emirates bank head office tssr v0.4
TRANSCRIPT
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
1/35
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
2/35
Technical Site Survey Report
Site Name: Emirates Bank Head Office (Al-Khor)
@REEN;IE/& ROO;TO< IBSTSS &ate: Motorola
% Su,contractor:
RMENT
To agree et!een all "arties "resent at the TSS on oth the design as !ell as the Health # Safet$ arrangements% asstated in the local reg&lations' This doc&ment is% !hen f&ll$ signed% the go-order for "re"aring the Engineering ackageand to egin the final lease negotiations'
ith the signing of this doc&ment &ndersigned "ersons agree !ith the asic la$o&t and the Health # Safet$arrangements of this site'
*. TSS ATTEN&EES %ONTA%T &ETAI/S
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
3/35
Technical Site Survey Report
Site Name: Emirates Bank Head Office (Al-Khor)
lot No O Bo=
Address Emirates Bank Head Office (Al-Khor)
it$ >&ai Emirate >&ai
Site o-Ordinates (>ecimal) 9atit&de 2/?@01'63N 9ongit&de //?@7C'0.E
Altit&de at gro&nd leetails
&rrent land &se E=isting &ilding
%omments:
1.*: /andlord
Name NDA O Bo=
Address Emirates Bank Head Office (Al-Khor)
it$ >&ai
9andlord re"resentati
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
4/35
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
5/35
Technical Site Survey Report
Site Name: Emirates Bank Head Office (Al-Khor)
1.TECHNICAL SITE SURVEY REPORTINDOOR COVERAGE SOLUTION
SITE NAME: Emirates Bank Head Office (Al-Khor)
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
6/35
Technical Site Survey Report
Site Name: Emirates Bank Head Office (Al-Khor)
*. Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
7/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
*. SITE IN;ORMATION
SiteDandidate N&mer: BSDN N&mer
Site Name: Emirates Bank Head Ofce (Al-Khor)
Site Address: Emirates Bank Head Ofce (Al-Khor)
oordinate 9atit&de: 2516'!"#$% oordinates 9ongit&de: 551&'!6$E
egion: >&ai Lone: >&ai
BTS T$"e: (s"ecif$) o-locate: (s"ecif$) Batter$ ack &": (s"ecif$)
E;&i"ment T$"e: (24)
MultimodeNokia UltraSite
EDGE BTSS-@0
E;&i"ment T$"e: (14)Ultrasite WCDMA
SupremeS-@0
Site Access rotocol: NON
omments:
hecked B$ Jamil
1. /AN&/OR& %ONTA%T IN;ORMATION:
Name: Address: Tele"hone: 5a= N&mer:
2. S>R?EC IN;ROMATION @[email protected]
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
8/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
S&rate:
5&nction:
&stomer e"resentati
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
9/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
Basement gro&nd C 5loors' The &ilding is constr&cted of concrete% !ooden% +eson and glass' offices aredistri&ted thro&gh all the ank'
Some of the ank areas are restricted (the asement) !hich !e cant f&ll$ access'
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
10/35
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
11/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
7. A% TION:
E=isting Ne! Needed Ne!
Kh Meter T$"e:
Kh Meter 9ocation:
Main A >istri&tion Board T$"e:
Main A >istri&tion 9ocation:
Main A S&""l$ ale Sie: (mm2)
Main A S&""l$ ale 9ength: (m)
Main A BreakerD5&se Sie:
Main A BreakerD5&se Sie andN&mer
Main A ale "rotection T$"e:
(F or Metal i"e% F or Metalond&it)
omments:
. SITE @RO>N&IN@ SCSTEM
E=isting Ne! Needed Ne!
E;&i"ment gro&nd location
E;&i"ment gro&nd collector sie:(mm2)
E;&i"ment gro&nd cond&ctor sie:(mm2)
A gro&nd collector sie: (mm2)
A gro&nd cond&ctor sie: (mm2)
4ro&nding B&sar T$"e andN&mer:
omments:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
12/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
+. TRANSMISSION SCSTEM IM>5 E;&i"ment T$"e and
N&mer:
M ale T$"e:
M onnector T$"e and
N&mer:
Transmission ale
rotection T$"e (F or
Metal i"e% F or Metal
ond&it)
omments*
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
13/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
-(. E4>I) 13.. o!er cons&m"tion ("er ainet): Ma= (>) 166.
>imensions:(h = ! = d) mm("erainet)
@7..P0..P/6. mm>imensions (h = ! = d) mm ("erainet)
@7..P0..P0.. mm
eight ("er ainet): Ma= 26. Kg eight ("er ainet): Ma= 2C. Kg
omments:
2. Antenna /ocation 3Types: >esign a""roach is clearl$ ased on ma=im&m co
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
14/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
Sectorization
This &ilding is going to e sectoried $ 2 sectors' The follo!ing tale sho!s floors "er sector'
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
15/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
7. E8uipment Room &ra9in0s and /ocation:
5ig&re elo! sho!s the 4SM room 9a$o&t located at the oof To" floors'
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
16/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
The ollo9in0 sho9s the e8uipment location in the AH> room.
TSSR d> Emirates Bank H.O. ?"(2 Room in the Basement ;loor
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
17/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
Basement - /evel:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
18/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
@round ;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
19/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
Me66anine ;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
20/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
-st;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
21/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
*nd;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
22/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
1rd;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
23/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
2th;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
24/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
)th;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
25/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
5th;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
26/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
7th;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
27/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
th;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
28/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
+th;loor:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
29/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
+. System Schematics:
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
30/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
31/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
-(. A. EIR< Ta,le Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
32/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
-(. B. EIR< Ta,le MTS$ :
TSSR d> Emirates Bank H.O. ?"(2
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
33/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
--. Antenna /ocation
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
34/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
-*. Transmitter Test
-
8/10/2019 Emirates Bank Head Office TSSR V0.4
35/35
Technical Site Survey Report
Site Name:Emirates Bank Head Office (Al-Khor)
-1. E=istin0 %overa0e R= /ev