etcs hybrid level 3railwayexpo.ru/images/docs/2019/presentation/ДЕНЬ 2...page 4 scherbinka...

5
ETCS Hybrid Level 3 siemens.com/mobility Unrestricted © Siemens Mobility GmbH 2018

Upload: others

Post on 15-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ETCS Hybrid Level 3railwayexpo.ru/images/docs/2019/presentation/ДЕНЬ 2...Page 4 Scherbinka EXPO1520 Forum 2019 Mobility Management –Mainline Rail Automation ATO/ETCS Hybrid level

ETCS Hybrid Level 3

siemens.com/mobilityUnrestricted © Siemens Mobility GmbH 2018

Page 2: ETCS Hybrid Level 3railwayexpo.ru/images/docs/2019/presentation/ДЕНЬ 2...Page 4 Scherbinka EXPO1520 Forum 2019 Mobility Management –Mainline Rail Automation ATO/ETCS Hybrid level

Unrestricted © Siemens Mobility 2019

Mobility Management – Mainline Rail AutomationScherbinka EXPO1520 Forum 2019Page 2

Page 3: ETCS Hybrid Level 3railwayexpo.ru/images/docs/2019/presentation/ДЕНЬ 2...Page 4 Scherbinka EXPO1520 Forum 2019 Mobility Management –Mainline Rail Automation ATO/ETCS Hybrid level

Unrestricted © Siemens Mobility 2019

EXPO1520 Scherbinka 2019Page 3 Mobility Management – Mainline

Thameslink

First commercial ATO application in mainline rail services with ETCS

World’s first commercial ATO application in

mainline rail services in combination with ETCS

• Delivery of rolling stock, ETCS and ATO

• Increased capacity on existing infrastructure

(24 trains per hour, track and direction on the

north-south inner-city link of London)

• Capacity objectives only achievable with ATO

• ATO over ETCS in the core area (communication

via Packet 44) with ETCS Level 2 Baseline 3

• Start of passenger services with ATO

in May 2018

Page 4: ETCS Hybrid Level 3railwayexpo.ru/images/docs/2019/presentation/ДЕНЬ 2...Page 4 Scherbinka EXPO1520 Forum 2019 Mobility Management –Mainline Rail Automation ATO/ETCS Hybrid level

Unrestricted © Siemens Mobility 2019

Mobility Management – Mainline Rail AutomationScherbinka EXPO1520 Forum 2019Page 4

ATO/ETCS Hybrid level 3 System. Thameslink Project

Page 5: ETCS Hybrid Level 3railwayexpo.ru/images/docs/2019/presentation/ДЕНЬ 2...Page 4 Scherbinka EXPO1520 Forum 2019 Mobility Management –Mainline Rail Automation ATO/ETCS Hybrid level

We turn your vision into reality.