FACULTATIVE LAGOONS Typical layout: two to three ponds in series: AREAL LOADING RATE CALCULATIONS: Average winter temperature (coldest month, o C) Total System BOD loading rate (kg/ha /day) Primary cell loading rate (kg/ha /day) > 15 45-90 100 0 - 15 22 - 45 60 < 0 11 - 22 40 PHYSICAL CHARACTERISTICS Location System Detention Time (days) Southern US 6 - 30 Michigan 120 - 180 Colorado 45 plus 1 - 3 day polishing Pond Water Depth (m) Sludge Depth (m) Total Depth (m) Primary 0.6 - 1.8 0.6 1.2 - 2.4 Secondary 2.4 - 3.0 0.3 2.7 - 3.3 Experience with operating lagoons throughout the US indicates that design guidelines will result in removal of ~ 85% of influent BOD. Effluent suspended solids due to algae growth may require polishing in a sand or gravel filter or other solids separation process.

Upload: phungkiet

Post on 09-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

FACULTATIVE LAGOONS Typical layout: two to three ponds in series: AREAL LOADING RATE CALCULATIONS:

Average winter temperature (coldest month, oC)

Total System BOD loading rate (kg/ha /day)

Primary cell loading rate (kg/ha /day)

> 15 45-90 100 0 - 15 22 - 45 60

< 0 11 - 22 40 PHYSICAL CHARACTERISTICS

Location System Detention Time (days) Southern US 6 - 30

Michigan 120 - 180 Colorado 45 plus 1 - 3 day polishing

Pond Water Depth (m)

Sludge Depth (m)

Total Depth (m)

Primary 0.6 - 1.8 0.6 1.2 - 2.4 Secondary 2.4 - 3.0 0.3 2.7 - 3.3

Experience with operating lagoons throughout the US indicates that design guidelines will result in removal of ~ 85% of influent BOD. Effluent suspended solids due to algae growth may require polishing in a sand or gravel filter or other solids separation process.