ENERGY AUDIT on New University of Plovdiv Building - Block A Case studies work by STE Expert team in collaboration with Bulgarian EEA Phare twinning project BG/2004/IB/EY/01 Institutional Building at the Energy Efficiency Agency

Upload: herrod-acosta

Post on 01-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

Phare twinning project BG/2004/IB/EY/01. ENERGY AUDIT on New University of Plovdiv Building - Block A Case studies work by STE Expert team in collaboration with Bulgarian EEA. Institutional Building at the Energy Efficiency Agency. Phare twinning project BG/2004/IB/EY/01. A. - PowerPoint PPT Presentation

TRANSCRIPT

ENERGY AUDITon New University of Plovdiv Building - Block A

Case studies work by STE Expert team in collaboration with Bulgarian EEA

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

A

Block A ( wing on left side ) :

1. Individual heating sub-station ( database )

2. Utilization ( representative )

Phare twinning project BG/2004/IB/EY/01

entrata

Blocco A

Institutional Building at the Energy Efficiency Agency

Plant ground areaPlant ground area LBALBA Heated floorHeated floor Gross VolumeGross Volume Net heated VolumeNet heated Volume

m²m² m²m² m²m² m³m³ m³m³

5.4675.467 3.1153.115 5.2935.293 22.19822.198 15.538,615.538,6

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

1. Intonaco

2. Pannello cemento

3. Pannello pietra

1. vetro

2. camera

3. vetro1,60

2,42

Parete verticale

Vetrate

Institutional Building at the Energy Efficiency Agency

Cornice verticale

1. ponte termico:

2. teoria delle alette

3. Keq. = 1,91 W/ mq*K

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

1. Solaio cemento

2. Camera d’aria

3. Basamento

1. Solaio cemento

2. Camera d’aria

3. Isolante in fibra

4. Solaio cemento

Phare twinning project BG/2004/IB/EY/01

Solaio interrato

Solaio a cielo

Institutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

LT

A2

A1

A4

A3

R2

Rs

e3 R3

Rs

i3

R1

Rs

i2

Rs

i4

R4 Applicazione del modello resistivo:

1. Analoghi risultati della EEA in Mladost

2. Risultati in linea con riferimenti generali

R3, A3

R2, A2

θe

R1, A1

θsi

2

θse

1

Rs

e3δвс

Rsi

2

Rsi

3Rsi

1

Rs

e2

Rs

e1

θ

i

θu

Institutional Building at the Energy Efficiency Agency

Centrale termica:

1. Bassa temperatura entrata

( 60 °C contro i 80 °C)

1. Cattive condizioni dello scambiatore

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

Radiatori:

1. Con copertura in legno si abbassa l’efficienza di emissione

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

Sistema di condizionamento:

1. Tipologie differenti di potenza e vetustà

2. Presenti solo in alcuni ambienti

3. ( studi dei professori )

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

Sistema di illuminazione

1. Lampade a medio consumo

2. Utilizzo consistente degli apparati dato l’ombreggiamento degli edifici a corte

Phare twinning project BG/2004/IB/EY/01

Institutional Building at the Energy Efficiency Agency

Distribution of Electricity demands

10% 12%

61%

17%

Lighting

Climatization

Power station

Office appliances

Phare twinning project BG/2004/IB/EY/01

Distribution of Energy expenses

31%

69%

Electricity

Heating

distribuzione dei consumi per tipologia

Institutional Building at the Energy Efficiency Agency

0

100.000

200.000

300.000

400.000

2003 2004 2005 2006

Electricity consumption

0

20.000

40.000

60.000

2003 2004 2005 2006

Electricity expenses (BGN) 2003-2006

Phare twinning project BG/2004/IB/EY/01

Consumi reali nel periodo 2003-2006

Institutional Building at the Energy Efficiency Agency

MonthMonth

Average Average monthly monthly temperattemperat

ure of ure of external external

airair

Electric Energy (1)Electric Energy (1)

2003-20062003-2006Central heatingCentral heating

Water supplyWater supplySubstation “A” Substation “A”

consumptioconsumption from D.H. n from D.H.

networknetwork

Room heatingRoom heating UHW (2)UHW (2)

оо

СС

Day Day DegrDegreeee

МWhМWh BGNBGN MWhMWh BGNBGN MWhMWhBB

GGNN

MMWWhhWWhh

BGNBGN mm33 BGNBGN

20062006    2.4832.483 297,73297,73 36.91836.918 348,04348,04 27.49527.495 66 430430

