university of pittsb urgh...d to be sol tions in oakland h’s main ca ow. the che laced on top the...

99
Univ CHE PITTS Rober Adviso versi EVRON SBURGH, rt Mrosk or: Dr. Ch ty of N ANN , PENNS key | Con himay Anu Pittsb NEX SYLVANI nstructio umba burgh IA on Optio h S R A 2 on Photo Co Senior Report April 4 2012 ourtesy of Masser Thesis ry Photography Final

Upload: others

Post on 29-Dec-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

  • UnivCHE PITTS

    Rober

    Adviso

    versiEVRON

    SBURGH,

    rt Mrosk

    or: Dr. Ch

    ty of N ANN

    , PENNS

    key | Con

    himay Anu

     

    PittsbNEX

    SYLVANI

    nstructio

    umba

    burgh

    IA

    on Optio

    h SR A

    2

    on

    Photo Co

    Senior Report April 4

    2012

    ourtesy of Masser

    Thesis

    ry Photography

    Final

  • EXECU

    This final Annex prexpected

    Analysis 1

    The Chevsuggestedproductivcommissialso recodiscoverethe overa

    Analysis 2

    The instalthe Chevcompareddeterminhelped dwell as po

    Analysis 3

    The Chevequipmenprocess wnew scheareas wer

    Analysis 4

    The Chevincrease the stormbuilding. gained in

    TIVE SUM

    report discuroject. Backgd outcome an

    1: Integration

    vron Annex dd that the p

    vity of the ioning, fill ou

    ommended. ed that the imall cost and tim

    2: Re-Design/

    llation and pvron Annex. d to the orige the proble

    determine theoint out any m

    3: Commission

    vron Annex nt for the teswas researchedule was crere analyzed a

    4: Addition of

    vron Annex’the efficiency

    m water runo This analysi

    n previous AE

    MMARY

    usses four anaground resead the steps th

    of Tablet PC

    did not utilizeroject team workers. T

    ut punchlists These progr

    mplementatiome savings fo

    /Re-Sequence

    hasing of the A re-seque

    ginal plan in ems and challe most efficiemajor concer

    ning of Labor

    developed sting and ba

    hed and analyeated and comand solutions

    f a Green Roo

    s roof was ay of the buildoff, the buildis also includ

    E courses.

    Arc

    alyses that warch was perfhat were perf

    ’s in the Field

    e any new oimplement d

    Tablet PC’s and close ourams will helon of new anor the Chevro

    e of the Facad

    e exterior skiencing of ththis analysislenges facedent and effecrns or proble

    ratory Spaces

    some compalancing of thyzed to determpared to th

    s were develo

    f

    a typical TPOding. This roding’s heat

    des structural

    chitectural En

    will be performformed, as wformed to ach

    d

    r unique medifferent form are recommut the projectlp increase t

    nd innovativeon Annex.

    de

    in caused a nhe installations. Members d during the ictive way to ms with the o

    s

    plications whhe systems. rmine the mohe original ploped to help

    O roof that oof was changisland effectl and mechan

    Universit

    ngineering |

    med for the Uwell as an exa

    hieve the tec

    ethods of techms of technomended to t. Applicatiothe overall p

    e technology

    number of prn of the faça of the projeinstallation osequence th

    original sche

    hen it came Throughout

    ost efficient wlan, determin with this pro

    did not use ged to a greet and the mnical breadth

    ty of Pittsbur

    April 4, 2012

    University ofmination of t

    chnical analy

    hnology duriology in the

    help controons and progrproductivity o in the field h

    roblems duriade systems

    ect team werof these systehe exterior fa

    dule.

    time to turt this analysi

    way to commining the probocess.

    any innovaten roofing sy

    mechanical lohs that rely o

    rgh – ChevroRobert

    2 | 2

    f Pittsburgh’she potential

    ysis/research

    ing construct field to incrol safety, corams applicaof the projechas a drastic

    ing the consts was complre also intervems. This coaçade constru

    n on the mis, the commission. Additblematic area

    tive solutionystem, helpinoads imposen knowledge

    on Annex t Mroskey

    s Chevron solutions, .

    tion. It is rease the oordinate able were ct. It was c effect on

    ruction of leted and viewed to

    omparison uction, as

    echanical missioning tionally, a as. These

    ns to help ng reduce ed on the e that was

  • ACKNO

    OWLEDGEEMENTS

    Arc

    chitectural En

    A

    BU

    Universit

    ngineering |

    ACADEMIC

    Pen

    Dr. Chim

    URCHICK C

    D

    J

    SP

    U

    My F

    ty of Pittsbur

    April 4, 2012

    C ACKNOW

    nn State AE F

    ay Anumba

    T.J. Kleinos

    CONSTRUCT

    INC.

    Dave Meusc

    Joe Scaramu

    Amanda My

    PECIAL THA

    Jeff Stoude

    Utkarsh Ghil

    Family and

    rgh – ChevroRobert

    2 | 3

    WLEDGEMEN

    Faculty

    a: CM Adviso

    sky

    TION COM

    chke

    uzzo

    yers

    HANKS

    en

    ldyal

    Friends

    on Annex t Mroskey

    ENTS

    or

    MPANY,

  • TABLE

    Executive

    Acknowle

    Project Ba

    Project

    Existin

    Local C

    Client I

    Project

    Staffing

    Technical

    Problem

    Backgr

    Case S

    Benefit

    Cost Ev

    Applica

    Summa

    Technical

    Problem

    Backgr

    Façade

    Schedu

    Summa

    Technical

    Problem

    OF CONT

    e Summary ...

    edgements ...

    ackground ...

    t Information

    g Conditions

    Conditions ....

    Information ..

    t Delivery Sy

    g Plan ...........

    l Analysis 1 –

    m Identificati

    round Inform

    tudies ..........

    ts & Savings ..

    valuation ......

    ations ...........

    ary ................

    l Analysis 2 –

    m Identificati

    round Inform

    e Sequencing

    ule Evaluation

    ary ................

    l Analysis 3 –

    m Identificati

    TENTS

    ....................

    ....................

    ....................

    ...................

    s ...................

    ....................

    ....................

    stem ............

    ....................

    – Integration

    ion ..............

    ation ...........

    ....................

    ....................

    ....................

    ....................

    ....................

    – Re-Design/R

    ion ..............

    ation ...........

    g ...................

    n & Impleme

    ....................

    – Commission

    ion ..............Arc

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    of Technolog

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    Re-Sequence

    ....................

    ....................

    ....................

    ntation .........

    ....................

    ning of Labor

    ....................chitectural En

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    gy in the Field

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    e of the Façad

    ....................

    ....................

    ....................

    ....................

    ....................

    ratory Spaces

    ....................

    Universit

    ngineering |

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    d .................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    de ................

    ....................

    ....................

    ....................

    ....................

    ....................

    s ..................

    ....................

    ty of Pittsbur

    April 4, 2012

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    rgh – ChevroRobert

    2 | 4

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    on Annex t Mroskey

    ............ 2

    ............ 3

    ............ 6

    ............ 6

    ............ 7

    ............ 8

    ............ 9

    .......... 10

    .......... 11

    .......... 13

    .......... 13

    .......... 13

    .......... 14

    .......... 16

    .......... 17

    .......... 18

    .......... 19

    .......... 20

    .......... 20

    .......... 20

    .......... 21

    .......... 22

    .......... 22

    .......... 23

    .......... 23

  • Schedu

    Solutio

    Summa

    Technical

    Problem

    Backgr

    Propos

    Installa

    Mainte

    Structu

    Mechan

    Summa

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    Appendix

    Reference

    ule Evaluation

    ns ................

    ary ................

    l Analysis 4 –

    m Identificati

    round Resear

    sed Design ...

    ation Procedu

    nance ..........

    ural Breadth ..

    nical Breadth

    ary ................

    x A – Actual P

    x B – Actual F

    x C – Swing S

    x D – New Fa

    x E – New Co

    x F – Actual C

    x G – Propose

    x H – Structur

    es ................

    n ..................

    ....................

    ....................

    – Addition of

    ion ..............

    rch ...............

    ....................

    ure ...............

    ....................

    ....................

    h ..................

    ....................

    Phasing Visua

    Façade Sched

    Scaffolding Lo

    çade Schedu

    ommissioning

    Commissionin

    ed Green Ro

    ral Breadth H

    ....................

    Arc

    ....................

    ....................

    ....................

    a Green Roo

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    al .................

    dule ..............

    ocations .......

    ule ................

    g Schedule ...

    ng Schedule .

    of Layout ......

    Hand Calculat

    ....................

    chitectural En

    ....................

    ....................

    ....................

    f ..................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    tions ............

    ....................

