ersity of pittsb urgh a - pennsylvania state university

18
Univ CHE PITTS Rober Adviso versi EVRON SBURGH, rt Mrosk or: Dr. Ch ty of N ANN , PENNS key | Con himay Anu Pittsb NEX SYLVANI nstructio umba burgh IA on Optio h S D 2 on Spring Decemb 2011 Photo Propos ber 9 o Courtesy of Bur Constr sal rchick ruction

Upload: others

Post on 25-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ersity of Pittsb urgh A - Pennsylvania State University

UnivCHE PITTS

Rober

Adviso

versiEVRON

SBURGH,

rt Mrosk

or: Dr. Ch

ty of N ANN

, PENNS

key | Con

himay Anu

 

 

PittsbNEX

SYLVANI

nstructio

umba

burgh

IA

on Optio

h S D

2

on

Spring Decemb

2011

Photo

Propos

ber 9

o Courtesy of BurConstr

sal

rchick ruction

Page 2: ersity of Pittsb urgh A - Pennsylvania State University

EXECU

The purpPittsburghpotential analysis/r

Analysis 1

The Chevsuggestedof the worApplicatiohelp increin the fiel

Analysis 2

The instalthe Chevrthe architinterviewThe re-secosts invo

Analysis 3

The Chevequipmenprocess wAdditionabuildings

Analysis 4

The Chevincrease system. Treduce thenvironm

TIVE SUM

ose of this prh’s Chevron solutions, exresearch.

1: Integration

vron Annex dd that the prorkers. Tableons and progease the overld will have a

2: Re-Design/

llation and phron Annex. Atectural eyeb

wed to determequencing of olved with the

3: Commission

vron Annex dnt for the testwill be researally, it will bes in order to e

4: Addition of

vron Annex’s the efficiencyThis change whe mechanica

mentally frien

MMARY

roposal is to d Annex projexpected outco

of Tablet PC

did not utilizeoject team im

et PC’s will alsgrams applicrall productiv

a drastic effec

/Re-Sequence

hasing of theA re-sequencbrow will be cmine the prob the façade sye installation

ning of Labor

developed soting and balarched and ane suggested tensure they c

f a Green Roo

roofs were tyy of the buildwill reduce thal loads impodly, as well a

Archite

discuss four act. Backgrouome and the

’s in the Field

any new or umplement the

so be used toable for Tablvity of the prct on the over

e of the Facad

exterior skincing of the inscompleted in

blems and chystems will d

n.

ratory Spaces

ome complicaancing of the nalyzed to dethat the USGBcontinue to ru

f

ypical TPO roding. It is sughe storm wat

osed on the bas providing

ectural Engine

analyses thatund researchsteps that wi

d

unique metho use of Table

o close out thlet PC’s will aoject. It is esrall time savi

de

n caused a nustallation of t

n this analysishallenges facedecrease the

s

ations when i systems. Thrtermine the m

BC implemenun as expecte

oofs that did ggested that ter runoff, red

building. A grmoney savin

Universit

eering | Dec

t will be perfoh will be perfoill be perform

ods of technoet PC’s in the he job, as welalso be recomstimated that ings related t

umber of prothe façade sys. Members ed during theoverall sched

it came time troughout thismost efficiennt a LEED reced.

not use any ithese roofs bduce the builreen roof wil

ngs to the own

ty of Pittsbur

cember 9, 20

ormed for theformed, as wemed to achiev

ology during field to increll as filling oummended. T the implemeto the superin

oblems durinystems, as we of the projece installation dule, thus de

to turn on thes analysis, th

nt way to comcertification f

innovative sobe changed tolding’s heat ill also make tner in the lon

rgh – ChevroRobert

11 | 2

e University oell as examinve the technic

g constructionease the produt the punch lThese prograentation of Tantendent.

ng the construell as a re-desct team will b of these syst

ecreasing the

e mechanicalhe commissiommission. for sustainabl

olutions to heo a green rooisland effect athe building ng run.

on Annex t Mroskey

of ning the cal

n. It is ductivity list. ms will

ablet PC’s

uction of sign of

be tems.

e labor

l ning

le

elp ofing and more

Page 3: ersity of Pittsb urgh A - Pennsylvania State University

TABLE

Executive

Project Ba

Technical

Problem

Backgr

Method

Potenti

Technical

Problem

Backgr

Method

Potenti

Technical

Problem

Backgr

Method

Potenti

Technical

Problem

Backgr

Method

Potenti

Analysis W

Timetable

Conclusio

OF CONT

e Summary ...

ackground ...

l Analysis 1 –

m Identificati

round Resear

dologies .......

ial Solutions &

l Analysis 2 –

m Identificati

round Resear

dologies .......

ial Solutions &

l Analysis 3 –

m Identificati

round Resear

dologies .......

ial Solutions &

l Analysis 4 –

m Identificati

round Resear

dologies .......

ial Solutions &

Weight Matri

e ..................

on ................

