EPC/Turn-key ProjectsZorlu Enerji, has provided services for international energy projects in the field of Indust-rial and Power Plant Construction since 1993 in accordance with Zorlu Holding’s value and strategies by giving importance to quality, health and safety, environment.

Zorlu Enerji produces environment-friendly and cost-effective solutions:

Zorlu Enerji who provides cost effective and environment-friendly solu-tion as per pre-feasibility studies and finance packages, delivers turn-key projects based on fossil fuel and renewable energy including en-gineering, procurement, civil works, erection and commissioning.

Zorlu Enerji is particularly experienced in the power plants based on renewable energy sources such as wind, solar, geothermal, hydroelectric as well as thermal power plants, energy transmission line and gas distribution industry.

Based on its power plant design and construction experience supported with its group companies’ considerable experience in developing power plant projects, operating and maintaining power plants and trading energy, qualified personnel, proven management methods and techniques, well established ven-dor relationships, Zorlu Enerji pro-vides single source of responsi-bility for successful and cost effective projects on time and within the budgeted cost.

> Pre-feasibility studies> Engineering > Fabrication > Procurement & Logistics > Construction & Commissioning

Page 3: ENERGIZING YOUR PROJECT

4 5

Mission To accomplish the domestic or foreign power plants of Zorlu Energy Group and energy sector as a turn-key basis with rational and innovative projects.

Vision and Mission

Vision

To be an internationally preferred and reliable engineering, pro-curement and construction (EPC) company executing projects in the field of energy and industrial facilities.

• Turn-key construction of economical, productive and long-life power plants

• Engineering services which provides economical and pro-ductive solutions

Page 4: ENERGIZING YOUR PROJECT

6 7

HSE Management

Zorlu Industrial adopts “Zero Accident” philosophy and implements Health and Safety, Environment (HSE) policy and go-als to protect all employees and shareholders working at Zorlu Enerji offices, construction sites and related facilities. This policy and goals include every kind of environmental impact that may result during project activities.

HSE Management System is based on the standards of ISO 14001 Environment Management System and OHSAS

18001 Occupational Health and Safety Management System including compliance with the HSE regulations.

Zorlu Industrial is conscious of a part of organizational culture of issues about Health, Safety and Environment to

have a performance of world class in all projects that are carried out.

Integrated Management System

Optimisation of human resources and integration of information and compe-tence are developed and implemented with Integrated Management System

(Quality, Health and Safety, Environment) adopted by Zorlu Enerji.

Zorlu Enerji has designed and implemented an Integrated Management System (Quality, Health and Safety, Environment) which is a systematic

process including objectives, plans, resources, actions, results and relevant analyses obtained through the participation of all involved people.

Zorlu Enerji is certified for ISO 9001, OHSAS 18001, ISO 14001 Standards.

Quality Management

Zorlu Industrial has established a Quality Management System based on minimum bureaucracy and documentation, imple-

mentation and quick decision making. This properties had been successfully integrated into Quality Management

System based on administration and process appro-ach.

ISO 9001 Quality Management System is used as an important tool for the continuous

assurance and improvement of Zorlu Enerji’s Quality Management System.

The certification bodies perform periodical audits for the

continuation of the validity of the ISO 9001 certificate.

Quality and HSE

Page 5: ENERGIZING YOUR PROJECT

8 9

EPC/Turn-key ProjectsCompleted Projects

Project Capacity Completion Date Location

GEOTHERMAL POWER PLANTS

Kızıldere-1 & 2 Geothermal Power Plant Ext. & Reh. 95 MWe 2013 Denizli, TURKEY

Alaşehir Geothermal Power Plant 45 MWe 2015 Manisa, TURKEY

Kızıldere-3 Geothermal Power Plant Unit 1 99,49 MWe 2017 Denizli, TURKEY

Kızıldere-3 Geothermal Power Plant Unit 2 65,51 MWe 2018 Denizli, TURKEY

FOSSIL FUEL POWER PLANTS

Lüleburgaz Cogeneration Power Plant 148 MWe, 239 t/h Steam Kırklareli, TURKEY

Bursa Combined Cycle Power Plant 90 MWe 1998 Bursa, TURKEY

Ankara Combined Cycle Power Plant 50 MWe 2003 Ankara, TURKEY

İpek Kağıt Cogeneration Power Plant 16 MWe, 30 t/h Steam 2005 Yalova, TURKEY

Kayseri OSB Combined Cycle Power Plant 188 MWe 2005 Kayseri, TURKEY

Birlik Mensucat Cogeneration Power Plant 7 MWe, 15 t/h Steam 2007 Kayseri, TURKEY

Tereshkovo District Heating Power Plant Phase I 205 MWe, 150 Gcal/h Heat 2010 Moscow, RUSSIA