    Universit

    ngineering |

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ty of Pittsbur

    April 4, 2012

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    rgh – ChevroRobert

    2 | 5

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    ....................

    on Annex t Mroskey

    .......... 23

    .......... 25

    .......... 26

    .......... 27

    .......... 27

    .......... 27

    .......... 28

    .......... 29

    .......... 30

    .......... 31

    .......... 34

    .......... 37

    .......... 38

    .......... 54

    .......... 57

    .......... 62

    .......... 66

    .......... 69

    .......... 75

    .......... 77

    .......... 98

  • PROJEC

    PROJEC

    The ChevThe constfacility isexisting afeet. TheBurchick for this th

    Included level conare similaother roospace tha

    The façadcotta, mewall and a

    AdditionaGold buienvironmUniversity

    The scheareas of tof the prowere dev

    CT BACKG

    CT INFORM

    vron Annex itruction of ths a two phasauditorium, ae Chevron An Construction

    hesis.

    in the projecnsist of a maiar to each ot

    oms are also at houses mos

    de of the builetal panels, loan aluminum

    ally, the Chevilding will h

    mental and hy of Pittsburg

    dule was thethe building oject was theveloped; how

    GROUND

    MATION

    s an additione Annex starse project loas well as a tnnex was a $n was the Ge

    ct are spacesn lobby, comther and are scattered thrst of the mech

    lding is a comouvers and g

    m cladded eye

    vron Annex ielp acknowl

    health perforgh’s campus.

    e main conceonce the stud

    e ongoing chwever, there

    Arc

    n to the Univerted on Novemocated in Pithree story ve

    $25 million deneral Contra

    s which encommputer lab, a devoted to croughout the hanical equip

    mbination of glazing. Addebrow (Figur

    is currently iledge the burmance, as

    ern of this pdents returne

    hanges that w was no addi

    Figure 1 Al

    chitectural En

    ersity of Pittsmber 20, 200ttsburgh, Penertical additi

    design-bid-buactor that was

    mpass a numauditoriums achemistry lab floor. The fopment.

    a number of ditionally, a sre 1) accents

    in pursuit of auilding in itwell as add

    project becaued to class. A

    were requesteitional time a

    uminum Cladde

    Universit

    ngineering |

    sburgh’s Che09 and was connsylvania tion above thuild project ts awarded th

    mber of functiand lounge abs and studeourth floor of

    f systems. Sosunshade sys the southwes

    a LEED Golds attempt to

    ding another

    use the UnivAnother areaed by the Unadded to the

    ed Eyebrow

    ty of Pittsbur

    April 4, 2012

    evron Tower ompleted in hat included

    hat is approxithat was bid

    his project, an

    ions. The firsarea. The seent desk aref the new ad

    ome of these stem is integst corner of th

    d rating. Beino implement r LEED cert

    ersity needea that was a riniversity. Coe schedule.

    rgh – ChevroRobert

    2 | 6

    and Ashe auSeptember 2

    d a renovatioimately 35,00 as a multi-pnd is also the

    st floor and mecond and thas. A few ofdition is a m

    systems inclgrated into thhe façade.

    ng certified a strategies fified buildin

    ed to turnoveisk for the co

    onstant changOverall, the

    on Annex t Mroskey

    uditorium. 2011. The on to the 00 square

    prime job. e sponsor

    mezzanine hird floors ffices and echanical

    lude terra he curtain

    as a LEED for better ng to the

    er certain ompletion ge orders Chevron

  • Annex haproblems2012 sem

    EXISTIN

    The projeUniversityaerial pho

    The new accessiblmaterial s

    ad several ps are expecte

    mester.

    NG CONDI

    ect is locatedy of Pittsburgotograph bel

    addition is ple from both storage and l

    Figure

    roblematic fed to be sol

    TIONS

    d in Oaklandgh’s main calow. The Che

    laced on topthe Chevronlocating an on

    e 2 Bird’s Eye Vi

    Arc

    features that ved through

    d, Pennsylvanampus is locaevron Annex

    the western n Tower and tn-site office.

    iew of the Chevr

    chitectural En

    were previohout the analy

    nia; which isated. The sit is outlined in

    section of buthe Ashe Aud

    ron Annex and a

    Universit

    ngineering |

    ously identifiysis of four t

    s large neighte and surroun RED.

    uilding abovditorium. Th

    adjacent structur

    ty of Pittsbur

    April 4, 2012

    ied in Techntechnical are

    hborhood in unding build

    ve the Ashe Ae compact si

    res prior to cons

    rgh – ChevroRobert

    2 | 7

    nical Report 3eas during th

    Pittsburgh wdings are sho

    Auditorium anite made it di

    struction

    on Annex t Mroskey

    3. These he Spring

    where the own in the

    nd will be ifficult for

  • LOCAL

    The Chevon a siteParkman

    Due to thneed werand was lsmall traiContractoof the pro

    Limited p

    The follow

    RED: Pro

    BLUE: Fie

    GREEN:

    CONDITIO

    vron Annex ise located in Avenue and

    he fact that thre hard to colocated apprilers and oneor and the Ligoject.

    parking was a

    wing figure d

    oject Site

    eld Offices &

    Lay-down/St

    ONS

    s located at 2the corner o

    University D

    he project siteome by. A siroximately a e larger doubghting Contra

    available at th

    displays the lo

    & Limited Park

    torage Areas

    Arc

    219 Parkman of The Univerive.

    e was locateite office was quarter mile

    ble-wide trailactor. The la

    his site-office

    ocations of th

    king

    s

    Figure 3 Ove

    chitectural En

    Avenue in Oersity of Pitt

    d in a denses needed for e west of the er. The two

    arger double

    e.

    he site, office

    erhead View of

    Universit

    ngineering |

    Oakland, Penntsburgh’s ma

    ely populatedr the multiple site. The sit smaller traile-wide trailer

    e, and lay-dow

    Project Area

    ty of Pittsbur

    April 4, 2012

    nsylvania. Tain campus

    d area, parkie primes invote office comers were occ was for the C

    wn areas.

    rgh – ChevroRobert

    2 | 8

    The building iat the inters

    ing and otherolved with th

    mplex consistcupied by theConstruction

    on Annex t Mroskey

    is located section of

    r areas of he project ted of two e General Manager

  • CLIENT

    The Univeowner of institutionareas rancompriseOakland, PennsylvaacademicThe mosLearning.in the wor

    Enrollmeaccounts institutionOver 13,5

    Although Departmeextremelyproducts.research heterocyc

    In additioManagemDepartmeKlimchoc

    INFORMA

    ersity of Pittsf the project.n that is highnging from ped of five ca with the oania. The Oc, research ast notable o. This buildirld, at an asto

    nt at the Univ for roughlyns of higher500 faculty an

    The Universent is the my notable pro. The space interests ofclic chemistr

    on to the Unment Department is the ma

    ck as two main

    ATION

    sburgh, comm. The Univehly recogniz

    philosophy toampuses. Thother campuOakland cam

    and administrof all the bung is one of onishing 42-s

    versity is moy five percenr education nd staff memb

    sity of Pittsbmain tenant o

    ofessor with me will be fittef the tenant y, combinato

    niversity and ment is ano

    ain representn representa

    Arc

    monly referreersity of Pittszed in a numo dentistry. he main camuses locatedmpus has ovrative buildiuildings is the tallest ac

    stories and 53

    re than 35,00nt of all studin the state bers assist an

    burgh is the of the space.multiple awaed for the dinclude the

    orial, medicin

    their Chemiother party tative for the

    atives for the

    chitectural En

    ed to as Pitt, burgh is a p

    mber of acad The Univers

    mpus is locat around wever one hunngs located the Cathedr

    cademic buil35 feet tall.

    00 students, wdents enrolle of Pennsylvnd support th

    outright own. The depa

    ards and pubdepartment’s total synthenal and comp

    istry Departminvolved in

    e University adepartment.

    Universit

    ngineering |

    is the public demic sity is ted in estern ndred on it.

    ral of ldings

    which ed in vania. he needs of th

    ner of the prartment is lelications invo synthetic chesis of naturputational che

    ment, The Un the projeand is led by

    ty of Pittsbur

    April 4, 2012

    he University

    roject, the Ued by Dr. Polved with thhemistry resral productsemistry.

    University of ct. The Fa

    y Chris Niem

    rgh – ChevroRobert

    2 | 9

    y.

    University’s Ceter Wipf, w

    he chemistry search progr, organomet

    Pittsburgh’s acilities Man

    mann along w

    on Annex t Mroskey

    Chemistry who is an of natural

    ram. The tallic and

    Facilities nagement

    with David

  • Fig

    PROJEC

    The UnivChevron competitiprimes aUniversityheld a cobelow.

    General Burchick

    CM Mascaro Co

    Roofing String

    Glazing Southwest

    G

    gure 4 Project D

    CT DELIVER

    ersity of PittAnnex proje

    ively bid andnd their suby chose to hi

    ost plus a fee

    ContractorConstruction

    Agentonstruction, Co.

    Contractorgert, Inc.

    Contractort Aluminum &

    Glass

    Other S

    Delivery Method

    RY SYSTEM

    sburgh usedect. The Univd was each a

    bcontractors ire a CM Ag contract wit

    Subs

    d

    Arch

    M

    d a Design-Biversity brokeawarded as awere also lu

    gent. Mascarth the owner

    OwUnivers

    hitectural Eng

    id-Build withe the projecta lump sum cump sum conro Constructi. The organiz

    wnerity of Pitt

    C

    Lu

    Universit

    gineering | A

    h CM Agencyt into eight bcontract. Contracts. Dueion was the Czational char

    Cont

    Cost Plus Fe

    ump Sum

    ty of Pittsbur

    April 4, 2012

    y project debid packagesontracts helde to the projCM Agent thrt for the Che

    PlumbContraSSM Ind

    Fire SuppContra

    Alliance Fire

    HVAC ConSSM Ind

    ElectrContra

    Lighthouse

    ArchiWilson Ar

    tract Type

    ee

    rgh – ChevroRobert

    | 10

    livery methos. Each pack

    d between eaject’s comple

    hat Pitt hired evron Annex

    bing actor

    dustries

    pression actor

    e Protection

    ntractordustries

    rical actore Electric

    itectrchitects

    es

    on Annex t Mroskey

    od for the kage was

    ach of the exity, the and they

    x is shown

  • STAFFIN

    Burchick job was c

    Typicallydoes thisproject. project mKonesky,Burchick’informatio

    On-site, Kalso in chvarious trkeep in tobe compAnnex.

