Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 1www.dasindia.org
FORM 1
i. Basic Information
Sl. Item Details
1 Name of the project/s Expansion of Group Housing “KW Srishti”at KhasraNo.1125/1, 1125/2 &1125/3, Village Noor Nagar,Pargana Loni, Raj Nagar Extension, Ghaziabad, UttarPradesh.
2 S.No. In the schedule Category B, Activity 8 (b) of Schedule – GazetteNotification dated Sep 14th, 2006 and its subsequentamendments.
3 Proposedcapacity/area/length/tonnage to behandled/command area/leasearea/number of wells to be drilled
Total Plot Area: 40,686 m2
Total Built-up Area: 1,57,383.999 m2
4 New/Expansion/Modernization Expansion
5 Existing Capacity/Area etc. Total Plot Area: 40,686 m2
Built-up Area: 97,779.347 m2 (as per EC granted in 2011)6 Category of Project i.e. ‘A’ or ‘B’ Item- 8, Category -B
(Township and Area Development)7 Does it attract the general
condition? If yes, please specify.No
8 Does it attract the specificcondition? If yes, please specify.
No.
9 Location
Plot/Survey/Khasra No. Khasra No.1125/1, 1125/2 &1125/3,
Village Noor Nagar
Tehsil Village Noor Nagar, Pargana Loni, Raj NagarExtension
District Ghaziabad
State Uttar Pradesh
10 Nearest railway station/airportalong with distance in kms.
New Ghaziabad railway station -3 km. (SE)Indira Gandhi International Airport, at approx- 36 km. (SW)
11 Nearest town, city, districtheadquarters along with distancein kms.
New Delhi- 23 km, while Noida is 17 km & Greater Noidais 25 km
12 Village Panchayats, Zilla Parishad,Muncipal corporation, Local body(complete postal addresses withtelephone nos. to be given)
Ghaziabad Nagar Nigam, Ghaziabad, UP
13 Name of the applicant Dingle Buildcons Pvt. Ltd.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 2www.dasindia.org
Sl. Item Details
14 Registered address Plot no B-2/5 Ashok Nagar, DB Gupta Road Near FaizChowk, Karol Bagh New Delhi-110005.
15 Address for correspondence B-97,Sector-63,Noida Uttar Pradesh -201301
Name Mr. Sonu Goel
Designation (Owner/Partner/CEO) General Manager
Address B-97,Sector-63,Noida Uttar Pradesh
Pin Code 201301
E-mail [email protected], [email protected]
Telephone No. 0120-4804747/19, 9650095984, 9911443255
Fax no.
16 Details of Alternative sitesexamined, if any. Location of thesesites should be shown on a toposheet.
No site alternatives are under consideration.
17 Interlinked projects Nil
18 Whether separate application ofinterlinked project has beensubmitted?
N.A.
19 If yes, date of submission N.A.
20 If no, reason N.A.
21 Whether the proposal involvesapproval/clearance under: If yes,details of the same and their statusto be given.(a) The forest (conservation) Act,
1980?
(b) The wildlife (protection) Act,1972?
(c) The C.R.Z. Notification, 1991?
No
No
No
22 Whether there is any Governmentorder/Policy relevant/relating tothe site?
The project lies in the Residential landuse of GhaziabadMaster Plan 2021. Master plan is a Govt. notified document,which is a land use certificate in itself. Ghaziabad MasterPlan attached as Annexure- I
23 Forest land involved (hectares) No24 Whether there is any litigation
pending against the project and/orland in which the project ispropose to be set up? Nil
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 3www.dasindia.org
Sl. Item Details
(a) Name of the court(b) Case No.(c) Orders/directions of the court,
if any and its relevance withthe proposed project.
25 Expected cost of the project Rs.347.97 Crore
ii. Activity
1. Construction, operation or decommissioning of the Project involving actions, which willcause physical changes in the locality (topography, land use, changes in water bodies,etc.)
