the resolutions, posting the modified document as d1P802-15-4k_Draft_Standard, to the members only site.
• TG4k requests that the 802.15 WG approve d1P802-15-4k_Draft_Standard for Letter Ballot upon completion of edits
<July 2012>
<Pat Kinney>, <Kinney Consulting LLC>Slide 26
doc.: IEEE 802.15-12-0442-00
Submission
Slide 27
July 2012
TG4m 4TV Closing Report for July 2012Sangsung Choi, Chair
(ETRI)
Sangsung Choi(ETRI)
doc.: IEEE 802.15-12-0442-00
Submission
Meeting Goal This Week
Slide 28
July 2012
Hear final proposal presentationsHear technical presentations if any Discuss merging processDiscuss timeline and next steps
doc.: IEEE 802.15-12-0442-00
Submission
Meeting Slots
July 2012
Sangsung Choi(ETRI)Slide 29
Mtg Monday Tuesday Wednesday Thursday
AM1• Hear PHY
Proposals
AM2• Hear PHY
Proposals
PM1• Opening Logistics
• Hear Presentation
• Hear MAC Proposals
• Panel Discussion
PM2• Hear presentations
if any• Hear MAC
Proposals
• Hear presentations if any
• Discuss Merging Process
• Discuss Next Step
doc.: IEEE 802.15-12-0442-00
Submission
TG4m Closing Report(1)• Heard 8 final proposals - 4 PHY & 4 MAC Proposals
Slide 30
July 2012
No DoC # Title Proposer(Affiliation)
115-12-0332-00 ETRI OFDM PHY Proposal for TG4m Cheol-ho Shin(ETRI)
15-12-0334-00 ETRI FSK PHY Proposal for TG4m Mi-Kyung Oh(ETRI)
2 15-12-0336-00 Full Proposal on PHY for IEEE 802.15.4m Hiroshi Harada(NICT)
3 15-12-0338-00 PHY Proposal to TG4m Cristina Seibert(SSN)
4 15-12-0340-00 PHY Proposal for the IEEE 802.15.4m Sasaki(Niigata Univ.)
5 15-12-0328-00 Proposed Approach for MAC changes for TVWS Benjamin A. Rolfe(BCA)
6 15-12-0333-00 IEEE802.15.4m MAC Proposal: TVWS Multi-Channel Utilization (TMCU) Youngae Jeon(ETRI)
7 15-12-0334-00 MAC proposal for supporting the TVBD Network Seong-Soon Joo(ETRI)
8 15-12-0336-00 Full Proposal on MAC for IEEE 802.15.4m Hiroshi Harada(NICT)
doc.: IEEE 802.15-12-0442-00
Submission
TG4m Closing Report(2)
• Heard 2 Presentations - The Usage of Polarized Antenna System(Kyunghee Chang/Inha University) - Discussion to facilitate expediting the selection of the PHY specification in
TG4m(Daniel Popa/ITRON)
Slide 31
July 2012
• Discuss Merging Process - 3 Sub-Groups: FSK PHY, OFDM PHY, NB-OFDM PHY, MAC - Merge proposals before Sep. meeting - Present & discuss merged proposals, and agree baseline during Sep.