TENTS

....................

....................

– Integration

ion ..............

rch Performe

....................

& Expected O

– Re-Design/R

ion ..............

rch Performe

....................

& Expected O

– Commission

ion ..............

rch Performe

....................

& Expected O

– Addition of

ion ..............

rch Performe

....................

& Expected O

ix .................

....................

....................Archite

....................

....................

of Tablet PC’

....................

d .................

....................

Outcomes .....

Re-Sequence

....................

d .................

....................

Outcomes .....

ning of Labor

....................

d .................

....................

Outcomes .....

a Green Roo

....................

d .................

....................

Outcomes .....

....................

....................

....................ectural Engine

....................

....................

’s in the Field

....................

....................

....................

....................

e of the Façad

....................

....................

....................

....................

ratory Spaces

....................

....................

....................

....................

f ..................

....................

....................

....................

....................

....................

....................

....................

Universit

eering | Dec

....................

....................

d ..................

....................

....................

....................

....................

de ................

....................

....................

....................

....................

s ..................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

ty of Pittsbur

cember 9, 20

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

rgh – ChevroRobert

11 | 3

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

on Annex t Mroskey

............ 2

............ 5

............ 6

............ 6

............ 6

............ 6

............ 7

............ 8

............ 8

............ 8

............ 8

............ 9

.......... 10

.......... 10

.......... 10

.......... 10

.......... 11

.......... 12

.......... 12

.......... 12

.......... 12

.......... 12

.......... 14

.......... 14

.......... 14

Page 4: ersity of Pittsb urgh A - Pennsylvania State University

Appendix

Appendix

Structu

Mechan

Appendix

x A – Critical

x B – Breadth

ural Breadth –

nical Breadth

x C – Spring S

Issue Resear

h Topics ........

– Technical A

h – Technical

Semester Pre

Archite

rch Methods .

....................

Analysis #2 &

Analysis #3

eliminary Tim

ectural Engine

....................

....................

Technical An

& Technical A

metable ........

Universit

eering | Dec

....................

....................

nalysis #4 ...

Analysis #4 .

....................

ty of Pittsbur

cember 9, 20

....................

....................

....................

....................

....................

rgh – ChevroRobert

11 | 4

....................

....................

....................

....................

....................

on Annex t Mroskey

.......... 15

.......... 16

.......... 16

.......... 16

.......... 17

Page 5: ersity of Pittsb urgh A - Pennsylvania State University

PROJEC

The ChevThe constfacility is existing afeet. TheBurchick for this th

Included level conare similaother roospace tha

The façadcotta, mewall and a

AdditionaGold builenvironmUniversity

The schedareas of thof the prowere devAnnex haproblems2012 sem

CT BACKG

vron Annex istruction of the a two phase auditorium, a Chevron An Construction

hesis.

in the projecsist of a mainar to each othms are also s

at houses mos

de of the buildtal panels, loan aluminum

ally, the Chevlding will hel

mental and hey of Pittsburg

dule was the he building o

oject was the veloped; howad several pros are expecte

mester.

GROUND

s an addition e Annex start project locat

as well as a thnnex was a $2n was the Gen

ct are spaces n lobby, compher and are dscattered throst of the mech

ding is a comouvers and gl

m cladded eye

vron Annex ilp acknowled

ealth performgh’s campus.

main conceronce the stud ongoing cha

wever, there woblematic fea

ed to be solve

Archite

to the Univerted on Novemted in Pittsbu

hree story ver25 million desneral Contrac

which encomputer lab, au

devoted to choughout the fhanical equip

mbination of alazing. Additebrow (Figur

s currently indge the build

mance, as wel

rn of this projdents returneanges that wewas no additiatures that wed throughou

Figure 1 Al

ectural Engine

rsity of Pittsbmber 20, 200urgh, Pennsylrtical additiosign-bid-builctor that was

mpass a numbditoriums an

hemistry labs floor. The foupment.

a number of stionally, a sunre 1) accents

n pursuit of a ding in its attel as adding a

ject because d to class. An

ere requestedional time adere previousut the analysi

uminum Cladde

Universit

eering | Dec

burgh’s Chev09 and was colvania that in

on above that ld project tha awarded thi

ber of functiond lounge are

and student urth floor of t

systems. Somnshade syste the southwes

LEED Gold rempt to impleanother LEED

the Universinother area td by the Univ

dded to the scsly identifiedis of four tech

ed Eyebrow

ty of Pittsbur

cember 9, 20

vron Tower anompleted in S

ncluded a ren is approximat was bid as is project, an

ons. The firstea. The secon desk areas. the new addi

me of these sem is integratst corner of th

rating. Beingement strateg

D certified bu

ty needed tohat was a risk

versity. Conschedule. Ove

d in Technicalhnical areas d

rgh – ChevroRobert

11 | 5

nd Ashe audiSeptember 20

novation to thmately 35,000

a multi-primd is also the

t floor and mnd and third A few officesition is a mec

ystems incluted into the che façade.

