Draft MEETING AGENDA Western Area Power Administration Rocky Mountain Region Transmission Planning Stakeholder Meeting WAPA’s RMR Regional Office 5555 East Crossroads Boulevard, Loveland, CO 80538 June 20, 2018 – 1:30 pm to 3:30 pm MDT 1) 1:30 pm ......................................... Introduction of Attendees \ Finalize Agenda (Roy Gearhart) 2) 1:35 pm ..................... Overview of WAPA’s Process for FERC Order No. 890 (Kristina Kampbell) 3) 1:45 pm .......................................................... West Connect Transmission Update (Roy Gearhart) 4) 2:00 pm .............................................................. Transmission Planning Studies (Jason Parker) 5) 2:15 pm ............. Review of 2018 Transmission Planning Study Scope & Process (Brian Stringer) 6) 2:30 pm ................................................................ Capital Improvement Plan (Jason Groendyk) 7) 3:00 pm .................................................... Stakeholder Input / Open Discussion (Roy Gearhart) 8) 3:15 pm ............................................. Next Meeting Date and Closing Remarks (Roy Gearhart) 9) 3:30 pm ....................................................................................................................... Adjourn

Upload: others

Post on 23-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Draft MEETING AGENDA

Western Area Power Administration Rocky Mountain Region

Transmission Planning Stakeholder Meeting

WAPA’s RMR Regional Office 5555 East Crossroads Boulevard, Loveland, CO 80538

June 20, 2018 – 1:30 pm to 3:30 pm MDT

1) 1:30 pm ......................................... Introduction of Attendees \ Finalize Agenda (Roy Gearhart)

2) 1:35 pm ..................... Overview of WAPA’s Process for FERC Order No. 890 (Kristina Kampbell)

3) 1:45 pm .......................................................... West Connect Transmission Update (Roy Gearhart)

4) 2:00 pm .............................................................. Transmission Planning Studies (Jason Parker)

5) 2:15 pm ............. Review of 2018 Transmission Planning Study Scope & Process (Brian Stringer)

6) 2:30 pm ................................................................ Capital Improvement Plan (Jason Groendyk)

7) 3:00 pm .................................................... Stakeholder Input / Open Discussion (Roy Gearhart)

8) 3:15 pm ............................................. Next Meeting Date and Closing Remarks (Roy Gearhart)

9) 3:30 pm ....................................................................................................................... Adjourn

Page 2: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Western Area Power Administration’s Rocky Mountain Region Stakeholder Meeting

June 20, 2018

Attendance by WebEx:

Mark Detsky Dietze and Davis, P.C.

Attendance in Person:

Roy Gearhart Western Area Power Administration

Kristina Kampbell Western Area Power Administration

Jason Groendyk Western Area Power Administration

Nathan Peters Western Area Power Administration

Brian Stringer Western Area Power Administration

Jason Parker Western Area Power Administration

Jim Hirning Western Area Power Administration

Page 3: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event

WAPA Open Access Transmission Tariff Attachment P

June 20, 2018Rocky Mountain Region Planning Stakeholder Meeting

Loveland, CO

Page 4: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event

WAPA Open Access Transmission Tariff Attachment P

Meeting Purpose• To inform stakeholders about WAPA’s transmission

system planning process and provide an opportunity for the stakeholders to provide their input

• Allow WAPA to maximize its understanding of its customers’ forecasted needs for WAPA’s transmission system

• Review transmission plans

2WAPA-RMR Transmission Planning Stakeholder Meeting WAPA Open Access Transmission Tariff – Attachment P

Page 5: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event 3WAPA-RMR Transmission Planning Stakeholder Meeting WAPA Open Access Transmission Tariff – Attachment P

WAPA Open Access Transmission Tariff Attachment P

OATT Revision• Order 890 issued February, 2007• WAPA maintains a safe harbor OATT with FERC

• Not required to abide by Order 890 compliance deadlines like jurisdictional TPs

