elte engineering l.l.c skopje company for manufacturing,...
TRANSCRIPT
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 1 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
About ELTE Engineering L.L.C. Skopje ELTE Engineering L.L.C. Skopje, has been established in 1999. Operated in managerial style and well developed organizational culture whose dominant values and norms are evolving continuously and becoming relatively sound features in the life of the organization.
ELTE Engineering L.L.C. Skopje is a company where in recent years there has been an average of 100 employees of different profiles, allocated in the respective departments:
Engineering Department
Department of Quality control and Technical preparation
Projecting Department
Operational Department
Department for Economic and Financial affairs
Commercial Department
ELTE Engineering L.L.C. Skopje is a company that specializes in repairs, revitalization of energy and industrial plants, welding, assembly and maintenance of equipment in the energy and mechanical engineering of a wide range of companies.
ELTE Engineering L.L.C. Skopje is working on the erecting of new hydro power plants with its’ own complete engineering, feasibility studies, design, supervision and construction of the same.
ELTE Engineering L.L.C. Skopje is founder of ELTE Hydro L.L.C. (sole proprietorship) Skopje, established in 2010. The main activity of ELTE Hydro L.L.C. (sole proprietorship) Skopje is the design and construction of small hydro power plants in the Republic of Macedonia. Its portfolio includes 3 small Hydro Power Plants: HPP Konjarka 236, HPP Eshterec 372 and HPP Konjarka 235.
ELTE Engineering L.L.C. Skopje is working on assembly of new facilities for gasification, new petrochemical facilities, new equipment and plants for mining.
In the scope of repair activities ELTE Engineering L.L.C. Skopje, is working on repairs of
installations in current Thermal Power Plants in Macedonia, existing hydropower plants and existing petrochemical facilities, as well as on repairs and maintenance of steam boilers for
large customers in Macedonia.
ELTE Engineering L.L.C. Skopje is a company that follows all the world trends in the field of mechanical engineering. The company follows all necessary certification and licensing. ELTE Engineering is a company with A Licenses for Construction Supervision and Design in Mechanical
Engineering, an ISO 9001: 2008 and ISO 14001 certification procedure: 2004.
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 2 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
HPP Matka
Assembly of new machine building -
Reconstruciton year 2007, 2008
In the period from 2006 to 2008 HPP Matka has been modernized by erecting a new machine hall and complete installation of the mechanical equipment
ELTE Engineering L.L.C. Skopje has been working on reconstruction of Hydro Power Plants for many years.
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 3 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
“MAKHIDRO PROEKT” KO AD
St.Marsal Tito No.43/1-6
1000 Skopje R.Macedonia
1. Object: HPP Matka-Skopje Production and delivery of steel plates(2 large and 1 small cap) for HPP Matka 2. Object: HPP Matka-Skopje Production and assembly of connector for flow gauge of Penstock 1 and 2 3. Object: HPP Matka-Skopje - welding and assembly of equipment for drainage pipe of pipeline DN 2500 - value reduction due to fail examination with ultrasound control of 4 joints Ø 219 4. Object: HPP Matka-Skopje Payment after phase 3 equipment installing (Appendix 04-Payment conditions) 5. Object: HPP Matka-Skopje - welding of steel joint Ø320x8 6. Object: HPP Sapuncica-Bitola - bypass intervention 7. Object: HPP Matka-Skopje - Dismantling Joint installation 8. Object: HPP Matka-Skopje - production and assembly of ladders and access platform in water tower on HEC Matka 9. Object: HPP Matka-Skopje Production and assembly of steel plate – diaphragm 10. Object: HPP Matka-Skopje Assembly with plates and pipes for gauging instruments on Penstock 1and 2 11. Object: HPP Matka-Skopje - revitalisation of pipeline with bypass Assembly of elements for gauging instruments, supply and assembly of pipe for air reduction on HEC Pesocani - additional activities - welding of joint DN 300 - welding of joint DN 50 12. Object: HPP Matka-Skopje Pipeline No.1 and 2 anticorrosive protection 13. Object: HPP Matka-Skopje Payment after finishing works 14. Object: HPP Matka-Skopje Supply and installation of Penstock, payment after delivery of Documentation for HPP. 15. Object: HPP Matka-Skopje Supply and installation of Penstock, payment after commencement of HPP Matka
