elevation a footpath - civica · existing ee/h3g bts3900a 1800 rfc & apm30 ver.d side by side...

1
Mobile Broadband Network Limited Sixth Floor, Thames Tower, Station Road, Reading, RG1 1LX Hatfield Hatfield Business Park Tel: 01707 315000 Fax: 01707 319001 Hertfordshire AL10 9BW H3G Base Station Information line: Hutchison 3G UK Limited Fax: 01628 765 001 0845 6043000 Tel: 01628 765 000 Available 8am-8pm Monday to Friday Star House, 20 Grenfell Road Maidenhead, SL6 1EH Master: MBNL / EE / H3G: Project: Revision / Upgrade Description: Purpose of Issue: Issue: Date: Drawn: Checked: Approved: A. Dobson U. Patel D. Warren 08/06/2020 M001 MBNL T&A Planning A First Issue - Site nomimation dated: TBC Site Name: Title: Purpose of Issue: Master Drawing No: EE Cell ID: MBNL Cell ID: 3UK Cell ID: Project: Issue: Address: Site ID: Mobile Broadband Network Limited Sixth Floor, Thames Tower, Station Road, Reading, RG1 1LX Hatfield Hatfield Business Park Tel: 01707 315000 Fax: 01707 319001 Hertfordshire AL10 9BW H3G Base Station Information line: Hutchison 3G UK Limited Fax: 01628 765 001 0845 6043000 Tel: 01628 765 000 Available 8am-8pm Monday to Friday Star House, 20 Grenfell Road Maidenhead, SL6 1EH v1.9 PLANNING 21430 BRW029 CM0277 1101856_BRW029_21430_CMO277_M001 A RUNNING WATER SW BRENTWOOD ESSEX CM13 2AP H3G UNILATERAL SW RUNNING WATER SW 1101856 Design Consultant & Principal Contractor: Unit E, Madison Place, Northampton Road, Manchester, M40 5AG Tel: 0161 785 4500 Fax: 0161 785 4501 Web: www.clarke-telecom.com Proposed 4G/5G Bearing 30° 30° 150° 150° 270° 270° Antenna Aperture ID A1 A2 B1 B2 C1 C2 Operator: Shared/ EE/H3G H3G EE/H3G H3G EE/H3G H3G EE/H3G 10mm 50mm 100mm V 1.8 10mm 50mm 100mm V 1.8 215 MAX CONFIGURATION SITE PLAN PROPOSED MAX CONFIGURATION SITE PLAN 0 8 1:200 5m NOTES: 1. ALL DIMENSIONS IN MM UNLESS OTHERWISE NOTED. ELEVATION A EXISTING OLO EQUIPMENT CABINET EXISTING OLO EQUIPMENT CABINET EXISTING OLO STREETWORKS POLE EXISTING OLO EQUIPMENT CABINET EXISTING BT INSPECTION CHAMBER EXISTING NEC NODE B CABINET ON ROOT FOUNDATION TO BE REMOVED AND GROUND MADE GOOD EXISTING EE/H3G BTS3900A 1800 RFC & APM30 VER.D SIDE BY SIDE CABINETS (AC FED) ON PLINTH ON ROOT FOUNDATION TO BE REMOVED & RELOCATED AND GROUND MADE GOOD EXISTING POGONA CABINET ON ROOT FOUNDATION TO BE REMOVED AND GROUND MADE GOOD EXISTING ROAD SIGN EXISTING STREET SIGN EXISTING 10.0m HIGH STREETLIGHT EXISTING SERVICE PILLAR EXISTING INSPECTION CHAMBER EXISTING DRAW PIT EXISTING DRAW PIT EXISTING 14.7m high PHASE 4 SW TOWER ON ROOT FOUNDATION TO BE REMOVED AND GROUND MADE GOOD BRENTWOOD ROAD (30 MPH) GRASS VERGE FIELD TARMAC FOOTPATH EXISTING 1.1m HIGH TIMBER POST AND RAIL FENCE EXISTING TREES 7.0m HIGH APPROX EXISTING METER CABINET ON ROOT FOUNDATION TO BE REMOVED AND GROUND MADE GOOD RUNNING WATERS (30 MPH) BRENTWOOD ROAD (30 MPH) PROPOSED EE/H3G WRAP-AROUND CABINET BUILT AROUND BASE OF PROPOSED STREET POLE PROPOSED 17.0m HIGH EE/H3G PHASE 8 STREET POLE ON NEW ROOT FOUNDATION. PROPOSED H3G COMMSCOPE BOWLER EQUIPMENT CABINET TO BE INSTALLED ON NEW COMBINED ROOT FOUNDATION PROPOSED H3G HUAWEI APM5930 EQUIPMENT CABINET TO BE INSTALLED ON NEW COMBINED ROOT FOUNDATION EXISTING RELOCATED EE/H3G BTS3900A 1800 RFC & APM30 VER.D SIDE BY SIDE CABINETS ON PLINTH ON NEW ROOT FOUNDATION PROPOSED H3G 1TRY Mk5 LINK/AC CABINET TO BE INSTALLED ON NEW ROOT FOUNDATION PROPOSED H3G COMMSCOPE KOMODO EQUIPMENT CABINET TO BE INSTALLED ON NEW ROOT FOUNDATION