    NG PLAN

    organized thcomplex, Burc

    y, for most ofs by staying

    For the Chemanager. Da kept him u’s chief estimon that perta

    Keith Koneskharge of fourradesmen thouch with Daleted. The d

    heir staff for tchick assigne

    f Burchick’s p in constant

    evron Annex,ave spent mupdated on mator, Joe Scined to the b

    ky is in chargr foremen thaat Burchick eave and Keithdiagram belo

    Arch

    this project sed more fore

    projects, Joe contact with

    , Burchick asmost of his ti

    the daily tascaramuzzo, fidding of the

    ge of coordinat help him kemploys. Both to keep traow outlines

    hitectural Eng

    similar to moeman than usu

    Burchick ovh the projectssigned Daveme in the osks that werfor any quese project.

    nating all of keep track ofth, Burchick’

    ack of any acthe staffing p

    Universit

    gineering | A

    ost of their otual to this pro

    verlooks the t manager the Meuschke

    office; while re being pestions regard

    the contractof the daily ac’s accountantccounting or plan that Bur

    ty of Pittsbur

    April 4, 2012

    ther projectsoject.

    entire procehat is assign to take on tthe on-site s

    erformed. Dding change

    ors involvedctivities that t and admini administrativrchick optim

    rgh – ChevroRobert

    | 11

    s. However,

    ess of the proned to the rethe responsibsuperintende

    Dave also re order costs

    d in the projeare performeistrative assive duties tha

    mized for the

    on Annex t Mroskey

    since this

    oject. He espective bilities of ent, Keith

    eferred to s and any

    ect. He is ed by the stant also

    at need to Chevron

  • ForeJohn W

    AHea

    Figure 5 B

    emanWalker

    ccountingather Sabala

    Bu

    Burchick Staffing

    ForemBill Mro

    urchic

    g Plan

    Arch

    PresidJoe Bur

    Project MDave Meu

    SuperinteKeith Kon

    manoskey

    ck Sta

    hitectural Eng

    dentrchick

    Manageruschke

    endentnesky

    ForemRay Bow

    affing

    Universit

    gineering | A

    manwser

    Ad

    A

    g Plan

    ty of Pittsbur

    April 4, 2012

    ChJo

    ForemaBob Mros

    dministrativAssistant

    Amanda Myer

    n

    rgh – ChevroRobert

    | 12

    hief Estimatoe Scaramuzz

    anskey

    ve

    rs

    on Annex t Mroskey

    orzo

  • TECHN

    PROBLE

    The Chevwas a cowhich maconsiderahave beealso a lacof new an

    Due to thidea thatsuggestio

    B C Be C A Su

    BACKGR

    As technopressure Upon comBurchick implemen

    This poindescribe Take Off briefly foTablets pinspectiophones ato leap fo

    In order analyzed

    NICAL ANA

    EM IDENTI

    vron Annex dncern during

    ade it difficultable amount

    en utilized beck of communnd innovative

    he potential bt should be on, a detailed

    ackground InCase Studies

    enefits & SavCost EvaluatioApplications

    ummary

    ROUND IN

    ology is bec of integratinmpletion, it Constructionting technol

    nt can be rei the populariin Construct

    ocuses on twoprovided thesns, arrange lnd laptops; srward.

    to gain a be. The first

    ALYSIS 1 –

    FICATION

    did not utilizeg the projectt for the supe of time that etter, thus incnication amone technology

    benefits that aaddressed o

    d study was p

    nformation

    vings on

    NFORMATIO

    oming more ng new techno

    was determon and the logy in the fie

    inforced by rity and effection describeo companiesse users newlogistics andsome believe

    etter undersreference u

    Arch

    – INTEGRA

    N

    e any new ort because th

    erintendents was wasted creasing the ngst the projein the field.

    are possible on this proj

    performed. T

    ON

    popular in tologies; and

    mined that thother contr

    eld.

    reviewing antiveness of taes the recent and how the

    w ways to spd manage. Ae that they m

    tanding of thsed for this

    hitectural Eng

    ATION OF

    r unique methe field office

    to keep trackwalking betw quality contect team, wh

    with the impect. To pro

    This study inc

    the construct whether or ne Chevron Aactors to ge

    n article fromablet PCs in t attractiveneey each use eed up comm

    Although, it ismay be one of

    he technolog analysis wa

    Universit

    gineering | A

    F TECHNO

    thods of teche was locatek of their docween the sitetrol and supehich could be

    plementationoperly detercludes the fol

    tion industrynot it is goingAnnex wouldet their foo

    m Engineerin the construcess iPads havthe tablet tomunication, s believed thf the enablin

    gy currently as a book ti

    ty of Pittsbur

    April 4, 2012

    OLOGY IN

    hnology duried a quarter cuments. Ade and field oervision of the resolved wi

    n of technologrmine if thisllowing:

    y, each compg to significad have been

    ot in the tec

    ng News-Recction industryve been rec

    o maximize thobtain client

    hat tablet PCng devices th

    available, aitled Applica

    rgh – ChevroRobert

    | 13

    N THE FIE

    ing constructmile west ofditionally, thffice. This ti

    he project. Tith the implem

    gy in the fiels idea is an

    pany is facedntly affect then a great prchnological

    cord (ENR) ty. The articleiving in theheir companyt approvals, s will not rep

    hat allows the

    a few resouration of Mob

    on Annex t Mroskey

    LD

    tion. This f the site;

    here was a ime could There was mentation

    ld, it is an effective

    d with the e project. roject for door by

    that helps le Tablets e field. It y’s goals. complete place cell e industry

    rces were bile IT in

  • Constructin the cobenefits aThroughothe contrreduce th

    CASE ST

    In order projects wcan be deseemed tSystems isummariz

    Case St

    The first companyBalfour Be(ROI) of

    tion (Bowdennstruction inand drawbac

    out this bookibuting facto

    he conflicting

    TUDIES

    to adequatewhere the iteetermined thto be one of included muzed below.

    tudy 1

    case study ty-wide, phaseeatty decidedthe software

    n, 2005). Thisndustry. Addcks associate, Bowden tou

    ors (Figure 6g information

    ely evaluate em of interesrough a varie the most wi

    ultiple case s

    hat was revied use of Veld to pilot Vel

    e. It was fou

    InsuffInappror Con

    Inform65

    Fig

    Arch

    s book providitionally, thed with eachuches on the ). From this throughout a

    a piece of est was used. ety of case stidely used pstudies on th

    iewed dealt wla Systems sola’s field manund that the

    ficient, ropriate nflicting mation5%

    gure 6 Contribut

    hitectural Eng

    des a full anais book usesh of the differecurring pr

    s figure, it isa jobsite.

    equipment o The problemtudies. While

    programs in their website

    with Balfour oftware and inagement sofre was a re

    Weath8%

    ting Factors to C

    Universit

    gineering | A

    alysis of the us helpful taberent forms roblems assos obvious tha

    or software, ims and solutie researchinthe industry.addressing t

    Beatty ConsiPads for onsftware and dduction of g

    her

    Human E17%

    Contractor Rewo

    ty of Pittsbur

    April 4, 2012

    use and applbles that give

    of technologociated with cat something

    it is essentiaions develop

    ng various pro. After furththe use of th

    struction decsite project mdetermine thegeneral cond

    Error%

    MaF

    PoWorkm

    5%

    ork

    rgh – ChevroRobert

    | 14

    ications of tee a breakdowgy that are pcontractor re

    g needs to be

    al to review ped by the teograms, Velaer investigat

    heir products

    ciding to impmanagement.e return on inditions and o

    aterials Failure

    5%

    oor manship%

    on Annex t Mroskey

    echnology wn of the

    proposed. ework and e done to

    previous echnology a Systems tion, Vela s and are

    plement a Initially,

    nvestment overhead,

  • resulting was due t

    Using iPaease-of-uwith Otterjobsite.

    The consSystems. issue crefeatures a

    This casewill not b

    Case St

    The seconto increaMassachucommuniof time itparticipatless focus

    After resecombinatfeatures wlightweig

    After impdevelopinfound andoutput, re

    Overall, iin the foll

    Pe Pr R C

    in a ROI of mto the real-tim

    ads to supporuse of iPads mrbox Defend

    struction indu This app inc

    eation/sign oare available

    study also ge covered. F

    tudy 2

    nd case studyase their efficusetts. This ication from tt took to capting parties; s on the pape

    earching multion of handwwere describ

    ght design an

    plementationng meeting md the superineports and do

    it was determlowing areas

    ersonnel Proroject Acceleisk Reduction

    Cost of Quality

    more than 300me access to

    rt the Vela Mmake them ander Series cas

    ustry’s first cludes a docuoff for trackin with or witho

    goes into detaFor more info

    y that was anciency. Suff project wasthe field backpture field n co-founder

    erwork and m

    ltiple tablet Pwriting and thbed, with the nd affordable

    n, the end rminutes in hantendent wasocuments are

    mined that co (Vela System

    oductivity eration n y

    Arch

    0%. An increthe quality an

    Mobile systemn essential elses also make

    “all in one”ument libraryng any issueout an Intern

    ail on cloud cormation, ple

    nalyzed focusfolk Construcs a luxuriousk to the archnotes on-siteand construc

    more focus on

    PCs, Vela chhe ability to m main focus b price.

    esult was thalf. Additionas able to repe also superio

    ompanies usims, 2012):

    hitectural Eng

    ease in efficiend safety asp

    m was also slement for coes the tablets

    iPad constry, checklists es while walet connection

    computing anease visit Vela

    es on the usection was his hotel that itects and de, type the dction manag

    n the actual p

    ose Motion Cmark up planbeing placed

    hat Suffolk’s ally, during aort the problor to the ones

    ing Vela con

    Universit

    gineering | A

    ency and redpects of their

    uggested. Tonstruction ms able to with

    ruction appl for QA/QC, lking in the n.

    nd BIM, whica Systems’ w

    e of Vela Softired to constrequired ve

    esigners. Aftdata at the oger, Adam Omproject.

