Site Fencing Managed / Secured Vehicle Gate Pedestrian Access Construction Traffic Movement Site Welfare and Accommodation Materials Storage Area Waste Separation & Recycling Demolition Construction of Building Scaffold Hoist Site Traffic / Plant Hardstandings Site Gate Manned by Banksmen Key / Legend Notes To be read in conjunction with Master Programme FEBRUARY (1) – Groundworks & Substructure PROJECT: Dover Court, Blocks D, E & G Date: Drawn By: 7 Site Fencing Managed / Secured Vehicle Gate Pedestrian Access Construction Traffic Movement Site Welfare and Accommodation Materials Storage Area Waste Separation & Recycling Demolition Construction of Building Scaffold Hoist Site Traffic / Plant Hardstandings Site Gate Manned by Banksmen Temporary Safe Escape Route November 2018 Robert Rundle To be read in conjunction with Contract Programme (PH2 CP00001) dated 07 November 2018 Spaces Required by Residents Spaces Suspended Spaces Available 25 53 34 Site Fencing Managed / Secured Vehicle Gate Operative Access Construction Traffic Movement Site Welfare and Accommodation Materials / Plant Storage Area Waste Separation & Recycling Demolition Construction of Building Scaffold Hoist Site Traffic / Plant Hardstandings Site Gate Manned by Banksmen Temporary Safe Escape Route Temporary Bin Store

Upload: others

Post on 30-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FEBRUARY (1) –Groundworks & Substructure 7

Site Fencing

Managed / Secured Vehicle Gate

Pedestrian Access

Construction Traffic Movement

Site Welfare and Accommodation

Materials Storage Area

Waste Separation & Recycling

Demolition

Construction of Building

Scaffold

Hoist

Site Traffic / Plant Hardstandings

Site Gate Manned by Banksmen

Key / Legend

Notes

• To be read in conjunction with Master Programme

FEBRUARY (1) – Groundworks & Substructure

PROJECT: Dover Court, Blocks D, E & G

Date:

Drawn By:

7

Site Fencing

Managed / Secured Vehicle Gate

Pedestrian Access

Construction Traffic Movement

Site Welfare and Accommodation

Materials Storage Area

Waste Separation & Recycling

Demolition

Construction of Building

Scaffold

Hoist

Site Traffic / Plant Hardstandings

Site Gate Manned by Banksmen

Temporary Safe Escape Route

November 2018

Robert Rundle

To be read in conjunction with Contract Programme (PH2 CP00001) dated 07 November 2018

Spaces Required by Residents

Spaces Suspended

Spaces Available

25 53 34

Site Fencing

Managed / Secured Vehicle Gate

Operative Access

Construction Traffic Movement

Site Welfare and Accommodation

Materials / Plant Storage Area

Waste Separation & Recycling

Demolition

Construction of Building

Scaffold

Hoist

Site Traffic / Plant Hardstandings

Site Gate Manned by Banksmen

Temporary Safe Escape Route

Temporary Bin Store

AkinkunmiB
Polygon
AkinkunmiB
Polygon
AkinkunmiB
Polygon
AkinkunmiB
Polygon
AkinkunmiB
Line
AkinkunmiB
Polygon
AkinkunmiB
Line
AkinkunmiB
Line
AkinkunmiB
Sticky Note
Unmarked set by AkinkunmiB
AkinkunmiB
Text Box
BLOCK G
AkinkunmiB
Text Box
BLOCK E
AkinkunmiB
Text Box
BLOCK D