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
1.1 Permanent ortemporary change inland use, land cover ortopography includingincrease in intensity ofland use (with respectto local land use plan)
No It is expansion of Residential project within same plot areadue to change in project conceptual and layout plan.Environment Clearance had already been granted bySEIAA vide letter no. 1900/612/Parya/SEAC/AD(H)/2010 -11, Dated 30-August-2011.The projectenvisages the development of Residential use buildingcomplex as per Master Plan of GDA, 2021. The site planshave already been approved by Ghaziabad DevelopmentAuthority.Hence the project do not anticipate any permanent ortemporary change in land use, land cover or topography ofthe area.EC is attached as Annexure-(II)
1.2 Clearance of existingland, vegetation andbuildings.
No This is an expansion project and has already beenapproved from MoEF (SEIAA) for Building andConstruction of Residential use Development in 2011.Siteclearing (which included sparse shrubs and grasses) wasdone following grant of EC in 2011.
1.3 Creation of new landuses?
No The project site is already earmarked for Residential usepurposes as per the local development plan and will bedeveloped as per the local building by-laws. Hence no newland use will be created.
1.4 Pre-constructioninvestigations e.g.bore holes, soil testing?
Yes Soil Investigation has been carried out for building design.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 4www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
1.5 Construction works? Yes
.
This is a Residential Use complex. All constructionactivities will be confined within project area..
Items New ProposalTotal Plot Area 40,686 m2
Area under 24 m Circulation Road 2953 m2
Area under Chak Road 283.23 m2
Deductible area(Road widening) 3236.23 m2
Net Plot area 37,449.77 m2
Less 15% Green area 5617.47 m2
School plot area 500 m2
Net plot Area for GroupHousing (NPAGH)
31,332.30 m2
Permissible Ground coverage 12,532.92 m2
(40% ofNPAGH)
Proposed Ground coverage 8458.33 m2
(27.00% ofNPAGH)
Total open (NPAGH - Groundcoverage) area
22873.97 m2
Area for roads and internalcirculation
2, 0314.248 m2
(65%)Area for Services 2559.722 m2
Permissible FAR (@2.50 ofNPAGH)(A)
78,330.76 m2
Allowed purchasable FAR 38237.75 m2
Permissible including purchasableF.A.R @ 3.75 (On Net Area)
1,17496.12 m2
Achieved FAR Area (On NetArea)
1,16,568.51 m2
Community Facility/Club-1StoresConvenient shops (Commercial)(1)FAR Achieved (Club, Stores,Convenient shops)(2)Residential FAR Achieved
399.768 m2
2602.291 m2
374.237 m2
3376.296 m2
1,13,192.217m2
FAR(1)+(2) 1,16,568.513m2 (@3.720)
School FAR 400 m2(@0.80)Total FAR Achieved 1,16,968.513m2
Total Non- FAR 40415.486m2
Built up Area (FAR+ Non FAR) 1,57,383.999m2
Maximum Height 48 m
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 5www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
The building bye-laws of Ghaziabad DevelopmentAuthority (GDA) permits for construction of additional10% compoundable FAR areas over permissible basicFAR area. Therefore, additional provision of 10%FARover sanctioned FAR has been made in the drawings forfuture development.The developer has obtained height NOC of 69 m fromHindon Airforce station and has done the provision instructure of Tower A for B+S+17 floor and in Tower H & Ifor 2B+G+21 Floor (vetted by IIT Delhi) to accommodatethe extra 10% compoundable FAR. The design ofunderground water tank & STP has been done as permaximum permissible FAR & population.
1.6 Demolition works? No Not required
1.7
Temporary sites usedfor construction worksor housing ofconstruction workers?
Yes All the constructions activities including storing of rawmaterials are confined within the project site only. Labourhutment has been made on a hired land nearby.
1.8 Above groundbuildings, structures orearthworks includinglinear structures, cutand fill or excavations
Yes The construction of Residential use complex includeserection of structures like water storage tank, piping,electric substations, temporary site offices, maintenanceworkshop facilities & other infrastructures to support allthese activities.Details of earthwork:
a. Total Amount of Excavated Earth :-90,000cu.mt
Substantial amount of excavated quantity was used at sitefor development of landscape, road construction,backfilling and filling of low-lying area. The earthworkwas done after grant of EC in 2011. The balance earthexcavated as part of expansion will be used for landscapeand filling of low-lying area.