    Computing slns with a pen.d on the blen

    superintenda project wallem in real tis Suffolk was

    nfigured Moti

    ty of Pittsbur

    April 4, 2012

    duced risk wa performance

    The low cost,management.hstand the ro

    ication is als Safety and C field. Inter

    ch are not an website: www

    tware on a Sutruct the Libery detailed ter being frusoffice and thmansky, felt

    late tablet PC. Several of M

    nd of its perfo

    dent was abllk through, seime. The qu using before

    ion tablets se

    rgh – ChevroRobert

    | 15

    as also evidee.

    , long battery. Protecting

    ough conditio

    so providedCommissioninrestingly, all

    area of this sw.velasystems

    uffolk Construberty Hotel i and time-costrated by then distribute that there s

    Cs to help suMotion tabletormance, rug

    le to cut hiseveral probleuality of the ee.

    ee exponenti

    on Annex t Mroskey

    ent, which

    y life and the iPads ons on the

    d by Vela ng and an l of these

    study and s.com .

    uction job n Boston, onsuming

    he amount e it to all should be

    upport the t’s unique

    ggedness,

    s time of ems were electronic

    ial results

  • Case St

    A third cmulti-faceemploy VCommisstested. Aspecific commissi

    With the relativelythe screeautomaticusing Velassist in th

    An exampinstance, window. image. Acolumn li

    Overall, tvariety oinvolved.

    BENEFI

    After revidiscoverepaper-bausing tecinformatiothe accur

    For examalter theirdirectly ininformatio

    Reducingsuperinteforeman uthat the sadds up t

    tudy 3

    ase study reeted construVela Systemssioning trackA handover d

    equipment. ioning proce

    use of Velay obsolete. Fen in their ocally convertla Systems. he overall or

    ple of how e if a few wind The photo co

    Also, it could nes were.

    this case studof tasks that

    TS & SAVIN

    iewing case sed that the uased documehnology in thon between t

    racy of the inf

    mple, many sur accuracy. Into the systemon, while cre

    g the numberendent makeusually makesuperintendeo three hours

    eviewed on Vction compas’ commissios systems anocument set This set iss (Vela Syst

    a Systems’ mField personnwn handwrit

    ts to electron Using a Tabrientation with

    easy it is to rdows were nould then bebe indicated

    dy reinforces can be perf

    NGS

    studies on thuse of technontation. Deche field. Thithe field and formation.

    uperintendenInstead of wam while obse

    eating a more

    r of trips betes an averages at least twoent spends ans and fifty mi

    Arch

    Vela Systemsany, expandinoning modulnd equipmen is also creates then delivems, 2012).

    mobile field nel can use ating; which tnic text. Comblet PC to viehin the field.

    report problenot operating e downloadedd directly on t

    the importanformed using

    he applicationology in the creasing the is is accompl office. Getti

    nts wait until aiting until theerving the woe efficient inte

    tween the sitge of five trio, with each n additional inutes a day t

    hitectural Eng

    s’ website inng their usele on Harvarnt as they areed by electrovered to the

    software, tha Tablet PC tothe tablet dimmunicationew drawings

    ems in the fie properly du

    d into the systhe plans whi

    nce of using tg Vela Syste

    ns of mobile field will elimpossibility olished by reding the inform

    the end of the end of the dork being peernal history

    te and field oips per day trip taking athree hours

    the superinte

    Universit

    gineering | A

    nvolves Bonde of Vela Sysrd Universitye delivered, onically tyinge owner, sp

    he paper sido view drawiisplays as pe

    n of punchlists, instead of

    eld was alsouring inspectstem and noteich window d

    technology inems software

    technology iminate manyf human erroducing the pmation direct

    he day to recday, superin

    erformed. Th for the estim

    office can sa between th

    approximatel a day in theendent is not

    ty of Pittsbur

    April 4, 2012

    d Brothers, a stems. Bondy’s Northwes installed, reg all relevantpeeding up

    de of the coings, as well en strokes, ht items werea bunch of 1

    o provided intion; a photo es could be wdoes not wor

    n the field. Ae and the tim

    in the construy of the probor is an adva

    paper-trail invtly from the f

    cord their wontendents canhis can increamating depart

    ave a lot of the site and fly ten minutee trailer, awa on-site supe

    rgh – ChevroRobert

    | 16

    Massachused Brothers dest Lab proje

    eadied for tet documentat the deliver

    onstruction p as writing dhighlighter m

    e also improv11 x 17 draw

    n this case st could be takwritten direc

    rk and show w

    Also, it showsme and cost

    uction industblems associantage associvolved in trafield can also

    ork reports; wn enter the infase the accurtment.

    ime and monfield office, wes. It is also eay from the srvising. Like

    on Annex t Mroskey

    etts-based ecided to

    ect. Vela sting and tion to the ry of the

    process is irectly on marks, or ved while

    wings, can

    tudy. For ken of the ctly on the where the

    s the wide s savings

    try, it was iated with iated with ansferring o increase

    which can formation acy of the

    ney. The while the estimated site. This ewise, the

  • foremen spend at workers.

    Without approximproject mminimize

    COST E

    When anasignificanassociateprovidedto note ththe misce

    Sup

    A

    Proj

    AdditionaAnnex, a determinOtterBox on the job

    The mainSystems sassociate$11,064. project. T$1,500 to Annex are

    spend an hothe field offic This can inc

    technology, mately an houmanager spen

    d if the field

    EVALUATIO

    alyzing the cnt advantaged with the la

    d by Burchickhat the superellaneous com

    Worker

    perintendent

    Foreman

    Accountant

    ject Manage

    ally, in order short evaluaed that the c protective cbsite.

    n costs assocsoftware. Ved with purch This includeThe training help train the shown belo

    our a day awce increases crease worke

    time is alsur a day transnds an hour areports and q

    ON

    costs incurrede is found. ack of technok Constructionintendent an

    mpany and un

    t $

    $

    $

    er $

    r to assess thation of the pcost of an iPaase would co

    ciated with imela’s softwarehasing Vela fes the use of associated whe end usersow (Table 2).

    Table

    Arch

    way from thethe amount or productivit

    so wasted wsferring the wa day confirmquantities of

    d and potentTo support logy in the fin, while the d

    nd foreman ranion burden

    Rate

    54.03

    48.80

    25.00

    50.00

    he costs involproposed tecad with a waost $70 each

    mplementinge prices are bfor a project f the softwar

    with learning. The total c

    e 1 Costs Associ

    hitectural Eng

    e site. By deof time they ay, as well as

    within the cwork reportsming invoicematerials are

    tial savings athis informa

    ield can be fodurations weates have a m costs.

    Unit Hour

    $/hr 3

    $/hr 1

    $/hr 1

    $/hr 1

    lved with addchnologies warranty and cand would h

    g technology based on the

    $10 to $29 mre, as well as this software

    costs associat

    iated without Te

    Universit

    gineering | A

    ecreasing thare available increasing th

    company’s s from a faxees and materie recorded d

    associated wiation, a comfound below re observed

    multiplier of

    rs/Day Pr

    D

    3.83 4

    1.00 4

    1.00 4

    1.00 4

    ding a new fwas performecamera will c

    help protect t

    on the Chev individual prmillion and a s online suppe costs $1,00ted with usin

    echnology in the

    ty of Pittsbur

    April 4, 2012

    e amount of to supervisehe overall qu

    office. Theed copy to theial quantities

    directly on sit

    ith using techmplete analys

    (Table 1). T while on-site1.6 applied t

    roject Days

    ToHo

    486 1,86

    486 486

    486 486

    486 486

    3,32

    form of techned. From Apcost roughlythe iPad from

    vron Annex roject size an duration of port for the

    00 for the set ng iPads and

    e Field

    rgh – ChevroRobert

    | 17

    f time the sue the project auality of the p

    e accountane computer, s. These timete.

    hnology in thsis of the labThese unit prie. Also, it is ito them to ac

    otal ours

    Tot

    63.00 $ 10

    6.00 $ 2

    6.00 $ 1

    6.00 $ 2

    21.00 $ 16

    nology to thepple’s websi

    y $937 each. m the rough c

    consisted ofnd duration. 24 months wentire durati up; and an a Vela for the

    on Annex t Mroskey

    upervisors and assist

    project.