Current Year 2008
“MAKHIDRO PROEKT” KO AD
St.Marsal Tito No.43/1-6
1000 Skopje R.Macedonia
1. Object: HEC Dosnica-Demir Kapija Turbine no.1 oil tank revitalisation
2. Object: HPP Matka-Skopje Pipeline machine production phase 1,3 and 3.
3. Object: HPP Matka-Skopje - Production and welding of front welded joint of INOX pipe Ø 219 with GTAW (141) procedure - production and welding of angle welded joint on
Current Year 2007
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 4 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
INOX pipe with Draft Tube Ø 219 with SMAW procedure. 4. Object: HPP Matka-Skopje Draft Tube and Cone installation 5. Object: HPP Matka-Skopje Welding and processing of 4 flanges channels connected with MIV 6. Object: HPP Matka-Skopje Spiral Cases installation, 7. Object: HPP Matka-Skopje HPP Matka pipeline - processing of phase 1 and 2 (temporary cap) - processing of phase 1 and 2 (non-invoiced flanges) - installation of phase 1 and 2 (installation deduction of temporary caps and non-installed Dismantling Joint deduction) 8. Object: HPP Matka-Skopje Turbine embedded part installation 9. Object: HPP Matka-Skopje Additional works on pipeline No.1 - engaging of labour for vertical pipe No.1 descent - engaging of labour for vertical pipe No.1 ascent
“MAKHIDRO PROEKT” KO AD
St.Marsal Tito No.43/1-6
1000 Skopje R.Macedonia
1. Object: HPP Pena-Tetovo – Turbo-aggregate revitalization
2. Object: HPP Matka-Skopje – Manufacturing and assembling of:
- steel bearing construction - access ladders for people and equipment
to the tunnel - tunnel materials extracting channel
3. Object: HPP Pena-Tetovo – Performed work activities on doors and railings.
4. Object: HPP Pena-Tetovo – Performed work activities on doors and railings – additional works.
5. Object HEC Dosnica –Demir Kapija - Turbine No.1 oil tank revitalization. The tank cracks revitalization is performed using machine processing and arc welding.
Current Year 2006
“MAKHIDRO PROEKT” KO AD
St.Marsal Tito No.43/1-6
1000 Skopje R.Macedonia
Revitalization and acculturation of hydropower plants in Republic of Macedonia:
HPP Pesocani – Ohrid
HPP Sapuncica – Bitola
HPP Sapuncica – Stara Buka
HPP Matka – Skopje
Current Year 2005
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 5 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Elektroprivreda Crne Gore, A.D. Nikshic,
TPP ”Pljevlja”, Pljevlja
TPP Pljevlja, Montenegro
TPP “Pljevlja” is the first Montenegrin Condensation Thermal Power Plant
designed with two units with capacity of 210 MW both. Water accumulation and
administrative buildings are constructed in two units also. TPP Pljevlja burns
Pljevlja’s coal with guaranteed caloric value of 9211 kJ/kg (220 Kcal/kg).
BЕТ Balkan Energy Team, Tadeuska Koscuska no. 56
11000 Belgrade, R.Serbia
- Services in TPP Pljevlja for sealing and replacing the hanging of the boiler
- Services in TPP Plevlja, overhaul of facilities and equipment for delivering coal
May - June 2013 година
VIA OCEL D.О.О. Tadeuska Koscuska no. 56
11000 Belgrade, R.Serbia
- Mechanical services for overhaul needs in TPP Plevlja, party 1 and 2.
May - June 2012 година
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 6 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Mining and Energy Combine Bitola
Plant whose main activity is the production of electricity and coal is the largest in the Macedonian power system is comprised of two production units: Mine "Suvodol" and the Thermal unit.
Production at the plant began in 1980, with mining tailings from the first BTS system (excavator, track, Stacker), and the
first kilowatt-hours of electricity were obtained in 1982 when the first of the three blocks in the plant began with work.
TPP "Bitola" provides over 72 per cent share in the total production of electricity in the domestic power system.