Upload: others

Post on 21-Feb-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELEVATION A FOOTPATH - Civica · existing ee/h3g bts3900a 1800 rfc & apm30 ver.d side by side cabinets (ac fed) on plinth on root foundation to be removed & relocated and ground made

Mobile Broadband N

etwork Lim

itedSixth Floor, Tham

es Tower, Station R

oad, Reading, R

G1 1LX

Hatfield

Hatfield Business Park

Tel: 01707 315000Fax: 01707 319001

Hertfordshire

AL10 9BW

H3G

Base Station Information line:

Hutchison 3G

UK Lim

ited

Fax: 01628 765 001

0845 6043000

Tel: 01628 765 000

Available 8am-8pm

Monday to Friday

Star House, 20 G

renfell Road

Maidenhead, SL6 1EH

Design C

onsultant & Principal Contractor:

Master:

MBN

L / EE / H3G

:Project:

Revision / U

pgrade Description:

Purpose of Issue:Issue:

Date:

Draw

n:C

hecked:Approved:

A. Dobson

U. Patel

D. W

arren08/06/2020

M001

MBN

LT&A

PlanningA

First Issue - Site nomim

ation dated: TBC

Site Nam

e:

Title:

Purpose of Issue:

Master D

rawing N

o:

EE Cell ID

: M

BNL C

ell ID:

3UK C

ell ID:

Project:

Issue:

Address:

Site ID:

Mobile Broadband N

etwork Lim

itedSixth Floor, Tham

es Tower, Station R

oad, Reading, R

G1 1LX

Hatfield

Hatfield Business Park

Tel: 01707 315000Fax: 01707 319001

Hertfordshire

AL10 9BW

H3G

Base Station Information line:

Hutchison 3G

UK Lim

ited

Fax: 01628 765 001

0845 6043000

Tel: 01628 765 000

Available 8am-8pm

Monday to Friday

Star House, 20 G

renfell Road

Maidenhead, SL6 1EH

v1.9

PLANN

ING

21430BR

W029

CM

0277

1101856_BRW

029_21430_CM

O277_M

001A

RU

NN

ING

WATER

SWBR

ENTW

OO

DESSEX

CM

13 2AP

H3G

UN

ILATERAL SW

RU

NN

ING

WATER

SW

1101856

Design C

onsultant & Principal Contractor:

Unit E, M

adison Place, Northam

pton Road,M

anchester, M40 5AG

Tel: 0161 785 4500 Fax: 0161 785 4501W

eb: ww

w.clarke-telecom

.com

Proposed4G

/5GBearing

30°

30°

150°

150°

270°

270°

AntennaAperture

IDA1A2B1B2C

1C

2

Operator:

Shared/EE/H

3G

H3G

EE/H3G

H3G

EE/H3G

H3G

EE/H3G

10mm 50mm 100mmV 1.8

10mm 50mm 100mmV 1.8

215 MAX C

ON

FIGU

RATIO

N SITE PLAN

PRO

POSED

MAX C

ON

FIGU

RATIO

N SITE PLAN

08

1:2005m

NO

TES:

1.ALL D

IMEN

SION

S IN M

M U

NLESS O

THER

WISE N

OTED

.

