engineers without borders: energy at the west bank

22
Engineers Without Borders: Energy at the West Bank David Christensen Research Assistant Department of Development & Planning [email protected] Chairman Engineers Without Borders Denmark (Aalborg) Lessons in Renewable Energy Service Provision in a Conflict Zone Seminar on New Business Models Aalborg University, November 8 2010

Upload: ady

Post on 02-Feb-2016

43 views

Category:

Documents


0 download

DESCRIPTION

Engineers Without Borders: Energy at the West Bank. Lessons in Renewable Energy Service Provision in a Conflict Zone Seminar on New Business Models Aalborg University, November 8 2010. David Christensen Research Assistant Department of Development & Planning [email protected] Chairman - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Engineers Without Borders: Energy at the West Bank

Engineers Without Borders:Energy at the West Bank

David ChristensenResearch AssistantDepartment of Development & [email protected]

ChairmanEngineers Without Borders Denmark (Aalborg)

Lessons in Renewable Energy Service Provision in a Conflict Zone

Seminar on New Business ModelsAalborg University, November 8 2010

Page 2: Engineers Without Borders: Energy at the West Bank

2

Page 3: Engineers Without Borders: Energy at the West Bank

3

Page 4: Engineers Without Borders: Energy at the West Bank

Contested Space:Palestinian Communities in Rural South Mount Hebron

4

Page 5: Engineers Without Borders: Energy at the West Bank

Stipulations in the Declaration of Principles of Interim Self-Government Arrangements

(aka the Oslo Accords), 1993

Area A – Full Palestinian National Authority (PNA) control over security-related and civilian issues (urban areas only)Area B – PNA civilian control only (some rural areas)Area C – Full Israeli control (60% land area including settlements and bypass roads between Palestinian communities)

5

Contested Space:Palestinian Communities in Rural South Mount Hebron

Page 6: Engineers Without Borders: Energy at the West Bank

The Idea- a logical framework approach minus indicators, means of

verification and assumptions Development ObjectiveSustainable livelihoods in the Southern Mount Hebron Region of the West Bank through

improvement of educational standards, decreasing rural-urban migration and increased business opportunities

Immediate Objectives• Improved Employment Opportunities• Decreasing Likelihood of Rural-Urban Migration• Gender Equality• Decreasing Isolation from Surroundings

OutputSufficient provision of energy services for Palestinian communities in the South Mount

Hebron Region of the West Bank

Activities• Provision of good energy service infrastructure• Build local capacity• Promote appropriate organizational structures taking gender into account

6

Page 7: Engineers Without Borders: Energy at the West Bank

Project Chronology

May 2009 – International Engineers Without Borders conference in Sweden, including participants from EWB-Denmark and EWB-Palestine. Joint venture project proposed for students from EWB-Denmark, EWB-Palestine and EWB-Israel.

June 2009 – Preliminary field study undertaken by EWB-Denmark engineer Fridolin Müller Holm on the feasibility of renewable energy projects in the West Bank.

September 2009 – EWB-Denmark project team established with AAU students supervised by David Christensen, Fridolin Müller Holm as project manager. Contact initiated with Comet-ME, an israeli NGO specializing in renewable energy installations in the same area of operations.

7

Butter Churner: Unexpored market potential?

Conducting a preliminary field study

Page 8: Engineers Without Borders: Energy at the West Bank

Project Chronology

November 2009 – Student team carries out field mission in the West Bank to carry out further feasibility studies and negotiate with stakeholders. Departure from original project idea – two projects proposed with Comet-ME and EWB-Palestine respectively.

December 2009 – Project fundraising an overwhelming succes. Original budget surpassed.

Maj 2010 – Completion of renewable energy installation in Haribat-an-Nabi in partnership with Comet-ME, EWB-Palestine as observers. Relations between Comet-ME and EWB-Palestine break down. Completely.

August 2010 – Fridolin Müller Holm, David Christensen and Bissan Zamzam (Danish-Palestinian AAU student) carry out last-ditch mediation attempt which ultimately fails.