    nt spends while the es can be

    he field, a bor costs ices were important ccount for

    tal Cost

    00,661.62

    23,716.80

    12,150.00

    24,300.00

    60,828.42

    e Chevron ite, it was Also, an conditions

    f the Vela The costs

    would cost ion of the additional

    e Chevron

  • T

    iPad w

    Comparin$144,243.Annex wo

    APPLIC

    There wetechnologthe amouamount oincreasin

    Another pthe extenManager punchlist of the copunchlistpunchlist

    Safety waconcerns using a s

    echnology

    w/ warrantyOtterBox CVela SystVela Train

    Total

    ng the costs .42 was founould have be

    ATIONS

    ere a lot of gy in the fielunt of time theof time eachg the overall

    problem that nsive amount was the lack were still inc

    ontractors dis on the Chs would have

    as also a hug were repeat

    safety inspec

    y Type

    y & camerCase ems ning

    l

    without techd (Table 3). en a good jo

    Poten

    Cos

    opportunitied. To begine superinten

    h supervisor l quality of th

    could have bt of time it tk of communcomplete sixid not know hevron Annee been compl

    ge concern otedly brough

    ction software

    Arch

    C

    ra $ $ $ 1 $ 2

    hnology to the This is an ob to use tech

    ntial Savings

    ts without T

    Technology

    Potential Sa

    es that the Cn, the overal

    ndents and fo spends at e project.

    been prevenook to comp

    nication durinx months afte what items ex, the comleted in an ap

    on the projecht up in meete, provided

    Table 2 Estima

    Table

    hitectural Eng

    Cost

    937.00 70.00 1,064.00 2,500.00

    e costs of imobvious advahnology in the

    s Associated in the Field

    echnology

    y Costs

    avings

    Chevron Anll quality of th

    oremen were the job wou

    nted with the plete the punng the first pr the phase w were still o

    mmunication ppropriate am

    ct and coulding, but wereby Vela, the

    ated Technology

    e 3 Potential Sav

    Universit

    gineering | A

    Qua

    3 3 1 1

    mplementing antage and sue field.

    d with Techn

    $ 160,8

    $ 16,58

    $ 144,2

    nnex would he project w away from t

    uld increase

    use of technonchlists. A mphase’s puncwas completeopen. By us

    delays woumount of time

    d have utilizee slowly resoe amount of

    y Costs

    vings

    ty of Pittsbur

    April 4, 2012

    antity

    .00 $

    .00 $

    .00 $

    .00 $

    $

    technology, upports the i

    nology

    28.42

    85.00

    43.42

    have benefiwould have inthe project si worker pro

    ology in the fmain concer

    chlist. Items ed. This wassing technol

    uld have bee.

    ed technologolved by the risk on the

    rgh – ChevroRobert

    | 18

    Total Cos

    $ 2,811.0$ 210.0$ 11,064.0$ 2,500.0$ 16,585.

    a potential sidea that the

    itted from thncreased by ite. By increoductivity, as

    field would hrn of the Con

    from the firss partly becalogy to comen reduced

    gy in the field offending pajob could ha

    on Annex t Mroskey

    st

    00 00 00 00 00

    savings of Chevron

    he use of reducing

    easing the s well as

    have been nstruction st phase’s use many

    mplete the and the

    d. Safety arties. By ave been

  • reduced. more effic

    The commhelp of teequipmenstatus. Alowner in the multip

    SUMMA

    It is recomsoftware foremen, shoulder

    In order tprogram will inclutechnologprogram,future pro

    Also, the macient manner

    missioning prechnology. nt, enabling lso, the comm an electroniple documen

    ARY

    mmended thincludes Ve should be g strap, which

    to reduce the by Vela’s Seude web-basgy. This wil, as well as hojects.

    ain safety cor.

    rocess for theReports are the commiss

    missioning inic form. This

    nts related to

    hat Burchick Cela Web, Vegiven an iPa will increase

    e difficulty relervice and Sused group sll benefit evehelp them in

    Arch

    ncerns of the

    e Chevron An completed sioning agennformation ans reduces the the commiss

    Constructionla Mobile an

    ad. Each iPae the durabili

    lated to the leupport Teamsessions targeryone withithe long run

    hitectural Eng

    e project team

    nnex would hby the softw

    nts and other nd linked doce time wastesioning proce

    n purchase Vnd Vela Repad will incluity and mobil

    earning curvm will be heldgeted to helpin the compa

    n by saving th

    Universit

    gineering | A

    m could have

    have also beeware, showinr responsiblecuments can

    ed by variousess.

    Vela Systems ports. Also, ude an Otterlity of the iPa

    ves associated at Burchickp the end uany and willhe company

    ty of Pittsbur

    April 4, 2012

    e been recor

    en a more smng the statusee parties to b be created as parties coll

    software for each superbox Defende

    ad.

    d with the nek’s office. Thusers learn l enable Bur a significant

    rgh – ChevroRobert

    | 19

    ded and reso

    mooth proceses of all sys

    better managand turned ovlecting and c

    r future projeintendent, aner Series ca

    ew software, hese trainingthe various

    rchick to leat amount of m

    on Annex t Mroskey

    olved in a

    ss with the tems and

    ge project ver to the

    compiling

    ects. This nd select se with a

    a training g sessions forms of arn Vela’s money on

  • TECHN

    PROBLE

    The instaChevron difficultieaddition, installatio

    Phasing scaffoldinrelated tonumber o

    Additionaconsumedstructuralpushing b

    Re-sequethe façadthe follow

    B Fa Sc Su

    BACKGR

    To effectperformeproject pmanager,

    • Thte

    • E(p

    • Th

    NICAL ANA

    EM IDENTI

    allation of thAnnex. Be

    es were enco the interdepon.

    and sequenng systems wo space and of scope mee

    ally, construcd much of thl studs, and back the start

    encing the façde systems. Twing:

    ackground Inaçade Sequechedule Evalummary

    ROUND IN

    tively analyzed was doneprogress pho, a number of

    his was Burcerra cotta nsuring that panels, clips,here was a la

    ALYSIS 2 –

    FICATION

    he exterior facause the roountered whpendencies

    cing of the were used tostaging. Co

    etings and pla

    cting the arche schedulethe finishingt dates for the

    çade will helTo properly s

    nformation encing luation & Imp

    NFORMATIO

    ze the probl. This analyotos and stuf difficulties a

    hick’s first at

    the order wa rails, gasket

    ack of flow ar

    Arch

    – RE-DESI

    N

    acade causeoofing and chen figuring of each of t

    façade waso install the

    ountless moveanning sessio

    chitectural e and manpo

    g and waterpe façade syst

    lp decrease support this i

    plementation

    ON

    lems associaysis consisteddying the oand obstacles

    ttempt at a la

    as placed prots, tile pieces

    round the bui

    hitectural Eng

    GN/RE-SE

    ed a numbercurtainwall c out which ithe façade s

    s another prdifferent faç

    es of the scaons.

    yebrow locaower. This fproofing of ttems.

    the confusioidea, a detai

    ated with thd of multipleriginal sches were broug

    arge metal pa

    operly with as/sizes, flashiilding with th

    Universit

    gineering | A

    EQUENCE

    r of problemcontractors witems were

    systems crea

    roblem encoçade systemaffolding swin

    ated on the feature was this item hel

    on and congeiled study wa

    he façade, ae interviews dule. Withi

    ght up. These

    anel project

    dequate quaing)

    he different sy

    ty of Pittsbur

    April 4, 2012

    E OF THE F

    ms during thwere separatowned by w

    ated confusio

    ountered. Ams, which cre

    ngs were ma

    southwest cobuilt and at

    ld up other t

    estion relatedas performed

    a complete a with the proin the interve challenges

    and their firs

    antities of the

    ystems

    rgh – ChevroRobert

    | 20

    FAÇADE

    he constructiote prime cowhich contraon and issue

    A limited nueated some pade due to th

    orner of thettached on-sitrades on th

    d to the instad. This study

    analysis of oject team, rview with ths were:

    st attempt at

    different com

    on Annex t Mroskey

    on of the ntractors, actor. In es during

    umber of problems

    he limited

    building ite out of

    he façade,

    allation of y includes

    the work reviewing e project

    installing

    mponents

  • • Th

    • Hco

    • Po

    In order tof the actConstructphotos wactual phwith each

    Before thobtained.The exterwith two mto fifty feetwo men complete

    FAÇADE

    The first (Appendiefficiencysequencinthe east eelevation

    Once all owere anastudied aneeded tdifferent the variopanels ha

    After all estimatedon the Chto create

    o The swineffic

    he eyebrow o Cause

    aboveHaving a sep

    omplicated moor definition

    to make suggual phasing ption, the gen

    were receivedhasing of the h month show

    e new phasin. The first pirior phasing motors. Twoet. These staeach, assigne

    e the exterior

    E SEQUEN

    step in devix C). This y of the extng was also elevation and

    ns are the foca

    of the swing alyzed. By uat each swingto be compleswing dropsus corners a

    ad to be coor

    of the activd from persohevron Annex a critical pat

    wing scaffoldcient also caused a

    ed problems e and below tparate curtaimatters ns of scope in

    gestions on hprocess needneral contracd, they were exterior (Ap

    wing what eac

    ng of the façaiece of inform for the Chev

    o of these stagages can be ded to the faça façade of the

    NCING

    eloping the minimizes terior sequebeing decided finish on thal point of the

    drops were dtilizing the id

    g location. Tete to finish throughout t

    and transitiondinated. Thi

    vities were donal experienx. The schedh. The final

    Arch

    ding was con

    a number of p associated whe eyebrow inwall contra

    n the docume

    how to improvded to be resctor, and aski reviewed an

    ppendices A ch elevation l

    ade could bemation needevron Annex ges have a m

    downsized acade of the bue building.