meeting
doc.: IEEE 802.15-12-0442-00
Submission
Future Plan/Timeline(1)• Form a New Task Group - Affirm new officers for TG4m
September ,2011 - Prepare TGD November,
2011 - Completed TGD March,
2012
• Proposal Effort - Call for Preliminary Proposals May, 7 2012 - Present Preliminary Proposal May, 2012 - Call for Final Proposals July 9, 2012 - Present Final Proposals July , 2012 - Present & Discuss merging proposals September, 2012 - Adopt Baseline September, 2012
July 2012
Sangsung Choi(ETRI) Slide 32
doc.: IEEE 802.15-12-0442-00
Submission
Future Plan/Timeline(2)
• Drafting - Editors create first draft November 2012 - Discuss & edit draft January 2013, March 2013 - Final draft (ready for WG Letter Ballot) May 2013
• Balloting - Letter ballot July 2013 - Recirculation September, November 2013, January 2014 - Sponsor ballot March 2014
July 2012
Sangsung Choi(ETRI) Slide 33
doc.: IEEE 802.15-12-0442-00
Submission
IEEE 802.15 TG4nChinese Medical Band
Art Astrin, ChairAstrin Radio
Closing Report
2st Meeting as a Task Group 4n
San Diego, CA
July 19, 2012
Slide 34
doc.: IEEE 802.15-12-0442-00
Submission
Slide 35
Since May meeting
• Issued First Call for Applications
doc.: IEEE 802.15-12-0442-00
Submission
Meeting Accomplishments
Heard 6 Presentations
Had discussions about the Chinese medical bands
Reviewed IEEE 11073
Reviewed and updated the TG4n web page
Slide 36
doc.: IEEE 802.15-12-0442-00
Submission
15-12-0307-01-004n-Interferences-on-frequency-bands-of-IEEE802-15-4n15-12-0310-00-004n-wban-based-micro-electronic-neural-bridge 15-12-0316-01-004n-Complex-EM- Environment-in-Chinese-Hospitals 15-12-0339-00-004n-Human-Physiological-Parameter-Monitoring15-12-0342-00-004n-cwpan-cban-actives-in-201215-12-0394-00-004n-overview-of-i2r-s-wireless-transceiver-design-for-
mban-activities
Contributions
Slide 37
doc.: IEEE 802.15-12-0442-00
Submission
Will issue Second Call for Applications:
15-12-0269-03-004n-call-for-applications
Next Steps
Slide 38
doc.: IEEE 802.15-12-0442-00
Submission
Timeline 2012
Slide 39
2012Task Comments May July Sept Nov
Draft call for Applications X Issue Call for Applications X Application Submission Period X X Draft Call for Tech Requirement X Issue Call for Tech Requirement XTech Requirement Submission Period X XDraft Call for Proposals
doc.: IEEE 802.15-12-0442-00
Submission
Slide 40
PAR and 5C
• PAR: 15-12-0215-00-004n-PAR Approved March 2012
• 5C: 15-12-0007-05-004n-Chinese-MBAN-Body-Area-Network-5C
doc.: IEEE 802.15-12-0442-00
Submission
• Thank You !
• Any Questions ?
Slide 41
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Jon Adams, Lilee SystemsSlide 42
IEEE 802.15.4p Positive Train Control Task Group
Closing Report
19 July 2012Jon Adams, ChairLilee Systems Ltd.
doc.: IEEE 802.15-12-0442-00
Submission
90 Participants from 60+ Entities• Herzog• TI• GuardRFID• Inha University• OneAccess Networks• Meiji University • ARINC• Siemens• US DOT• Sunrise Micro• US DOT FTA• Samsung Information Systems
America• The Ohio State University• Electronics and
Telecommunications Research Institute
• US DOT Volpe• Safetran (Invensys Rail)• Union Pacific RR• LG Electronics• Notor Research• Semtech
• Noblis• Tohoku University REIC• Beijing Univ of Posts and
Telecommunications• NXP• Verizon• Authentec• Sensus• TU Braunschweig• Via Technologies• Halcrow• US DOT FRA• Philips• Astrin Radio• China Academy of Telecomm
Research• Gannett Fleming• GE• APTA• Semaphore Group• Anritsu• Oki
July 2012
Jon Adams, Lilee SystemsSlide 43
• CalAmp• Rail Safety Consulting• Institute for Infocomm Research• National Taiwan University• Qualcomm• Freescale• Kyocera• Interdigital• Tensorcom• Analog Devices• CSX• National Technical Systems• Parsons Brinckerhoff• Stantec• Bombardier Transportation• Rohde and Schwarz• Korea Railroad Research Institute• Lilee Systems• Parsons• The Boeing Company• Vinnotech• Yokogawa• Sony