1.9 Undergroundtunneling? worksincluding mining or
No No underground works are required
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No off shore structures required.
1.13 Production and No No production / manufacturing process is involved.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 6www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
manufacturingprocesses?
1.14 Facilities for storage ofgoods or materials?
Yes Construction Phase:Minimum bulk material for construction is beingpurchased as per requirement and temporarily stored at sitewith appropriate arrangement which will be removed later.Thus, the impact on physical environment will betemporary.Separate storage arrangements will be made for storage ofbulk raw material. Cement is being stored under cover inbales and Sand is stacked neatly under tarpaulin cover.Bricks and steel is being laid in open.
Operation Phase:Not required except for common cleaning and maintenanceequipment and material. There will be well designatedconfined storage areas within the building, which will nothave impact on the physical environment.
1.15 Facilities for treatmentof disposal of solidwaste or liquideffluents?
Solid WasteConstruction Phase:Construction activities causes generation of debris, brickbats, plaster falls, battered stone mixture, aggregateleftovers, sand leftovers, empty cement bags, cartons, etc.Most of the construction waste generated is being reused inroad construction and filling.
Operation Phase:Domestic waste:3525 kg/dayHorticultural waste : 21kg/dayE- waste : 3 kg/daySTP Sludge: 26 kg/daySolid wastes generated from project site will be ofdomestic in nature. A door to door collection system willbe provided for collection of kitchen & other wastes at acommon collection point and disposed by hired/municipalagency for further treatment and disposal.Segregation of wastes will be encouraged among residentsthrough twin bin system colored bins (green and Blue –separate for Bio-degradable and Non Bio-degradable).A 48 hour storage facility will be developed with cover.Biodegradable segregated waste and garden litter will betransported to the compost site for bio-composting by the
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 7www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
hired vendors.The percentage of recyclable wastes will be high and theserecyclable wastes will be handed over to authorizedrecyclers/ vendors.Litter bins will also be provided in open areas like parksetc.Waste will be collected on daily basis by contracted/licensed agency.
Liquid Effluent
Construction Phase:Sewage generation during construction phase is beingtreated and disposed through septic tank with soak pits/sewer line.
Operation Phase:During operation, 563 KLD will be the total waste watergenerated, which will be treated in the STP of 900KLD(225+225+450KLD). After considering evaporation andother losses, 188KLD treated tertiary water will berecycled for various uses including Flushing &Horticulture and the spare 319 KLD will be treated up tosecondary treatment before its disposal into MunicipalSewer line.At present, there is occupancy of approx. 200 families.One module of 225 KLD STP is functional. Treated wateris being utilized within site for different purposes(Flushing, horticulture and construction). Residual treatedwater (upto Secondary Treatment) is being disposedthrough tankers.Wastewater treatment details are mentioned in Form 1A.
1.16 Facilities for long termhousing of operationalWorkers?
No No long term housing for operational workers is proposed
1.17 New road, rail or seatraffic duringconstruction oroperation?
Yes There is movement of vehicles during constructioncarrying construction material, labor and supervising staff.After construction, minor traffic increase will be observedon the road to some extent.There is no new road, rail or sea traffic.
1.18 New road, rail, airwaterborne or othertransport infrastructure
No No alteration of routes.Internal roads will be constructed for smooth movement oftraffic.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 8www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
including new oraltered routes andstations, ports, airportsetc?
1.19 Closure or diversion ofexisting transportroutes or infrastructureleading to changes intraffic movements?
No No diversion of transport routes will be required
1.20 New or divertedtransmission lines orpipelines?
No There will be no shifting of transmission lines.
1.21 Impoundment,damming, culverting,realignment or otherchanges to thehydrology of watercourses or aquifers?
No No impounding, damming, culverting, realignment orother changes to the hydrology of surface watercourses isproposed.
1.22 Stream crossings? No Not required.
1.23 Abstraction or transfersof water from groundor surface waters?
Yes Ground water abstraction is being done.
1.24 Changes in waterbodies or the landsurface affectingdrainage or run-off?
Yes Due to increase in paved area, the runoff during rains willincrease from the project during the monsoon. Provisionsas per EMP shall be kept to capture this runoff and harvestthe rain water from the project area. Well planned stormwater drainage has been designed for internal storm waterdrainage.