    new façade the number

    encing. Whed. It was dhe north. The building an

    determined, dea of the laThe multiple the respectthe façade, kns of the sysis caused eac

    determined, nce that was dule was then façade seque

    hitectural Eng

    nstantly bein

    problems with the swin actor who w

    ents

    ve the installasearched. Thing for progrnd organized& B). The re

    looked like a

    e developed,ed related toconsists of th

    maximum lenccordingly. Auilding. Thes

    sequence w of moves fhile the swinetermined thhe reasoningnd was a main

    the activitiesast planner, t

    systems werive area we

    keeping in mstems. Eachch side of the

    their duratiogained while

    n finalized byencing sched

    Universit

    gineering | A

    ng relocated

    ng staging fo

    was not unde

    ation of the ehis research fress photos d to developeference bre

    at the beginni

    , a few key po the scaffoldhree swing s

    ngth of forty feAdditionally,se crews will

    was to deterfor each swing locations

    hat the installg behind thisn concern of

    s that neededthe last swingre analyzed are determin

    mind the multih corner thate system to be

    ons were cae observing

    y linking the ndule can be f

    ty of Pittsbur

    April 4, 2012

    d and reset,

    r the exterio

    er Burchick’

    exterior façadfirst began bof the entire

    p a visual aideaks down thing of the mo

    pieces of infoding that wasscaffolding stfeet and the t there will be perform all

    rmine the locing, while ins were beinlation of the s was becau the Universit

    d to be perfog drop was tand all the ded. This waiple coordinat consisted oe installed sim

    alculated. T the actual wnecessary acfound in Appe

    rgh – ChevroRobert

    | 21

    which was e

    or façade acc

    ’s contractua

    de, a compleby contactinge project. Ond and scheduhe project byonth.

    rmation needs available atages, each ethird stage cae a total of fothe work nec

    cations of thncreasing thng determinfaçade woulse the south ty.

    ormed at eachthe first area

    different activas done for ation issues r

    of terra cottamultaneously

    These duratiowork being pctivities to onendix D.

    on Annex t Mroskey

    extremely

    cess, both

    al control

    ete review g Burchick nce these ule of the y months,

    ded to be at the site. equipped an extend

    our crews, cessary to

    he swings he overall ned, their d start on and east

    h location a that was vities that all of the related to

    a of metal y.

    ons were performed ne another

  • SCHEDU

    Once the Construct

    Key Differ

    Th E Th

    When woin extremdeterminsystems. constructsmoothly

    SUMMA

    After thorhave bee

    Pb

    T S

    K S T

    ULE EVALU

    new phasingtion. Main di

    rences:

    he estimatedyebrow tookhere was no

    o There o Swing

    orking on a pme detail. Aed. This wi Efficient plaing these sys around the p

    ARY

    roughly analn made:

    Proper plannbuilding’s sysThorough defSeparate prim

    o Multipproje

    o Get alKnowing howStarting from Take advanta

    UATION &

    g plan was esifferences be

    d durations dik up an unexpinitial plan th was no flow

    g scaffolding w

    roject that haAdditionally, ll help reducanning will astems. Creaperimeter of

    lyzing the fa

    ning is an estem finitions of th

    me contractorple coordinact ll parties invo

    w a system wo the end and

    age of the on-

    Arch

    IMPLEMEN

    stablished, itetween the tw

    iffered from tpected amounhat maximize maintained awas moved b

    as complex fa the scopes ce confusionalso ensure tating a phasinthe building

    açade system

    essential step

    e scope of wrs on a projecation and sco

    olved in creaorks and is in backtracking-site knowled

    hitectural Eng

    NTATION

    t was comparwo schedules

    the actual dunt of time d the efficien

    around the bubefore the res

    acade systemof work eac

    n related to tto the most eng plan that was essentia

    ms used on th

    p in determ

    ork in the doct add additioope review

    ating a schednstalled shoulg can prove t

    dge to determ

    Universit

    gineering | A

    red to the acs were discov

    urations of the

    ncy of the swuilding spective area

    ms, it is impoch contractothe interdepefficient and allowed the al in this analy

    he Chevron

    mining the m

    ocuments is imonal coordinmeetings ne

    dule ld be known to be an effec

    mine activity

    ty of Pittsbur

    April 4, 2012

    tual schedulevered and are

    e activities be

    wing scaffolds

    a’s work was

    ortant to examor is responspendencies o practical wa constructionysis.

    Annex, the

    most efficient

    mportant nation concereed to be h

    before beginctive practicedurations

    rgh – ChevroRobert

    | 22

    e created bye listed below

    eing perform

    s

    s completed

    mine all of thesible for neeof the multipay of sequenn of the façad

    following co

    t way to co

    rns to the proeld on a mu

    nning the woe in schedulin

    on Annex t Mroskey

    y Burchick w:

    med

    e systems eds to be le façade

    ncing and de to flow

    onclusions

    onstruct a

    oject ulti-prime

    ork ng

  • TECHN

    PROBLE

    LaboratorChevron for the tecompleteitems thatdate, resunegative job more

    In additiouncoverewas contrunder conby the cosubmittaldue to theby Jeff wa

    Within thThis new comparispossible performe

    SCHEDU

    The issuecircumstarelating tothe criticasubstantiato start. Tup.

    Once thecommissi

    NICAL ANA

    EM IDENTI

    ry spaces haAnnex deveesting and b

    ely dust free t needed to bulting in scheair condition difficult with

    on to the aboed some morracted directnstruction. Aommissionings and RFI’s we difference as that it was

    his analysis, a schedule wi

    son, the key solutions will

    ed to help imp

    ULE EVALU

    es discussedances. Withio the commisal steps and al completionThis schedul

    e activities wioning sched

    ALYSIS 3 –

    FICATION

    ave extreme loped some balancing ofbefore any o

    be installed tedule compl

    n; which tendh cleanliness.

    ove complicre problems.tly with the oAnother issueg agent. It wwere not theof viewpointoften difficul

    a new commill be compaareas of discl be proposeprove the ove

    UATION

    d above are n this analysssioning of th their activitin date, detere includes al

    were determidule created

    Arch

    – COMMIS

    N

    cautions relcomplication

    f the systemof the systemhat produced

    lications. Added to suck th.

    ations, an in The first is

    owner and the related to thwas also poin same persos on how the

    lt to get the c

    missioning scared to the ocrepancy wiled. These solerall efficienc

    general issusis, the last plhe building (Aies were detrmining whatll the activitie

    ned and a nd by Burch

    hitectural Eng

    SSIONING

    lating to the ns when it ca

    ms. The ownms could be t

    d dust and dedditionally, thhe dirt from t

    nterview withsue that was

    hat they did nhe commissinted out that

    onnel who rae systems shoommissionin

    hedule will briginal schedll be determilutions are oncy of the com

    ues that coullanner methoAppendix E)ermined. Tht needed to bes that have

    new scheduleick Constru

    Universit

    gineering | A

    G OF LABO

    cleanliness ame time to tner insisted turned on; hoebris. This inhe existing Cthe project in

    h the projects described wnot get involoning of the t the commis

    an the field teould work. Tng agents to v

    be developedule used onined. Thesenly some of t

    mmissioning p

    ld happen ood was utilize). With the suhis was donebe completed an impact on

    e was createuction (Appe

    ty of Pittsbur

    April 4, 2012

    ORATORY

    and precisioturn on the m on the laboowever, thernterrupted th

    Chevron Townto the existi

    t’s MEP coorwas that the lved until the building wasssioning ageests. This caThe final issuvisit the site.

    ed using the n the Chevroe differences the multiple cprocess.

    n any projeced to develoubstantial coe by workingd in order to n the mechan

    ed, it was coendix F). D

    rgh – ChevroRobert

    | 23

    Y SPACES

    on of the aremechanical eoratory spacre were still lhe owner’s oc

    wer was in aning tower, m

    rdinator, Jeff commissionie project was the lack of

    ents that reviaused some pe that was br

    last planneron Annex. D will be analchanges that

    ct, dependinop a detailed ompletion datg backwards allow the curnical equipm

    ompared to tDuring the

    on Annex t Mroskey

    eas. The quipment

    ces being long lead ccupancy

    n extreme making the

    Stouden, ing agent

    as already site visits ewed the problems rought up

    r method. During the lyzed and t could be

    ng on the schedule te known,

    s from the rrent task

    ment start-

    the actual schedule

  • compariswere disc

    Key Differ

    A Fo N St A A La

    These keywhile comhandling By delayiwhich wafinished p

    The archiconditiondeviationmillwork items. Thdust free contractostrobic fa

    The abocommissiwhich puaffected ttile to be

    The nipplwork wasitem. Onresulting

    The labordeliveredthe casewlaboratorfabricate,

    The probschedule ultimately

    son and projecovered and

    rences:

    Air Handling Uootball Shrou

    Nipple Plenumtrobic Fan Sta

    Architectural MAbove Ceiling

    aboratory Ca

    y differencesmpiling pos units (AHU’sing the start-uas a major coproducts that

    itectural millned air throun in moisture also requiredhis delayed th to properly

    ors that did nans.

    ve ceiling ioning. The wushed back the mechanic installed to c

    le plenums as not well dence this scop in the ceiling

    ratory casewd on time, thwork installery casework a, deliver and

    lems discuss comparisony responsible

    ect team inter are listed be

    Units uds at Fume Hms art-Up Millwork & Dg Work / Neeasework

    s were analyzsible solutio). The AHU’sup date of thncern of this were to be i

    lwork in the ughout the be content wod a lot of altehe strobic fan

    y test and banot adequate

    work was work that wathe start-up cal equipmecomplete thei

    lso caused thefined and thpe problem wg space to the

    work was anotere were mu

    ed in its entialso involved install.

    sed above are. A number e because o

    Arch

    rviews, mainelow:

    Hoods

    Dust-Free Acted for Access

    zed to determons. First ans were delivee AHU’s mea

    s project. Thinstalled, mos

    student deskbuilding. Thould result ierations; causns’ start-up dalance. Addely define the

    another conas being perf

    of the mechnt start-up wir system eva

    he ceilings tohere was conwas resolveden get closed

    ther issue relultiple changirety, the cod a number o

    e only the ma of smaller pf the lack of

    hitectural Eng

    differences

    ivities s Above Ceili

    mine the contnd foremostered later thaant that the bis was a mainst of which re

    k area was oe millwork win the expansing small amdate because itionally, thee appropriat

    ntributing faformed abovehanical equi

    was because aluations.

    o remain openfusion on wh

    d, the fabricad up.

    lating to the dges associateommissioningof different c

    ain problemsproblems alsof detail in the

    Universit

    gineering | A

    and problem

    ing

    tributing factt, the main an expected,

    building wouln concern beequired cond

    one of the mawas extremending and comounts of dus

    the laboratoere was a lacte cleanlines

    actor to thee the ceilingipment. The the commiss

    n for an extenhich contractation of the n

    delay of the wd with the ca

    g of the builcustom items

    s and concerno occurred be scope of w

    ty of Pittsbur

    April 4, 2012

    ms with the co

    tors that causproblem foc which delayld not receiveecause of theditioned air.

    ain items affeely detailed ontracting ost from the cuory areas neeck of informss that was n

    e problems g was taking le reason thesioning agen

    nded periodor owned th

    nipple plenum

    work. Althouasework andlding was un that require

    ns that were but it was uncwork within t

    rgh – ChevroRobert

    | 24

    ommissioning

    sed the discrecused aroundyed their stare any conditi

    e significant a

    ected by theand precisef the materi

    utting and fitteded to be coation provid

    needed to tur

    experiencedlonger than ee above ceilnt required a

    d of time. Thee work relat

    ms was able

    ugh the cased lab spaces.nable to begd a significan

    discovered wclear which pthe project.

    on Annex t Mroskey

    g process

    epancies, d the air t-up date. ioned air, amount of

    e delay of e and any ials. The ting of the ompletely

    ded to the rn on the

    d during expected, ling work all ceiling

    e scope of ed to this to begin;

    work was . Without gin. The nt time to

    within the party was The next

  • section dconfusion

    SOLUTI

    As discucommissito the Che

    The delaproblemscritical pproblemscritical pahave beeapproval would hatime.

    If this prpossibilitbeing prereducing componetesting an

    Reducingpreventeresulted define thneeded to

    Finally, thCommisstested. Aspecific commissi

    Overall, tproject ocoordinatremembeconstruct

    discusses posn and difficult

    ONS

    ssed above,ion process. evron Annex

    ay in the dels for the conath item thats that resulteath item direen the propo from the Ow

    ave accepted

    roposed soluy to help theefabricated s the amount

    ents would limnd balancing

    g the confusid by a morein confusing

    he requiremeo occur befor

    he commissiosioning trackA handover d

    equipment. ioning proce

    there were a on schedule.tion that neeer that constr a building o

    ssible solutioty that occurr

    , there were This section

    x.

    livery date fstruction of tt affected a n

    ed from this ectly affectedosal of workiwner of the e the proposa

    ution was noe project stayshould have of time nee

    mit the amoun to possibly b

    ion and diffie detailed sc and an inad

    ents of each re the testing

    oning process systems anocument set This set iss (Vela Syst

    number of id These sol

    eded to be dructing a buif the highest

    Arch

    ons that couldred during th

    e a number discusses po

    for the AHUthe project. number of acdelay, a lett

    d the completing overtimeextra costs t

    al and extra c

    ot accepted y on schedulbeen. This weded to instant of time thabegin on the

    iculties encocope of workdequate amo

    party, resulg and balanci

    ss could havend equipmen is also creates then delivems, 2012).

    deas and sollutions were done throughilding is a te quality poss

    hitectural Eng

    d have beenhe commissio

    of problemossible soluti

    ’s was a ma This deliverctivities throer could havtion date of te to maintainhat would bcosts, allowin

    by the Ownle. Any comwould allow all the items

    at the ceiling original date

    untered durk for the con

    ount of risk sting in repeing of the me

    e been simplint as they areed by electrovered to the

    utions that co not discove

    hout the progeam effort anible.

    Universit

    gineering | A

    n implementeoning proces

    ms that resulions to these

    ain problem ry date and t

    oughout the pve been writthe project. n the substane encounterng the possib

    ner, prefabrimponents or s

    the compones in the field needed to be.

    ring the endntractors. Thsharing. Theeat work; espechanical equ

    ified by the ue delivered, onically tyinge owner, sp

    ould have beered becausgress meetin

    nd everyone

    ty of Pittsbur

    April 4, 2012

    ed on the prs on the Chev

    lted in a co problems th

    that contribthe installatioproject. In otten to the O Also includential compleed. More thbility of comp

    ication couldsystems that ents to begind. Prefabricbe open and e

    d of construche informatio

    e scopes propecially in thuipment coul

    use of technol installed, reg all relevantpeeding up

    een implemese of the lacngs. Therefoinvolved sho

    rgh – ChevroRobert

    | 25

    roject to minvron Annex.

    onfusing andhat are related

    buted to manon of the AHorder to min

    Owner statinged in this lettetion date, rehan likely, thpleting the p

    d have been had the posn being sizedcating the mexposed, allo

    ction could aon that was

    ovided did nohe final clead begin.

    logy in the fieadied for tet documentat the deliver

    ented to helpck of leaderore, it is impould work to

    on Annex t Mroskey

    nimize the

    d difficult d directly

    ny of the HUs was a nimize the g that this er should equesting he Owner project on

    n another ssibility of d and cut, echanical owing the

    also been provided ot clearly

    an up that

    eld. Vela sting and tion to the ry of the

    keep the rship and portant to

    ogether to

  • SUMMA

    After thorhave bee

    Gin

    R Th

    th Th St A

    ex Th

    p Th

    ARY

    roughly analyn made:

    Get the commn hand with thequire the cohe same com

    he testing he commissiotart-Up of the

    An adequate axpected of thhe commissiroject to minhe commissio

    yzing the com

    missioning aghe design teaommissioningmmissioning

    oning agent ne AHU’s was aamount of infhem to be ablioning proce

    nimize the numoning proces

    Arch

    mmissioning

    gent involvedam to spot pog agent to visagent should

    needs to be aa critical pathformation neele to turn on

    ess, as a whmber of unfoss is affected

    hitectural Eng

    process for

    d in the projeossible issuessit the projecd do the sub

    available whh item, delayeds to be prothe strobic fa

    hole, should reseen prob by all trades

    Universit

    gineering | A

    the Chevron

    ect during thes ct site routinebmittal and R

    hen they are sying multiple ovided to infoans be an area lems s

    ty of Pittsbur

    April 4, 2012

    n Annex, the

    e design pha

    ely RFI reviews a

    schedule activities orm/define t

    of interest t

    rgh – ChevroRobert

    | 26

    following co

    ase so they w

    and then com

    he contracto

    throughout t

    on Annex t Mroskey

    onclusions

    work hand

    me and do

    rs what is

    the entire

  • TECHN

    PROBLE

    The Chevprotectionall placedpackage flashing t

    After lookproject mOnce thisGhildyal the additidecided tbe perfor

    BACKGR

    Before anDuring Ugreen rootake the aconsidereby Utkars

    There aregreen rooeffect, asincreaseswhich can

    To assist Building Awith a grgreen roofoot, as crequire edesignedimposed

    NICAL ANA

    EM IDENTI

    vron Annex’sn board on td on top of mwas bid se

    o the façade

    king into themanager, it ws was foundof Renaissanional expensthat the initiarmed.

    ROUND RE

    ny changes toUtkarsh’s inte

    of to a buildiadditional soed. More mash, http://gba

    e a number oofs help redu well as red

    s the marketn reduce the

    with compiliAlliance (GB

    reen roof. Gofs are lightecompared to excessive mad to provide

    on the roof. (

    ALYSIS 4 –

    FICATION

    s roof consishree inch tapmetal deckinparately, wh systems.

    e idea of addwas discovered out, one once 3 Architee of adding a

    al idea of a gr

    ESEARCH

    o the roof derview, he offing. First an

    oil load. Alsoaintenance byapgh.org/ an

    of benefits assuce the amou

    duce greenhotability of the potential for

    ing informatiBA) was extreGenerally, theer and less ex the 80-150

    aintenance an a space of (GBAPGH, 20

    Arch

    – ADDITIO

    N

    ts of a new Tpered insulang supportedhich caused

    ding a greened that the Af the Archite

    ects. While ta green roof; reen roof wo

    esign or struffered a numnd foremost, to, a root barry the Owner

    nd the city of

    sociated withunt of heatinouse gases. e building. flooding and

    ion, the souremely helpfuere are two

    xpensive thanpounds per nd are not in interaction 012)

    hitectural Eng

    ON OF A G

    Thermoplastiation with air d by the buil some comp

    n roof to theAnnex’s origects involvedalking with U so there wasuld be taken

    ucture, a bettmber of sugge

    the roof wourier and a thi would also bPortland.

    h the additiong and coolin Adding a g Green roofsd water conta

    ces providedul in develop

    types of gren intensive. Tsquare foot

    ntended for ubetween nat

    Universit

    gineering | A

    GREEN RO

    ic-Polyolefin barrier and lding’s steel

    plications wh

    e Chevron Anginal design d with the pUtkarsh, he ss no detailedn to the next s

    ter understanestions and i

    uld need addicker layer obe required.