g certified as gies for bette

uilding to the

o turnover cerk for the comstant change erall, the Chel Report 3. Thduring the Sp

on Annex t Mroskey

itorium. 011. The

he square

me job. sponsor

mezzanine floors s and

chanical

ude terra curtain

a LEED er

rtain mpletion

orders evron hese pring

Page 6: ersity of Pittsb urgh A - Pennsylvania State University

TECHN

PROBLE

The Chevwas a conwhich maconsiderahave beealso a lacof tablet P

BACKGR

There is aare spendthem gainof Tablet client appthat is higproductivprove to sTablet PC

METHO

In order t

Peco

Peim

Ain

In A Fa

fo

NICAL ANA

EM IDENTI

vron Annex dncern during ade it difficultable amount n utilized bek of communPC’s in the fie

ROUND RE

an increasingding a critican an edge on PC’s. Tabletprovals, compghly mobile. vity of the comsave time and

C’s will also b

DOLOGIES

to follow thro

erform detailosts, uses, eterform detail

mplementingA case study wnitial costs of ndustry profe

Applications aaculty and st

or Tablet PC’

ALYSIS 1 –

FICATION

did not utilize the project bt for the supeof time that wtter, thus incr

nication amoneld.

ESEARCH P

g interest andal amount of tin other compats are offeringplete inspect The amount mpany will ald money thro

be recommen

S

ough and perf

led researchc. of the consled research

g the use of Tawill be used t investment t

essionals thatand programaff of Penn Sts.

Archite

– INTEGRA

N

any new or ubecause the ferintendents twas wasted wreasing the qngst the proje

PERFORME

d use of technime and monanies. The mg constructiotions, arrang of informatiolso be lookedoughout the pnded.

form this tech

on the differstruction Tab on the time aablet PC’s. to evaluate coo the paybac

t have implems for Tablet Ptate will be in

ectural Engine

ATION OF

unique methofield office wto keep track

walking betwequality controect team, whi

ED

nology througney trying to

main form of teon users new e logistics an

on a superinted into. It is suproject. App

hnical analys

rent types of Tble PC. and cost savi

ost savings ock period. mented TablePC’s will alsonterviewed to

Universit

eering | Dec

F TABLET

ods of technowas located a

k of their doceen the site aol and supervich could be

ghout the con utilize differeechnology th ways to speend manage otendent needuggested tha

plications and

sis, the follow

Tablet PC’s;

ings that can

on the Chevro

et PC’s alreado be analyzedo get informe

ty of Pittsbur

cember 9, 20

T PC’S IN T

ology duringquarter mile

cuments. Addand field officvision of the p resolved wit

nstruction indent types of that will be aned up commuther complic

ds to efficientlat effective usd programs, s

wing steps are

while compa

be establish

on Annex, wh

dy will be intd. ed of new tec

rgh – ChevroRobert

11 | 6

THE FIELD

g construction west of the pditionally, thece. This timeproject. Therth the implem

dustry. Comtechnology tonalyzed will bunication, obcations in an ily increase thses of technosuch as Latist

e necessary:

aring the diffe

hed when

hile comparin

terviewed.

chnologies av

on Annex t Mroskey

D

n. This project; ere was a

e could re was

mentation

mpanies o help be the use btain industry he

ology will ta, for

erent

ng the

vailable

Page 7: ersity of Pittsb urgh A - Pennsylvania State University

POTENT

ImplemenFor instanproblemsof upper mforms of dwell as filrecomme

It is estimtime savinand amousuperintealso increaccuracy actual lab

TIAL SOLU

nting Tablet Pnce, the learns; so ways to managementdocumentatiolling out the pended and the

mated that thengs related tount of time spendent’s timeease the amo will also ben

bor hours.