1.25 Transport of personnelor materials forconstruction, operationor decommissioning?
Yes Construction workers and material is being procured fromthe nearest available market. During the operation phase,parking provision as per norms shall be provided.
1.26 Long-term dismantlingor decommissioning orrestoration works?
No Not applicable
1.27 Ongoing activityduringdecommissioningwhich could have animpact on theenvironment?
No There will be no decommissioning activity related to theproject
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 9www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
1.28 Influx of people to anarea in eithertemporarily orpermanently?
Yes During the construction phase, majority labourers arelocally and temporarily hired hence there will not be majorinflux of people anticipated during construction phase ofproject. Whereas during operation phase permanentresidential and commercial population will be there forwhich all amenities and supporting infrastructure isproposed to accommodate this influx of personnel.
1.29 Introduction of alienspecies?
No All plantations will be of indigenous species.
1.30 Loss of native speciesor genetic diversity?
No No loss of native species or genetic diversity is envisaged.
1.31 Any other actions? No No
2. Use of Natural resources for construction or operation of the Project (such as land,water, materials or energy, especially any resources which are non-renewable or in shortsupply):
S.No. Information/checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
2.1 Land especiallyundeveloped oragricultural land (ha)
No Land has been developed as Residential Use project as perGDA. Earlier this land was agricultural land.
2.2 Water (expectedsource & competingusers) unit:
Water/ Waste water Details:Fresh water 465KLDFlushing 160 KLDHorticulture 28KLD
Total waterrequirement
653KLD
Waste water 563KLDWater Source: Ground Water & Recycled
water2.3 Minerals (MT) No Sand and Murram are required for the construction and
development works. These are being purchased fromvarious vendors.
2.4 Construction material– stone aggregates,,and / soil (expectedsource – MT)
Yes Stone, aggregate, sand, and cement is required for theconstruction of roads. Thereafter, different types ofconstruction material will be required according to thedesign and size. These will be purchased from variousvendors. Hence no permission is required separately.Cement, Steel, Sand, Aggregate and ACC blocks are beingused in construction.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 10www.dasindia.org
2.5 Forests and timber(source MT)
No Timber required for scaffoldings, doors and windowswould be procured from authorized dealers.
2.6 Energy includingelectricity and fuels(source, competingusers) Unit: fuel (MT),energy (MW)
Yes Power requirement:5200KWSource of Power: UP PVVNLBack up DG sets (as per requirement): 4 DG Sets havingcapacity 500 KVA.4 x 500 =2000 KVA
2.7 Any other naturalresources (useappropriate standardunits)
No Not required.
3. Use, storage, transport, handling or production of substances or materials, which could beharmful to human health or the environment or raise concerns about actual or perceivedrisks to human health.
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsource of information data
3.1 Use of substances or materials,which are hazardous (as perMSIHC rules) to human healthor the environment (flora, fauna,and water supplies)
No The Project is a Township and AreaDevelopment Project in which no storage ofhazardous chemicals (as per MSIHC rules)will be done, except HSD (low sulphurvariety) required to run standby DG sets.Also, the quantity to be stored will be belowthe threshold limit specified in the MSIHCrules. Suitable management practice will beadopted for the same.
3.2 Changes in occurrence ofdisease or affect disease vectors(e.g. insect or water bornediseases)
No Suitable drainage and waste managementmeasures will be adopted in bothconstruction and operational phase, whichwill restrict stagnation of water oraccumulation of waste. This will effectivelyrestrict the reproduction and growth ofdisease vectors.
3.3 Affect the welfare of people e.g.by changing living conditions?
Use, storage, transport, handling orproduction of any harmful product is notenvisaged from the project. Thus, no majoradverse impacts on the humanhealth/environment are envisaged.Local vendors, retailers, workers will beemployed during construction & operationof the project. The project and employmentgenerated from it would help in improvingthe socioeconomics of the area and will
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 11www.dasindia.org
create a more interactive environment forliving, leisure and recreation.