With the opening of a new coal mine Brod - Gneotino located in Pelagonija pool, it is estimated that the life of the plant will be extended for at least 15 years
ELTE Engineering L.L.C. Skopje each year participate in the regular annual overhauls in TPP Bitola, interventions and
other projects of the Investor
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 7 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
≠ Mechanical – assembly activities on boiler and auxiliary facilities
Coal System Mill ventilator with separator Steam way tract
≠ Mechanical – assembly activities on turbo generator and auxiliary facilities
Pumps Other works in Machine Hall and
auxiliary facilities ≠ Mechanical – assembly activities for
reinforcements, pipelines, welding and ash removal
Reinforcements Pipelines and welding
Overhaul activities for current year 2012 for Block 2
“ENERGO SISTEM” D.O.O Skopje
Servisna Zona Jug
≠ Modernization of Unit 2 TPP Bitola, MEC Bitola, Bitola in 2013 July - September 2013
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
≠ Mechanical – assembly activities on boiler and auxiliary facilities
Coal System Mill ventilator with separator Steam way tract
≠ Mechanical – assembly activities on turbo generator and auxiliary facilities
Pumps Other works in Machine Hall and
auxiliary facilities ≠ Mechanical – assembly activities for
reinforcements, pipelines, welding and ash removal
Reinforcements Pipelines and welding
Overhaul activities for current year 2012 for Block 1
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
≠ Mechanical – assembly activities on boiler and auxiliary facilities
Coal System Mill ventilator with separator Steam way tract
≠ Mechanical – assembly activities on turbo generator and auxiliary facilities
Pumps Other works in Machine Hall and
auxiliary facilities ≠ Mechanical – assembly activities for
reinforcements, pipelines, welding and ash removal
Reinforcements Pipelines and welding
Overhaul activities for current year 2012 for Block3
“TERMOELEKTRO” “Uralska” 9
11060 Belgrade R.Serbia
≠ Modernization of Block 3 TPP Bitola,
Bitola 2012 August – November 2012
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 8 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.11-2391/1 from 03.05.2011
- Services for using of specialised labour during the 2011 overhaul in TE REK Bitola for boiler installations and auxiliary objects LOT1-Coal system LOT2-Mill ventilator with separator LOT3-Gas-air apparatus LOT4-Steam way apparatus
By Contract No.11-2396/1 from 03.05.2011
- Services for using of specialised labour during the 2011 overhaul in TE REK Bitola for turbo generator and auxiliary objects LOT2-Pumps LOT3-Residuary works in MS and PO
By Contract No.11-1788/5 from 03.05.2011
- Services for using of specialised labour during the 2011 overhaul in TE REK Bitola for metal and welding control LOT2-Managing resources
By Contract No.11-1789/1 from 09.05.2011
- Services for using of specialised labour during the 2011 overhaul in TE REK Bitola for reinforcement, pipelines, welding and de-ash. LOT1-reinforecement LOT2-Pipelines and welding
By Contract No.11-3893/1 from 27.07.2011
- Services for using of specialised labour during the 2011 overhaul and current maintenance in TE REK Bitola for balancing rotors
LOT1-Balancing rotors
Overhaul Activities for 2011 in T3 and T2
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
- Call interventions by Contracts: Contract No.11-2391/1 from 03.05.2011 Contract No.11-1788/5 from 03.05.2011 Contract No.11-1788/5 from 03.05.2011 Contract No.11-1789/1 from 09.05.2011
Current Year 2011
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.11-3294/6 from 07.06.2011 - Services for overhaul activities of
mining equipment in PE Rudnici Bitola Slag Excavators
By Contract No.11-4225/6 from 25.08.2011 - Services for overhaul activities of
mining equipment in PE Rudnici Bitola Coal Excavators
By Contract No.11-4227/1 from 25.08.2011 - Services for overhaul activities of
mining equipment in PE Rudnici Bitola Slag Excavators
Disposals, ESh’s, transport conveyers hydraulics
Maintenance Activities for 2011
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.09r. 5609/1 from 26.11.2008 Electro-machine assembly of mining equipment:
Excavator SRs (x) 1050.23/2,0 and
Disposal Unit A2 Rs-V 5500.60
Current Year 2010
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.11-2011/1 1. Maintenance services in year
2010 in TE-REK Bitola for boiler units and auxiliary objects by LOT’s and positions
By Contract No.11-2216/1 2. Maintenance services in year
2010 in TE-REK Bitola for reinforcement, pipelines welding and ash cleaning for LOT 1 and LOT 2 by positions
Maintenance Activities for Year 2010 in T3 and T1
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.03-2570/04 from 28.05.2009 and Annex No.03-708 from 16.02.2010