    n of a green rng needed. Tgreen roof als also reducamination. (G

    d by Utkarshping an undeeen roofs; exThey typicall of an intensuse by humature and hu

    ty of Pittsbur

    April 4, 2012

    OOF

    (TPO) syste gypsum boal frame. Addhen installing

    nnex and intintended on project was stated that th

    d information step and a de

    nding of greissues to con

    ditional structof waterproof

    Two sources

    roof to a builThey help relso provides ce a buildingGBAPGH, 201

    h were first rrstanding of

    xtensive and ly weight 10-sive roof. Exans. Howeveumans, which

    rgh – ChevroRobert

    | 27

    m that is plaard sheathingditionally, thg the transit

    terviewing B having a grinterviewed

    he owner did provided. Itetailed analy

    en roofs wasnsider when tural reinforcfing would nes were also s

    lding. As maeverse the he sound insul

    g’s stormwate12)

    reviewed. Th the layers a intensive. E-50 pounds pxtensive roo

    er, intensive h increases t

    on Annex t Mroskey

    aced over g. This is

    he roofing tions and

    Burchick’s reen roof.

    d; Utkarsh d not want t was then

    ysis would

    s needed. adding a cement to eed to be

    suggested

    any know, eat island ation and er runoff,

    he Green associated Extensive er square

    ofs do not roofs are the loads

  • Regardlewaterprosecond lawater, asThe typesto be livinplants beconsider

    In additioinstance, wind is afrom blow

    The layerfor the rostructure.

    PROPOS

    When coconsidereAnnex’s r

    Once an developeintensive

    In additiogreen rooadding anThis cannconnectio

    ss of the typeofing. The w

    ayer associat well as prevs of medium,ng on the gre

    eing installed drought and

    on to these fo a small laye

    an issue, a wiwing soil off o

    rs and detailiof can place . Additionall

    SED DESIG

    onsidering aded. First off, roof will be a

    intensive gred. With th green roof d

    on to the conof needs to bn intensive g

    not be accomon between t

    e of roof, botwaterproofingted with a grventing the p, mixture andeen roof. Fin

    d on a green r wind-resista

    our layers, ser of gravel cind erosion lof the roof.

    ing of a gree additional loly, the draina

    GN

    dding a gree the primary ccessible for

    reen roof wahe help of Adesign was ab

    nsiderations pbe consideredreen roof to t

    mplished with the Chevron

    Figure 7 Sta

    Arch

    h types consg is used to peen roof is thpotential for d depth of thenally, vegetatroof should b

    ant plants.

    everal speciaan be placedlayer can be

    en roof is a croads on the roage associate

    en roof to a function of thr human use,

    as chosen, thAmerican Hyble to be dev

    previously dd. Also, the the Chevron a roof hatch Annex’s roo

    andard Lawn Ass

    hitectural Eng

    sist of four baprevent the phe drainage.leaking and e growing mtion is anothebe non-invas

    alized layers d on the drai

    e added to th

    ritical step inoof and struc

    ed with the ad

    a building, thhe green roo an intensive

    he design androtech, Inc

    veloped (Figu

    discussed, theonly point of Annex, the m, so it is prop

    of and the ex

    sembly Courtesy

    Universit

    gineering | A

    asic layers. Tpenetration o. The draina rotting. A g

    medium depeer layer needive and nativ

    can be choseinage layer the growing m

    n the design cture, which wddition of a g

    here are a nof needs to b roof will be

    nd detailing c.’s website ure 7).

    e drainage af access to th

    main purposeposed that a nxisting Chevr

    y of American Hy

    ty of Pittsbur

    April 4, 2012

    The first layerof any water iage is used togrowing med

    ends on the tyded for a greve to the regi

    en to be addo provide ex

    medium laye

    process. Thwill result in a

    green roof nee

    number of itbe determine chosen over

    of the greeand literatu

    associated wihe roof is throe is for use bynew access pron Tower’s

    ydrotech, Inc.

    rgh – ChevroRobert

    | 28

    r of a green rinto the buildo help removdium is also ypes of planteen roof. Theion. It is also

    ded to the dextra drainageer to prevent

    he more layera need to inceds to be ana

    tems that need. Since the an extensive

    en roof needure, a typica

    ith the additiough a roof hy the buildin

    point be crea10th floor. Th

    on Annex t Mroskey

    roof is the ding. The ve excess essential. ts that are e types of o smart to

    sign. For e. Also, if the wind

    rs chosen crease the alyzed.

    eed to be e Chevron e one.

    ded to be al shallow

    ion of the hatch. By g’s users.

    ated at the his would

  • require thpoint. A proposedonly grastwo feet w

    INSTALL

    Due to thof the sysand are d

    The first sthe membmembranof the mmembran

    Once the seal. Afteover the pin order t

    Next, thethicknessall drain drainage

    he removal o plan view ofd green roof ss and concrewide. The res

    LATION PR

    e complexitystem. To ass

    described be

    step involvedbrane terminne consists ofembrane is

    ne while still w

    membrane aer the membprevious layeto protect aga

    e insulation is of the insulalocations and component

    of the womenf the proposelayout and itete pavers. Tst of the roof

    ROCEDURE

    y of a green rsist with the ilow (Figure 8

    Ac

    Le

    Ro

    Ins

    Ga

    Fil

    Sy

    Ha

    Lit

    Er

    Ro

    Mi

    d with constrnation pointsf one coat at then installe

    warm to ensu

    and Hydroflerane is approer, extendingainst the later

    s to be laid ation should bd ensure proof the system

    Fi

    Arch

    n’s toilet in ted green roots componenThe pavers a is covered in

    E

    roof system, installation, s8). (Hydrotec

    ctivity Name

    eak Test

    oot Stop - Loo

    sulation - Lo

    ardendrain 3

    ll Gardendra

    stemFilter

    ardscape Ele

    te Top Grow

    osion Contro

    oll GardMat

    isc. Planting

    ructing a gre are located 90 mils into wed at 125 mure good adh

    ex 30 are instoved, the Rog it full heighral growth of

    loosely overbe predetermoper fitting am needs to be

    igure 8 Steps As

    hitectural Eng

    the Chevron of can be fou

    nts. Keeping are placed arn grass and is

    the installatisteps for the ch, 2012)

    e

    ose Lay

    oose Lay

    30 - Loose La

    ain w/ Aggre

    ements & Pa

    wing Media

    ol Blanket

    & Stake in P

    gs

    en roof is to above the ewhich Hydro

    mils with the hesion.

    alled, a leak ot Stop can b

    ht to cover allf roots.

    r the root bamined, basedaround all pee put in plac

    ssociated with thGreen Roof

    Universit

    gineering | A

    n Tower and und in Appen the layout siround the ens completely

    ion is a cruci installation o

    ay

    egate

    avers

    Place

    install the roeventual leveotech’s Flex F Hydroflex 3

    test is to be be installed. l flashing and

    arrier that wd on the desienetrations. ce. The Gard

    he Installation of

    ty of Pittsbur

    April 4, 2012

    a door be adndix G. Theimple, the gr

    ntire perimety accessible t

    ial part of theof the green

    oofing membel of the soil Flash is embe30 being ro

    performed tThe Root Stod lapping ad

    was just previred R-value. After installidendrain 30 m

    f a

    rgh – ChevroRobert

    | 29

    dded at the e plan view sreen roof syster of the rooto humans.

    e overall per roof were d

    brane, makin and vegetatedded. A seclled directly

    o ensure a wop is to be laidjacent sheets

    viously instal. Also, cut thing the insulmaterial is to

    on Annex t Mroskey

    transition shows the stem uses of and are

    rformance developed

    ng sure all tion. This cond coat

    y into the

    water-tight id loosely s five feet

    lled. The he foam at ation, the

    o be loose

  • laid over all penetr

    The nextHydrotecplaced ovthe soil fr

    After theincorporapaver bal

    Hydrotecmedia is sis rolled complete

    MAINTE

    Properly beautiful attention importancweeds wi

    By propesimplifiedmaintena

    R M Ir

    The seedseeds canrecommeit reduces

    Also, graroof shoukeeping t

    It is also iof vegetairrigatingplanted o

    the entire rorations.

    step involvch’s LiteTop Ever the Garderom washing

    e filter fabricated in the dellasts require

    ch’s Lite Top spread to theout over the

    ed, the variou

    ENANCE

    designing a architectura

    and care thce of giving ill invade the

    erly planningd and reducence. The am

    emoving unwMowing, trimmrrigation

    s of many unn create man

    ended methos the amount

    ss lawn landuld also be trthe trees and

    important to ation used wig. However, on the roof, as

    oof deck, wit

    ved with instExpanded Agendrain and out through t

    c is installedesign; which ed for wind re

    growing mee desired thice growing mus plantings c

    and installingl feature. Hohroughout its the green ro area and var

    g for the amed. Howeve

    mount of main

    wanted plantsming, prunin

    nwanted planny unwantedd of removin of digging n

    dscapes requrimmed and

    d shrubs heal

    determine thithin the syst the frequens well as the i

    Arch

    th the aeratio

    talling the gggregate. O lapped at leathe system.

    d, it is then can be built esistance are

    edia is then ickness, an er

    media and stacan be put int

    g a green roowever, a grs lifetime inoof proper arious areas o

    mount of mar, it is impor

    ntenance a gr

    s g

    ts and weedsd plants and wng these