3.4 Vulnerable groups of peoplewho could be affected by theproject e.g. hospital patients,children, the elderly etc.,
No This is development of ResidentialComplex. The changes in the air & noiseenvironment during both construction andoperation phase would be low and shall becontrolled through EMP, so no adverseimpact is anticipated by this project.
3.5 Any other causes No
4. Production of solid wastes during construction or operation or decommissioning(MT/month)
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) with
source of information data4.1 Spoil, overburden or mine
wastesNo Details of earthwork:
Amount of Excavated Earth :- 90,000 m3
Approximately 90,000 m3 is the total earthexcavated during construction phase forfoundations & basement. Substantialamount of excavated quantity was used atsite for development of landscape, roadconstruction, backfilling and filling of low-lying area. The earthwork was done aftergrant of EC in 2011. The balance earthexcavated as part of expansion will be usedfor landscape and filling of low-lying area.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 12www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) with
source of information data4.2 Municipal Waste (domestic and
or commercial wastes)Yes Domestic waste:3525kg/day
Horticultural waste : 21 kg/dayE- waste : 3 kg/daySTP Sludge: 26 kg/daySolid wastes likely to be generated in theproject are of domestic in nature. It will becollected from door to door and floor tofloor and segregated into inorganic andorganic wastes as far as possible.
Biodegradable segregated waste (organicwaste such as waste vegetables, foods etc)and garden litter will be handed over towaste collecting agency for bio-compostingand energy recovery.
Recyclable wastes will be handed over toauthorized recyclers and inert waste will beused for construction of road & pavement.
4.3 Hazardous wastes(as per Hazardous WasteManagement Rules)
Yes Construction Phase:The domestic hazardous waste likecontainers of paints, acrylics, PVC,chemicals, admixtures, bitumen etc. Lampsand tubelights, electrical scrap etc are likelyto be generated.Provisions are being made to segregate thewaste and the waste is being sold to thevendors for recycling.
Post Construction/ Operational Phase:The only hazardous waste in the project willbe used/spent oil from standby DG set,which is classified as hazardous wastecategory 5.1 as per Hazardous & OtherWastes (Management & Handling)Amendments Rules, 2016. The spent oil willbe carefully stored in HDPE drums underisolated storages, and periodically sold toauthorize recyclers. All precautions will betaken to avoid spillage from the storage. Theimpact will be negligible as DG setsoperated will be environmental friendly(operated on LSD).
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 13www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) with
source of information data4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6Sewage sludge or other sludgefrom effluent treatment
Yes Will be used as manure for horticulture.
4.7 Construction or demolitionwastes
Yes
Constructionwaste
material
Totalconstruction
waste generated@ 40 Kg/sq.m of
builtup area(MT)
6284(MT)
soil, sand &Gravel
0.35 2198
bricks &Masonry
0.3 1884
concrete 0.25 1570metal 0.05 314bitumen 0.0204 128wood 0.0204 128other 0.01 62
Source: TIFAC
Approx. 93,000 m3 of earth material wasexcavated during initial construction phasefor foundations, basement. Excavatedmaterial was re-used for back filling, roadconstruction, leveling of site andlandscaping.
4.8 Redundant machinery orequipment
No There is no generation of redundantmachinery or equipment for disposal.
4.9 Contaminated soils or othermaterials
No Not applicable
4.10 Agricultural wastes No No agriculture waste will be generatedduring operation phase. Only dry leaves,grasses, weeds etc will be cleared.
4.11 Other solid wastes No Not applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.No. Information/Checklistconfirmation
Yes/No
Details thereof (with approximate quantities/rates,wherever possible) with source of information data
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 14www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No
Details thereof (with approximate quantities/rates,wherever possible) with source of information data
5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources
Yes During construction emission are being generated fromvehicles and machineries and D.G. sets to be installed forPower supply. During operation, the main source ofemission would be D.G. Sets and emissions due tovehicular movement.
5.2 Emissions fromproduction processes
No
5.3 Emissions from materialshandling includingstorage or transport
Yes Water sprinkling is being carried out regularly atconstruction and camp sites. Vehicles deliveringconstruction materials are being covered to avoid spillageof construction materials. Paints, adhesives and sealantsare stored as per the product instructions.