Labour services for call intervention in PE Termoelektrani PE Rudnici,Bitola for call intervention – machine works
Interventions in March-Year 2010 T2
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 9 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.03-2570/4 from 28.05.2010 and Annex No.03-708 from 16.02.2010
Services for call intervention in PE Termoelektrani PE Rudnici,Bitola
By Contract No.03-4016/1 from 25.08.2010 and Annex No.03-709 from 16.02.2010
Services for call intervention in PE Termoelektrani PE Rudnici,Bitola
Interventions in Current Year 2009 and 2010
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract for regular yearly maintenance for: 09-1917/1 from 16.04.2009
- Mill fans - Aero mixture channels - Air tract
Maintenance Activities for
Year 2009
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.09r. 5609/1 from 26.11.2008 Electro-machine assembly of mining equipment:
Excavator SRs (x) 1050.23/2,0 and
Disposal Unit A2 Rs-V 5500.60
Current Year 2009
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract for regular year maintenance for: - 2008 – Contract No.09-2050/1 from 06.05.2008 - 2007 – Contract No.09-1675/1 from 07.05.2007 - 2005 – Contract No.09-1290-1 from 28.04.2005
Maintenance Activities for
Year 2008,
2007 and 2005
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 10 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Electro – Mechanical assembly of Excavator SRs (H) 1050.23/2.0
REK Bitola - 2009, 2010
In the period from January 2009 to May 2010 on the plateau of Mine Suvodol in REK Bitola was carried out an successful electro-mechanical assembly of Excavator SRs (H) 1050.23/2.0.
Electro – Mechanical assembly of Disposal unit А2Rs (B) 5500.60
Rek Bitola - 2009
In the period from December 2008 to December 2009 on the plateau in power plant REK Bitola was carried out an successful electro-mechanical assembly of Disposal unitr A2 Rs-B 5500.60
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 11 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Mining and Energy Combine “REK Bitola” - Bitola
The coal is dominant electroenergetical resource for producing electric power. Coal and gas combined are holding more than 50% of electric power production in EU and will remain important resources in the next decades. Coal – Lignite is the main resource in the power system in Macedonia. It has been using in industry, central heating, etc. For us it is essential
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.09r. 5609/1 from 26.11.2008 Electro-machine assembly of mining equipment:
Excavator SRs (x) 1050.23/2,0 and
Disposal Unit A2 Rs-V 5500.60
Current Year 2010
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.09r. 5609/1 from 26.11.2008 Electro-machine assembly of mining equipment:
Excavator SRs (x) 1050.23/2,0 and
Disposal Unit A2 Rs-V 5500.60
Current Year 2009
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 12 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
that discovery of new sources, production and usage remain continuous.
Strategically it can be concluded that the future of the energy sector in Macedonia is in the already established and potential coal reserves. The total coal reserves along with potential Pelagonija basin are estimated at 2.5 billion tons.
Macedonian coal is lignite with relatively low calorific value and high moisture content and ash. Coal in RM is currently
being exploited in two types of mines. The first type mines that are within the power plants for electricity production (Suvodol, Oslomej), and the second type mines that meet the needs of industry and consumers of coal as a fuel.
Base energy power system of the state is based on coal potential Kicevo and Pelagonija pool and its established coal
mines: SPOT Brod-Gneotino, Zivojno, Oslomej, Popovjani and Stragomishte, which enabled the opening of both our major coal quarries – PK Oslomej and PK Suvodol
Natural conditions and established reserves of coal deposits, as well as the technical possibilities of the energy system is a
kind of guarantee that in the future will continue the continued operation of thermal power plants. Of the identified 664 million tons of geological reserves of coal in the RM, it is estimated that 38% can be exploited with Surface Mining, and the
rest with pit-underground technology. Pit-underground coal mining in our region has not yet been represented.
It is expected that in the future coal will have a large application in industry, central heating and in wide range of consumers. Our country is energy dependent on its research, production and use.
Environmental pollution when using lignitite is their weak side, but setting strict environmental criteria and maximum care to protect labor and the environment are our priorities
ELTE Engineering L.L.C. Skopje in the recent years participated in the regular annual repairs and interventions of mining
equipment at REK Bitola.