November 2010 – New EWB-Denmark project team established, decides to exclusively partner with EWB-Palestine for 2nd project.

8

The ‘cursed’ Middle-Eastern handshake: Danish, Palestinian and Israeli partners clasping hands.

Page 9: Engineers Without Borders: Energy at the West Bank

Student Field Mission, November 2009

EWB-Denmark Team:•Joszef-Bartha Attila•Paw Stefan Jensen•Katja Lähdesmäki•Jules Risser•Kristen Skelton

Mission: Fact-finding, stakeholder negotiation, project design

9

Page 10: Engineers Without Borders: Energy at the West Bank

The Students7th semester (Environmental Management & Sustainable Energy Planning & Management)

Paw KatjaAttila KristenJules

Page 11: Engineers Without Borders: Energy at the West Bank

The Students’ Problem Formulation/Research Question

How can renewable technologies satisfy the needs and improve the quality of lives for villagers of Haribat-an-Nabi and Qawawis in a

sustainable way?

• Who are our primary stakeholders? • Possible challenges for collaboration?

• What are the villager’s needs? • Long and short term?

• What are our technological options?• What is the availability of funding?

• Allocation?

11

Page 12: Engineers Without Borders: Energy at the West Bank
Page 13: Engineers Without Borders: Energy at the West Bank

10

Page 14: Engineers Without Borders: Energy at the West Bank

Implementation at Haribat-an-Nabi, May 2010

EWB-Denmark Team:Paw Stefan JensenKatja LähdesmäkiKristen SkeltonJesper Rost Villumsen (New – from Engineering College of Aarhus)

14

Page 15: Engineers Without Borders: Energy at the West Bank

15

Page 16: Engineers Without Borders: Energy at the West Bank

16

Page 17: Engineers Without Borders: Energy at the West Bank

17

Page 18: Engineers Without Borders: Energy at the West Bank

18

Page 19: Engineers Without Borders: Energy at the West Bank

Evaluation and Mediation Trip, August 2010

EWB-Denmark Team:Fridolin Müller Holm (Project Manager)David Christensen (Project Manager)Bissan Zamzam (New – from AAU Esbjerg)

19

Page 20: Engineers Without Borders: Energy at the West Bank

Challenges and Contention Points

A very tangible “Tragedy of the Commons”

•System dimensioning OK in theory; In practice, could not take into account bad neighbourly relations within the community itself•Three families cannot agree on sharing the power load. One family overconsumes. Result: Battery is depleted, days go by without power•Refusal of payments: Inability on the part of the community to understand payment mechanisms and/or unwillingness to accept treating electricity as a paid-for commodity

20

Page 21: Engineers Without Borders: Energy at the West Bank

EWB-Palestine•An Israeli NGO will never have the legitimacy required to conduct even humanitarian aid work in the Palestinian Territories. Such activities perpetuate the occupation and still place Israelis in a position of power to decide the fates of Palestinians. EWB-Denmark is folly to partner with Comet-ME.

•It is unacceptable that payment for energy service provision in the West Bank goes to anything other than Palestinian bank accounts.

•EWB-Palestine insists that Palestinian energy service companies should handle payment matters for the installations, and handle system maintenance.

Comet-ME•EWB-Palestine, or any other Palestinian NGO for that matter, has absolutely no on-the-ground track record of continuous engagement with communities in the area like Comet-ME has. Comet-Me may not be Palestinians, but they are more deeply tied in with the communities.

•Comet-ME insists that based on experience, immediate handing-over of control of payment services to a community doesn’t work.

•Comet-ME insists that Palestinian energy service companies have no mandate for operating in Area C and will not do so. They will not be able to provide the same level of service that Comet-ME can provide, and Comet-ME has better knowledge than anyone on how to maintain the system.

21

Two Diverging Viewpoints

Page 22: Engineers Without Borders: Energy at the West Bank

Despite all this…

22

“Never doubt that a small group of thoughtful, creative,

committed citizens can change the world. Indeed, it is the only thing that ever

has” Margaret Mead