5.4 Emissions fromconstruction activitiesincluding plant andequipment
Yes The dust emission sources during construction phase willbe: Excavation Haul-road movements Construction Material Handling FinishingEmissions factors for construction equipment are givenin table below:Equipment
Emissions Factors(g/hr)CO VOC NOX SOX PM10
Excavator 214.09 43.99 516.18 3.31 27.21Backhoe/FrontEnd loader
190.05 56.69 370.13 1.58 37.64
Rubbertiredcrane
161.02 39.00 464.02 2.67 23.58
HydraulicCrane 161.02 39.00 464.02 2.67 23.58ConcreteVibrator 72.57 13.60 122.46 0 4.53PavingEquipment 186.42 48.53 412.31 1.95 29.93Roller/Compactor 165.10 34.92 316.15 1.90 23.13*Source: SCAQMD CEQAHandbook
Impacts:Increase levels of PM10, PM2.5, NOx, HC, VOC etc. fromthe above activities.Mitigation measures like: minimizing drop heights ofdebris, enclosures, covered transport, use of barriers,wetting surface, plantation, avoiding idling of vehiclesetc. will be adopted.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 15www.dasindia.org
S.No. Information/Checklistconfirmation
Yes/No
Details thereof (with approximate quantities/rates,wherever possible) with source of information data
5.5 Dust or odours fromhandling of materials,including constructionmaterials sewage andwaste
Yes Dust is being generated during construction, this is watersprinkled, and provided with tarpaulin cover over storedraw material to reduce dust emission. Duringconstruction and operation phase, odour emanating fromwaste and sewage would be managed through properhousekeeping and implementation of EMP.
5.6Emissions fromincineration of waste
No There is/ will be no incineration of waste
5.7 Emissions from burningof waste in open air (e.g.slash materials,construction debris)
No No open burning of waste will be allowed.
5.8 Emissions from any othersources
No Not applicable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No. Information/Checklistconfirmation
Yes/No
Details thereof (with approximate quantities/rates,wherever possible) with source of information data
with source of information data
6.1 From operation ofequipment ventilationplant, crushers e.g.engines,
Yes Noise will be generated from the construction equipment’sand operation of DG sets.During construction work following will be the tentativesources of noise:
Name ofsource
Noise Level at 16m (50 ft) fromSource in db (A)
Noise level at 1 mfrom source in dB(A)
Back hoe/Loader
81 105
Cranes-mobile 81 105Dump truck 83 107Generator Not considered 75 (as prescribed
by CPCB)The following measures will be taken: CPCB certified DG sets conforming to the standards
for noise are being used. All construction equipment and machineries are being
maintained in good conditions. Personal protective equipment like ear muffs, ear plugs
are being provided to the workers.Silent type DG Sets with anti-vibration pads are beingprovided.
6.2 From industrial orsimilar processes
No Not applicable
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 16www.dasindia.org
6.3 From construction ordemolition
Yes During construction work, there is short term noise impactsin the immediate vicinity of the project site due to variousconstruction activities such as excavation activities,Concreting and mixing, vehicular movement and variousconstruction machinery;Following precautions shall be taken to control noisepollution : High noise generating construction activities is
being carried out only during day time Installation, use and maintenance of mufflers on
equipmentWorkers working near high noise construction machineryare being supplied with ear muffs/ear plugs
6.4 From blasting or piling No No blasting or piling is being done.
6.5 From construction oroperational traffic
Yes It shall be restricted within a limited area. Some amount ofnoise will be generated in the construction and operationalphase however, adequate precautions will be taken toreduce noise generation i.e. development of green areawhich will act as barrier to control noise/air pollution(detailed in EMP).
6.6 From lighting orcooling systems
No Cooling towers are not proposed so there will be no noisegeneration from them. During power failure, operation ofDG sets will generate noise. However, these shall behoused in acoustically enclosed chambers. Hence, nosignificant impact anticipated.