• Resources and projects are based on statutory or budgetary restrictions• Any variances in the FERC approved OATT must be justified to

customers and accepted by FERC• May make modifications that are consistent with or superior to pro

forma OATT provisions

• WAPA revised OATT to address Order 890• Submitted to FERC September 29, 2009• Effective Date: December 1, 2009

Page 6: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event4WAPA-RMR Transmission Planning Stakeholder Meeting

WAPA Open Access Transmission Tariff – Attachment P

WAPA Open Access Transmission Tariff Attachment P

OATT Revision• WAPA has filed revisions to its OATT to clarify certain

provisions. FERC approved April 12, 2013

• OATT Revisions can be viewed through FERC’s tariff viewer: http://etariff.ferc.gov/TariffList.aspx

• Tariff documents are posted on OASIS at the following URL: http://www.oasis.oati.com/WAPA/WAPAdocs/WAPA-OATT-Effective-2013-0513.pdf

Page 7: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event 5

WAPA-RMR Transmission Planning Stakeholder Meeting WAPA Open Access Transmission Tariff – Attachment P

WAPA Open Access Transmission Tariff Attachment P

FERC Order 890 – Planning Principles• Transmission Planning: FERC requires a more inclusive

transmission planning process incorporating nine principles:(1) coordination(2) openness(3) transparency(4) information exchange(5) comparability(6) dispute resolution(7) regional participation(8) economic planning studies(9) cost allocation for new projects

Page 8: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event 6

WAPA-RMR Transmission Planning Stakeholder Meeting WAPA Open Access Transmission Tariff – Attachment P

WAPA Open Access Transmission Tariff Attachment P

Types of Planning Studies• NERC/WECC Reliability Studies – meet NERC/WECC

standards and coordination through CCPG.• Sub-regional Coordination (CCPG) - identify congestion and

overloads and address integration of new resources and loads

• Ten Year Transmission Study – evaluates the system to ensure we can serve our customers requirements/load growth

• Generator Interconnection and Transmission Service Requests

Page 9: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event 7

WAPA-RMR Transmission Planning Stakeholder Meeting WAPA Open Access Transmission Tariff – Attachment P

WAPA Open Access Transmission Tariff Attachment P

Types of Planning Studies

• WAPA invites the stakeholders to submit any transmission study requests for review and discussion

•WAPA’s point of contact for study requests is [email protected].

Page 10: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Subject, Office or event 8WAPA-RMR Transmission Planning Stakeholder Meeting WAPA Open Access Transmission Tariff – Attachment P

WAPA Open Access Transmission Tariff Attachment PService Territory

Page 11: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

WestConnect

Regional Planning Update forWAPA-RMR

890 Stakeholder Meeting

June 20, 2018Roy Gearhart - Transmission Planning North

1

Page 12: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Transmission Owner w/Load Serving Obligation (18)

Enrolled TO

•Arizona Public Service

•Black Hills

•El Paso Electric

•NV Energy

•Public Service of NewMexico

•Tucson Electric

•Xcel - PSCo

Coordinating TO

•Arizona Electric Power Cooperative (formerly SWTC)

•Basin Electric

•Colorado Springs Utilities

•Imperial Irrigation District

•Los Angeles Department of Water and Power

•Platte River

•Sacramento Municipal Utility District

•Salt River Project

•Transmission Agency of Northern California

•Tri-State G&T

•Western Area Power Administration

Transmission Customer

Vacant

Independent Transmission Developer (8)

American Transmission

Company

Blackforest Partners

Exelon Transmission

ITC Grid Development,

LLC

Southwestern Power Group

TransCanyon

Western Energy

Connection

Xcel –Western

Transmission Company

State Regulatory Commission

Vacant

Key Interest Group (1)

Natural Resources

Defense Council

2

PMC Membership as of 12/21/2016

Updated 12/21/16

Page 13: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

WestConnect Planning Footprint

Quick Facts•Touches 11 WesternStates•9.8 Million RetailCustomers•56,000 MW Demand•39,000 Miles ofTransmission•1.7 Million Miles2

3

WestConnect Regional Planning:

Page 14: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

WECC Subregional Planning Groups Major Transmission Facilities

ColumbiaGridNorthern Tier Transmission Group (NTTG)BC Coordinated Planning and Alberta System Operator that are not part of ColumbiaGrid or NTTGWestConnect (SWAT, CCPG & SPPG)California ISOCalifornia Transmission Planning Group that are not part of CAISOOther Facilities

4

Page 15: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

CCPGCCPG

SWSWAATT

SSPG

WestConnect Subregional Planning Groups

SPG's are technical planning work groups within the WestConnect footprint.CCPG - Colorado Coordinated Study GroupSSPG - Sierra Subregional Planning GroupSWAT - Southwest Area Transmission

• Coordinate Information for use by all study participants.