Dorad Combined Cycle Power Plant Phase I 420 MWe 2013 Dorad, ISRAEL

Dorad Combined Cycle Power Plant Phase II 420 MWe 2014 Dorad, ISRAEL

Ashdod Combined Cycle Power Plant 55 MWe, 40t/h Steam 2015 Ashdod, ISRAEL

Ramad Negev Combined Cycle Power Plant 120 MWe, 100t/h Steam 2015 Ramad Negev, ISRAEL

WIND POWER PLANTS

Jhimpir Wind Power Plant Phase I 6 MWe 2009 Jhimpir, PAKISTAN

Jhimpir Wind Power Plant Phase II 50,4 MWe 2010 Jhimpir, PAKISTAN

Gökçedağ Wind Power Plant 135 MWe 2010 Osmaniye, TURKEY

Gökçedağ Wind Power Plant Relocation30 MWe - Rel. 13,5 MWe -

Capacity Increase2014 Osmaniye, TURKEY

Sarıtepe - Demirciler Wind Power Plant 80,3 MWe 2016 Osmaniye, TURKEY

HYDROELECTRIC POWER PLANT

İkizdere Weir and Hydroelectric Power Plant 25,78 MWm, 24,94 MWe 2018 Rize, TURKEY

COAL FIRED POWER PLANT

Lüleburgaz Power Plant, Coal Fired FluidizedBed Boiler Add-On Project

2x40 t/h, 12 barg Steam 2018 Kırklareli, TURKEY

EV DC FAST CHARGING STATIONS

Ev DC Fast Charging Stations 9 x 100kW (DC) + 65kW (AC) 2018 Various Cities, TURKEY

Tereshkovo District Heating Power Plant Phase I / Moscow, RUSSIA

Kızıldere-3 Geothermal Power Plant Unit 2 / Denizli, TURKEY

Kızıldere-3 Geothermal Power Plant Unit 1 / Denizli, TURKEY

Alaşehir Geothermal Power Plant / Manisa, TURKEY

Kızıldere-1 & 2 Geothermal Power Plant Ext. & Reh. / Denizli, TURKEY

Page 6: ENERGIZING YOUR PROJECT

10 11

Gökçedağ Wind Power Plant / Osmaniye, TURKEY İkizdere Weir and Hydroelectric Power Plant / Rize, TURKEY

Sarıtepe - Demirciler Wind Power Plant / Osmaniye, TURKEY Ev DC Fast Charging Stations / Various Cities, TURKEY

Kayseri OSB Combined Cycle Power Plant / Kayseri, TURKEY Lüleburgaz Power Plant, Coal Fired Fluidized Bed Boiler Add On Project / Kırklareli, TURKEY

Bursa Combined Cycle Power Plant / Bursa, TURKEY Dorad & Ashdod Combined Cycle Power Plant Phase / ISRAEL

Ankara Combined Cycle Power Plant / Ankara, TURKEY Jhimpir Wind Power Plant Phase I-II / Jhimpir, PAKISTAN

Page 7: ENERGIZING YOUR PROJECT

12 13

Projects At Front-End Engineering Design (FEED) Stage

EPC/Turn-key Projects

Project Capacity Location

Simav Geothermal Power Plant Project 25 MWe Kütahya, TURKEY

Nemrut Geothermal Power Plant Project 25 MWe Adıyaman, TURKEY

Bahawalpur Solar Power Plant Project Phase II 200 MWp Bahawalpur, PAKISTAN

Jhimpir Wind Power Plant Project 30 MWp Jhimpir, PAKISTAN

Filistin Wind Power Plant Project 50 MWp PALESTINE

Projects Under Construction

Project Capacity Location

GEOTHERMAL POWER PLANTS

Alaşehir-2 Geothermal Power Plant Project 24,9 MWe Manisa, TURKEY

Kızıldere-4 Geothermal Power Plant Project 35 MWe Denizli, TURKEY

Tekkehamam Geothermal Power Plant Project 35 MWe Denizli, TURKEY

FOSSIL FUEL POWER PLANTS

Kojuhovo District Heating Power Plant Project 340 MWe, 270 Gcal/h Heat Moscow, RUSSIA

SOLAR POWER PLANTS

Pakistan Solar Power Plant Project Phase I 100 MWp Bahawalpur, PAKISTAN

Alibeyhöyüğü Solar Power Plant Project 21 MWp (18MWac) Konya, TURKEY

EV DC FAST CHARGING STATIONS

Ev DC Fast Charging Stations 16 x 100kW (DC) + 65kW (AC) Various Cities, TURKEY

Pakistan Solar Power Plant Project Phase I / Bahawalpur, PAKISTAN

Kojuhovo District Heating Power Plant Project / Moscow, RUSSIA

Page 8: ENERGIZING YOUR PROJECT

14 15

Page 9: ENERGIZING YOUR PROJECT

www.zorluenerji.com.tr

Levent 199 Büyükdere Cad. No: 199 Şişli 34394 İstanbul / TURKEY

T: +90 212 456 2300 F: +90 212 422 0099

[email protected] | [email protected]