TRANSCRIPT
2
Financial Management of Equipment… Evaluating Maintenance & Repair Costs
• Direct Equipment CostsExpenditures against equipment as a result of Planned Maintenance, Breakdown or Preventative Maintenance
• In-Direct Equipment CostsExpenditures undertaken to support and facilitate fleet maintenance; on-site & off-site
3
In-Direct Machine Financial Requirements
Off-Site Support Staffing
Set Up Costs
Tooling
Service Vehicles
On-Site Support Critical Success Factors
Planning
Component Inventory
Parts Inventory
Losses
Consumable Inventory
Non Cat Parts Sourcing
Continuous Improvement
Technical Support
Warranty
Financial Management
Business System
Rebuild Logistics
Inventory Management
Safety
HR & Payroll
Logistics
Management Tree
Training
Staff Recruitment
Staff vs Machines
Early SMU Management
Crane Availability
Fuel Truck Availability
Components vs Machines
Component Planning
Utilization vs. Maintenance
Component Life
Operation Severity
4
Set Up Costs
• Mining normally in Remote Location• Internet connection
– V-SAT– Maintenance of communicatiions
• On Site IT– Computers– Laptops
• Workshop Set Up– Consumable Dispensing Units– Lubricant Suction Units– Air Lines– Demarcation Lines– CC & Safety Signage
• PM Bay Set Up– Walk Around PM Stand– Kidney Loop Equipment Integration– Drip Trays– Tooling Cabinets and Tool Boxes– Workbenches
On Site Support
5
Set up Costs
• Oil Dispensing Units– Environmentally complying Cubes– Fine in-line filtration– Pump– Consumables
• Wash Bay Facility– Pressurized Water Supply allowing
localized and efficient washing• Office Facility
– Furniture– IT – Printers, Scanners etc.– Cupboards, cabinets– Planning Boards
On Site Support
6
Tooling
• Tooling provided to all employees?– Finance Costs– Specialised Tooling Requirements
• Lost / Replacement tooling • Tooling Supply• Lifting Chain Safety Requirements• Non Cat Tooling Sourcing• Tooling Supply• Depreciation• Finance Charge
On Site Support
7
Service Vehicles
• Mobile Fueling Truck– In – pit daily servicing– Daily Inspection of machines– Lubricant and Coolant supply– Selection
• Mobility• Speed• Reliability• Supply• Spare parts & Stocking
• Light Vehicles– Fleet Coverage– On Board Tooling Requirement– Maintenance– Parts Supply and Stocking
On Site Support
8
Service Vehicles
• Specialised Support Equipment– Telehandlers
• Facility Manoeuvrability• Component Replacement• Man Basket Function
– Fork Lift• Parts and Component Manoeuvrability• General Workshop use
– Hiab Truck• Component replacement• Heavy / Large item transport
• Specialised Maintenance Equipment– Welding Bay
• Mobile / Stationary Welding Sets• Work benches
– Compressor• Mobile / Stationary• Air supply in field
On Site Support
9
Planning
• Storage of WIP (Backlog) Parts– Shelving– Plastic Boxes– Clipboards– Warehouse space
• Planning Visual Aids– Component Planning Boards– PM planning Boards
• Information Storage – Business Dealer System
• Capture planning functions
– Machine History Files– Storage Room
On Site Support
10
Parts & Component Inventory
• Parts Availability– Lead Time Variables– Fast Moving vs. Slow Moving Stock– Effect on Machine Availability
• Finance Charges• Warehouse Racking and Manoeuvrability
– Logistics
• Exchange Components– Increase Availability– Component Stands– Installation Kits– Extra ‘Seeded’ Components
• Charges– Finance Cost– Depreciation
• Component Space Allocation– Rust Prevention– Forklift Access
On Site Support
11
Consumable Inventory & Losses• Lubricant
– Grease, Oil & Coolant– Finance Costs– Logistics
• Welding Consumables– Nitrogen & Oxygen Bottles– Grinding Discs– Welding Rods
• Workshop Consumables– Rags– Contamination Control
• Wipes• Mats
• Stationary– Printed Forms– Printer paper and cartridges
• Theft• Dead Stock• Wastage
– Oil & Fuel• Incorrectly ordered parts• Warranty Claims• Poor Workmanship
On Site Support
12
Safety
• Personal Protective Equipment– Vests– Boots– Glasses– Hats– Welding Screens
• Vehicle Safety Enhancements– Flashing Lights– Buggy Whips– ROPS
• Fleet Safety Enhancements– Mounting and Dismounting Standards– Lock Out Devices– Wheel Chocks
• Lifting Device Certification and Training– Chains Periodic Inspection– Crane Inspection and Certification– Lifting Training
On Site Support
13
Operation Severity
• Operation Severity Measurement– Consistency– Key Performance Indicators
• Operator Influence– Long Term Abuse
• Transmission Shifting• Retarder Control• Torque Stall
• Pit Floor / Haulroad Influence– Fleet Life– Labour Hour Calculations– Workshop Space Calculations– Tyre Maintenance