TIONS & E

PC’s into the ning curves inbypass this pt, and will beon used throupunch list. Apese program

e implementao the superin

pent travelinge, allowing hiunt of accura

nefit the estim

Archite

EXPECTED

field has sevnvolved withproblem will e used to recoughout the prpplications a

ms will help in

ation of Tablentendent. Impg between them to stay on

acy when recmating depar

ectural Engine

OUTCOM

veral advantah a new form be suggesteord work houroject. Tableand programsncrease the o

et PC’s in the plementing Te site and fiesite and over

cording work rtment by cre

Universit

eering | Dec

ES

ages and disaof technolog

ed. Tablets wurs, quantity ret PC’s will as applicable

overall produ

field will havTablet PC’s w

eld offices. Thrsee the proj

k hours and qeating a more

ty of Pittsbur

cember 9, 20

advantages agy in the fieldwill also be iss

reports, qualalso be used t for Tablet PC

uctivity of the

ve a drastic ewill decreasehis frees up mect for longe

quantities of me accurate int

rgh – ChevroRobert

11 | 7

associated wid can cause so

sued to eachlity control anto close out thC’s will be project.

effect on the oe the number much of the er. Tablet PCmaterials. Thternal history

on Annex t Mroskey

ith them. ome

h member nd other he job, as

overall of trips

C’s will his y of

Page 8: ersity of Pittsb urgh A - Pennsylvania State University

TECHN

PROBLE

The instalthe Chevrwere encinterdepe

Phasing ascaffoldinrelated tosouthwesand attachtrades on

BACKGR

Scope revthe interdcreate moscaffoldinsystems. this featurfeature, wstrong en

METHO

In order t

PeC

Men

Rin

Afe

NICAL ANA

EM IDENTI

llation and phron Annex. B

countered whendencies of

and sequencing systems wo space and sst corner of thhed on-site o

n the façade, p

ROUND RE

view and puldependencieore space forng system is c The architecre, while dec

which will reqnough to hold

DOLOGIES

to follow thro

erform reseaChevron AnneMembers of th

ncountered deview and an

nstallation of Analyze the ineature in orde

ALYSIS 2 –

FICATION

hasing of theBecause the rhen figuring o each of the f

ing of the façawere used to istaging. Addhe building coout of structurpushing back

ESEARCH P

l planning ms of the façad

r trades on thchosen to ensctural eyebrocreasing the squire a moded the weight o

S

ough and perf

arch of differeex. he project teaduring the conalyze the muthese system

nitial design oer to decreas

Archite

– RE-DESI

N

exterior skinroofing and cout which itemfaçade system

ade was anotinstall the diff

ditionally, cononsumed mural studs. Thek the start da

PERFORME

meetings will bde systems. Ohe building’s sure all proje

ow will also bschedule. Th

el of the strucof the eyebro

form this tech

ent scaffoldin

am will be inonstruction ofultiple façade

ms. of the architese the amoun

ectural Engine

GN/RE-SE

n caused a nucurtainwall coms were ownms created co

ther problemferent façadenstructing theuch of the sche finishing an

ates for the faç

ED

be suggestedOther scaffol exterior. Alsect participanbe analyzed inhe new desigture. This mo

ow’s new des

hnical analys

ng systems an

terviewed tof the façade. e systems and

ectural eyebrnt of time inst

Universit

eering | Dec

EQUENCE

umber of proontractors wened by whichonfusion and

m encounteree systems, whe architecturahedule and mnd waterprooçade system

d to solve thelding systemsso, a safety pnts are safe dn detail to de

gn may increaodel will help

sign.

sis, the follow

nd analyze w

o determine th

d determine

row and deteralling it.

ty of Pittsbur

cember 9, 20

E OF THE F

oblems durinere separate h contractor. d issues durin

ed. A limitedhich created al eyebrow th

manpower. Thofing of this it

ms.

e communicas will be look

plan will be dduring the insetermine the ase the overap determine

wing steps are

which system

he problems

the best way

rmine a way

rgh – ChevroRobert

11 | 8

FAÇADE

ng the constru primes, diffi In addition, t

ng installation

d number of some problehat is locatedhis feature wtem held up

ation issue relked into in or

developed onstallation of th best way to iall weight of t if the structu

e necessary:

will be best

s that were

y to sequence

to prefabrica

on Annex t Mroskey

uction of culties the

n.

ems d on the

was built other

lating to rder to nce a he façade install the

ure is

for the

e the

ate this

Page 9: ersity of Pittsb urgh A - Pennsylvania State University

Ad

Osa

Joth

POTENT

The phasiappropriareview aninterdepe

The archiamount oto the eyeneed to b

Followingexpectedfaçade wiorganized

A model of theesigned.

OSHA regulatiafety plan. ob photos, prhe actual pha

TIAL SOLU

ing of the façate scaffoldinnd pull plannendencies of

itectural eyebf congestion

ebrow installbe changed a

g the re-sequd that the oveill be decread and detaile

e building’s s

ions will be r

rovided by Buasing of the fa

TIONS & E

çade will be rng system wilning meetings the systems.

brow will also on the site. Tation to begi

and will be de

uencing of therall schedulesed. Due to t

ed, reducing

Archite

structure will

reviewed to d

urchick Consacade.

