Technical Information Project Completion Date: October 31, 2014 Project Location: Hillsboro, OR Size of Project: The hotel consists of 7 stories with a basement, 165 guest rooms, and 6,411 cubic yards of concrete. Strength Requirements: 4,000 – 6,000 psi Water/Cement Ratios: 0.38 – .047

Embassy Suites – Hillsboro

Page 3: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting

Rooms, Exercise Room, and Indoor Pool.

Page 4: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting

Rooms, Exercise Room, and Indoor Pool.

Page 5: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The 140,000 SF Embassy Suites project located in Hillsboro, Oregon consists of 165 rooms, complete with Offices, Lobby, Kitchen, Restaurant, Lounge, Meeting

Rooms, Exercise Room, and Indoor Pool.

Page 6: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.

Page 7: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

This seven story structure includes a poured in place concrete basement, topped with concrete columns and shearwalls, and post -tensioned concrete slab.

Page 8: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs

with longer spans between supporting walls and columns.

Page 9: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The use of posttension concrete framing results in lower construction costs and a more open building design due to thinner concrete slabs

with longer spans between supporting walls and columns.

Page 10: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.

Page 11: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.

Page 12: Embassy Suites Hillsboro, OR - OCAPA

Embassy Suites – Hillsboro

The ability to use a “Flyer Table” shoring systems allowed the concrete contractor to cycle floors rapidly to meet the aggressive project schedule.