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 13 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.11-3294/6 from 07.06.2011 - Services for overhaul activities of mining equipment in
PE Rudnici Bitola Slag Excavators
By Contract No.11-4225/6 from 25.08.2011 - Services for overhaul activities of mining equipment in
PE Rudnici Bitola Coal Excavators
By Contract No.11-4227/1 from 25.08.2011 - Services for overhaul activities of mining equipment in
PE Rudnici Bitola Slag Excavators
Disposals, ESh’s, transport conveyers hydraulics
Maintenance Activities for 2011
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.03-2570/04 from 28.05.2009 and Annex No.03-708 from 16.02.2010
Labour services for call intervention in PE Termoelektrani PE Rudnici,Bitola for call intervention – machine works
Interventions in March-Year 2010
T2
AD “ELEM” Skopje Branch REK Bitola
Novacki Pat bb R.Macedonia
By Contract No.03-2570/4 from 28.05.2010 and Annex No.03-708 from 16.02.2010
Services for call intervention in PE Termoelektrani PE Rudnici,Bitola
By Contract No.03-4016/1 from 25.08.2010 and Annex No.03-709 from 16.02.2010
Services for call intervention in PE Termoelektrani PE Rudnici,Bitola
Interventions in Current Year 2009 and 2010
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 14 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Mining and Energy Plant “REK Oslomej”
The smallest TPP in Macedonia’s power system is Mine and Energy Plant is “Oslomej” in Kicevo with installed capacity of
125 MW and net - annual production of 700 GWh / year.
TPP "Oslomej" began with production in 1980 and until today the notes excellent production results
This plant provides about 9 percent of the total electricity production in the Republic of Macedonia
ELTE Engineering L.L.C. Skopje each year participate in the regular annual overhauls in TPP Oslomej, interventions and other projects of the Investor
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
- Mechanical – assembly activities in Machine Hall and reinforcement:
Connections for replacement of valves with various dimensions
Mechanical – assembly activities in turbine and generator
Revision of “French” clamps and control of the hydraulics
Revision of steam colander
-Mechanical – assembly activities for works in boiler: Taking of short pipes from group 265 and its replacement Taking of short pipes from group 271 and its replacement
Taking of short pipes from group 222 and its replacement Control of steam line RB and calibrating
Overhaul activities for
2013
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
- Mechanical – assembly activities in Machine Hall and reinforcement:
Connections for replacement of valves with various dimensions
Mechanical – assembly activities in turbine and generator
Revision of “French” clamps and control of the hydraulics
Revision of steam colander
-Mechanical – assembly activities for works in boiler: Taking of short pipes from group 265 and its replacement Taking of short pipes from group 271 and its replacement
Taking of short pipes from group 222 and its replacement Control of steam line RB and calibrating
Overhaul activities for
2012
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 15 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
By Contract No.11-373/6 from 31.05.2011 - Services for using of specialised labour during the 2011 overhaul
in TE REK Oslomej for works in measurement, testing and control (Testing on VP steam ways by program)
By Contract No.2908/1 from 31.05.2011 - Services for using of specialised labour during the 2011 overhaul
in TE REK Oslomej for works on turbine and generator (steam ways suspension control)
By Contract No.11-3073/1 from 07.06.2011 - Services for using of specialised labour during the 2011 overhaul
in TE REK Oslomej for works on boiler (boiler suspension, hardware, welding works)
Maintenance Activities for
2011
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
By Contract No.09-1211 1. Maintenance services in boiler (maintenance 2010)
Elbows replacement of economizer ǿ38 x 4/K18
Mill No.6 and double layer control
Coal dust channels No.6 By Contract No.09-1151
2. Maintenance services of reinforcement in boiler and machine hall
Reinforcement in machine hall
Valve grinding in machine hall
Valve replacement in machine hall By Contract No.09-1150
3. Maintenance services in machine hall in TE (maintenance 2010)
Burning machine 120KW
Burning machine 80KW
Burning machine operators By Contract No.09-1551
4. Maintenance services in TE for measuring, examination and control (maintenance in TE 2010)
Turbine parts examination with NDT methods by program Examination of high pressure steam lines with NDT methods by
program
By Contract No.09-1524 from 05.07.2010 Machine-welding services
Maintenance Activities for
2010
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 16 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
By Contract No.07-13/2009
Maintenance services for boiler in TE By Contract No.07-14/2009
Maintenance services for turbo aggregate in TE By Contract No.07-15/2009
Maintenance services in machine hall in TE By Contract No.07-16/2009 Maintenance services – reinforcement in TE
Maintenance Activities for
2009
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
By Contract No.09-976 from 08.05.2008 1. Turbine maintenance services 2. control of steam lines RA,RB,RC and RL and calculated calibrating
Maintenance Activities for
2008
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
1. Turbine repair services. Turbine paddle necessary replacement Pipelines welding activities Exemination, metal control on VP steam lines by program, collector to boiler joints. 2. Repair services on auxiliary objects: Exemination on plug of gr.275 Ø44.5x3 – material 10N2M Exemination on plug of gr.275 Ø44.5x3 – material 10NM Chambers examination – gr.275 with magnetic flux, penetrants.
