dri roof bim profile
TRANSCRIPT
Dri Roof MEP BIM Consultancy
Profile
Services
BIM (Architectural, MEP,Structure)
Clash Detection & Model Based Coordination
Model Driven Quantification
Development of Fabrication Level MEP BIM (High-Detail)
Development of Fabrication Level Structural BIM (High-
Detail)
BIM Driven – Project Planning & Cost Control – 4D / 5D Model
Services
Infrastructure BIM ServicesTerrain Modelling from GPS Survey, Point Cloud Data, Survey Points and Grading
Roads and Bridge Modeling
Sewer, Surface, Underground Networks and Simulation
Quantification - BoM, Cut/Fill Analysis
Reinforcement Model Dev.Clash Detection
Automatic Bar Bending Schedule Extraction
Accurate Steel Quantity Extraction
Interactive Walkthroughs
Operable with Mouse / Keyboard
Photorealistic
Supports Virtual Reality
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Overall Factory Zone with Underground Services
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Complex HVAC Systems inside Factory
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
BIM Federated for Production Factory
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
HVAC Installation Assembly
Projects || Industrial Development in Middle East. Area – Over 8000 Sqm
Clash Detection &
Coordination
Projects || 21 Storey Commercial Tower, Kenya
Projects || 21 Storey Commercial Tower, Kenya
Structural BIM with
technically accurate Façade
Systems.
Projects || 21 Storey Commercial Tower, Kenya
Complex MEP Systems at Sub-Structure
Levels
Clash Detection & Coordination
Projects || 21 Storey Commercial Tower, Kenya
Project Schedule BIM Based 4D
Simulation from Contractor’s Schedule
prepared in Microsoft Project.
Projects || Riverside Drive, SA
Projects || Riverside Drive, SA
Federated BIM Model on Autodesk Revit
BIM Platform
Projects || Riverside Drive, SA
Clash Detection & Coordination
BCF (BIM Collaboration Format) enables software independent Clash Test Sharing
Projects || Riverside Drive, SA
Projects || 21 Storey Commercial Tower, Kenya
Project Schedule BIM Based 4D
Simulation from Contractor’s Schedule
prepared in Microsoft Project.
Projects || 21 Storey Commercial Tower, Kenya
Keyboard & Mouse Driven Interactive
Photorealistic Walkthrough Simulation.
Projects || Wipro IT, Pune
Development of highly detailed Clash Free MEP Model
Projects || Dhirubhai Ambani International Convention Centre, BKC
Construction Finishing Simulation for
DEPA
Projects || As Built BIM Development for a Retail Chain in UK
Retail Outlet with Site BIM
Projects || As Built BIM Development for a Retail Chain in UK
With all the details embedded in the
model itself.
Projects || As Built BIM Development for a Retail Chain in UK
A Section Cut in 3D