• Loading Practices influence– Strut Maintenance– Body Maintenance– Tyre Maintenance
On Site Support
14
Inventory Management & Non Cat Parts Sourcing
• Central Inventory Control– Initial inventory stocking– Min / Max Setting– Re-ordering metrics– Parts Clearing– In country logistics
• Fast Moving Parts– GET Management
• Cost / Hour• Hrs / Change
– Undercarriage Management• CTS Inspections• Wear rates• Shoe Life• Link Life• Roller Life• Frame Life
• Non CAT Sourcing– Mega Water Truck Spares– Service Truck Spares– Fork Lift Parts
Off Site Support
15
C.I., Technical Support & Warranty
• Continuous Improvement– Site Audits– Conference Calls– PIP/PSP Completions– Fleet Updates
• Technical Support– Repetitive Machine Issues– Urgent Welding and fabrication– Software and Support Documentation– Warranty Follow Up
• Warranty– Documentation Processing– Caterpillar Follow Up– Reporting– Claim follow up and resubmission
Off Site Support
16
Business System and Financial Management
• Parts and Work Order Management– Parts Requests and Additions– Work Order Opening– Invoicing Requirements– Cost Control
• Scheduled Reporting– Work in Progress– Backlog Parts– Non-moving Parts
• Fleet Costs Management– Expenditure versus Budget– Projected Costs– High Costing Machine Areas– Machine Specific Reports– Re-alignment of maintenance practices
along with expenditures
Off Site Support
17
Rebuild Logistics
Off Site Support
Component Return to M.A.R.C. Site
Planned / Unplanned Component Replacement
C.R.C. Strip, Rebuild & Test
(Following R.P.I. Administration)
Component delivery to C.R.C. Workshop
(Component Tags andRepair Instructions)
The 3 week Component Return
Cycle
Fleet Long Life Component Projections
Pre-Prepared 100% Rebuild Kits
Pre-Ordering 100% Kits for all Components
(Seafreight)
Pre-Prepared Labour Enhancements and Structure Upgrade
12 m
onth
Pla
nnin
g pr
oces
s
18
Recruitment, HR & Payroll
• Interviews, medicals and appointments– Selection Criteria– Aptitude Testing– Medical Letters– Unsuccessful Medicals– Appointment Letters
• Inductions– Company inductions– Safety inductions– Initial training
• Union Negotiations• Staff quantity increase
– Payroll Stresses– Allowance calculations
• Provident Funds
Staffing
19
Management Structure
Staffing
Project Manager
Maintenance PlannerSHEMaintenance Supervisor Parts Supervisor
Welding Supervisor Electrical SupervisorService Bay Supervisor Shift Supervisor
Abraham Sackey Alfred Tawiah Samuel Ayiku
Francis Gyakye Alex Baah
Kwasi Amande Isaac Nyarko
Emmanuel EwudziDominic Cudjoe Asare Baidoo
Benjamin AhorseyBuami Xola
GeorgeNkrumah CyrusSampson Larbi
Daniel AcheampongLawrencia Ofosu Gyan
Martin Satekla Gabriel Cudjoe
Hagar NyamekyeKofi Gyimah
Thomas Appiah Lawrence Mensah
Ebenezer Oppong Christian Kumordzi Anthony Aquach
George Blay
Workshop Supervisor
Admin Manager
Terrence BlanksonDaniel Adjah
John Oko AmarteifioSamuel Okine
Fred AkuffoEmmanuel AmuCharles Mends
William Asare DonkorEmmanuel Bart-Plange
James Abban (C)James Asamoah (C)
Isaac ObengAbdul Karim
Nicholas KueviFuseini Amandu
Moses AtivoRichard Kofi Norgbey
Samuel DanquahAgbessi Bamidele Kingsley Appiah Richard Nyanney
James Bilini Samuel Arthur Bekai Darku JohnTanko
AyubaBen VondeyMaxwell Boaitey
Fuel Bay Inspectors Dan Venance
Samuel IncoomPaul Bluvi
Prince Yeboah Lord Cudjoe Lube Truck
Edward Kwame KyiAkakpo MichaelFranklin Kwofie
Peter Danso William AmpahPatrick Boakye
CIL InspectorsGeorge Solomon Richard MensahJohn Kyei Bosco
Samuel Boadi Bramsco Isaac Kyereboah
Wilson VordzorgbeJohn Opoku
Emmanuel Nsiah AdamsGaddiel Amoako
Yussif SeiduAlfred Yankson
Vehicle Info Manager
Hose Technician Rowland Bessieh
Crane operators Ebenezer Asimeng
Wakson Supervisor
Seidu DawudaIbrahim Abubakari
Francis KwofieAugustine Tsiwah
Joel AnkomallBen TakyiKwesi Ano
20
Logistics• Transport
– Staff transport to/from work– Expatriate travel to/from site for
leave/training– Leave / Training Flights– Visitor travel arrangements– External trainers
• Accommodation– On site accommodation for expatriate staff
• Furniture• Kitchen Utensils• Cleaning and Laundry
– Hotels – Local accommodation for training– Visitor and Management Hotel Costs
• Food– Local Food supply
• Dayshift/Nightshift
– Expatriate Meals– Visitor / Management Meals
Staffing
21
Training
• On-Site Training – Room and Projector– Training Co-ordinator– Updated Schedules– Initial induction
• Safety• Contamination Control
• Off-Site Training– Technical– Supervision– Management– Soft Skills– Traineeship
• On-Line Training– SIS– Parts Pro– New Product Information
Staffing
22
Components vs. Machines
• How many spare components do I need on site?