Repair Activities
May-August Year 2007
AD “ELEM” Skopje Branch REK Oslomej
Oslomej R.Macedonia
REK Oslomej PE-TE - Spare parts supply for turbine, generator and alarm - Tank devices repair (economizer knees replacement) - Welding works in workshop - Auxiliary objects repair (replacement of tank thrust
pipeline on pump Ø 168.3 × 8) - Tank-boiler devices repair and boiler testing - Repair at workshop (replacement of paddles on rotor NP
VI grade) - Repair at workshop (replacement of new hangers on tank
with spring adjustment)
Repair Activities for
Year 2005
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 17 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Branch ENERGETIKA, Skopje Branch “Energetika” is located in the municipality of Zhelezara in Skopje
Designed and built to provide a complete power supply, technological steam and hot water for heating systems of all
consumers within Mines and Still Mill Skopje
Its construction was completed in 1967, when production begins, and natural gas as the type of fuel used. Its facilities consist of a steam boiler with an output of 96 MW, steam turbine with an output of 12.5 / 15 MW and a
generator with an output of 75 MW
ELTE engineering L.L.C Skopje throughout the 2012 participate in the construction of the heating pipeline in settlement Avtokomanda and settlement Zhelezara as well as on other projects of the Investor
AD “ELEM” Skopje Branch “Energetika”
St. “11 Oktomvri” No.9 1000 Skopje R.Macedonia
- Making the main heating pipeline from the settlement Avtokomanda to branch “Energetika” - Skopje
March – November Year 2012
AD “ELEM” Skopje Branch “Energetika”
St. “11 Oktomvri” No.9 1000 Skopje R.Macedonia
- Reconstruction and expansion of the main heating pipeline from Heating Station in Branch “Energetika” to the small gate (W-1)
September – December Year 2012
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 18 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
System for distribution of natural gas Natural gas distribution system in the Republic of Macedonia is a part of Russian transit gas pipeline passing through Ukraine, Romania and Bulgaria, and is intended to Turkey, Greece, Serbia and Montenegro. The point of connection of our system with the Bulgarian is on the east border in the municipality of Deve Bair. High-pressure part of the distribution pipeline system is designed for physical capacity of 800 million normal cubic meters of natural gas a year on working pressure of 40bar. The main measurement station (MMS) located in the area of Zhidilovo with capacity of 240.000 Nm3/h. Design pressure of the natural gas pipeline can be over 54bar. On the Linear part there are tracking facilities, a dispatch-parlor cleaning station,8 block stations on main system, 8 block stations on the distributing system and cathode protection. On the high-pressure part there are five main measuring and control stations (MMCS). Through these stations, high-pressure part is connected with low-pressure urban networks in Kriva Palanka, Kratovo, Kumanovo and Skopje. In these cities there are urban gas pipeline networks with a working pressure of 12bar. Users through the measuring and control stations are connected to city gas networks (CGN). Facilities:
Main Gas Pipeline Distribution Gas Pipeline to Kriva Palanka Distribution Gas Pipeline to Ginovci Distribution Gas Pipeline to Kratovo Distribution Gas Pipeline to Kumanovo Distribution Gas Pipeline to Skopje - south Distribution Gas Pipeline to Skopje- north MMS Zhidilovo MMCS Kriva Palanka MMCS Kratovo MMCS Kumanovo MMCS Skopje - south MMCS Skopje - north MMCS Bunardzik CGN Kratovo CGN Kumanovo CGN Skopje
Mechanical and Assembly works on the gas pipeline system
From 2006 till present day, ELTE engineering L.L.C is working on mechanical and assembly projects on GA – MA’s A.D. gas pipeline system.