EXPECTED

re-sequencedll be chosen,s will be held

o be re-desigThe re-desigin sooner thanetermined by

e facade and e duration wilthis decreasethe number o

ectural Engine

l be performe

determine the

struction, will

OUTCOM

d to increase as well as a

d to solve the

gned to try angn of the eyebn anticipatedy modeling th

preliminary ll be decrease in scheduleof conflicts re

Universit

eering | Dec

ed using etab

e information

l be reviewe

ES

e the producti simplified sa

e communicat

nd reduce thbrow will alsod. Due to thishe structure t

design of thesed. Also, thee, the façade elated to the

ty of Pittsbur

cember 9, 20

bs once the e

n necessary f

ed to develop

ivity of the crafety plan wiltion issue rel

he schedule, ao allows activs re-design, tthrough etab

e architecture labor costs installation w systems’ diff

rgh – ChevroRobert

11 | 9

eyebrow is re

for a fully fun

p an understa

rews. The ll be createdlating to the

as well as redvities that arethe structure

bs.

al eyebrow, s involved wiwill be more ficulties.

on Annex t Mroskey

e-

nctional

anding of

. Scope

duce the e linked may

it is th the

Page 10: ersity of Pittsb urgh A - Pennsylvania State University

TECHN

PROBLE

LaboratorChevron for the tescompleteitems thatdate, resunegative job more

BACKGR

A better ucoordinatcommissiwill also bdiscovere

In additiosystems abuilding sperform dsuggestedconfirm thCertified place in o

METHO

In order t

Su Th

oc V

g

NICAL ANA

EM IDENTI

ry spaces havAnnex develsting and bal

ely dust free bt needed to bulting in scheair condition difficult with

ROUND RE

understandintion needed wioning will bebe determineed.

on to the comand controls wsystems’ efficduring occupd that the UShat the buildi buildings wiorder to be LE

DOLOGIES

to follow thro

uggestions whe MEP Coorccurred duri

Various booksain a better u

ALYSIS 3 –

FICATION

ve extreme cloped some clancing of thebefore any ofbe installed thedule complicn; which tendh cleanliness.

ESEARCH P

ng of the comwill be detere understooded. Reasons

mmissioning, twill be analyciencies befo

pancy as comGBC incorpoings are perfill help ensurEED Certified

S

ough and perf

will be made trdinator of thng the testings and magaziunderstandin

Architec

– COMMIS

N

cautions relatcomplicatione systems. Thf the systemshat producedcations. Added to suck th.

PERFORME

mmissioning prmined, as wed. Documentawhy this com

the pre and pyzed. LEED Core occupanc

mpared to the orate some soforming to there that occupd.

form this tech

to help ownehe project teag and balancines dealing wng of the proc

ctural Enginee

SSIONING

ting to the clens when it camhe owner ins

s could be turd dust and deditionally, thehe dirt from th

ED

process will bell as the veration and tra

mmissioning p

post occupanCertified buildcy and during expected pe

ort of re-certie requiremenants and own

hnical analys

ers benefit anam will be intcing of the sywith the comcess.

Universit

ering | Dece

G OF LABO

eanliness andme time to tursisted on the lrned on; howebris. This ine existing Chhe project int

be gained thrification and ining for the process was

ncy efficienciedings will beg occupancyerformance wification for Lnts after certners are conf

sis, the follow

nd prepare foterview to de

ystems. mmissioning o

ty of Pittsbur

ember 9, 201

ORATORY

d precision orn on the melaboratory sp

wever, there wnterrupted thhevron Towerto the existin

roughout this testing that i future facility so complicat

es of LEED Ce analyzed wi. How the sy

will be analyzLEED Certifieification. Re-

forming to the

wing steps are

or eventual LEetermine the

of buildings w

rgh – ChevroRobert

1 | 10

Y SPACES

of the areas. Tchanical equpaces being were still long

he owner’s ocr was in an exng tower, mak

s analysis. This involved wy managemeted will also b

Certified buildith respect to

ystems actualzed. It will beed buildings t-Certificatione requiremen

e necessary:

EED recertifimajor proble

will be refere

on Annex t Mroskey

The uipment

g lead ccupancy xtreme king the

he with the ent staff be

ding o their ly e to n of LEED nts put in

ication. ems that

enced to

Page 11: ersity of Pittsb urgh A - Pennsylvania State University

Th

POTENT

A commiscommissianalyzed suggestedfor the fut

An increaeffective Analysis for the coensure th

he document

TIAL SOLU

ssioning teamioning proce and organized to the USGBture re-certif

ase in the amknowledge a1 will also be

ommissioninghat their build

tation needed

TIONS & E

m and coordiss. The docued using a TaBC for the fut

fication of LEE

ount of coordand use of thee put to good g process anddings are con

Architec

d for the com

EXPECTED

nation plan wumentation neablet PC. A rture. SuggesED certified b

dination of the commission use by usingd turnover of nforming to th

ctural Enginee

mmissioning p

OUTCOM

will be develoeeded for there-certificatiosted solutionsbuildings.