• Define subregional study plans, provide study resources, and perform studies.

• Provide forum for coordination and peer review of planning studies and 10 years plans.

5

Page 16: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Today

ALLOCATE

COSTSDRAFT

REGIONAL PLAN

MODEL DEVELOPMENT

STUDY PLAN

DEVELOPMENT

IDENTIFY REGIONAL NEEDS

PROJECT/NTA SUBMITTAL WINDOW

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May JUN JUL AUG SEP OCT NOV DEC JAN FEB

SCENARIO

SUBMITTALS

2018

EVALUATE & IDENTIFY

ALTERNATIVES

20192017 2020

ITP Submittal Deadline(3/31/18)

Milestone (2018-19) Lead Next PMC Key Date and Action

Qualified Developer Recertification Developers June 31, 2018 (not PMC action)

2018-19 Model Development Summary PS / ES September, 2018

Notify New Qualified Developers PMC September 31, 2018

2018-19 Regional Transmission Needs Assessment PS / ES December, 2018

2018-19 Process Timeline

6

Page 17: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

2018-19 Scope of WorkPerform 2018-2019 Order 1000 Assessment.

– Link to WestConnect 2018-2019 Planning Cycle

Current activities:

– Model Development - Power Flow and Production Cost Model

– Power Flow models from the WECC 2028HS & 2028LS basecases

– PCM from the WECC Anchor Data Set PCM. 7

Page 18: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

2018-19 Scope of WorkCurrent activities (cont):

– Scenarios model development

– Transmission Developer Qualification

– Interregional coordination

8

Page 19: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

More Information:

WestConnect website: www.westconnect.com

9

Page 20: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

1

2018 Transmission Planning StudiesJason Parker, Transmission Planner

June 20, 2018WAPA-RMR Transmission Planning Stakeholder Meeting

Loveland, CO

Page 21: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

NERC/WECC Transmission Planning

• TPL-001-4, Requirements 2-4• Ensure system is adequate to meet present and future

needs• Demonstrate through assessment

• System Peak For Year One or Two and for Year Five• System Off-Peak for one of the years one through five• System Peak for one of the years six through ten• Sensitivity Analysis

2WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 22: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

CCPG

• Colorado Coordinated Planning Group

• Seven Member Utilities

• Basin Electric Power Cooperative• Black Hills Corporation• Colorado Springs Utilities• Platte River Power Authority• Public Service Company of Colorado (Xcel Energy)• Tri-State Generation & Transmission Assoc.• Western Area Power Administration-RMR

3WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 23: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

4WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Sidney(DC Terminal)

Stegall(DC Terminal)

Rapid City(DC Terminal)

Yellowtail

Dave Johnston

Laramie River

Pawnee

Archer

Jim Bridger

Craig

Comanche

Thermopolis

Buffalo

CasperRiverton

Wyodak

Ft. St. Vrain

Ault

Story

Flaming Gorge

Lost Canyon

Hesperus

Lamar(DC Terminal)

Hayden

Meeker

Rifle

Bonanza

Vernal

Osage

Lange

Spence

Platte

MontroseCurecanti

Cherokee

N .Yuma

Trinidad

Burlington

To Shiprock To San Juan To Glade Tap

Midway

Big Sandy

Boone

Gore Pass

Poncha

Malta

To Ashley

To Upalco

To Mona

Page 24: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

2018 NERC/WECC Compliance Report

• Performed Annually• Area Studied

• Colorado• Wyoming• Western Nebraska• Western South Dakota

5WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 25: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Purpose