Construction of new pipelines
Ongoing maintenance, interventions in major accidents and emergency plug-ins on GA – MA’s A.D. gas pipeline system
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 19 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
Maintenance, interventions in emergency conditions and urgent connections on A.D. GA-MA’s Skopje gas system. Mechanical and assembly works, construction works, electrical works and cathode protection works.
Current year 2013
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
Construction of gas installations to Gas Pressure Regulating and Metering Stations at State High School “Georgi Dimitrov” and State High School “Zdravko Cvetkovski”
December 2012 - January 2013
“FILBIS” D.O.O.E.L Skopje
"Petar Acev” no.19A 1000 Skopje
Construction of gas installations for gas boiler stations at State High School “Georgi Dimitrov” and State High School “Zdravko Cvetkovski”
December 2012 - January 2013
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
Maintenance, interventions in emergency conditions and urgent connections on A.D. GA-MA’s Skopje gas system. Mechanical and assembly works, construction works, electrical works and cathode protection works.
Current year 2012
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
Mechanical – assembly, construction, electrical and works regarding cathode protection, with procurement, delivery and assembly of the needed equipment and materials for construction of the linear part of the gas pipeline for connecting the Airport TAV, logistic center and Pekabesko on the System for gas distribution.
Current year 2012
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
By Contract No.02/0701-3273/1 from 21.12.2010 - Machine assembly works for access section (gas line
junction 25,26,27 and 28) and MRS for object TO Zapad, Skopje on pipeline system of GA-MA A.D.Skopje
Current year 2011 and 2012
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
By Contract No.0701-614/1 from 22.03.2011 1. Machine assembly works in order cleaning of line part of pipeline
towards TE TO A.D.Skopje
Current year 2011
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
By Contract No.0701-96/1 from 20.01.2011 Assembly of natural gas low-pressure installation in Skopski Leguri D.O.O.E.L.,Skopje
Current year 2011
“A.D.”GAMA” Sv.Kliment Ohridski
No.54, Skopje
By Contract-Frame agreement No.02/0701-2864/1 from 08.11.2010
- Current maintenance, failure condition interventions and emergency connections on pipeline system of GA-
Current year 2011
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 20 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
MA A.D.Skopje Objects:
- MRS Kumanovo gas - Pit No.6, Skopje - Connection of access pit No.8 Alkaloid with pipeline to
MZT Skopje - Kogel Skopje - MRS Alkaloid drugs - MRS Makinvest Kriva Palanka - GMRS Skopje Sever - Access section 7 and MS CNG Kumanovo - Access pit Bunadzik - MRS Skopski Leguri,Skopje - Coat assembly on ul.Ilindenska, Skopje
GMRS Skopje JUG
“A.D.”GAMA” Sv.Kliment Ohridski
No.54. Skopje
- Mechanical – assembly works for replacement of damaged gas pipeline – distribution gas pipeline No. 10
Current year 2010
“A.D.”GAMA” Sv.Kliment Ohridski
No.54. Skopje
- Dismantling of current gas pipeline and mechanical – assembly works with cathode protection on a newly designed gas pipeline on Skopje Fair location.
Current year 2010
“A.D.”GAMA” Sv.Kliment Ohridski
No.54. Skopje
1. Works for Block stations with blowing candles, which are part of line part of the distribution gas line for “SEZ Bunardzik-Skopje
2. machine-assembly works for GMRS on the distribution gas line to “SEZ Bunardzik-Skopje” - Object: performing machine works on access
junction 5 GGM Kumanovo.
Current year 2008
“A.D.”GAMA” Sv.Kliment Ohridski
No.54. Skopje
1. Distribution gas line Skopje-South with North Bypass,Skopje
2. Object:”Zito Komerc Luks”-Skopje – inner installation works
3. Object:”Mill-Bakery Kompleks-Dime”-Skopje-machine, construction works and gas installation.
4. Object:’Alkaloid” close to MZT entrance-Skopje-machine, construction works and cathode protection on access pit.
5. Object: from MZT exit to MRS Komuna-Skopje- machine, construction works and cathode protection on access pit.
6. Mechanical – assembly works for maintenance of Gas pipeline system of different locations in Macedonia. (2006)
Current year 2007 and 2006
Makstil A.D. , Skopje
Makstil A.D. is a leader in the metal industry in the Republic of Macedonia and the region.