e mechanicaning processg them for thef the buildinghe requireme

Universit

ering | Dece

process will b

ES

oped to ensue commissionon of LEED ces will be mad

al systems wil. The Tablet e documenta

g to the ownerents put in pl

ty of Pittsbur

ember 9, 201

be organized

ure an efficienning of the buertified buildde to the own

ll be accomp PC’s sugges

ation and trainr. Owners wace in order

rgh – ChevroRobert

1 | 11

d using a Tab

nt and coordiuilding will a

dings will alsoner on how to

plished througsted in Technning that is n

will also be for to be LEED c

on Annex t Mroskey

blet PC.

inated also be o be o prepare

gh the nical needed

rced to certified.

Page 12: ersity of Pittsb urgh A - Pennsylvania State University

TECHN

PROBLE

The Chevprotectionplaced onseparatelsystems.

BACKGR

Throughocomparedstructure additionaassociatereceived

METHO

In order t

R A C Ev M

POTENT

A green rthe locatiwell as anroof will hloads. A savings to

NICAL ANA

EM IDENTI

vron Annex’s n board on thn top of metaly, which cau

ROUND RE

out this analyd. Valuable i will also be a

al weight of a d with the he from implem

DOLOGIES

to follow thro

esearch varioAssess the cosCalculate any

valuate the cModel the bui

TIAL SOLU

roof is proposon and type o

ny changes tohelp reduce sgreen roof wo the owner i

ALYSIS 4 –

FICATION

roofs consisthree inch tapl decking sup

used some co

ESEARCH P

sis, the primainformation ranalyzed to d green roof s

eating and comenting a gre

S

ough and perf

ous types of gst and schedu energy and

constructabiliilding in etab

TIONS & E

sed to replacof building wo any other bstorm water r

will make the in the long ru

Architec

– ADDITIO

N

t of a new Thped insulationpported by thmplications w

PERFORME

ary costs invorelated to gredetermine whsystem. Addiooling of the been roof will a

form this tech

green roof syule implicatiocost savings ity issues ass

bs to determin

EXPECTED

ce the existinwill be chosenbuilding comprunoff, reducbuilding mor

un. However

ctural Enginee

ON OF A G

ermoplastic-n with air barhe building’swhen installin

ED

olved with theen roof techhether additioitionally, the building will also be deter

hnical analys

ystems. ons of a gree involved witociated with ne if any chan

OUTCOM

ng TPO roof. n. Necessaryponents. Ch

ce the buildinre environme, the schedul

Universit

ering | Dece

GREEN RO

-Polyolefin (Trrier and gyps steel frameng the transi

he existing rohnology will aonal framing change in m be analyzedrmined.

sis, the follow

n roof additioth adding a g the green ronges are nee

ES

The green roy changes to anging the o

ng’s heat islanentally friendle involved w

ty of Pittsbur

ember 9, 201

OOF

TPO) system tpsum board s. This roofingtions and flas

oof and new galso be provi

g will be needmechanical load. The amoun

wing steps are

on. green roof. oof. eded to the st

oof system th the structure

original TPO rnd effect, anddly, as well aswith the instal

rgh – ChevroRobert

1 | 12

that is placedsheathing. Thg package wshing to the f

green roof wiided. The buded to suppoads and costsnt of LEED po

e necessary:

tructure.

hat is most suie will be madroof to a newd reduce mes provide mollation of the

on Annex t Mroskey

d over his is all

was bid façade

ill be uilding’s ort the s

oints

itable for de, as

w green chanical

oney roof will

Page 13: ersity of Pittsb urgh A - Pennsylvania State University

be increaby the lonof the bui

ased, as well ng term enerilding.

as the materirgy savings to

Architec

ial and laboro the owner d

ctural Enginee

costs involvedue to the ex

Universit

ering | Dece

ed. These coxtended lifecy

ty of Pittsbur

ember 9, 201

osts will evenycle and over

rgh – ChevroRobert

1 | 13

ntually be courall thermal e

on Annex t Mroskey

untered efficiency

Page 14: ersity of Pittsb urgh A - Pennsylvania State University

ANALY

Four corefour areasreductioninvestiga

D

Integra

Re-Desi

ComLab

Additio

TIMETA

In order tcreated. and revie

CONCL

Overall, tAnnex. Inschedule building’would havdecrease

SIS WEIG

e areas of invs of investiga

n. The figuretion.