6.7 From any other sources No
7. Risks of contamination of land or water from releases of pollutants into the ground orinto sewers, surface waters, groundwater, coastal waters or the sea:
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities/rates,wherever possible) with source of information data
7.1 From handling, storage,hazardous materials useor Spillage of hazardousmaterials
Yes The hazardous waste includes spilled paints, adhesive,sealants and spent oil from standby DG sets. The spilledhazardous waste would be carefully collected anddisposed off as per applicable norms. The spent oil willbe carefully stored in HDPE drums under isolatedstorage, and periodically sold to authorize recyclers. Allprecautions will be taken to avoid spillage from storage.
7.2 From discharge ofsewage or othereffluents water or theland (expected modeand place of discharge)to
No There will be no discharge of untreated sewage on wateror land, as the wastewater after tertiary treatment will bereused for flushing, horticultural and the remainingamount of treated water (upto Secondary treatment) willbe discharged into the municipal sewers. So, no adverseeffect is envisaged
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 17www.dasindia.org
7.3 By deposition ofpollutants emitted to airinto the land or intowater
No Deposition of dust on land & plants from air due totransportation will be there, both during operational &construction phase but will be minimal. Watersprinkling and good house keeping shall be regularlycarried out
7.4 From any other sources No Not applicable
7.5 Is there a risk of longterm build up ofpollutants in theenvironment from thesesources?
No There is no risk of long term build up of pollutants inthe environment from handling, storage, use or spillageof hazardous materials, discharge of sewage or othereffluents to water or the land and by deposition ofpollutants emitted to air into the land or into watersources.
8. Risk of accidents during construction or operation of the Project, which could affecthuman health or the environment
S.No.Information/Checklist
confirmation Yes/No
Details thereof (with approximatequantities/rates, wherever possible) with
source of information data
8.1 From explosions, spillages, firesetc from storage, handling, useor production of hazardoussubstances
This is basically a construction project and doesnot involve major hazardous constructionactivity. Hence, chances of explosions,spillages, fires are minimal.
All construction workers are being providedwith suitable personal protective equipment(PPE) as per the health & safety norms. Trainingand awareness about the safety norms is beingprovided to all supervisors and workers involvedin construction activities.
An agreement is signed with the contractor,which clearly deals safety aspects duringconstruction. No major hazardous waste is beingstored with in the project site. No industrial orprocess activity is involved in this project hencechances of chemical hazards and accidents areminimal. However, suitable fire-fightingmeasures will be provided.
8.2 From any other causes No For accidental fires, Fire fighting Pumps shall beinstalled
8.3 Could the project be affected bynatural disasters causingenvironmental damage (e.g.
No As per the secondary data available no suchprecedents has been reported. However thepossibility of such incidents cannot be ruled out.
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 18www.dasindia.org
floods, earthquakes, landslides,cloudburst etc)?
Earthquakes:The project falls under seismic Zone IV. Designand architecture of RCC Frame work isearthquake resistant and complies with therequired IS Specifications.Suitable seismic coefficients in horizontal andvertical directions respectively, are beingadopted while designing the structures tominimize the impact of any disaster.Landslide: Area is not land slide proneCloudburst: Not reportedFloods:The area is not flood prone. The project hasplanned storm water layout in regards to thepeak intensity of the rainfall so far received asrecorded by IMD.
9. Factors which should be considered (such as consequential development) which couldlead to environmental effects or the potential for cumulative impacts with other existingor planned activities in the locality.
S.No. Information/Checklist confirmation Yes/No Details thereof (with approximatequantities/rates, wherever possible)
with source of information data9.1 Lead to development of supporting
facilities, ancillary development ordevelopment stimulated by the projectwhich could have impact on theenvironment e.g.:• Supporting infrastructure (roads,power supply, waste or waste watertreatment, etc.)
Yes
This is a development of Residentialcomplex. The existing infrastructure isadequate to meet the requirement ofproject.In order to support, power lines will bedrawn, roads will be constructed withinthe project as well as for access. Watersupply and sewage systems will be laiddown extensively.
• housing development• extractive industries• supply industries• other
YesNoYesNo
Construction of Residential complexproject.In order to meet the requirement of theproject, the supply industry will grow tomeet the demand for vegetable,processed food, gas, cloth, groceries,stationary and several other items.
9.2Lead to after-use of the site, whichcould have an impact on theenvironment
No
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 19www.dasindia.org
9.3 Set a precedent for later developments No The area falls under Residential zone ofMaster Plan, therefore, no illegalactivity is predicted and development ofthe entire region is anticipated as perGhaziabad Master Plan, 2021.