doc.: IEEE 802.15-12-0442-00
Submission
About Positive Train Control• Positive Train Control systems designed to prevent:
– Train-to-train collisions– Overspeed derailments– Unauthorized incursions into work zones– Movement through improperly configured track switch
• PTC systems are designed to mitigate error by human operators
• Comprised of four subsystems– Locomotive segment– Wayside segment – Back office segment– Communications segment
• IEEE 802.15.4p– Adds vehicular mobility to 802.15.4– Initial application is interoperable communications between
• Train and Wayside• Train and Network Infrastructure• Wayside and Network Infrastructure
July 2012
Jon Adams, Lilee SystemsSlide 44
Communications Segment
Locomotive Wayside
Office
doc.: IEEE 802.15-12-0442-00
Submission
Meeting Highlights
• Presentations– 15-12-0407, Security Device Identities for transit– 15-12-0406, Use of DSRC band for PTC– 15-12-0414, Preliminary Technical Proposal for PTC
• Joint Meeting with 802.18 to discuss DSRC band regulatory considerations
• Special guests– Mr. Louis Sanders, Technical Director of the American
Public Transportation Association (APTA)– Mr. Satoshi (Sam) Oyama, Senior Researcher in
Intelligent Transportation Systems, ARIB
July 2012
Jon Adams, Lilee SystemsSlide 45
doc.: IEEE 802.15-12-0442-00
Submission
15.4p Meeting Objectives
• 6 Time Slots• Discuss technical proposal process and
the Technical Guidance Document (802.15-12-0267-01)
• Preliminary technical presentations• Informative presentations• Continue to flesh out schedule moving
toward completed standard
July 2012
Jon Adams, Lilee SystemsSlide 46
doc.: IEEE 802.15-12-0442-00
Submission
IEEE 802.15.4p PTC ScheduleStudy Group•Approval of Study Group Nov 2011•Completion of PAR/5C Docs Jan 2012•Approval of PAR/5C Docs Jan 2012•Preparation for Task Group Phase
– Call for Applications Dec 2011– Extension of Call for Applications Mar 2012– Approval by NESCOM and 802 EC of IEEE802.15.4p TG Apr 2012
Task Group•Proposal Effort
– Technical Guidance Document May 2012– Call for Proposals May 2012– Preliminary Proposals July 2012– Final Proposals Sep 2012– Adopt Baseline Nov 2012
•Drafting– Preliminary specification draft Jan 2013– Final draft (ready for WG Letter Ballot) Mar 2013
Jon Adams, Lilee SystemsSlide 47
July 2012
doc.: IEEE 802.15-12-0442-00
Submission
PAC Closing ReportMyung Lee, Chair
CUNY
July 19, 2012
<July 2012>
Myung Lee, CUNYSlide 48
doc.: IEEE 802.15-12-0442-00
Submission
Meeting Objectives
• Presentations on application and use cases• Development of Applications Matrix • Development of Technical Guidance Document (TGD) • Project Plan
<July 2012>
Myung Lee, CUNYSlide 49
doc.: IEEE 802.15-12-0442-00
Submission
Achievements• 7 time slots at this meeting• 10 Presentations on Application Matrix & Technical Guidance Document (TGD)
– Jong Taek Oh (Hansung U): Doc. 15-12-0313r0– Eldad Zeira (InterDigital): Doc. 15-12-0346r0– Marco Hernandez (NICT): Doc. 15-12-0379r0– Robert Moskowitz (Verizon): Doc. 15-12-0388r0– Marco Hernandez (NICT): Doc. 15-12-0365r0– Eldad Zeira (InterDigital): Doc. 15-12-0345r0 (TGD)– Igor Dotlic (NICT) : Doc. 15-12-0408– Seunggeun Jin (ETRI): Doc. 350r2 (Application matrix)– Byung-Jae Kwak (ETRI): Doc. 411r0 – Seunghoon Park (Samsung): Doc. 385r1 (TGD)
• Drafted First versions of Application Matrix (AM) and Technical Guidance Document (TGD)
• TG8 Web page established
<July 2012>
Myung Lee, CUNYSlide 50
doc.: IEEE 802.15-12-0442-00
Submission
Timeline• TG formation Mar 12• Call for Application April 12• Application presentation May 12• TGD approval/Call for proposal Sep 12• Preliminary proposal presentation Nov 12• Final proposal presentation Jan 13• PAC Framework Document/Call for contribution May 13• Contribution presentation July 13• Draft spec (P802.15.8 D1.0) complete/Letter Ballot Mar 14• LB Comment resolution/ LB recirculation May 14• Sponsor Ballot Jan 15• RevCom submission July 15