ELEVATION

A

EXISTING

OLO

EQU

IPMEN

T CABIN

ET

EXISTING

OLO

EQU

IPMEN

T CABIN

ETEXISTIN

G O

LO STR

EETWO

RKS PO

LE

EXISTING

OLO

EQU

IPMEN

T CABIN

ETEXISTIN

G BT IN

SPECTIO

N C

HAM

BER

EXISTING

NEC

NO

DE B C

ABINET O

N R

OO

T FOU

ND

ATION

TO BE R

EMO

VED AN

D G

RO

UN

D M

ADE G

OO

D

EXISTING

EE/H3G

BTS3900A 1800 RFC

& APM30 VER

.D SID

E BYSID

E CABIN

ETS (AC FED

) ON

PLINTH

ON

RO

OT FO

UN

DATIO

NTO

BE REM

OVED

& RELO

CATED

AND

GR

OU

ND

MAD

E GO

OD

EXISTING

POG

ON

A CABIN

ET ON

RO

OT FO

UN

DATIO

NTO

BE REM

OVED

AND

GR

OU

ND

MAD

E GO

OD

EXISTING

RO

AD SIG

N

EXISTING

STREET SIG

N

EXISTING

10.0m H

IGH

STREETLIG

HT

EXISTING

SERVIC

E PILLAR

EXISTING

INSPEC

TION

CH

AMBER

EXISTING

DR

AW PIT

EXISTING

DR

AW PIT

EXISTING

14.7m high PH

ASE 4 SW TO

WER

ON

RO

OT FO

UN

DATIO

NTO

BE REM

OVED

AND

GR

OU

ND

MAD

E GO

OD

BRENTWOOD ROAD (30 MPH)

GR

ASSVER

GE

FIELD

TARM

ACFO

OTPATH

EXISTING

1.1m H

IGH

TIMBER

POST AN

D R

AIL FENC

E

EXISTING

TREES 7.0m

HIG

H APPR

OX

EXISTING

METER

CABIN

ET ON

RO

OT FO

UN

DATIO

NTO

BE REM

OVED

AND

GR

OU

ND

MAD

E GO

OD

RUNNING WATERS

(30 MPH)

BREN

TWO

OD

RO

AD (30 M

PH)

PRO

POSED

EE/H3G

WR

AP-ARO

UN

D C

ABINET BU

ILTAR

OU

ND

BASE OF PR

OPO

SED STR

EET POLE

PRO

POSED

17.0m H

IGH

EE/H3G

PHASE 8

STREET PO

LE ON

NEW

RO

OT FO

UN

DATIO

N.

PRO

POSED

H3G

CO

MM

SCO

PE BOW

LER EQ

UIPM

ENT C

ABINET

TO BE IN

STALLED O

N N

EW C

OM

BINED

RO

OT FO

UN

DATIO

N

PRO

POSED

H3G

HU

AWEI APM

5930 EQU

IPMEN

T CABIN

ET TOBE IN

STALLED O

N N

EW C

OM

BINED

RO

OT FO

UN

DATIO

N

EXISTING

RELO

CATED

EE/H3G

BTS3900A 1800 RFC

& APM30 VER

.D SID

EBY SID

E CABIN

ETS ON

PLINTH

ON

NEW

RO

OT FO

UN

DATIO

N

PRO

POSED

H3G

1TRY M

k5 LINK/AC

CABIN

ETTO

BE INSTALLED

ON

NEW

RO

OT FO

UN

DATIO

N

PRO

POSED

H3G

CO

MM

SCO

PE KOM

OD

O EQ

UIPM

ENT C

ABINET

TO BE IN

STALLED O

N N

EW R

OO

T FOU

ND

ATION