20032003    2.5512.551 317,45317,45 39.36339.363 366,65366,65 28.96528.965 66 474474

20052005    2.6642.664 350,56350,56 45.27445.274 394,24394,24 31.14531.145 66 474474

20042004 2.4162.416 369.14369.14 51.67051.670 393,54393,54 34.66634.666 66 528528

Phare twinning project BG/2004/IB/EY/01

Valori medi 2003-2006

gradigiorno 2500;energia elettrica 333 MWh; termica 376 MWh

Institutional Building at the Energy Efficiency Agency

Provincia autonoma di Bolzano

Phare twinning project BG/2004/IB/EY/01

Software casaclima

1. Semplicità di confronto con altri software

2. Open source quindi confrontabile assieme a terzi ( EEA )

3. Aggiornato su fabbisogni di raffrescamento ed energia primaria ( forma semplificata )

Institutional Building at the Energy Efficiency Agency

Provincia autonoma di Bolzano

Phare twinning project BG/2004/IB/EY/01

Software casaclima

1. Inserimento dati dimensionali 2. dati climatici a databaseInstitutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

Inserimento di

1. Tipologie costruttive 2. superfici di scambio termico

Institutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

Inserimento di

1. Dettagli caratteristiche tecniche ( spessori- trasmittanze termiche )Institutional Building at the Energy Efficiency Agency

Provincia autonoma di Bolzano

Phare twinning project BG/2004/IB/EY/01

Output

1. Fabbisogni specifici

2. Potenze specifiche

3. Classificazione su protocollo casaclima

( Bolzano e località riferita )

Provincia autonoma di Bolzano

Phare twinning project BG/2004/IB/EY/01

Input

1. Caratteristiche impianti elettrici

2. raffrescamento

Correzione

1. Su dati reali i calcoli sono stati integrati

Institutional Building at the Energy Efficiency Agency

Provincia autonoma di Bolzano

Phare twinning project BG/2004/IB/EY/01

Output

1. Fabbisogni specifici

2. Potenze specifiche

3. Classificazione su protocollo casaclima

( Bolzano e località riferita )

Institutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

Energy Efficiency Measures

Existing situation

Proposed situation

Savings

Profitability analysis (1)

Costs savings Pay-backtime

kWh kWh kWh % BGN BGN

Wall insulation (heat) 683.371 414.627 268.774 39,3 138.900,00 23.649,00 5,95,9

Replacement of woodwork (heat)

683.371 577.615 105.756 15,5 253.678,00 9.306,00 27,327,3

TOTAL (heat) 374.530374.530 54,854,8 392.578392.578 32.95532.955 11,911,9

Misure correttive di efficienza energetica proposte

1

2

Institutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

Energy Efficiency Measures

Existing situation

Proposed situation

Savings

Profitability analysis

Costs savings Pay-backtime

kWh kWh kWh % BGN BGN

Heat exch. Station refurbishing (heat)

375.600 300.480 75.121 20

25.75025.750

6.610,00

3,83,8Heat exch. Station refurbishing (electric)

13.140 11.856 1.284 9,7 180,00

Dismantling of radiator’s wooden case (heat)

165.000 156.750 8.250 5 2.8002.800 726,00 3,93,9

Thermostatic valves installation (heat)

168.000 142.800 25.200 15 6.3006.300 2.218,00 2,82,8

Lighting plant refurbishing(electric)

117.383 54.057 63.326 54 48.31548.315 8.866,00 5,45,4

TOTAL (heat) 108.571 n.d. n.d. 9.554,00 n.d.

TOTAL (electric) 64.610 n.d. n.d. 9.046,00 n.d.

Misure correttive di efficienza energetica proposte

3

4

5

6

7

Institutional Building at the Energy Efficiency Agency

Phare twinning project BG/2004/IB/EY/01

Conclusioni e suggerimenti

1. Sul profilo tecnico la conoscenza e il potenziale utilizzo di più software aumentano la qualità del risultato finale riducendo la probabilità di errore umano che nel caso di raccolta ed elaborazione dati è significativo

2. Gli interventi di efficienza energetica, contestualizzati nell’ambito territoriale ( costi energetici della Bulgaria ) si evidenziano comunque come interessanti sul profilo economico finanziario oltre che ambientale ( isolamento a cappotto, valvole termostatiche,..)

3. La competenza in materia energetica dovrebbe essere vincolante in fase progettuale poiché ai casi come questo, concorrente alle aspettative architettoniche ( in cui la EEA è in grado di svolgere un ruolo di riferimento istituzionale )

Institutional Building at the Energy Efficiency Agency