Slide 5
<July 2012>
Slide 51 Myung Lee, CUNY
doc.: IEEE 802.15-12-0442-00
Submission
TG8 PAC Officers • Chair: Myung Lee (CUNY)
• Vice Chair: Huan-Bang Li (NICT), Suhwook Kim (LGE)
• Editors: Shannon Park (Samsung), Sunggeun Jin (ETRI)• Secretary pro tem Chanho Yoon (ETRI)
<July 2012>
Myung Lee, CUNYSlide 52
doc.: IEEE 802.15-12-0442-00
Submission
Plan for Palm Springs • Teleconference before September meeting
– Teleconf. bridge provided by LGE – International: 1-877-668-4493 Access code: 627805157– 1st teleconference: August 21 (Tuesday), US EST
• US EST 8:00pm , 5:00pm PST, Japan, Korea: 9:00am, China: 8:00am • Review of AM and TGD
– 2nd teleconference September 5 (Wednesday), US EST• US EST 9:00am, PST 6:00am, Japan, Korea, 10:00 pm, China 9:00pm. • Final review of AM and TGD• Preparation of September F2F meeting
• At September Meeting (8 time slots)– Completion of Application Matrix (AM) and Technical Guidance
Document (TGD)– To Issue the Call for Proposals (CFP)
<July 2012>
Myung Lee, CUNYSlide 53
doc.: IEEE 802.15-12-0442-00
Submission
Robert Moskowitz, VerizonSlide 54
IEEE 802.15.9 Task GroupKey Management Protocol
Bob Moskowitz, VerizonChair
Closing ReportSan Diego, CA
July 15-20, 2012
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert Moskowitz, VerizonSlide 55
Accomplishments of the July Meeting
Refine KMP Transport mechanism– Work on Trigger events
Work on draft document Inform LED ID Interest Group of work
for 802.15.7 Joint session with 802.1 Security
workgroup In depth discussions on use cases
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert Moskowitz, VerizonSlide 56
Planning for September Meeting
3 sessions Anticipate progress on Technical Editor
position Technical presentations
doc.: IEEE 802.15-12-0442-00
Submission
Pat Kinney, Kinney ConsultingSlide 57
IEEE 802.15.4q Study GroupUltra Low Power
Shahriar Emami, SamsungChair
Closing ReportSan Diego, CA
July 15-20, 2012
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Shahriar Emami, SamsungSlide 58
July Closing Report for ULP SG (1/6)
• Number of meetings slots: 4• Total Number of contributions: 5• Participation: Tuesday (23)- Wednesday (10)
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Shahriar Emami, SamsungSlide 59
July Closing Report for ULP SG (2/6)
• Meeting Activities:- Hear presentations- Work on PAR and 5C
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Shahriar Emami, SamsungSlide 60
July Closing Report for ULP SG (3/6)
• Contributions:Document #15-12-381-01Document #15-12-389-00Document #15-12-393-00Document #15-12-383-00Document #15-12-384-00
doc.: IEEE 802.15-12-0442-00
Submission
July Closing Report for ULP SG (4/6)
• Accomplishments- Heard all 5 presentations- Prepared PAR and 5C drafts
July 2012
Shahriar Emami, SamsungSlide 61
doc.: IEEE 802.15-12-0442-00
Submission
July Closing Report for ULP SG (5/6)
• Conference Calls - August 9, 2012 7 pm-8 pm PST- August 23, 2012 7 pm-8 pm PST
July 2012
Shahriar Emami, SamsungSlide 62
doc.: IEEE 802.15-12-0442-00
Submission
July Closing Report for ULP SG (6/6)
• Plan for September Meeting- Hear presentations on technical
requirements- Finalize PAR and 5C
July 2012
Shahriar Emami, SamsungSlide 63
doc.: IEEE 802.15-12-0442-00
Submission
Pat Kinney, Kinney ConsultingSlide 64
IEEE 802.15 TeraHertz Interest Group
Thomas Kürner, TU BraunschweigChair
Closing ReportSan Diego, CA
July 15-20, 2012
To be Provided
Jul 2012
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Shoichi Kitazawa, ATRSlide 65
IEEE 802.15 IG SRU
Shoichi Kitazawa, ATRChair
6th Meeting Closing reportSan Diego, CA19 July, 2012
doc.: IEEE 802.15-12-0442-00
Submission
Draft plan of IG SRU schedule
• Goal: To summarize informative ideas to judge to establish SG.