• Evaluate the steady state post-contingency response of the Integrated System

• Evaluate transient and voltage stability• Identify problem areas due to system load growth• Meet NERC/WECC Transmission Planning Standards

6WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 26: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Study Procedure

• CCPG Compliance Study• Cases To Be Examined

• 2020 Heavy Summer (Peak - Year Two)• 2020 Light Summer (Off-Peak – Year Two)• 2023 Heavy Summer (Peak – Year Five)• 2028 Heavy Summer (Peak – Year Nine)

• System Intact Criteria• 100% Continuous Rating Loading• 0.95 p.u. – 1.05 p.u. Voltage

• Contingency Analysis Criteria• 100% Continuous/Emergency Rating Loading• 0.90 p.u. – 1.10 p.u. Voltage

7WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 27: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

WAPA-RMR TPL Studies

• Short Circuit Evaluation• Obtain Short Circuit Data from Maintenance/HQ• Compare to Breaker Interrupting Capability

• Sensitivity• Stress Paths and Compare results to CCPG Results

8WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 28: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Questions

Any Questions or Comments?

9WAPA-RMR Transmission Planning Stakeholder Meeting 2018 Transmission Planning Studies

Page 29: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

RMR2018 Annual Ten Year Network Study

Stakeholder Meeting 2018

Page 30: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

ObjectivesWestern will provide reliable, value driven service to preferential customers.

To maintain compliance with NERC and Western standards.

Evaluate the load serving capability of the integrated system while preserving TOT path capacities.

Scope, schedule and prioritize Western transmission and substation system projects for inclusion in the Capital Improvement Plan (CIP).

Stakeholder Meeting 2018

Page 31: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Timeline

Stakeholder Meeting 2018

Loads

•Request and receive load data from network customers•Jan-March 2017

Power Flows

•Develop base cases•March-April 2017

Projects

•Analyze power flow results•Study solutions•Report•May-July 2017

Inclusion in Capital Improvement Plan

•Preliminary Scope and Estimates•Aug-November 2017

Stakeholders

•Present study results at Quarterly Stakeholders Meeting•December 2017

Page 32: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Study CriteriaCases selected to study a near term and far term heavy winter/summer.

WECC approved cases:2019 Light Summer2027 Heavy Summer

Stakeholder Meeting 2018

Page 33: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Study CriteriaCriteria

• System Intact• 0.95 p.u. – 1.05 p.u. Voltage• 100% Continuous Loading Rate

• Contingency• 0.95 p.u. – 1.05 p.u. Voltage• 100% Continuous Rating or Emergency Limit

5% was used to catch any issues that are just under the 10% threshold. We still use the 0.90 – 1.10 criteria for contingencies.

Contingency Analysis: P1-P7 + Extreme Event

Stakeholder Meeting 2018

Page 34: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Study Details

Stress Levels applied to cases:

• TOT1, WECC Path 30

o 529 MW East-West, 2019 LS

• YTS• 560 MW North-South , 2027 HS

Stakeholder Meeting 2018

Page 35: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Study Details

Voltage and thermal issues that appear for the first time will be monitored for recurrence.

Studies based on network customer projections 1-10 years in the future.

Voltage and thermal issues that repeatedly appear may be studied as a sensitivity study and result in a change of the corrective action plan and Capital Improvement Plan.

Stakeholder Meeting 2018

Page 36: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

2017 Results

• The system was compliant with NERC and Western standards for all contingencies analyzed.

Stakeholder Meeting 2018

Page 37: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Questions?

