european regions for innovative productivity · 2011-01-30 · douki-seisan achievement of qcdp...

41
European Regions for Innovative Productivity

Upload: others

Post on 06-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

European Regions

for

Innovative Productivity

Page 2: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Dr Colin Herron

• 31 years experience of the automotive industry.

• 17 years with Nissan.

• Worked in Nissan Quality, Engineering, and

Purchase departments in the UK, Spain and Japan.

• 9 years in the Nissan Supplier Development Team.

• 4 lean benchmarking visits to 27 companies in Japan.

• Visiting Professor of Engineering (Newcastle University).

• Manager and founding member of the NEPA team.

• Responsible for manufacturing in Regional Development A

Agency (RDA).

Page 3: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

•With a regional economy of £38.8bn, North East England is

the smallest UK region, However:

•North East England produces 1 in every 5 cars made in the UK

•Over 500 leading international companies, including 40% of

Dow Jones listed businesses, have made the region their home

•The North East is well connected to Europe with:

- two international airport

- three main ports

• Five universities

Regional profile

Page 4: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

•One-fifth of the UK’s production capacity for process industries is

based in the North East, including 58% of its petrochemical

industry, 35% of its pharmaceuticals and a major share of its

speciality chemicals sector.

•Over 70% of the platforms operating in the North Sea were built on the region’s major rivers

•Over the past three years, North East England has had the highest

number of new technology start-ups in the digital media and

animation field, outside London, according to the London Business

School

Regional profile

Page 5: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Low cost economies

The conscious or unconscious

ability of our manufacturing to run their own businesses effectively.

Energy prices

Lack of innovation

Problems!

Page 6: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

NMUK has been the most productive plant in Europe for the last several years, and the largest car producer in the UK for the last three years.

Our 6th University

Page 7: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality
Page 8: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Semi-Direct

Indirect

Direct

14%

63%23%

People Facts

NMUK’s total workforce of c.5000 is split into three areas

of operation.

- Direct staff (manufacturing)

- Semi-direct (eg QA, maintenance)

- Indirect (engineers, administrative)

Page 9: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

- Capacity 500,000

- 2007 production 353,000 vehicles

- About 75% of NMUK output is exported to over

55 countries worldwide

- Workforce is currently 4,500-5,000

Production Facts

Page 10: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

What can we learn from an exemplarsuch as Nissan?

•Nissan is split into autonomous units which are interlinked.

•The Supervisor is in effect a plant manager of an SME.

•Every year the Supervisor has to make his business more effective.

•The Supervisor has no spare staff.

•Planning works on JIT

•The Sunderland plant is designated the training centre for:

UK, Russia, Africa, India, Morocco and Iran

Page 11: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Individual responsibility of

a Nissan Supervisor

Facility

SafetyProcessChange

Quality

NPW

CostOperation

Training

People

Page 12: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

NISSAN PRODUCTION WAY (NPW)

IDEAL MANUFACTURING SYSTEM

DOUKI-SEISAN

ACHIEVEMENT OF QCDP TARGETS

Genba Kanri (shop floor)

QCS PLM

JIT

Production

Prod Control EngineeringQuality Assurance

IMPROVEDCUSTOMER

SATISFACTION

IDS

GK (shop)

The Nissan productionway (NPW)

Page 13: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Safety Quality Productivity Cost HR

Set up standard

Check abnormality

Kaizen

PD

CA

TPS = Make problems andopportunitiesfor kaizen visible

J. K. Liker Toyota culture 2008Without kaizen the tools of TPS

would be useless

Page 14: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Nissan definition of Kaizen

“ Renew the heart to let it make good”

KaizenChange / New Begin / Spirit

Kaizen = Continuous Improvement

Page 15: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

The North East ProductivityAlliance (NEPA)

� Operational in 2003

� Led by industry, focusing on the needs of industry

� Improving the productivity of all manufacturing sectors

� Developing long-term sustainability

� Maximising the return on public and private investment

� Provides a tailored package of support

� Has a provenance back to Honda, Nissan and Toyota

Page 16: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

NEPA

IndustryEducation

The North East Productivity Alliance

Regional Development Agency

Page 17: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

The founding conceptof NEPA was to disseminatethe best practice of Nissaninto general manufacturing.

This will be the basis of theERIP methodology

The concept for NEPAand ERIP

Page 18: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

What is Lean manufacturing?

TQC

Pull systems

Andon

5 S

Kaizen

Agile

OEE

FMEA

Toyota production system

SMEDKan Ban

Quality circles

MRP

TPM Genba kanri

6 sigma

Poka Yoke

Hoshin Kanri

RCM

VSMERP

TQM

JIT

MRP 2

Jidoka

Heijunka

Kaizen blitz

Kaikaku

Chaku-chaku

MudaTAKT

Page 19: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

My image of what can happening

Page 20: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

The theory of abstractionand application

Theory proposed by Paul Lillrank

Recipient

Transfer

CopySource

Application

Abstraction

Page 21: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

CopyJAPAN

Transfer

Application

Abstraction

Basis of the NEPA methodology

Page 22: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

CopyingCompany

Copying

Transfer

Abstraction

Application

Transfer

Application

Abstraction

Abstraction

Application

ExemplarIPC

IPC

IPC

North East model

Page 23: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality
Page 24: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Anybody who makes something

Target is less than 150 staff

Who is it for?