• Meeting Schedule: Every plenary meeting or required based upon contributions.
• IG output: Technical documents of Better Use of Spectrum Resources in WPANs.
July 2012
Shoichi Kitazawa, ATRSlide 66
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Shoichi Kitazawa, ATRSlide 67
Agenda Items for the Week
• Approve meeting minutes.• Presentations
– IG SRU technical document (15-12-0184r1)• Other business items
– Next step– Call for contributions– Schedule
• Report on progress to WG
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Shoichi Kitazawa, ATRSlide 68
Accomplishment for the meeting• IG SRU 6th meeting was called to order 18 July 2012 at 08:20
and finished at 09:30.– 9 Attendee– Approve meeting agenda (15-12-0326r1)– Approve meeting minutes (15-12-0197r0)
• Presentation– IG SRU technical document (15-12-0184r1)
• Discussion– Scope of IG SRU and next step– Call for contributions– Next meeting
doc.: IEEE 802.15-12-0442-00
Submission
Plans for November Meeting
• Hearing presentation.• Editing Technical document.• Discussion
July 2012
Shoichi Kitazawa, ATRSlide 69
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Yeong Min Jang, Kookmin UniversitySlide 70
LED-ID Interest GroupYeong Min Jang, Kookmin University
Chair
2ndMeeting, Atlanta
Closing Report20 July, 2012
doc.: IEEE 15-12-0430-00-0led
doc.: IEEE 802.15-12-0442-00
Submission
Purpose of LED Interest Group
• Determine whether there is sufficient interest in creating a LED Study Group for the purpose of developing a LED PAR 5C.
July 2012
Yeong Min Jang, Kookmin UniversitySlide 71
doc.: IEEE 15-12-0430-00-0led
doc.: IEEE 802.15-12-0442-00
Submission
Objective of Meeting
• Call for presentation of LED• Hearing of presentations of LED issues
July 2012
Yeong Min Jang, Kookmin UniversitySlide 72
doc.: IEEE 15-12-0430-00-0led
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Yeong Min Jang, Kookmin UniversitySlide 73
1. 2-hour time slot was held in Wednesday. - Attendance:
12 attendees in Wednesday AM1 slot.
3. Relative Documents: - Presentations
15-12-0399-00-0led Secure Device Identities 15-12-0396-00-0led Standardization Directions in
IEEE802.15 IG-LED 15-12-0397-00-0led Technical Issues for LED
commercialization15-12-0398-00-0led LED-based Hybrid Techniques for
High-performance Positioning Systems
15-12-0331-00-0led IEEE802.15 IG-LED Beamforming
doc.: IEEE 15-12-0430-00-0led
doc.: IEEE 802.15-12-0442-00
Submission
Plans for November Meeting
July 2012
Yeong Min Jang, Kookmin UniversitySlide 74
• Before Nov. meeting: generate and circulate a “call for presentation and participation” paragraph• During Nov. meeting: continue discussion to determine market focused technical objectives of the IG• Invite many interested parties
doc.: IEEE 15-12-0430-00-0led
doc.: IEEE 802.15-12-0442-00
Submission
Slide 75Slide 75
Layer 2 Routing- Interest Group
Closing Report for July 2012
Clint Powell, Powell Wireless Commsulting, LLCChair
doc.: IEEE 802.15-12-0442-00
Submission
Slide 76Slide 76
IG-L2R
Determine the level of interest for a project onLayer 2/Mesh Under Routing and make recommendation to WG.
doc.: IEEE 802.15-12-0442-00
Submission
Slide 77Slide 77
Determine Interest Level ofLayer 2/Mesh Under Routing
Timeslots Wed. AM1
Open and Review Call for Interest/Presentations Hear 3 Presentations incl. Q&A
Thurs. AM1 Discuss Next Steps Formulate Recommendation to WG
Meeting Goals
doc.: IEEE 802.15-12-0442-00
Submission
Slide 78Slide 78
Avg. # of Individuals Attending sessions: 30
Avg. # of Entities Represented in sessions: 22
IG-L2R Group Participation
doc.: IEEE 802.15-12-0442-00
Submission
Slide 79Slide 79
Minutes posted as doc. # 15-12-0403-01-0l2r
Overwhelming consensus to recommend to WG to continue as an Interest Group at next mtg.