• Brian Stringer• Planning Engineer – RM Planning North• 970-461-7530• [email protected]

Stakeholder Meeting 2018

Page 38: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

1

FY18 Capital Program Overview

June 20, 2018

Rocky Mountain RegionLoveland, CO

Page 39: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Pick Sloan CapitalCompleted Projects FY18 (to date)

• Spence 230 kV Breaker replacement• ISD: Q1 FY18

• Granby Pumping Plant-Windy Gap 69 kV Rebuild• ISD: Q2 FY18

• Pole Hill Breaker and Switch replacements• ISD: Q2 FY18

• Box Butte 115kV Switch Structure• ISD: Q2 FY18

• Pilot Butte Station Service• Anticipated ISD: Q3 FY18

2FY18 Capital Program Overview

Page 40: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Pick Sloan CapitalConstruction Projects FY18 (ongoing)

• Goshen County Substation (230/115 kV)• Anticipated ISD: Q4 FY18

• Beaver Creek 115 kV Breaker (166) and CCVT replacement

• Anticipated ISD: Q3 FY18

• Kremmling 138 kV Breaker replacements• Anticipated ISD: Q4 FY18

3FY18 Capital Program Overview

Page 41: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Pick Sloan Large Capital ProjectsFY19-FY23• Flatiron Breakers and Switches

• Anticipated ISD: Q1 FY19

• Medicine Bow – MB Wind Site A T-line re-route• Anticipated ISD: FY19

• Airport – Weld OPGW• Anticipated ISD: FY19

• Badwater New 230 kV, 30 MVAR Reactor• Anticipated ISD: FY19

• Big George-North Cody 115 kV Conversion • Anticipated ISD: FY20

4FY18 Capital Program Overview

Page 42: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Pick Sloan Large Capital ProjectsFY19-FY23• Kimball Substation Expansion

• Anticipated ISD: FY20

• Alliance-Dunlap 115 kV Line Rebuild• Anticipated ISD: FY20

• Estes Flatiron 115 kV rebuild• Anticipated ISD: FY21

• Golden Prairie Line Sectionlizing project• Anticipated ISD: FY21

5FY18 Capital Program Overview

Page 43: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Pick Sloan Large Capital ProjectsFY19-FY23• Laramie – Snowy Range 115kV T-line construction

• Anticipated ISD: FY20

• Lingle Breaker and Switch Replacements• Anticipated ISD: FY20

• Lovell-Yellowtail (Phase 3) 115 kV #1 & #2 Line Rebuild• Anticipated ISD: FY21

• Seminoe Man Camp & MW Distribution Line Rebuild• Anticipated ISD: FY21

6FY18 Capital Program Overview

Page 44: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

Pick Sloan Large Capital ProjectsFY19-FY23

• Beaver Creek 115kV Breaker Replacement• Anticipated ISD FY23

• Cheyenne Breaker Replacement• Anticipated ISD FY22

• Happy Jack Breaker Replacement• Anticipated ISD FY23

• Hoyt 115kV Breaker Replacement• Anticipated ISD FY23

• Kiowa Creek 115kV Breaker Replacement• Anticipated ISD FY22

7FY18 Capital Program Overview

Page 45: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

CRSP CapitalCompleted Projects FY18 (to date)

• Ault Station Service• ISD: Q1 FY18

• Weld 115 and 230 kV Breaker Replacements• ISD: Q1 FY18

• Pleasant View 24.9 kV Line Replacement• ISD Q1 FY18

• Archer Station Service • ISD: Q2 FY18

8FY18 Capital Program Overview

Page 46: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

CRSP Large Capital Projects FY19-23

• Ault KU1A Transformer Replacement• Anticipated ISD: FY19

• Ault KW1F and KW1G• Anticipated ISD: FY19

• Ault 230 kV Breaker Replacements• Anticipated ISD: FY19

9FY18 Capital Program Overview

Page 47: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

CRSP Large Capital ProjectsFY19-FY23

• Archer Breaker Replacement• Anticipated ISD FY19

• Midway Transformer and Reactor Replacements• Anticipated ISD: FY21

• Shiprock 345 kV Breaker Replacement• Anticipated ISD: FY21

• Weld 230kV breaker-and-a-half conversion• Anticipated ISD: FY23

10FY18 Capital Program Overview

Page 48: Draft MEETING AGENDA Western Area Power Administration ...€¦ · Cost Model –Power Flow models ... • Sensitivity Analysis. 2. WAPA-RMR Transmission Planning Stakeholder Meeting

11FY18 Capital Program Overview

Questions?Jason Groendyk970-461-7565