As the only one Macedonian steel producer, Makstil A.D. is very important company in the new National Strategy in the field of steel industry, short-term Macedonian program for reconstruction of the steel sector helped by European Agency for Reconstruction as main target on the Agreement of EU’s Association and Stabilization of East Europe. Draft Regional Initiative “European Steel Star 2001” was developed to promote the production, processing and marketing of steel products in the Balkan region. The ultimate goal is the creation of a new regional dynamics of the implementation of the Economic Cooperation and coordination in the region, the general policy objectives of the European Commission.
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 21 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
Rolling Mill for thick sheets
Electric arc furnace
ELTE Engineering L.L.C. Skopje, has been working on mechanical – assembly works in different facilities of Makstil A.D.
“Makstil” AD St.XVI Makedonska
Brigada No.18 Skopje
R.Macedonia
1. Steam heating recondition in mess hall at VDL. 2. Project realization for regular ventilation after fire
extinguishing system activation in Oil Basement. 3. Performed installation and connection to wardrobe of
water and gas. Supply and assembly of 3 doors for bathrooms in wardrobe.
Repair of tank No.8 and It’s revitalisation to a proper technical condition.
Current year 2007
“Makstil” AD St.XVI Makedonska
Brigada No.18 Skopje
1. Revitalization and bracing of loose side metal plates over crane trail
2. Production and assembly of 3 (three) inbound doors in plant Topla Valalnica
Current year 2006
“Makstil” AD St.XVI Makedonska
Brigada No.18 Skopje
R.Macedonia
1. Tank No.3 damage revitalization 2. Project developing for natural gas, oxygen and air
installations on row E,F and G in Steel works 3. disassembly of front side on metal plate hangar production of steel construction and closing with ribbed plate of open front side of the hangar 4. production of platform on electrical oven (50%
accomplishment) 5. correction of cable channel around oven No.2 6. production of platform on electrical oven (50%
accomplishment) 7. assembly for natural gas, oxygen and air in “Staro
Zelezo – Celicarnica” installation 8. assembly of platform-trace pressing oven in Rolling Mill
for thick sheets 9. installation extension for natural gas, oxygen and air in
“Staro Zelezo – Celicarnica: ten machinists and two welders for maintenance of Electric Arc
Furnace
Current year 2008
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 22 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
R.Macedonia 3. Production and assembly of metal construction shaft 4. Revitalization of spar on lift 155- Konti.Liv. 5. Repair of shutters in DE Pole; Doors repairing at
entrance. 6. Dissembling of existing door and production and
assembly of new slide rule door at AB-Pole at adjustaza.
7. Part replacement of vertical pipeline for rain waters (Ø340) on pillar A9 in length of 10m for its deterioration.
8. Bracing revitalization on row G on used iron. Existing pipeline input Ø100 into pipeline for machines and
faceplates Ø500 , L 10 level 0. Valve NO 100 assembly. Junction of pipeline Ø100 with Ø80 for crystalisator testing, L 13
level 9. Reinforcing with
Republic of Macedonia’s Ministry of Defence
ELTE Engineering L.L.C. Skopje from 2006 till present day, is working on :
Maintenance of thermo – energetic installations in the facilities of MoD and ARM
Empower high-pressure equipment, installations and reinforcement, as well as dry cleaning steam boiler units and other equipment in thermal power facilities MoD and ARM.
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 23 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje
R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2009
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2012
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2011
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2010
ENGINEERING
ELTE Engineering L.L.C Skopje
Company for manufacturing, commerce and services
Goran and co. L.L.C. Export Import - Skopje
Account No.: 30000000076 Tax. no.: МК 4030999369627 Deponent: Commercial Bank - Skopje
EL TE Engineering page 24 / 24
Address: st. Zhelevo 2/2 - 10, 1000 Скопје, R. Macedonia Tel: (+389 2) 2033 453; 2033 473 Fax: (+389 2) 2033 454 web: www.elte-inzenering.com.mk е-mail: [email protected] е-mail: [email protected]
ISO 9001:2008
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje
R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2008
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje
R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2007
MINISTRY OF DEFENCE Republic of Macedonia, Sector for
logistics and real estates, Sector for
infrastructure
“Sv.Kliment Ohridski” 15
1000 Skopje
R.Macedonia
current maintenance of high pressured equipment with chemical cleaning of boilers as well as thermo technical installations
Current Year 2006