dritrail creation procedure[1]

Upload: shashank-rana

Post on 07-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/4/2019 DRItrail Creation Procedure[1]

    1/22

    1

  • 8/4/2019 DRItrail Creation Procedure[1]

    2/22

  • 8/4/2019 DRItrail Creation Procedure[1]

    3/22

    3

    Agenda

    What is DRI.

    What are the advantage when using DRI.

    How to create DRI trail step after step.

    Hands on training.

  • 8/4/2019 DRItrail Creation Procedure[1]

    4/22

    4

    What is DRI ?

    Dual Ring Interworking (DRI)

    User-assisted DRI

    Automatic DRI

  • 8/4/2019 DRItrail Creation Procedure[1]

    5/22

    5

    The advantage of using DRI

  • 8/4/2019 DRItrail Creation Procedure[1]

    6/22

    6

    One fiber cut.

    Switch to protection path.

  • 8/4/2019 DRItrail Creation Procedure[1]

    7/22

    7

    Two fiber cuts

    TRAFFICAFFECTING!!!!!

  • 8/4/2019 DRItrail Creation Procedure[1]

    8/22

    8

    So,what can we do ?

    Add links:

    TRAFFIC WORKS!!!

  • 8/4/2019 DRItrail Creation Procedure[1]

    9/22

    9

    Even if we have more fiber cut:

    Even with 3 fiber cuts the traffic works!!!

  • 8/4/2019 DRItrail Creation Procedure[1]

    10/22

    10

    DRI

    In order to use it we need to create path from the mainTo the protection andvice versa.

    The step for creating DRI trail:

    1. choose current&underline in the protection filed

    2. Sign V the create trail window DRI.

    3.define the main and the protection path.

    4.define the first link for the bridge.

    5.in the segment window- go to the main and find the linkwhich you already defined for the bridges.

    6.right click and choose DRI bridge.

    7.select the first End Point and its link.

    8.select the secondEnd Point and its link.

  • 8/4/2019 DRItrail Creation Procedure[1]

    11/22

    11

    DRI - Example

    Path from the main to the protection

  • 8/4/2019 DRItrail Creation Procedure[1]

    12/22

    12

    Step A:Define the protection

    criteria and protection type:

  • 8/4/2019 DRItrail Creation Procedure[1]

    13/22

    13

    Step B:Define the main and the

    protection path:

    A

    B

    CD

    E

    G

    H

    I

    JK

    L

    M

    R

    W

    S

  • 8/4/2019 DRItrail Creation Procedure[1]

    14/22

    14

    Step C:Define the first link for the

    main path:

    A

    B

    CD

    E

    G

    H

    I

    JK

    L

    M

    R

    W

    S

  • 8/4/2019 DRItrail Creation Procedure[1]

    15/22

    15

    Selection of the bridge:

    Note: The direction of this link is veryimportant,

    it should be from the main to the

    protection.

    D

    R

    D RLinkName

    STName

    In this case we need the direction

    From D to R.

    Select Segment

    The Same action should be done for the rest of the

    required bridges.

    STName

  • 8/4/2019 DRItrail Creation Procedure[1]

    16/22

    16

    Step D: Select ST for the bridges:

    Afterdefining the first link of the bridge, go the trail path

    List (in the bottom of the left side) and choose the first bridge.

    Press right click and select DRI bridge:

    Note: before

    Defining theBridge, the EP

    Must be selected.

  • 8/4/2019 DRItrail Creation Procedure[1]

    17/22

    17

    Step E: Define the DRI bridge.

    Now you need to match between the server trail and

    the source end point.

    For each bridge we need to match the first end point to one server

    Trail an

    dthe secon

    dend

    point to the other!!!!!

  • 8/4/2019 DRItrail Creation Procedure[1]

    18/22

    18

    After you define which resources will be used for the bridges

    You will see a small blue sign near the resource, in the trail path, inside the tree view:

    This sign shows us that this server in part of bridge.

  • 8/4/2019 DRItrail Creation Procedure[1]

    19/22

    19

    After finishing the definition of the first

    part of each bridge, we can complete

    the trail, and is the result is successfullycompleted we can activate it.

    Note: because of the using of the Path Finder DRI completing can be

    little longer comparing 1+1 protected trail.

    Step F: Complete and activate.

  • 8/4/2019 DRItrail Creation Procedure[1]

    20/22

    20

    The result of the complete:

    A

    B

    CD

    E

    G

    H

    I

    JK

    L

    M

    R

    W

    S

  • 8/4/2019 DRItrail Creation Procedure[1]

    21/22

    21

    Common problems and solutions:

    In case the trail is failed to complete:

    Cross bridge path: Define the DRI bridge

    again, you probably had a mistake in the

    bridge definition.

    In case the trail cant find bridge: check

    the resource trough the server.

    Remember that a bridge need 2 TU12 foractivate.

  • 8/4/2019 DRItrail Creation Procedure[1]

    22/22

    22

    Thanks