Description

ation of Tablin the Field

ign/Re-Sequthe Façade

mmissioningboratory Spac

on of a Gree

Total

ABLE

to stay organ This schedul

ew of the anal

LUSION

this analysis wntegration of of the projecs overall andve been intro

e in the overa

HT MATR

vestigation wiation include below displa

Re

et PC's

uence of

g of ces

n Roof

ized throughle, found in Alyses method

will help incrf technology ict. Additionad life time peroduced to thell cost of the

Architec

RIX

ill be accoun research, vaays the weigh

esearch En

5%

5%

10%

5%

25%

hout the SprinAppendix C, ds.

rease the efficin the field an

ally, the commrformances. e project, thebuilding.

ctural Enginee

ted for durinalue engineerht percentag

Value ngineering

10%

5%

10%

25%

ng 2012 semewill allow a s

ciency of thend re-sequenmissioning an If these meth

e owner woul

Universit

ering | Dece

ng the four tecring, constru

ges expected

ConstructaReview

10%

15%

10%

35%

ester, a prelimsignificant am

e constructionncing the tradnd addition ohods of constld have seen

ty of Pittsbur

ember 9, 201

chnical analyuctability revid to be related

ability w

SchRed

1

1

minary sememount of time

n process reldes will bothof a green rootruction and n a reduction i

rgh – ChevroRobert

1 | 14

ysis methodsiew and sched to the core

hedule duction

5%

10%

15%

ester schedule for the comp

lated to the Ch help the oveof will help wnew technoloin schedule a

on Annex t Mroskey

. The edule areas of

Total

30%

35%

20%

15%

100%

e was pletion

Chevron erall with the ogies and a

Page 15: ersity of Pittsb urgh A - Pennsylvania State University

APPEN

Through rissues, antechnical subtopic potential

It is thougbeen avoaccordingtype of sybest poss

In additiosystems abuilding sperform dsuggestedconfirm thCertified place in o

DIX A – C

research basn analysis wa analysis is thdiscussed du for future re-

ght that throuided. In ordgly. Multipleystems used, sible solution

on to the comand controls wsystems’ efficduring occupd that the UShat the buildi buildings wiorder to be LE

RITICAL

sed on the exs formed aro

he commissiouring the ene-certification

ugh detailed cer to fully an

e laboratory s timing of com

n for the phas

mmissioning, twill be analyciencies befo

pancy as comGBC incorpoings are perfill help ensurEED Certified

Architec

ISSUE RES

xperience at tound this topioning of laboergy managem of LEED cert

coordination alyze this prospaces will bmmissioning ing of the sys

the pre and pyzed. LEED Core occupanc

mpared to the orate some soforming to there that occupd.

ctural Enginee

SEARCH M

the 2011 PACic. The criticaratory spacement servicetified buildin

and scheduloblem, the sce also be ana and parties istems.

post occupanCertified buildcy and during expected pe

ort of re-certie requiremenants and own

Universit

ering | Dece

METHODS

CE Roundtablal industry is

es. The commes breakout sngs was analy

ling meetingschedule will balyzed from ainvolved will

ncy efficienciedings will beg occupancyerformance wification for Lnts after certners are conf

ty of Pittsbur

ember 9, 201

S

le and discusssue that will missioning of session. Thisyzed in Techn

s that this probe revieweda number of al be evaluate

es of LEED Ce analyzed wi. How the sy

will be analyzLEED Certifieification. Re-

forming to the

rgh – ChevroRobert

1 | 15

ssing critical be pursued f a building w topic, as we

nical Analysis

oblem could d and adjustedareas of inter

ed to determi

Certified buildith respect to

ystems actualzed. It will beed buildings t-Certificatione requiremen

on Annex t Mroskey

industry through a

was a ll as the s 3.

have d rest. The ine the

ding o their ly e to n of LEED nts put in

Page 16: ersity of Pittsb urgh A - Pennsylvania State University

APPEN

The demoin one or breadth t

STRUCT

When anarecommerequire abe reviewchanged,

Th In

Additionaanalysis wnew greeAlso, diffeIf a chang

MECHA

Technicalrecertificdemonstrbe gainedverificatiotraining foprocess w

Technicalwith a greperformewill also bbe determ

DIX B – B

onstration of more of the fopics will be

TURAL BRE

alyzing the exended. This rn analysis of

wed to determ some of the

he addition oncrease the s

ally, Technicawill also requen roof systemerent size bege in the struc

ANICAL BRE

l Analysis 3 dation. This arated throughd throughouton and testinor the future

was so compl

l Analysis 4 ween roof systeed. These loabe determinemined.