– Fleet Availability Requirements– Rebuild Turnaround Time– Rebuild Failure Rate– Component Durability– Fleet SMU Proximity– Model Importance– Maintenance Strategy
• On-Site / Off-Site Repair• Reman Strategy
• Fleet Example– 1 Power Train Exchange per 10
Equipment Models• >90% Availability• <1 month turnaround• <10% failure rate• >80% Rebuild Life
Critical Success Factors
23
Staff vs Machines
• How many staff do I need on site?– Fleet Size
• Qty of PM’s per day• Average Breakdowns per day• Component Changeouts per day
– Fleet Age• Proximity to Component Changeouts• Specialised Work Required
– Welders (Body repairs)• Breakdown % per day
– Workmanship• Quality of work• Scope Capabilities• Training Needs
– Key Areas• PM Supervisor• Toolstore• Backlog Store• Maintenance Planner
Critical Success Factors
24
Component Life & Planning
• Component Life Extention– Increasing component life does not mean
decreasing cost per hour– Increasing component life and achieving budgeted
rebuild cost will decrease cost per hour– Rear Axle Life
• Kidney Looping• Condition Monitoring
– Oil Cleanliness• High efficient filters• Continuous Monitoring
• Fleet SMU Proximity Implication– Try to avoid Component Change-Out Peaks– Be aware of the possibility of component potential
failure increase.– Plan 12 months in advance– Ensure Parts and Rebuild Centres are aware
• Replacement Strategy– Reman option– Recondition option– New option– After/ Before Failure option– Condition Monitoring option
Critical Success Factors
25
Early SMU Management
• Early Hour Principles– Be aware of the ‘Honeymoon’ Period!– Utilize Training Opportunity– Keep Work Efficiency High– Ensure the Asset is looked after, not the
breakdown– Ensure Systems and Procedures are
adhered to.• Contamination Control• Safety
– Keep discipline consistent– Assign Roles and responsibilities– Ensure fully furnished workshop
• Tooling• Fabricated Stands• Fabricated Steps
– Plan some components early– Validate parts kits
• PM• Component Replacement
Critical Success Factors
26
Crane & Fuel Truck
• Crane Usage– Vital in machine build– Component Changeouts
• Dump Bodies
• Fuel Truck Availability– Vital for all tracked machines
• Fuel Truck Spec– Fuel Capacity– Oil Types– Pump capacity and flow rate
• Quantity of fuel trucks– Tracked Fleet quantity– Strategy
• Truck fueling• In pit Fuel Bay
Critical Success Factors
27
Utilization vs Availability
• Projected utilization of fleet key to facility and maintenance planning
– Components – Staff– Workshop Space – Tooling – Rebuild Centres
• Utilization is directly proportionate to machine downtime
– Availability in relation to calendar hours will vary due to machine utilization
– Example• 8760hrs Calender Hours• 50% Utilized 4380 hrs worked• 800hrs downtime 91% Availability
• 75% Utilized 6570 hrs worked• 1200hrs downtime 86% Availability
Critical Success Factors
28
In-Direct Machine Financial Requirements
Off-Site Support Staffing
Set Up Costs
Tooling
Service Vehicles
On-Site Support Critical Success Factors
Planning
Component Inventory
Parts Inventory
Losses
Consumable Inventory
Non Cat Parts Sourcing
Continuous Improvement
Technical Support
Warranty
Financial Management
Business System
Rebuild Logistics
Inventory Management
Safety
HR & Payroll
Logistics
Management Tree
Training
Staff Recruitment
Staff vs Machines
Early SMU Management
Crane Availability
Fuel Truck Availability
Components vs Machines
Component Planning
Utilization vs. Maintenance
Component Life
Operation Severity