9.4 Have cumulative effects due toproximity to other existing or plannedprojects with similar effects
It will improve the environment bycreating a more attractive and interactive environment for living, leisure &recreation, create an urban landmark.
iii. Environmental Sensitivity
S.No. Areas Name/Identity
Aerial distance (within 15km.) Proposed project
location boundary1. Areas protected under international conventions,
national or local legislation for their ecological,landscape, cultural or other related value
No Nil
2. Areas which are important or sensitive forecological reasons -Wetlands, watercourses orother water bodies, coastal zone, biospheres,mountains, forests
Yes River Hindon: 3.5 km (W)River Yamuna: 20 km (SW)
3. Areas used by protected, important or sensitivespecies of flora or fauna for breeding, nesting,foraging, resting, over wintering, migration
No Nil
4. Inland, coastal, marine or underground waters No Nil
5. State, National boundaries No Project lies in U.P.State.Delhi boundary lies approx20 km from project site.
6. Routes or facilities used by the public for accessto recreation or other tourist, pilgrim areas
No
7. Defense installations Yes Hindon Air Base- 7 km(W)
8. Densely populated or built-up area(aerial distances)
New Delhi: 23 km (SW)Noida: 17 km (SE)Greater Noida: 25km (SE)
9. Areas occupied by sensitive man-made land uses(hospitals, schools, places of worship,community facilities)
Yes There are several hospitals,schools, places of worship,and community facilitieswithin 15 Km radius of theproject site.
10.
Areas containing important, high quality orscarce resources (ground water resources,surface resources, forestry, agriculture,fisheries, tourism, minerals)
Yes River Hindon: 3.5 km (W)River Yamuna: 20 km (SW)
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 20www.dasindia.org
S.No. Areas Name/Identity
Aerial distance (within 15km.) Proposed project
location boundary11. Areas already subjected to pollution or
environmental damage.(Those where existing legal environmentalstandards are exceeded).
Nil
12 Areas susceptible to natural hazard which couldcause the project to present environmentalproblems (earthquakes, subsidence, landslides,erosion, flooding or extreme or adverse climaticconditions)
No According to the IndianStandard Seismic ZoningMap, the area under studyfalls in Zone-IV. Suitableseismic coefficients inhorizontal and verticaldirections will be adoptedwhile designing thestructures.
“I hereby given undertaking that the data and information given in the application and enclosuresare true to the best of my knowledge and belief and I am aware that if any part of the data and
information submitted is found to be false or misleading at any stage, the project will be rejected
and clearance give, if any to the project will be revoked at our risk and cost.
Date:Place: Ghaziabad
Signature of the applicantWith Name and Full Address
(Project Proponent/ Authorized Signatory)
NOTE:1. The Projects involving clearance under Coastal Regulation Zone Notification, 1991 shall
submit with the application a C.R.Z map duly demarcated by one of the authorizedagencies, showing the project activities, w.r.t. C.R.Z. and the recommendations of the state
Expansion of Group Housing “KW Srishti”at Khasra No. 1125/1, 1125/2 &1125/3,Village Noor Nagar, Pragana Loni,Raj Nagar Extension, Ghaziabad, Uttar Pradesh_________________________________________________________________FORM-1
Page 21www.dasindia.org
Coastal Zone management Authority. Simultaneous action shall also be taken to obtain therequisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activitiesto be located in the CRZ.
2. The projects to be located within 10 km of the National Parks, Sanctuaries, BiosphereReserves, Migratory Corridors of Wild Animals, the project proponent shall submit themap duly authenticated by Chief Wildlife Warden showing these features vis-à-vis theproject location and the recommendations or comments of the Chief Wildlife Wardenthereon.”
3. All correspondence with the Ministry of Environment & Forests including submission ofapplication for TOR/ Environmental Clearance, subsequent clarifications, as may berequired from time to time, participation in the EAC Meeting on behalf of the projectproponent shall be made by the authorized signatory only. The authorized signatory shouldalso submit a document in support of his claim of being an authorized signatory for thespecific project”.