Straw Poll #5 (28 in room)Recommend to Working Group to continue as an IG?YES: 22NO: 0Abstain: 5New to room*: 5
*Was not in Wed. AM1 IG L2R Session
Status
doc.: IEEE 802.15-12-0442-00
Submission
Slide 80Slide 80
Palm Springs (in Sept.)Issue call for Interest/Presentations for Sept. mtg.
Expand topical area per mins. Related work in other areas
Work on generating and giving a Tutorial(at next Interim or Plenary)
See mins. (doc. # 15-12-0403-01-0l2r) for details
Next Steps
doc.: IEEE 802.15-12-0442-00
Submission
Slide 81July 2012Pat Kinney, Kinney Consulting LLC
Standing Committee Closing ReportsWNG & Maintenance Advisory Group (MAG)
July 2012
Pat Kinney, Kinney Consulting LLCChair
doc.: IEEE 802.15-12-0442-00
Submission
Standing Committees
The SC WNG meeting had one presentation:•Dependable Wireless M2M Network for Controlling - Applications for Cars, Energy, Medicine, Cities (15-12-0370-00) by Dr. Ryuji Kohno (Yokohama National University)
SC Maintenance:•Meeting objectives were to review the web site, review the request form, and define a process for this committee
Pat Kinney, Kinney Consulting LLC
Slide 82July 2012
doc.: IEEE 802.15-12-0442-00
Submission
Dependable Wireless M2M Network• Dependability in network” means to guarantee lowest performance enough high in
a sense of highly reliable, safe, secure, fault tolerant, robust services in any predictable and even unpredictable worse environments
• Demand for Dependable Networks– Need for Highly Reliable, Robust Communications for Controlling– Transition from Human centric communications to Machine-to-Machine (M2M)
communications.– Highly reliable, safe, secure and robust communications for M2M Controlling is
necessary– Integrated wired & wireless networks provide dependable, green and ecological
networks adaptable for environment.• Emotion and Sustainability
– Medicine, Robot, ITS, Energy Supply, and Manufacturing require more dependability in controlling network, integrated circuit, link in micro devices.
– Medical equipment and industrial products need long life time, fault tolerance.– Dependable Network Architecture for M2M controlling.
Pat Kinney, Kinney Consulting LLC
Slide 83July 2012
doc.: IEEE 802.15-12-0442-00
Submission
SC WNG Actions• Straw Poll: How many companies have an interest on this
activity? Count was 31• Do we establish an interest group or a study group within 802.15
to discuss it? Support for IG was 18 with 5 for study group• Given the interest and the expected participation an interest
group will be formed at the closing plenary if an IG chair can be named (perhaps Dr. Kohno?)
Pat Kinney, Kinney Consulting LLC
Slide 84July 2012
doc.: IEEE 802.15-12-0442-00
Submission
SC Maintenance• Web site and request form were reviewed and approved• Process was defined using 802.1 maintenance as a
baseline, and will be included in the 802.15 Operations Manual– Revised Operations Manual to be voted on next
session– Committee size will be 5 – 7, selected by WG chair– Committee will maintain maintenance database and
make recommendations to WG
Pat Kinney, Kinney Consulting LLC
Slide 85July 2012
doc.: IEEE 802.15-12-0442-00
Submission
July 2012
Robert F. Heile, ZigBee AllianceSlide 86
Upcoming Sessions• September 16-21, 2012, Hyatt Grand Champion, Palm Springs, CA,
USA, 802 Wireless Interim Session
• November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session.
• January 13-18, 2013, Hyatt Regency Vancouver, BC, CA, 802 Wireless Interim Session*
• March 17-21, 2013, Caribe Royale, Orlando, FL, USA, 802 Plenary
• May 12-17, 2013, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session*
• July 14-19, 2013, Geneva, CHE, 802 Plenary Session.