READTH T

at least two bfour analyses

e discussed:

EADTH – TE

xterior façadre-design wil the structuremine if the str potential sol

of steel beamize of the exi

al Analysis 4 uire an analysm. If requiredams, columncture is requi

EADTH – T

deals with thenalysis will rh a mechanict this analysisg that is invo facility manalicated will al

will also haveem. A calculads will be coed. The amou

Architec

TOPICS

breadth topics topics. For

ECHNICAL

de of the buildll place addite through a mructure will nlutions includ

ms or columnsisting beams

involves repsis of the exisd, additional

ns and deckinired, the cost

TECHNICA

e commissionequire the kn

cal breadth. As. The coordiolved with theagement stafflso be discov

e a mechanicalation of the rompared agaunt of LEED p

ctural Enginee

cs in Architec the technical

L ANALYSIS

ding, a re-detional stress o

model of the bneed to be chde:

s to the desig or columns

placing the TPsting structur supports wil

ng may be ret and schedu

AL ANALYS

ning of laboranowledge of A better undeination needee commissionf will also be vered.

al breadth. Treduction in tainst the desigpoints receiv

Universit

ering | Dece

ctural Enginel analyses alr

S #2 & TEC

esign of the aron the structubuilding. Onhanged. If th

gn

PO roofs withre to determill be added t

equired for thule impacts w

IS #3 & TE

atory spaces mechanical serstanding oed will be dening will be u determined.

This analysis the total heatgned loads, w

ved from imp

ty of Pittsbur

ember 9, 201

eering are reqready descri

CHNICAL A

rchitectural eure of the bui

nce the modee structural s

h a green rooine if it can suto the buildinhe roof of the will also be an

ECHNICAL

and the impsystems, whi

of the commisetermined, asunderstood. . Reasons wh

involves repting and coolwhile the coslementing a

rgh – ChevroRobert

1 | 16

quired to be ibed, the follo

ANALYSIS

eyebrow is ilding and wi

el is developesystem needs

of system. Thupport the loang’s existing r new Chevro

nalyzed.

ANALYSIS

lementation ich will be ssioning procs well as the Documentatihy this comm

placing the TPing loads wil

st savings assgreen roof w

on Annex t Mroskey

analyzed owing

#4

ill ed, it will s to be

his ad of the roof.

on Annex.

S #4

of LEED

cess will

ion and missioning

PO roofs ll be sociated

will also

Page 17: ersity of Pittsb urgh A - Pennsylvania State University

APPEN

DIX C – SPPRING SE

Architec

EMESTER

ctural Enginee

PRELIMIN

Universit

ering | Dece

NARY TIM

ty of Pittsbur

ember 9, 201

METABLE

rgh – ChevroRobert

1 | 17

on Annex t Mroskey

Page 18: ersity of Pittsb urgh A - Pennsylvania State University

SENIOR THESIS FINAL PROPOSAL12/9/11

UNIVERSITY OF PITTSBURGHCHEVRON ANNEX

ROBERT MROSKEYCONSTRUCTION

Milestone 1 Milestone 3

1/27/2012 3/2/2012

9-Jan-12 16-Jan-12 23-Jan-12 30-Jan-12 6-Feb-12 13-Feb-12 20-Feb-12 27-Feb-12 5-Mar-12 12-Mar-12 19-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12 23-Apr-12

Analysis 1

1 Analysis 2

2 Analysis 3

3 Analysis 4

4

Chevron Project Team Interviews Complete

All Appropriate Research Complete

All Analyses in Evaluation Stages

All Analyses Complete & Ready for Formatting

Milestones

2/13/2012

Milestone 2

3/26/2012

Milestone 4

Research Tablet PC Uses

Develop Problems Solved by Tablet PC's

Perform Constructability & Schedule Analysis

Perform Final Analysis

Develop Final Schedule

Create a New Phasing Plan

Model the Building's Structure

Develop New Eyebrow Designs

Review/Study Actual Façade Phasing/Details

Research Commissioning Requirements

Commissioning Coordintation & LEED ReCertification Details

Develop a Training Program

Final Documentation & Commissioning Plan

Proposed Spring Semester Thesis Schedule

Fa

cult

y J

ury

Pre

sen

tati

ons

Fin

al

Rep

orts

Du

e

Spri

ng

Bre

ak

201

2

Assess Cost Savings

Develop Maintenance Requirements

Analyze Impacts to Systems & Structure

Research Green Roofs

Integration of Tablet PC's in the Field

Re-Design/Re-Sequence of the Façade

Commissioning of Laboratory Spaces

Addition of a Green Roof

Sen

ior

Ba

nq

uet