Page 25: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

SME

SME SME

SME

SME

SME

The concept for NEPA and ERIP

(Using the UK as an example)

Exemplar

University

IPC

Development Agency

Page 26: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Current performance

metrics+

Diagnosis of current

manufacturing needs =

Business

needs

Support group

Strategy

Activities

Training

Page 27: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Local government

Industry

University

Local government

Industry

University??

Knowledge transfer

Local government

Industry

University??

Local government

Industry

University??

Local government

Industry

University??

Local government

Industry

University??

Partner A Partner B Partner C

Partner D Partner E Partner F

Page 28: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

RDA RDA RDA RDA

HEI HEI HEI HEI

SME SME SME SME

EX EX EX EX

IPC IPC IPC IPC

Transnational

Transnational

Optional transnational(not funded by the programme)

High level of transnationalexchange

High level of transnationalexchange

Country A Country B Country C Country D

Internal

Main transnational work

Page 29: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Knowledge transfer

Page 30: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Main transnational work

1. IPC to IPC

2. IPC to Exemplars

3. HEI conferences/seminars

4. RDA Strategy setting

5. Lead SME meetings

6. SME conferences

7. Communication

Page 31: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Role of IPC

1. Manage the regional programme

2. Work with HEI (universities) to measure impact

3. Produce case studies

4. Attend/organise transnational events

5. Pilot the methodology

6. Collate and feedback outputs/findings

Page 32: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

•Identify the IPC members

•Identify the participating

SME

WP 2

SME ClusterMembers/partners

Country A

HEI (University)

Exemplar

RDA

Chamber

Others

Page 33: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Wo

rk p

ackag

e 1

Wo

rk p

ackag

e 7

SMEPartners SMEPartners SMEPartners SMEPartners

Country A Country B Country C Country DWP 2

WP 4

WP 6

IPC IPC IPC IPCWP 3

IPC IPC IPC IPCWP 5

Copyright (c) Colin Herron One Northeast 2007

Page 34: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Evaluation

Copying

Recipient

company

Transfer

Application

Abstraction

P

N

A

IPC

Page 35: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

A word of cautionA word of caution

90% of change programmes fail

Up to

Page 36: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

The NEPA Programme Statistics

�Jobs Safeguarded 3,042

�Jobs Created 200

�Total Number Trained 5,900

�SME’s engaged 183

�Non-SME’s engaged 119

Page 37: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

©Colin Herron 2007

TMD Friction Ltd could this year increase production on one of

their pressing lines by up to 30% - saving them almost £500,000 a

year.

TMD

An historic North East manufacturer with links to the region’s

proud rail past has embraced the latest business productivity

techniques to win new orders worth over £300,000.

Henry Williams

A WEARSIDE manufacturing company has won valuable new

contracts worth nearly £100,000 after adopting the latest

business improvement techniques to make it more productive.

Faraday

The firm which employs 316 staff in the North-East needs 30 extra

machinists to help make 20,000 of its world famous wax jackets at its

South Shields base. Barbour is now in a position to bring work back

in-house after training from NEPA, an advisory body.

Barbour

Page 38: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

©Colin Herron 2007

“The result has been increased staff retention – 35% up from 2004 - and currently we are on track to achieve

a further 25% retention increase this year. “We have also improved efficiency in terms of throughput rates

and cost reductions, both of which have enabled the company to increase profitability year on year.”

International Cuisine

Rosemary Bertram, A&J Scott finance director said: “Our data collection so far has proven that by adopting all the

lean manufacturing techniques learned on the NEPA masterclass we can achieve an increase in turnover of £1.1m

with an initial investment of £40,000 to automate some of the changeovers.

A and J Scott

Page 39: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

2008 2009

J J A S O N D J F M A M J J A S O N D

IPC Membership

WP 2

Close IPC membership stage

IPC Strategy and business plan

WP 3

WP 4

•Collate outputs from WP 2 and 3•Bring together existing tools/models/experience etc

•Develop a common toolkit and methodology for SME change

Apply PDCAWP 1 and 7

2010 2011

J F M A M J J A S O N D J F M A M J

WP 5

Closure event

WP 6Trial and modify

Evaluation and final format ofthe methodology and materials

Total project review

•Conference

•Speech

•Commission feedback

Suggested next stage

WP 7HEI to continue

post closure

Communication

• Between partners

• The rest of the EU• EU policy

• EU Outcomes

• With WP 1WP 1

Management (governance)

Copyright (c) Colin Herron One Northeast 2007

Page 40: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality

Thank you for your attention

Special thank you to translators

Also

Page 41: European Regions for Innovative Productivity · 2011-01-30 · DOUKI-SEISAN ACHIEVEMENT OF QCDP TARGETS Genba Kanri (shop floor) QCS PLM JIT Production Prod Control Engineering Quality